CC RES 2016-003 RESOLUTION NO. 2016-03
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO PALOS
VERDES, CERTIFYING A MITIGATED NEGATIVE DECLARATION PURSUANT
TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT FOR PLANNING CASE
NO.ZON2015-00555(CODE AMENDMENT)FOR AMENDMENTS TO CHAPTER
15.20 (MORATORIUM ON LAND USE PERMITS) OF THE RANCHO PALOS
VERDES MUNICIPAL CODE TO ESTABLISH AN EXCEPTION CATEGORY(`T')
TO ALLOW RESIDENTIAL DEVELOPMENT WITHIN ZONE 1 OF THE
LANDSLIDE MORATORIUM AREA.
WHEREAS, on March 3, 2015, the City Council considered a Code Amendment Initiation
Request(CAIR)to create an exception category that would allow vacant undeveloped parcels within
Zone 1 of the Landslide Moratorium Area to be developed with single-family residences. After
considering the record and public testimony,the City Council directed Staff to bring back an item on
a future agenda to allow the development of one(1)single-family residence per 25-acre lot through
an exception category on properties located within Zone 1; and,
WHEREAS, pursuant to the provisions of the California Environmental Quality Act, Public
Resources Code Sections 21000 et seq. ("CEQA"),the State's CEQA Guidelines,California Code of
Regulations, Title 14, Section 15000 et seq., the City's Local CEQA Guidelines, and Government
Code Section 65962.5(f)(Hazardous Waste and Substances Statement),the City of Rancho Palos
Verdes prepared an Initial Study and determined that, by incorporating mitigation measures into the
Negative Declaration, there is no substantial evidence that the approval of Planning Case No.
ZON2015-00555) would result in a significant adverse effect on the environment. Accordingly, a
Draft Mitigated Negative Declaration was prepared and circulated for public review for thirty (30)
days between December 3, 2015 and January 11, 2016, and notice of that fact was given in the
manner required by law; and,
WHEREAS, after notice issued pursuant to the provisions of the Rancho Palos Verdes
Municipal Code, the City Council conducted a public hearing on January 19, 2016, at which time all
interested parties were given an opportunity to be heard and present evidence regarding the
proposed revisions to Chapter 15.20 as set forth in the City Council Staff Report and Mitigated
Negative Declaration; and,
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RANCHO PALOS VERDES
DOES HEREBY FIND, DETERMINE, AND RESOLVE AS FOLLOWS:
Section 1: The City Council has independently reviewed and considered the proposed
Mitigated Negative Declaration, the public comments upon it, and other evidence before the City
Council prior to taking action on the proposed project and finds that the Mitigated Negative
Declaration was prepared in the manner required by law and that there is no substantial evidence
that, with appropriate mitigation measures, the approval of Planning Case No. ZON2015-00555
(Code Amendment), would result in a significant adverse effect upon the environment.
Section 2: Planning Case No. ZON2015-00555 for the Zone 1 Landslide Moratorium
Ordinance Revisions is consistent with the Rancho Palos Verdes General Plan and with the
underlying Residential, <1 DU/acre and Residential, 1-2 DU/acre land use designations,which will
not be changed as a result of the approval of the proposed project.
Section 3: With the appropriate mitigation measures, which require Neighborhood
Compatibility Analysis for new residences; limitations on exterior illumination; imposition of City and
regional restrictions upon fugitive dust control and construction vehicle emissions; preparation of
biological surveys for properties identified as containing sensitive vegetation communities; protection
of cultural resources during grading operations;completion of geotechnical analysis of any proposed
01203.0001/282860.1
grading and construction prior to building permit issuance; imposition of fire protection requirements
upon the construction of all new structures in accordance with the City's most recently-adopted
Building Code; control and treatment of site runoff both during and after construction; limitations on
construction hours and haul routes; and connection of all new structures to the Abalone Cove Sewer
System or other approved system, the proposed project will not have a significant impact on the
environment.
