Loading...
VH Properties Corporation 2004 11111 (-Aft SECOND AGREEMENT BETWEEN THE CITY OF RANCHO PALOS VERDES AND V.H. PROPERTIES, CORPORATION REGARDING GEOLOGIC ISSUES THIS SECOND AGREEMENT BETWEEN THE CITY OF RANCHO PALOS VERDES AND V.H. PROPERTIES, CORPORATION REGARDING GEOLOGIC ISSUES ("Second Agreement") is made and entered this 16th day of July, 2004,by and between the City of Rancho Palos Verdes, a California municipal corporation("City") and V.H. Properties, Corporation("Developer"). City and Developer are sometimes referred to singularly herein as "Party" and collectively as the "Parties." RECITALS A. Developer is the owner of that certain real property encompassed within Tentative Tract Map No. 50666, a portion of which is proposed for single-family residential development(the"Property"). The Property is part of a larger golf course and residential project that is being constructed on the Property, which is owned by Developer and is generally located at 1 Ocean Trails Drive,Rancho Palos Verdes, California, commonly known as the Ocean Trails Project("Ocean Trails"or"the Project"). Ocean Trails consists of a 258-acre site bounded by Palos Verdes Drive South on the north, the Portuguese Bend Club on the west, the Pacific Ocean on the south and Shoreline Park on the east. B. City approved various applications for the Ocean Trails project to allow the construction of a Residential Planned Development of 75 single family dwelling units and the development of an 18-hole golf course with associated clubhouse and parking facilities. C. The Property encompasses three landslide areas. Because portions of the Property that are being developed for residential purposes and for public parks and trails may be affected by one or more landslides on the Property, the public safety, health and welfare require that the geological and geotechnical conditions of the Property be thoroughly analyzed and addressed before the entire eighteen-hole golf course can open for public use. D. City and Developer have each retained experts to analyze the geological conditions that underlie the site and to make recommendations regarding the potential development of the Property. However, given the inherent complexity of the geology on the Property and the inherent subjectivity of the science of geology, the Parties' respective experts have not always agreed on the geologic conditions on the Property. 784710.3 .• , 11111 E. In the past, the Parties have found it useful to utilize a three-member panel of independent experts to review the geological and geotechnical data for the Ocean Trails Project to resolve any differences between the Parties' respective experts. However, the former panel of experts did not provide the definitive guidance desired by either City or Developer regarding the development of the residential lots in Tentative Tract 50666. Accordingly, City and Developer formed a new three-member panel (the "Panel")to resolve disputes regarding the geotechnical and geological issues affecting the development of the residences on the Property. F. City and Developer have selected three new geological/geotechnical experts to comprise the Panel and entered into an Agreement to memorialize their understanding with respect to certain work that is to be performed by the Panel regarding the boundaries of Landslide A and its affect on future development of the Property("the First Agreement"). G. City and Developer wish to enter into this Second Agreement so that the Panel can resolve additional disputes between the City's geological and geotechnical experts and the experts that are performing work on behalf of Developer, which previously were determined by the City's geologist or geotechnical engineer, regarding additional geotechnical and geological conditions affecting the Property. In particular, disputes have arisen with respect to (1)whether the planned expansion of the Ocean Trails Clubhouse(as identified in Revisions T and U to Conditional Use Permit 163) meets the geological standard of a Factor of Safety of at least 1.5, and(2) whether the current condition of the as-built golf course raises public safety issues that need to be addressed. NOW, THEREFORE, in consideration of the mutual promises, obligations and covenants hereinafter set forth, the Parties hereto agree as follows: Section 1. Incorporation of Recitals. Each and every recital set forth above is hereby incorporated by this reference as though set forth in full and expressly made a part of this Agreement. Section 2. Selection of Panel Experts. City and Developer previously selected three experts who are the members of the Panel pursuant to the provisions of the First Agreement. They are Scott T. Kerwin, Eldon Gath, and Glenn Tofani. Section 3. Impartial Review. The Parties hereby acknowledge and agree that although City shall retain the three experts who will comprise the Panel, the Panel shall be charged with providing an impartial analysis of certain geological and geotechnical data related to the Property and to resolve disagreements between City's geological and geotechnical experts and the experts that are performing work on behalf of Developer, pursuant to a written Scope of Work that was prepared jointly by the Parties,which is attached as Exhibit"A"hereto and incorporated herein by this reference. 