Loading...
Willdan Engineering (2013) PROFESSINAL SERVICES AGREEMNT FOR RYAN PARK SOUTHERN ENTRANCE REALIGNMENT AND PARKING LOT EXPANSION PAGE 4 0F9 First Amendment to Agreement between the City of Rancho Palos Verdes and Wilidan Engineering This agreement is an amendment ("Amendment") to the on-call civil and traffic engineering services agreement between the City of Rancho Palos Verdes ("CITY") and Willdan Engineering ("CONSULTANT"), dated June 19th, 2012 ("Agreement"). This Amendment is effective as of September 3, 2013, and is being made to affect the single- project compensation limit for the Robert E. Ryan Park Southern Entrance and Parking Lot Improvements Design Services Project and the total compensation limit for Fiscal Year 2013-2014. Section 1. Section 2.1 ("Fee") of the Agreement is hereby amended to read as follows: "Upon CITY's request, CONSULTANT shall submit a proposal for a particular project, including a scope of work and total cost for services ("Proposal"). Once CITY accepts a Proposal as submitted or amended and issues a written Notice to Proceed therefor, CITY agrees to compensate CONSULTANT in accordance with the total cost for services listed in the Proposal. In any case, the CITY's compensation shall be in an amount not to exceed twenty-five thousand dollars ($25,000) for a single project, except for the design services project for the Robert E. Ryan Park southern entrance and parking lot improvements, which compensation shall not exceed thirty-seven thousand dollars ($37,000). Additionally, the CITY's compensation to CONSULTANT for all projects shall not exceed sixty thousand dollars ($00,000) for Fiscal Year 2012-2013, seventy-two thousand dollars ($72,000) for Fiscal Year 2013-2014, and sixty thousand dollars ($00,000) for Fiscal Year 2014-2015. On-call services that are reimbursed by a trust deposit shall not count towards the maximum amounts CONSULTANT shall be paid for such services. If the CITY requests any work that is beyond the scope of work listed in the Proposal, the CITY and CONSULTANT shall negotiate the scope of work and fees for this extra work in accordance with CONSULTANT's Schedule of Hourly Rates up to the single project maximum amount. Upon mutual agreement of the scope of work and fees, the City shall issue a written Notice to Proceed therefor. CONSULTANT's Schedule of Hourly Rates effective from the commencement of this Agreement until June 30, 2013, is attached hereto as Exhibit "A" and incorporated herein by this reference. CONSULTANT's Schedule of Hourly Rates effective from July 1, 2013, until the termination of this Agreement is attached hereto as Exhibit "B" and incorporated herein by this reference. The rates in Exhibits "A'' and "B" shall remain in effect for the full term of the Agreement_" Section 2. Exhibit "A" of the Agreement shall be renamed "Exhibit 'A': Consultant's Schedule of Hourly Rates effective until June 30, 2013." PROFESSINAL SERVICES AGREEMNT FOR RYAN PARK SOUTHERN ENTRANCE REALIGNMENT AND PARKING LOT EXPANSION PAGE 5 0F9 Section 3. Exhibit "B," which is attached to this Amendment and incorporated herein, is hereby added to the Agreement. Section 4. Except as expressly amended by this Amendment, all of the other provisions of the Agreement shall remain in full force and effect as written in the Agreement. IN WITNESS WHEREOF, the parties hereto have executed this Amendment as of the date and year first above written. q/ilf/0 Dated: WILLDAN ENGINEERING ("CONSULTANT") By: sAgete Printed Name: /tietev\ C• Pcur 14-- Circle one: Board Chair Presi Vice President Printed Name: Roy L &LA_ Circle one: SeciCa Assistant Secretary Chief Financial Officer Assistant Treasurer CITY OF RANCHO PALOS VERDES ("CITY") By: Mayor PROFESSINAL SERVICES AGREEMNT FOR RYAN PARK SOUTHERN ENTRANCE REALIGNMENT AND PARKING LOT EXPANSION PAGE 6 OF9 ATTEST. By: !'I 1/14 City Clerk PROFESSINAL SERVICES AGREEMNT FOR RYAN PARK SOUTHERN ENTRANCE REALIGNMENT AND PARKING LOT EXPANSION PAGE 7 0F9 Exhibit"B": Schedule of Hourly Rates effective July 1, 2013 WILaLDAN ENGINEERING Schedule of Hourly Rates Effective July 112013 to September 30,2015 ENOINE.�ERING :. , ... LANDSCAPE ARCHITECTURE _.. Technical Aide.........,.... $88.00 Assistant Landscape Architect.... .... 103.00 Drafter I......,...._................................... 98.00 Associate Landscape Architect..,.. ...... ... ... ...... 118.00 Drafter Ii .................., ..... .........103 00 Senior Landscape Architect . ,.............._ 129.00 Senior Drildter...._........... ..........._.... ,11300 Principal Landscape Architect.... . 155.00 GIS Analyst i.. .. .... .... ,........ ..,. ... ... _ ....11800 Principal Project Manager......................_.._...._.........185.00 GiSAnalyst it........................................................._,......134.00 GIS Analyst BUILDING AND SAFETY. 111 155.00...... �;�1� � Design Engineer f ._.._.. ..........................118.00 Assistant Code Enforcement Officer..................... .72.00 Design Engineer 11 ...,.........,.._124.00 Plans Examiner Aide..... .77.00 Designer l.....