Section 4: Prior to development,the owner shall record a covenant agreement running
with the land in a form approved by the City Attorney enforceable by City and (i) prohibiting future
subdivision of said property, (ii) acknowledging that the City makes no representation as to the
suitability of the land for development and assuming risk, and (iii) providing for trail dedication.
Section 5: Based upon the foregoing findings, the adoption of the proposed Mitigated
Negative Declaration is in the public interest.
Section 6: The time within which the judicial review of the decision reflected in this
Resolution, if available, must be sought is governed by Section 1094.6 of the California Code of Civil
Procedure and other applicable short periods of limitation.
Section 7: For the foregoing reasons and based on the information and findings included
in the Staff Report, Environmental Assessment and other components of the legislative record, in
the proposed Mitigated Negative Declaration, and in the public comments received by the City
Council, the City Council of the City of Rancho Palos Verdes hereby certifies that the Mitigated
Negative Declaration has been prepared in compliance with CEQA and adopts the attached
Mitigation Monitoring Program(Exhibit'A')associated with Planning Case No.ZON2015-00555 for a
Code Amendment, thereby approving amendments to Chapter 15.20 (Moratorium on Land Use
Permits) of the Rancho Palos Verdes Municipal Code to establish an exception category to allow
residential development within the Landslide Moratorium Boundary Area of Zone 1.
PASSED, APPROVED, AND ADOPTED this 19th day of January 2016.
2(z., ,t
Ma
Attest:
/0fr4
/,, /,
City Clerk
State of California )
County of Los Angeles ) ss
City of Rancho Palos Verdes )
I, Carla Morreale, City Clerk of the City of Rancho Palos Verdes, hereby certify that the above
Resolution No. 2016-03 was duly and regularly passed and adopted by -- ,said City Council at a
regular meeting thereof held on January 19, 2016.
City Clerk
01203.0001/282860.1
Resolution No.2016-03
Page 2 of 2
Resolution No. 2016-03
Exhibit 'A'
Mitigation Monitoring Program
Project: Case No. ZON2015-00555 (Code Amendment& Environmental Assessment)
Location: Two (2) Residential Lots in "Zone 1" of the Landslide Moratorium Area
Rancho Palos Verdes, CA 90275
Applicant: City of Rancho Palos Verdes
Landowners: York Point View Property(Parcel 1 in the Certificate of Compliance—Instrument No. 04-
2035438) and Plumtree PV Associates, LLC
TABLE OF CONTENTS
I. Introduction 2
II. Management of the Mitigation Monitoring Program 3
Roles and Responsibilities 3
Mitigation and Monitoring Program Procedures 3
Mitigation Monitoring Operations 4
III. Mitigation Monitoring Program Checklist 4
IV. Mitigation Monitoring Summary Table 5
Mitigation Monitoring Program
Exhibit A- Page 1 Resolution No. 2016-03
I. INTRODUCTION
PURPOSE
This Mitigation Monitoring Program (MMP) is to allow the following project, located at within "Zone 1" of the
City's Landslide Moratorium Area: The proposed "Zone 1 Landslide Moratorium Ordinance Revision"would
create a new exception category in the City's Landslide Moratorium Ordinance (Chapter 15.20 of the Rancho
Palos Verdes Municipal Code) to allow the residential development of any privately owned legal lots greater
than 25 acres in area ("two(2)subject lots") located within in Zone 1 of the City's Landslide Moratorium Area.