784710.4 2 ,• The Parties further acknowledge and agree that the Panel shall be instructed not to meet, either individually or as a panel, privately with either the City, its geologists or its geotechnical engineers or the Developer, its geologists or its geotechnical engineers. City and Developer further agree that: (i) City and Developer shall limit their contact with the Panel to times when both Parties are present; (ii) City and Developer shall have equal input into the Panel's performance of its impartial review; and (iii) City and Developer shall provide joint instructions to the Panel. However, nothing in this Section 3 shall be construed to prevent the members of the Panel from meeting with one another privately to discuss the geological and geotechnical data, nor shall this Section 3 prevent the Panel from seeking additional input from the Parties, so long as such requested input shall be either communicated to the City and the Developer in a meeting at which both parties are present or in a writing, which is provided to both Parties simultaneously. Section 4. Compensation for Panel. Upon execution of this Agreement, Developer shall deposit with the City the sum of$15,000. City shall hold these funds in a trust account established for the purpose of compensating the members of the Panel for their services rendered pursuant to this Agreement. When the balance in the trust account drops below $5,000, City shall notify Developer and request additional funds. Developer shall deposit such additional funds with City within ten(10)business days of receipt of the written request from the City. Notwithstanding the immediately preceding sentence, Developer shall not be in default hereunder if it fails to deposit such additional funds with City,but either party shall have the right to terminate this Agreement if Developer fails to deposit such additional funds with City, all as more specifically set forth in Section 5 below. Nothing herein shall be construed to permit Developer to fail to reimburse City for work that already has been performed by the Panel prior to the date of termination of this Agreement. Section 5. Termination. If Developer fails to deposit any additional funds contemplated by Section 4 above or Section 8A below, then Developer shall not be default hereunder,but either Developer or City shall have the right to terminate this Agreement by providing at least thirty(30) days advance written notice to the other Party. If Developer fails to provide documentation that has been requested by the Panel within a reasonable period of time, as specified by the Panel, City shall have the right to terminate this Agreement by providing at least thirty(30) days advance written notice to the other Party,provided that such election shall be null and void if Developer provides such documentation prior to the expiration of the thirty-day period. Additionally, if this Agreement is terminated prior to the resolution of the geologic issues concerning the Property, the members of the Panel shall be compensated for the work that has been performed as provided in Section 4, and City again shall use its standard process of having its geologists and geotechnical engineers review the reports and recommendations of the Developer's experts as to those issues that had not been resolved by the Panel. Developer further acknowledges that if this Agreement is terminated prior to the resolution of all of the geologic issues concerning the Property, Developer shall not have the right to rely on this Agreement as to those issues that had not been resolved by the Panel, that the issue of the developability of particular areas of the Property may not have been resolved to City's satisfaction, and that City shall not be bound by this Agreement 784710.4 3 •` • 410 as to those issues that had not been resolved by the Panel. In addition, Developer shall not be entitled to the issuance of any permits from City for which: (1) the geological analysis has not been completed to the Panel's satisfaction; or(2)work or improvements required by the Panel have not been completed by or on behalf of the Developer; (3) and as to any issue that had not been resolved by the Panel prior to the termination of this Agreement, until the geological analysis or work has been completed through the City's standard process to the satisfaction of the City's geologists and geotechnical engineers. Section 5A. Termination Upon Transfer. If, prior to resolution by the Panel of the issues in the Scope of Work, Developer sells or otherwise transfers the golf course or substantially all of the residential property contained within Tentative Tract Map No. 50666 to a person or entity that is not affiliated with or related to Developer, then Developer shall have the right to terminate this Agreement as to any issue not yet resolved by the Panel by providing at least thirty(30) days advance written notice to the City. Section 6. Scope of Panel's Review. The Panel shall provide an impartial analysis of the geological and geotechnical data related to the Property and shall resolve disagreements between City's geological and geotechnical experts and the experts that are performing work on behalf of Developer, pursuant to the Scope of Work or other written instructions or additional scope of work that are prepared jointly by the City and the Developer. In addition to the issues concerning whether the residential lots within Tract 50666 can be developed, which are governed