+...._ ... ... ... .... 118.00 Assistant Construction Permit Specialist...... ...., .............77.00 Designer R ..... ............ ....................................124,00 Construction Pamir Speciafrat..................+....... ,.........82.00 Senior Design Engineer l........ .........,,....,....129.00 Code Enforcement Officer. ........................._....., ..82.00 Senior Design Engineer it .......................134.0© Assistant Building Inspect.. "98.001113.00 Senior Designer ..,............ ....,... ..... 134.00 Senior Code Enforcement Officer....,.................. 98.00 Assciate Engineer ..... .... ,.... 139.00 Senior Construction Permit Speciate.. .. 103.00 Design Manager._....., 139.00 Supervising Construction Permit Specialist .............108.00 Senior Design Manager....,,.....,...__............ ....... . 149,00 Building ice,.,........ ............."708.00•113.00 SeniorEngineer 149.00 Sup Code Enforcement..................,..... ..., 118.00 Supervising Engineer•,>. .....,...,.................,, ......,>,..155.00 Senior Building inspector.............. .. .. ..... 118.00 Program Manager. .,.......... 185.00 Plans Examiner......,... 118.00 Project Manager 185.00 Supervising Building Inspector 129.00 City Engineer....... ..._.........._...........................185.00 Senior Plans Examiner................,._ 129.00 Principal Project Manager..........................._.. ...........185,000 Inspector of Record ................................,..... 144.�00� DeputyDi r..,........,.. ......, ........._.........,195.00 Deputy Building Official. ,144.00 Director .... ,..............+«........... ,.. ... ..... 195,00 Plan Check Engineer ..............._.,.144.00 Principal Engineer.. ... .... ........ .... ............215.00 Building Official.. 155.00 Supervising Plan Check Engineer...... .. ... 155.00 CD11i'3 iU0776/..1dJ AGEit 'AT y:7 _.!. Principal P ojec!Manager .. 185.00 Labor Compliance Specialist ......,.. .. 9800 Deputy Director, .... .. .......... ...,.._. 195.00 LilborC.otrtptiantx Manager ........,124.00 Director..................,. ......,.......... ..... ....,...165.00 Utility Coordinator . .........,... 129,00 Assistant Construction Manager......, ....._............_.....124.00 Construction Manager... .......... .... ................ 149,00 Community Development Techniciah..._...... 88.00 Senior Construction Manager... ..,. 160.00 Planning Technesart....._....,.. ...88.00 Project Manager185.00 Assistant Planner. _.__..........................108.00 Deputy Director.,..... ....,>.................. ....... .........w..195.00 Assistant Community Development Planner... 108.00 Director ,..........................................,......._...._...195.00 Associate Community Development Planner, ...... ......118.00 Aaaeciate Planner ........................... 118.00 .+ 7 7 ZN TION.SE RVIC.. «, .` Senior Communiy Gevelapment Planner....... ....134.00 •i,•,,. ..�•_,>tk,..m.yzrsmm«.s<f.v�' s :www°'�+., 3 Assistant Public Works observer......... "103.00Y113.00 Senior Planner............._..._ ...... ......134.00 Public Works Observer .....,...,................."103.t)Qt113.00 Principal Community Development Planner. 155.00 Senior Pubic Works Observer.._., 113.00 Principal Planner ........ 155.00 Supervising Pubic Works Observer,,,.............................124.00 Deputy Lire,for......+......,+...............,...,._.., ,....195.00 Director_.__... .............,.,.,.....195.00 MAPPING AND TSERVICES: Survey I 1 3.00 «» ,•;m ..._w:. ..� :... ,:, v.ye...,....._._-. SurveyAnalystII ........,....,.....118.00 Computer Data Entry,.. 8700 Calcutor I. .................... ........ ... .... ... 103.00 Clerical..... .._ 67.00 Calculator 11.......>...,.. .,........ 113,00 Word Processing. ..... ... 67.00 Senior Calculate, ...........,...............124.00 ;._.._.;�.._..«. ..... ., . , Senior Survey Analyst.. ...,.... 134.0` Mileage-reimbursement viii be charged at the current Federal Supervisor-Survey&Mapping.... 180.00 guideline rate at the time of billing. Vehicles will be charged at a Principal Project Manager ...._.. 185.00 monthly rate of 5500.00. Prevailing Wage Project Use$113.00 Addams!Ming siRiZiioaiofs m*y be added to lite above Wag clump the year as nsf peationt ata triaged.Cenauttstan in cannaceon with kipsborn and eourt apparent.%rweJ be waited sapsretel r. Thy abort,imbecilic ie kr eiracht tinea.Oveetrsts Mier be d arped st i 5 lienee,end Sa mity&and Pinky s,ZD berm the macaw nits.bitisprintans sepmdu;ban,massanpet saevias,and pretbip wit be invoiced at cost plus Peen percent(15%).A sub eansaktsnt nunspeenenst bo or insert percent (15%) be added to ine tired cast el et aeb censutent wrdicea b provide for lie cast of**ministration,esnsuttsl*ori,and tooninebon.Valid Jr'a1,2013 bre.lana 30 2014,thereater,b odes snsy be raised once per yser to the vale of Change sr the Corim+er puke tndew ter the Las MpeletOranps countylSecnoneenn*ma,but rot mors lien live pt Vcwt par pear.