The proposed revision to the Landslide Moratorium Ordinance includes the addition of subsection T to Section
15.20.040 (Exceptions), described as follows:
The construction of residential buildings, accessory structures, and grading totaling less than 1,000 cubic yards
of combined cut and fill, and including no more than 50 cubic yards of imported fill material on the two lots in
Zone 1 of the "landslide moratorium area"as outlined in yellow on the landslide moratorium map on file in the
director's office; provided, that a Landslide Moratorium Exception Permit is approved by the director, and
provided that the project complies with the criteria set forth in Section 15.20.050 (Landslide Mitigation
Measures Required) of this chapter. Residential buildings and accessory structures shall not exceed a
maximum combined total of up to 4,000 square feet(habitable and non-habitable area), including non-habitable
structures such as garages, sheds, and barns, and shall be limited to a maximum of 25%lot coverage. Horse
keeping is permitted up to a maximum of 4 horses per lot. Such projects shall qualify for a Landslide
Moratorium Exception Permit only if all applicable requirements of this code are satisfied, and the parcel is
served by a sanitary sewer system. Those who take advantage of this exception category shall agree to record
a covenant on the subject property which would prohibit future subdivision of said property. Prior to issuance of
a Landslide Moratorium Exception Permit, the applicant shall submit to the director any geological or
geotechnical studies reasonably required by the city to demonstrate to the satisfaction of the city geotechnical
staff that the proposed project will not aggravate the existing situation.
Non-substantive revisions to the Landslide Moratorium Ordinance that are proposed include the addition of
cross-references to the new subsection T and the map of Zone 1 in Sections 15.20.050 (Landslide Mitigation
Measures Required), 15.20.060 (Application) and 15.20.110 (Required Connection to Operational Sanitary
Sewer System).
The MMP responds to Section 21081.6 of the Public Resources Code, which requires a lead or responsible
agency that approves or carries out a project where a Mitigated Negative Declaration has identified significant
environmental effects, to adopt a"reporting or monitoring program for adopted or required changes to mitigate
or avoid significant environmental effects." The City of Rancho Palos Verdes is acting as lead agency for the
project.
An Initial Study/Mitigated Negative Declaration was prepared to address the potential environmental impacts of
the project. Where appropriate, this environmental document recommended mitigation measures to mitigate or
avoid impacts identified. Consistent with Section 21080 (2)(c) of the Public Resources Code, a mitigation
reporting or monitoring program is required to ensure that the adopted mitigation measures under the
jurisdiction of the City are implemented. The City will adopt this MMP when adopting the Mitigated Negative
Declaration.
Mitigation Monitoring Program
Exhibit A- Page 2 Resolution No. 2016-03
ENVIRONMENTAL PROCEDURES
This MMP has been prepared in accordance with the California Environmental Quality Act of 1970(CEQA), as
amended (Public Resources Code Section 21000 et seq.) and the State Guidelines for Implementation of
CEQA (CEQA Guidelines), as amended (California Administrative Code Section 15000 et seq.). This MMP
complies with the rules, regulations, and procedures adopted by the City of Rancho Palos Verdes for
implementation of CEQA.
MITIGATION MONITORING PROGRAM REQUIREMENTS
Section 21081.6 of the Public Resources Code states: "When making the findings required by subdivision(a)
of Section 21081 or when adopting a negative declaration pursuant to paragraph (2) of subdivision (c) of
Section 21081, the public agency shall adopt a reporting or monitoring program for the changes to the project
which it has adopted or made a condition of project approval in order to mitigate or avoid significant effects on
the environment. The reporting or monitoring program shall be designed to ensure compliance during project
implementation. For those changes which have been required or incorporated into the project at the request of
an agency having jurisdiction by law over natural resources affected by the project, that agency shall, if so
requested by the lead or responsible agency, prepare and submit a proposed reporting or monitoring program."
II. MANAGEMENT OF THE MITIGATION MONITORING PROGRAM
ROLES AND RESPONSIBILITIES
The MMP for the project will be in place through all phases of the project including final design, pre-grading,
construction, and operation. The City will have the primary enforcement role for the mitigation measures.
MITIGATION MONITORING PROGRAM PROCEDURES
The mitigation monitoring procedures for this MMP consists of,filing requirements, and compliance verification.
The Mitigation Monitoring Checklist and procedures for its use are outlined below.
Mitigation Monitoring Program Checklist
The MMP Checklist provides a comprehensive list of the required mitigation measures. In addition, the
Mitigation Monitoring Checklist includes: the implementing action when the mitigation measure will occur; the
method of verification of compliance; the timing of verification; the department or agency responsible for
implementing the mitigation measures; and compliance verification. Section III provides the MMP Checklist.