by the First Agreement, the Panel shall resolve the current disputes between the Parties' geologic and geotechnical experts regarding the proposed expansion of the Clubhouse and regarding the review of the golf course Clay Cap/As-Built Report. City and Developer hereby acknowledge and agree not to restrict the areas that the Panel may explore to make such determinations and to defer to the judgment of the Panel with respect to what additional geologic studies and tests, if any, should be conducted and what additional changes or improvements, if any, should be incorporated into the Project to address these issues and insure public safety. The Panel also shall resolve any other area of dispute between the City's geological and geotechnical experts and the experts that are performing work on behalf of Developer, pursuant to any additional written scope of work or written instructions that are prepared jointly by the Parties. Section 7. Hold Harmless and Covenant not to Sue. The Parties hereby acknowledge that the Panel is being retained to resolve differences between the respective geological/ geotechnical experts retained by the Parties in order to allow Developer to complete the development of the Project, and that the Panel is solely providing impartial analysis and recommendations based on their combined professional judgment and are not preparing geotechnical designs for any future structures on the Property or insuring that the stability is sufficient to safely support such structures. The Parties further acknowledge that the members of the Panel are not in any way interested 784710.4 4 ,. 0 0 in the development of the Property, either financially or otherwise, and would not provide the advice contemplated by this Agreement absent assurances by the Parties that they will not sue the Panel or its individual members based on the advice provided. Accordingly, City and Developer hereby covenant and agree not to sue the Panel or any of its individual members for any advice, opinions, conclusions or recommendations the Panel makes with respect to the geological and geotechnical conditions underlying the Property and the stability of the Property for development. Developer further agrees to indemnify, defend and hold the Panel and each member thereof harmless from any claims, losses, costs or damages that result from geological instability on the Property. The members of the Panel are third party beneficiaries of this Agreement, and the provisions of this Section 7 shall also run to the benefit of the members of the Panel as if made directly to them. This Covenant shall survive the termination of this Agreement. Section 8. Legislative and Quasi-Judicial Authority Maintained. City and Developer hereby agree that this Agreement shall not affect the ability of the current City Council or any future City Council to make legislative or quasi-judicial determinations regarding the Project pursuant to the provisions of Federal or State law or the Rancho Palos Verdes Municipal Code. Section 8A. Covenant to be Bound. City and Developer covenant and agree that any decisions rendered by the Panel regarding geologic or geotechnical issues that are directed to the Panel pursuant to the Scope of Work, or any subsequent scope of work, or joint instructions from the Parties, which otherwise would be made by the City's geologic or geotechncial experts, shall be binding on both City and Developer, including, but not limited to: (i) any decisions supporting, or disagreeing with, the recommendations or conclusions of one Party's geologic or geotechnical experts; and (ii) any conclusions or recommendations regarding geologic or geotechnical issues that are arrived at independently by the Panel, including any recommendations regarding additional studies, borings or analysis to be performed or improvements to be constructed, in response to the Scope of Work or other scope of work or written instructions prepared jointly by the Parties. The Parties further agree to take all steps reasonably necessary to diligently pursue and implement the recommendations of the Panel. Notwithstanding the foregoing, Developer shall not be in default hereunder if Developer elects not to incur any additional cost or expense as a result of any such recommendations. Section 8B. Binding on Successors. This Agreement shall inure to the benefit of and bind the Parties to this Agreement and each of their respective heirs, assigns and successors in interest. Section 8C. Limitation of Authority. Nothing herein shall be construed to grant the Panel any authority to obligate the City to incur any expense whatsoever; and except as expressly provided herein, nothing herein shall be construed to grant the Panel any authority to obligate the Developer to incur any expense whatsoever. 784710.4 5 . • Section 9. Further Assurance. Each Party hereto agrees to take such actions, and to execute such certificates and other instruments, as may be necessary or appropriate to give effect to and carry out the provisions of this Agreement. Section 10. Integration and Amendment. 10.1. This Agreement, and any documents incorporated herein by specific reference, represents the entire and integrated agreement between Developer and City with respect to the Peer Review to be conducted, as identified in the Scope of Work. This Agreement supersedes all prior negotiations, representations or agreements, whether oral or written, which are related to the Peer Review of the matters identified in the Scope of Work. However, this Agreement does not supercede or amend the First Agreement between the Parties. 10.2 This Agreement may not be amended, modified, or expanded except by a written instrument signed by each of the Parties hereto. 10.3 The City has entered into a separate agreement with each of the members of the Panel. Those three agreements are attached hereto as Exhibits B ,C and D and are incorporated herein by this reference, and shall not be amended without Developer's prior written consent. This Agreement shall not be amended, terminated or otherwise modified without thirty days advance written notice first being provided to all of the members of the Panel. Section 11. Assignment. Neither Party shall assign its interest in this Agreement, or any portion of this Agreement, without the prior written consent of the other Party, which consent shall not be unreasonably withheld. Notwithstanding the foregoing, Developer shall have the right to assign this Agreement to any person or entity to whom Developer sells the golf course or substantially all of the residential portions of Tentative Tract Map No. 50666,provided that at least fifteen days prior to the effective date of such assignment, Developer shall give written notice thereof to City, and provided, further, that Developer shall deliver to City a copy of the proposed assignment and assumption agreement for City's review and approval, which shall not be unreasonably withheld, and Developer shall deliver a copy of the executed assignment and assumption agreement, in the form approved by the City, prior to the effective date of the assignment. Section 12. Interpretation. This Agreement is deemed to have been prepared by both of the Parties hereto, after consulting with legal counsel, and any uncertainty or ambiguity herein shall not be interpreted against the drafter, but rather, if such ambiguity or uncertainty exists, shall be interpreted according to the applicable rules of interpretation of contracts under the substantive law of the State of California without reference to choice of law rules. Section 13. Governing Law. This Agreement shall be construed and enforced in accordance with the substantive laws of the State of California without reference to 784710.4 6 0 0 choice of law rules. Each of the parties hereto agrees to submit to the jurisdiction of the courts in the County of Los Angeles with respect to any action to enforce or interpret the terms hereof. Section 14. Notices. Any notice required or authorized to be given by this Agreement shall, unless otherwise specified herein, be in writing, shall be served on the receiving Party either by personal delivery or deposit in the United States mail with first- class postage prepaid, and shall be addressed to the receiving party's specified contact person and address listed below, unless written notice is provided of a change of address as to either party. For the purposes of this Agreement, notices delivered in person shall be deemed communicated as of the date of actual receipt; notices sent via regular mail shall be deemed communicated as of three (3) days after deposit thereof in the United States mail, addressed as shown on the addressee's registry or certificate of receipt. All notices served pursuant to this Agreement shall be addressed as follows: If to City: Les Evans, City Manager City of Rancho Palos Verdes 30940 Hawthorne Boulevard Rancho Palos Verdes, California 90275 With a copy to: Carol W. Lynch, City Attorney Richards, Watson & Gershon 355 South Grand Avenue, 40th Floor Los Angeles, California 90071 If to Developer: V.H. Properties Corporation 1 Ocean Trails Drive Rancho Palos Verdes, California 90275 Attn: Jeff Kaplinski With a copy to: Kenneth Wolfson, Esq. Latham&Watkins 650 Town Center Drive, 20th Floor Costa Mesa, California 92626-1925 Either City or Developer may change its mailing address at any time by giving written notice of such change to the other party in the manner provided herein at least ten(10) days prior to the date such change is effected. Section 15. Relationship of the Parties. No joint venture, partnership, employment, agency or similar arrangement is created between the parties by this Second Agreement. 784710.4 7 , , . •. 4 Section 16. Waiver. Neither the failure nor any delay by any person or entity in exercising any right, power, or privilege under this Agreement or the documents referred to in this Agreement will operate as a waiver of such right,power, or privilege, and no single or partial exercise of any such right, power, or privilege will preclude any other or further exercise of such right, power, or privilege or the exercise of any other right, power, or privilege. Section 17. Counterparts. This Second Agreement may be executed in several counterparts, each of which shall be an original and all of which shall constitute but one and the same instrument. IN WITNESS WHEREOF, Developer and City have executed this Agreement as of the date first hereinabove written. CITY OF ' s k CHO P; LOS VERDES I By: w • Pe -r C. Gardiner, Mayor ATTEST: i , i / / 1 Jo urcell, City Clerk V. H. PROPERTIES CORPORATION yN me...4-e---------,-------- /QVC ST CC/t Title: E V. DEV4-6 '1 Mt /71 Li By: ii Name: tv�'Abces Title: e,; ate.