Mitigation Monitoring Program Files
Files shall be established to document and retain the records of this MMP. The files shall be established,
organized, and retained by the City of Rancho Palos Verdes Community Development Department.
Compliance Verification
The MMP Checklist shall be signed when compliance of the mitigation measure is met according to the City of
Rancho Palos Verdes Community Development Director. The compliance verification section of the MMP
Checklist shall be signed, for mitigation measures requiring ongoing monitoring, and when the monitoring of a
mitigation measure is completed.
Mitigation Monitoring Program
Exhibit A- Page 3 Resolution No. 2016-03
MITIGATION MONITORING OPERATIONS
The following steps shall be followed for implementation, monitoring, and verification of each mitigation
measure:
1. The City of Rancho Palos Verdes, Community Development Director shall designate a party
responsible for monitoring of the mitigation measures.
2. The City of Rancho Palos Verdes, Community Development Director shall provide to the party
responsible for the monitoring of a given mitigation measure, a copy of the MMP Checklist indicating the
mitigation measures for which the person is responsible and other pertinent information.
3. The party responsible for monitoring shall then verify compliance and sign the Compliance Verification
column of the MMP Checklist for the appropriate mitigation measures.
Mitigation measures shall be implemented as specified by the MMP Checklist. During any project phase,
unanticipated circumstances may arise requiring the refinement or addition of mitigation measures. The City of
Rancho Palos Verdes, Community Development Director, with advice from Staff or another City department, is
responsible for recommending changes to the mitigation measures, if needed. If mitigation measures are
refined, the Community Development Director would document the change and shall notify the appropriate
design, construction, or operations personnel about refined requirements.
III. MITIGATION MONITORING PROGRAM CHECKLIST
INTRODUCTION
This section provides the MMP Checklist for the project as approved by the City Council of the City of Rancho
Palos Verdes on January 19, 2016. Mitigation measures are listed in the order in which they appear in the
Initial Study.
* Types of measures are project design, construction, operational, or cumulative.
* Time of Implementation indicates when the measure is to be implemented.
* Responsible Entity indicates who is responsible for implementation.
* Compliance Verification provides space for future reference and notation that compliance has
been monitored, verified, and is consistent with these mitigation measures.
Mitigation Monitoring Program
Exhibit A- Page 4 Resolution No. 2016-03
MITIGATION MEASURES TYPE TIME OF RESPONSIBLE COMPLIANCE
IMPLEMENTATION ENTITY VERIFICATION
1. AESTHETICS
AES-1: All new residences shall be subject to
neighborhood compatibility analysis under the Community
provisions of Section 17.02.030.B (Neighborhood Project Design Prior to Planning Approval Property Owner Development
Compatibility) of the Rancho Palos Verdes Department
Municipal Code.
AES-2: All new residences will be limited to a Prior to BuildingPermitCommunity
maximum square footage established by the City Project Design Property Owner Development
Issuance p
Council through the exception category. Department
AES-3: All new residences shall be subject to
the Development Standards established under the Prior to BuildingPermit Community
Project Design Property Owner Development
RS-1 Zoning District (Single-Family Residential), Issuance
with a maximum net lot coverage of 25%. Department
AES-4: All new residences and residential
structures shall be subject to the following Prior to BuildingPermit Community
Project Design Property Owner Development
setbacks: Front = 20'; Rear = 15'; Department
10'; Interior Sides = 5'. p
AES-5: Exterior illumination for new residences
shall be subject to the provisions of Section Community
17.56.030(Outdoor Li htin for Residential Uses Project Design Ongoing Property Owner Development
Lighting )
Department
of the Rancho Palos Verdes Municipal Code. p
AES-6: All residential lighting shall be fully
shielded, and no outdoor lighting shall be
permitted where the light source is directed toward Community
or results in direct illumination of aparcel of Project Design Ongoing Property Owner Development
Department
property or properties other than that upon which
such light source is physically located.
2. AIR QUALITY
AIR-1: During construction, the applicant
shall be responsible for the implementation of all
Construction Prior to GradingPermit Community
Property owner Development
dust and erosion control measures required by the Issuance Department
Building Official. p
.
AIR-2: Trucks and other construction
vehicles shall not park, queue and/or idle at the Community
project sites or in the adjoiningpublic or private
Construction On-going Property owner Development
p > p Department
rights-of-way, and shall be in accordance with the
Mitigation Monitoring Program
Exhibit A- Page 5 Resolution No. 2016-03
MITIGATION MEASURES TYPE TIME OF RESPONSIBLE COMPLIANCE
IMPLEMENTATION ENTITY VERIFICATION
permitted hours of construction stated in Section
17.56.020.B of the Rancho Palos Verdes
Municipal Code.
Mitigation Monitoring Program
Exhibit A- Page 6 Resolution No. 2016-03
MITIGATION MEASURES TYPE TIME OF RESPONSIBLE COMPLIANCE
IMPLEMENTATION ENTITY VERIFICATION
3. BIOLOGICAL RESOURCES
BIO-1: For lots that are identified as
containing sensitive habitat on the City's most-
recent vegetation maps and/or that abut any
portion of the current or proposed future boundary
of the Palos Verdes Nature Preserve,the applicant
shall be required to prepare a biological survey as
a part of a complete application for the
construction of a new, single-family residence.
Said survey shall identify the presence or absence Community
Construction and Prior to Building Permit
of sensitive plant and animal species on the Post-Construction Final Property owner Development
subject property, and shall quantify the direct and Department
indirect impacts of the construction of the
residence upon such species, including off-site
habitat impacts as a result of Fire Department-
mandated fuel modification. The applicant and/or
any successors in interest to the subject property
shall be required to mitigate such habitat loss
through the payment of a mitigation fee to the
City's Habitat Restoration Fund.
4. CULTURAL RESOURCES
CUL-1: Prior to the issuance of a grading permit,
the applicant shall consult with the South Central Prior to Grading Permit Community
Coastal Information Center(SCCIC)regarding any Construction Property owner Development
known archaeological sites on or within a half-mile Issuance Department
radius of the subject property.
CUL-2: Prior to the issuance of a grading permit,
the applicant shall conduct a Phase 1 Community
archaeological survey of the property. The survey Construction Prior to Grading Permit Property owner Development
results shall be provided to the Director of Issuance Department
Planning, Building and Code Enforcement for
review prior to grading permit issuance.
CUL-3: Prior to the commencement of grading, Community
the applicant shall retain a qualified paleontologist Construction Prior to commencement of Property owner Development
and archeologist to monitor grading and gradingDepartment
excavation. In the event undetected buried cultural
Mitigation Monitoring Program
Exhibit A- Page 7 Resolution No. 2016-03
MITIGATION MEASURE TIME OF RESPONSIBLE COMPLIANCE
S TYPE IMPLEMENTATION ENTITY
VERIFICATION
resources are encountered during gg radin and
excavation, work shall be halted or diverted from
the resource area and the archeologist and/or
paleontologist shall evaluate the remains and
propose appropriate mitigation measures.
5. GEOLOGY AND SOILS
GEO-1: If required by the City geotechnical staff,
the applicant shall submit a soils report, and/or a Prior to Building Permit Community
geotechnical report,for the review and approval of Construction Issuance Property owner Development
p pp Department
the City geotechnical staff. p
GEO-2: The applicant shall submit for recordation
a covenant agreeing to construct the project strictly
in accordance with the approved plans; and
agreeing to prohibit further projects on the subject
site without first filing an application with the Construction and Prior to Building Permit Community
Director pursuant to the terms of Chapter 15.20 of Post-Construction Issuance Property owner Development
the Rancho Palos Verdes Municipal Code. Such Department
covenant shall be submitted to the Director for
recordation prior to the issuance of a building
permit.