- , ,t At,)Pt ca ., 784710.4 8 • • EXHIBIT "A" Peer Review Panel Scope of Work Review of the Clay Cap/As-Built Grading Report BACKGROUND: The history of the requirement for a clay cap: • Supplement to original EIR (March 1992): In the Geologic Investigation Report (prepared by Leighton, April 22, 1991), which is in the appendix to the Supplemental EIR, it states, "Mitigation Measures: The geotechnical hazard created by mass movements can be mitigated by a number of methods depending on site-specific geotechnical evaluation...Construction of the golf- course was determined to be feasible provided that the mass balance of the landslide was not adversely altered, buildings were constructed behind a design setback line, infiltration of water was minimized, and ground water levels were monitored. Similar mitigation measures may also be recommended for other mass movements on the subject site, but site-specific investigation is necessary for proper evaluation." • Adopted Mitigation Measure #9 states: "All of the recommendations made by the project geologist, except as modified by the City Geologist, shall be incorporated into the design and construction of the project." Note that the "Monitoring Milestone" for this mitigation measure indicates that implementation of this measure shall occur: "Prior to issuance of Grading Permit and throughout the grading process"(emphasis added). • There are no specific adopted mitigation measures or conditions that were imposed by the City Council that require the 3' Clay Cap. • After Council approval of the project, and prior to issuance of Grading Permits for development of the project, various detailed geologic reports were prepared by the Developer and approved by the City Geologist. It is within these reports that the detailed specifications of how the course was to be developed, including the specifications of the clay cap, various water monitoring measures and other geologic issues, were formulated. • City Staff issued the Grading Permit in 1997. On the approved Grading Plans, a note indicates, "I. Irrigated portions of the golf course are to receive a minimum 3 foot thick clay cap to control infiltration of surface water. The clay cap shall have a permeability constant of 3x10(-7) cm/sec or less (hereinafter referred to as the 'Clay Cap)." 784897-2 'Peer Review Panel - Ake of Work Page 2 of 9 POSITIONS OF EACH FIRM Both Geological Firms (Converse Consultants and Cotton Shires Associates) Agree that: • The Clay Cap was specified on the Grading Plan to be installed under all irrigated golf course areas as noted above. • It is uncertain whether the Clay Cap underlies all of the irrigated portions of the golf course. • The As-Built Grading Report, prepared by the Developer's Geologist, needs to be approved by the City Geologist prior to opening the 18-hole golf course. The Clay Cap and Monitoring Program are components to the As-Built Grading Report. Cotton Shires Associates (CSA) believes that: • Although the Clay Cap may have been compromised in various areas of the Golf Course, this is not a significant risk to most of the Golf Course, but that there is a higher risk in the areas of Holes 10 and 11, which are located in the vicinity of Landslides A and B. • There are monitoring methods that should be implemented to ensure that areas of high risk (Holes 10 and 11) do not pose a risk to public safety. • As envisioned when this project was first approved, safety for the public, golf course and residential property is dependent upon a combination of project design aspects which includes not only the Clay Cap, but also water monitoring and ground movement monitoring. • The following measures are intended to allow installation of monitoring wells at appropriate depths, and that if an area does move, a warning will be provided via both the use of the inclinometers and the monitoring wells. 1. Install 2 Inclinometers in the vicinity of Hole 10/Landslide B. The purpose is to measure ground movement so as to warn the public, allow mitigative action and to close this portion of the course if movement causes a risk to public safety or improvements. 2. Repair Monitoring Well #1, which is also located near Landslide B. CSA believes that MW1 is at the wrong depth and not suitable for monitoring purposes. CSA is recommending a large diameter boring so that both CC and CSA can verify the location of the bentonite layer so as to accurately determine the elevation of the base of the well. The goal is to have an 784897-2 2 •• 'Peer Review Panel - Slike of Work Page 3 of 9 effective monitoring well. Once the bentonite layer is found, CC will have to perform supplemental stability calculations to determine the risk to the sewer line, protocol to address excessive or accelerating movement, and action levels for the monitoring well. 3. Repair Monitoring Well #3, which is located behind former Landslide C. CSA believes that it is also installed at the wrong depth; however everyone agrees to the location of the bentonite layer in this area so there will be no boring required - they only need to re-install the well at the proper elevation within the hole. 4. Repair Monitoring Well #6, which is located near Hole #17. CSA believes this well is also at the wrong depth. This will likely require a large diameter boring to determine where the bentonite layer is and what the proper elevation of the well should be - this is similar to MW#1 (see 2 above). 5. Prepare revised stability calculations for Monitoring Well #2, which is located near green of hole #1 and tee of hole #2. CSA believes that the calculations were done incorrectly and they just need to prepare revised calculations. 6. Submit as-built plans and any other data on Lakes #8 and #16, which have been in existence since the project was built and were not affected by Landslide C (the lake that was affected by Landslide C and is being re-built is Lake #9). The information would be submitted to the City's Lake Consultant, who has been reviewing the plans for Lake #9 and the waterfalls, to see if he has any comments for improving the lakes. It is not CSA's intent to have Ocean Trails re-build these lakes. However, there may be some minor modifications that are needed to improve these lakes. Alternatively, the Lake Consultant may say they are fine and nothing needs to be done. CSA is simply recommending that the Lake Consultant review the data and provide an opinion. • If these measures are implemented, and nothing unexpected shows up in the analysis/borings, then CSA will sign off on the golf course. Converse Consultants (CC) believes that: • The items requested by CSA are unnecessary. The project's current as-built clay cap and monitoring wells and as-monitored conditions are safe for the public and golf course. • Converse believes that CSA's recommendations regarding monitoring wells and slope inclinometers are unfounded and technically unwarranted. All monitoring well locations and depth intervals were submitted to Cotton, Shires and Associates Inc. (CSA) for review and approval prior to well installation. 784897-2 3 •• `Peer Review Panel - Alpe of Work Page 4 of 9 Monitoring well depths were adjusted per CSA requests. Interpreted depths and elevations of the UBL and LBL layers were based on the best information and data available at the time the wells were designed and installed in 1998 and 1999. CSA now believes that Monitoring Well groups MW-1, MW-3 and MW-6 were constructed to wrong depths for the UBL and LBL layers. No technical data has been presented by CSA to indicate the monitoring well depths are wrong. CSA's interpretation of the site's geologic structure has been inconsistent and does not even acknowledge the existence of the LBL layer. • The specific reasons why CSA's requested recommendations are unnecessary are as follows (referenced according to numbered items above): 1. Converse Consultants (Converse) believes that it is unnecessary and a waste of the developer's money to install 2 new inclinometers in Hole 10 above Landslide "B". The effect of existing cracks is insignificant. The extension cracks are limited in both area and spatial extent. The cracks have been observed and remain unchanged since the 1971 Converse report. The area above the extension crack is stable. There is no need for inclinometers in Hole 10. 2. Converse believes that Monitoring Well Group MW-1 does not need repair. As documented in the 11/27/02 Converse report, the well-screen bottoms are only a couple feet above the interpretable UBL and LBL elevations. Monitoring Well Group MW-1 is located in a stable area. As described in the 3/22/04 Converse report, the stability in the general area of MW-1 and beyond is three-dimensional in nature. In Converse's opinion, CSA's recommendation regarding MW-1 was based on inappropriate stability analyses of a geologic cross-section that is inconsistent with available geologic data. 3. Converse believes that no repair for Monitoring Well MW-3 is necessary, however, this well group needs to have loose soils cleaned-out that fell in during construction after completion of the Landslide "C" repair. MW-3 is located in a very stable area with a factor of safety of more than 1.5. In addition, Landslide "C" repair provides horizontal drains and backslope subdrains beneath the general area of MW-3. Water accumulation is not a concern even though the bottom of well casing of MW-3U is about 2 to 4 feet below the interpreted UBL, since little or no accumulation of water above the UBL is anticipated. 4. Converse believes no repair for MW-6 is necessary. Well screens of MW-6 were installed to the depth ranges requested by CSA. As shown in Converse's 11/27/02 report, the bottom of MW-6U is about 1 foot above the 784897-2 4 •• 'Peer Review Panel - See of Work Page 5 of 9 interpreted UBL. This small depth differential is inconsequential as demonstrated in Converse's 11/27/02 report, since MW-6 is located in a stable area. As described in Converse's 11/27/02 report, the calculated factor of safety for the case of 25' water accumulated on top of UBL is more than 1.4. We strongly reject CSA's recommendation of drilling a large diameter boring for MW-6 and performing stability analysis. In Converse's opinion, CSA's understanding of the site conditions in the Ocean Trails Golf Course Area is questionable. 5. Monitoring Well MW-2 is located above Landslide "C" and is in a very stable area after the Landslide "C" was repaired and buttressed. In our opinion, there is no need to perform additional stability analysis. Converse's Landslide "C" repair design report, and all the geologic evaluation reports for the Golf Course Modifications (Converse's reports dated 2/17/03, 5/8/03 and 6/3/04) have presented updated stability analyses for this general area. In our opinion, CSA has presented no technical basis in making such a request. 