GEO-3: All other necessary permits and
approvals required pursuant to the Rancho Palos Prior to Building Permit Community
Verdes Municipal Code or anyother applicable Construction Issuance Property owner Development
p pp Department
statute, law or ordinance shall be obtained. p
GEO-4: Prior to building permit issuance, the
applicant shall prepare an erosion control plan for
the review and approval of the Building Official. Prior to Building Permit Community
shall be responsible for continuous Construction Issuance Property owner Development
The
applicantp Department
and effective implementation of the erosion control p
plan during project construction.
Mitigation Monitoring Program
Exhibit A- Page 8 Resolution No. 2016-03
MITIGATION MEASURES TYPE TIME OF RESPONSIBLE COMPLIANCE
IMPLEMENTATION ENTITY VERIFICATION
6. HAZARDS AND HAZARDOUS MATERIALS
HAZ-1: New,single-family residences and related
accessory structures shall be designed to DuringBuilding &Safe Plan Community
incorporate all fire protection requirements of the Project Design Property owner Development
Check p
City's most recently adopted Building Code,to the Department
satisfaction of the Building Official.
7. HYDROLOGY/WATER QUALITY
HYD-1: Any development proposal located within,
adjacent to or draining into a designated
Environmentally Sensitive Area(ESA)shall require Prior to BuildingPermit Community
Project Design Property owner Development
the review and approval by the City s LID Issuance Department
Ordinance consultant prior to building permit p
issuance.
HYD-2: If lot drainage deficiencies are identified Construction and Prior to Building Permit Department of Public
by the Director of Public Works, all such Property owner p
deficiencies shall be corrected by theapplicant. Post-Construction Issuance Works
HYD-3: Roof runoff from all buildings and
structures on the site shall be contained and Construction and Prior to Building Permit Department of Public
directed to the streets or an approved drainage Post-Construction Issuance Property owner
pp 9 Works
course.
HYD-4: All landscaping irrigation systems shall
be part of a water management system approved Prior to BuildingPermit Department of Public
by the Director of Public Works. Irrigation for Post-Construction Property owner p
landscaping shall bepermitted onlyas necessaryIssuance Works
P g
to maintain the yard and garden.
8. NOISE
NOI-1: Permitted hours and days for
construction activity are 7:00 AM to 6:00 PM,
Monday through Friday, 9:00AM to 5:00PM on
Saturday,with no construction activity permitted on
s or on the legal holidays specified in Community
Sundays Construction On-Going Property owner Development
Section 17.96.920 of the Rancho Palos Verdes Department
Development Code. During demolition, p
construction and/or grading operations, trucks
shall not park,queue and/or idle at the project site
or in the adjoining street rights-of-way before 7AM
Mitigation Monitoring Program
Exhibit A- Page 9 Resolution No. 2016-03
MITIGATION MEASURES TIME OF RESPONSIBLE COMPLIANCE
TYPE IMPLEMENTATION ENTITY VERIFICATION
Monday through Friday and before 9AM on
Saturday, in accordance with the permitted hours
of construction stated in this condition. When
feasible to do so,the construction contractor shall
provide staging areas on-site to minimize off-site
transportation of heavy construction equipment.
These areas shall be located to maximize the
distance between staging activities and
neighboring properties, subject to approval by the
building official.
Mitigation Monitoring Program
Exhibit A-Page 10 Resolution No. 2016-03
TIME OF RESPONSIBLE COMPLIANCE
MITIGATION MEASURES TYPE IMPLEMENTATION ENTITY VERIFICATION
9. UTILITIES/SERVICE SYSTEMS
UTL-6 Prior to issuance of any building permits,
for either of the two lots ("Point View" or
"Plumtree"), an Area Sewer Study shall be
submitted to the Director of Public Works for
review and approval that indicates adequate Community
capacity in both the Abalone Cove Sewer System Prior to BuildingPermit Development
and within the existing Sanitation District systems Project Design Issuance Property Owner Department&
Department of Public
exists. Should a connection to a sanitary De p
sewer system not be available, an Works
additional CEQA analysis shall be
conducted to assess use and maintenance
of waste holding tanks.
Mitigation Monitoring Program