6. Converse understands that Lake No. 8 and Lake No. 16 design plans were reviewed and approved by the City of Rancho Palos Verdes and that Lake No. 8 and Lake No. 16 have been constructed according to the plans. Converse tested and approved both the clay cap and subgrade as it was installed under Lake Nos. 8 and 16. In addition, Converse observed and tested area drain pipe trenching and backfill when all the area drain pipes were raised above the lake water levels of each lake. Converse agrees that an as-built report of the area drain pipes that were raised should be submitted. Lake Nos. 8 and 16 are in stable areas and we do not see any need to have any additional review performed of the approved lake design since the lakes have already been constructed. • Doing more work will only lead to additional studies/issues/questions that CSA will pose with no hope for resolution or project completion in sight. SCOPE OF WORK: Based upon this information, the dispute between CSA and CC is whether Ocean Trails should be required to do the work outlined by CSA. This is what the Peer Panel needs to evaluate, not whether the clay cap should be completed per the original specifications. The City's Geologist already has indicated, in the December 21, 2001 letter, that the Developer does not have to meet that specification. Instead, the real issue is: whether or not CSA is requesting too much of CC. 784897-2 5 'Peer Review Panel - like of Work Page 6 of 9 Specific Questions/Issues to be Addressed by the Peer Panel: 1. Does the current condition of the as-built golf course raise public safety issues that need to be addressed, as discussed in the letter from Cotton Shires Associates dated April 8, 2004? 2. If yes, what additional information is necessary? 3. If no, then no further work or studies are necessary. Schedule: Day 1: Reports provided to Peer Panel (Ocean Trails to provide CC reports while City provides CSA reports) Week 3: Panel meeting/conference call to determine the need for consultant Q&A meeting or preparation of written review questions. Week 4: Finalize reviews. Week 5: Meet with consultants or submit review questions for consultant response. Week 7: Await response from consultants. Week 8: Review consultant's responses. Panel meeting/call to finalize Panel concurrence or rejection of consultant responses. Week 9: Submit Panel response. Peer Review Panel Scope of Work Review of the Clubhouse Expansion BACKGROUND: • Conditional Use Permit No. 163, originally approved by the City Council in 1992, includes the following condition of approval: "C-1: The golf clubhouse shall be located west of the terminus of Street "A"(Paseo Del Mar extension), in the area generally described as east of Forrestal Canyon, south of the single family Lot Nos. 6, 7, and 8 located on Street "B", and north of Half Way Point Park, as shown on "Site Plan for Conditional Use Permit Amended Map No. 2,"dated June 19, 1996, prepared by ESCO Engineering Service Corporation, and dated as received by the City on August 2, 1996. No portion of the golf course clubhouse shall be located in areas currently zoned Open Space Hazard(OH). A minimum factor of safety of 1.5 shall be demonstrated for the clubhouse 784897-2 6 • 'Peer Review Panel - lie of Work 11111 Page 7 of 9 structure. If the developer is unable to provide for a minimum factor of safety of 1.5 using mechanical methods, including but not limited to de-watering wells, or if the clubhouse location is modified for any other reason, the developer shall submit an application for a revision to this Conditional Use Permit, for review and approval by the Planning Commission and City Council prior to recordation of any Final Map." • The existing Clubhouse Building was reviewed and permitted on October 3, 1998. The first Temporary Certificate of Use and Occupancy was issued on October 25, 1999, while the final Certificate of Use and Occupancy was issued on April 30, 2001. Prior to issuance of Building Permits, a 1.5 Factor of Safety was identified for the proposed Building. The Clubhouse Building was reviewed, approved and permitted for grading and construction by the City. • Since the Clubhouse Building was constructed, Landslide C failed (June 2, 1999) and subsequent issues arose regarding Landslide A and the location of the foundation setback line affecting Tract No. 50666. The Landslide "C" failure was investigated by CC and CSA with 28 large diameter borings and 3 corehole borings to provide subsurface information on the mechanism of failure, geologic structure and determine how to repair it. The Landslide "C" failure was then repaired by excavating and removing the UBL slip surface and constructing a large geosynthetic reinforced compacted fill buttress to stabilize the upslope areas. • In November 2003, the City Council approved a request for an expansion to the Clubhouse Building. When the Council originally approved the Clubhouse Expansion in August 2003, and an amendment in November 2003, the Staff Reports noted that the condition (C-1 above) requiring a 1.5 FOS would continue to be enforced and would need to be satisfied prior to issuance of any building permits for the proposed expansion. • Converse Consultants submitted two reports addressing the Factor of Safety for the Clubhouse Building Expansion. Cotton Shires Associates submitted one review response to the two reports. POSITIONS OF EACH FIRM Converse Consultants (CC) believes that: • Detailed subsurface information and stability analyses have been submitted to show that there is a 1.5 factor of safety for the Clubhouse Expansion. Converse Consultants (CC), submitted their first report addressing the FOS on February 26, 2004. The report, using a two dimensional stability Analysis" identified a FOS of 1.45 along one of 3 cross-sections provided in the report, however, the report indicated that overall there would be a FOS greater than 1.5 for the expansion since the stability of the Clubhouse is three dimensional in nature. CC submitted a second report on March 22, 2004, which included a more detailed three- 784897-2 7 'Peer Review Panel - Alpe of Work Page 8 of 9 dimensional stability analysis indicating that the FOS was 2.61. Three dimensional stability analyses were also performed using the CSA structural contour model indicating a FOS of about 3.2. • There is no justification for doing the additional sub-surface investigation requested by CSA (see below). Extensive amounts of subsurface data has been gathered to date and is more than sufficient in showing that there will be at least a 1.5 FOS for the expansion. Converse has also indicated that they believe the data that was used to support the original approved location of the Clubhouse, with a FOS 1.5, should be more than sufficient, and that the expansion is relatively minor given the size of the Clubhouse. • Converse believes that no additional exploration is necessary. The geologic model presented in the two reports for the proposed Clubhouse expansion were based on the more up-to-date information generated from the large diameter borings downhole logged for the Landslide "C" repair investigation as well as the direct survey data of the exposed UBL in the deep slot cut excavations and in the mouth of Forrestal Canyon. CSA has ignored this direct survey data of the UBL in their structural model and analysis. Converse believes that CSA has misinterpreted the geologic model for the Clubhouse expansion area. • Converse has used the approved shear strength parameters that are the same as those used for the Clubhouse. These strength values were approved by the City and CSA at the time the original Clubhouse was approved. Converse does not understand and does not agree with CSA's recommendation requiring Converse to "revise calculations by using appropriate parameters". Cotton Shires Associates (CSA) believes that: • There is not sufficient sub-surface data to support the interpretations that CC has provided in their recent reports for the Clubhouse expansion. Additionally, although the geology previously presented by CC for the existing Clubhouse Building indicated a 1.5 FOS, new data generated from the Landslide C repair and review of Landslide A needs to be considered when analyzing the FOS for the Clubhouse expansion. Further, the most recent geologic model presented by CC differs from the previous model and sufficient subsurface data has not been presented to support this model. CSA believes that there is a sufficient lack of subsurface data regarding the depth and inclination of the upper bentonite layer between the park and Forrestal canyon. To resolve this issue, CSA is recommending that CC conduct 3 additional large diameter borings to support CC's interpretations. One of the recommended large diameter borings would be satisfied by the large diameter boring needed to address issues pertaining to the Clay Cap/As-Built report. In addition, CSA has recommended that once the additional subsurface data has been collected, 784897-2 8 1 'Peer Review Panel - e of Work 40 Page 9 of 9 CC revise their calculations by using appropriate established strength parameters, address the affects of existing retaining walls in the area on the proposed structure's foundation design, and address issues related to the installation of perimeter drains. SCOPE OF WORK: Based upon this information, the dispute between CSA and CC is whether Ocean Trails should be required to do the additional exploratory work outlined by CSA. Specific Questions/Issues to be Addressed by the Peer Panel: 1. With respect to the Clubhouse expansion identified in Conditional Use Permit No. 163 - Revision U, the Peer Review Panel shall determine whether Converse Consultants has presented sufficient data, when considered with all other presently known project data, to demonstrate to the accepted level of geological certainty ordinarily required by professionals in this discipline, to establish that the proposed Clubhouse expansion meets a 1.5 Factor of Safety? a. If the answer is "yes" the City shall issue the building permits for the Clubhouse expansion. b. If the answer is "no" then answer question 2 below. 2. What additional information is necessary or, what additional work is needed to be done to demonstrate a Factor of Safety of 1.5? Schedule: Day 1: Reports provided to Peer Panel (Ocean Trails to provide CC reports while City provides CSA reports) Week 3: Panel meeting/conference call to determine the need for consultant Q&A meeting or preparation of written review questions. Week 4: Finalize reviews. Week 5: Meet with consultants or submit review questions for consultant response. Week 7: Await response from consultants. Week 8: Review consultant's responses. Panel meeting/call to finalize Panel concurrence or rejection of consultant responses. Week 9: Submit Panel response. 784897-2 9