ARTICLE 1
SCOPE OF SERVICES
1.1 Project Description
The Project is described as on-call services as follows: Civil Engineering
and design services for Public Works projects.
1.2 Description of Services
CONSULTANT shall provide such on-call traffic engineering consulting
services as may be requested by CITY. CONSULTANT acknowledges that this
Agreement is for on-call services, and there is no certainty that CONSULTANT will be
asked to perform any services pursuant to this Agreement. CONSULTANT's Statement
of Qualifications is attached hereto as Exhibit A and incorporated herein by this reference.
In the event of any conflict between the terms of this Agreement and incorporated
documents, the terms of this Agreement shall control.
1.3 Schedule of Work
Upon receipt of written Notice to Proceed from CITY, CONSULTANT shall
perform with due diligence the services requested by CITY. Time is of the essence in this
Agreement. CONSULTANT shall not be responsible for delay, nor shall CONSULTANT
be responsible for damages or be in default or deemed to be in default by reason of
strikes, lockouts, accidents, or acts of God, or the failure of CITY to furnish timely
information or to approve or disapprove CONSULTANT's work promptly, or delay or faulty
performance by CITY, other consultants/contractors, or governmental agencies, or any
other delays beyond CONSULTANT's control or without CONSULTANT's fault.
1.4 Term of Agreement
This Agreement shall commence on August 18, 2015 and shall terminate
on June 30, 2021 unless sooner terminated pursuant to Article 4 of this Agreement.
R6876-0504\1859634v2.doc
ARTICLE 2
COMPENSATION
2.1 Rates; Expense Reimbursement
2.1.1 CITY agrees to compensate CONSULTANT in accordance with
CONSULTANT's Schedule of Hourly Rates, which is within Exhibit A and shall meet or
exceed prevailing wage rates, and in any case an amount not to exceed Sixty Thousand
Dollars ($60,000) per fiscal year for services as described in Article 1. On-call services
that are reimbursed by a trust deposit shall not count towards the maximum amount
CONSULTANT shall be paid for such services. The rates in Exhibit A shall be in effect
through the end of the term of this Agreement.
2.1.2 CITY will not reimburse CONSULTANT for costs and expenses
unless such costs and expenses are previously approved by CITY.
2.2 Payment of Compensation
CONSULTANT shall submit monthly invoices for the work completed in the
previous month. CITY agrees to authorize payment for all undisputed invoice amounts
within thirty (30) days of receipt of each invoice. CITY agrees to use its best efforts to
notify CONSULTANT of any disputed invoice amounts within ten (10) days of the receipt
of each invoice. However, CITY's failure to timely notify CONSULTANT of a disputed
amount shall not be deemed a waiver of CITY's right to challenge such amount.
Additionally, in the event CITY fails to pay any undisputed amounts due
CONSULTANT within forty-five (45) days after invoices are received by CITY then CITY
agrees that CONSULTANT shall have the right to consider the default a total breach of
this Agreement and be terminated by CONSULTANT without liability to CONSULTANT
upon ten (10) working days advance written notice.
ARTICLE 3
INDEMNIFICATION AND INSURANCE
3.1 Indemnity
3.1.1 Indemnity for Design Professional Services. To the fullest extent
permitted by law, CONSULTANT shall, at its sole cost and expense, protect, indemnify,
and hold harmless CITY and its elected officials, officers, attorneys, agents, employees,
designated volunteers, successors, assigns and those CITY agents serving as
independent contractors in the role of CITY officials (collectively"Indemnitees"), from and
against any and all damages, costs, expenses, liabilities, claims, demands, causes of
action, proceedings, judgments, penalties, liens, and losses of any nature whatsoever,
including fees of accountants, attorneys, or other professionals and all costs associated
therewith, and reimbursement of attorney's fees and costs of defense (collectively
"Liabilities"), whether actual, alleged or threatened, which arise out of, are claimed to arise
out of, pertain to, or relate to, in whole or in part, the negligence, recklessness or willful
Page 2 of 12
Agreement for On-Call Professional/Technical Services
R6876-0504\1859634v2.d oc
misconduct of CONSULTANT, its officers, agents, servants, employees, subcontractors,
material men, contractors or their officers, agents, servants or employees (or any entity
or individual that CONSULTANT shall bear the legal liability thereof) in the performance
of design professional services under this Agreement by a "design professional," as the
term is defined under California Civil Code Section 2782.8(c)(2).
3.1.2 Other Indemnities.
(a) Other than in the performance of design professional services, and
to the fullest extent permitted by law, CONSULTANT shall, at its sole cost and expense,
defend, hold harmless and indemnify the Indemnitees from and against any and all
damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings,
judgments, penalties, liens, and losses of any nature whatsoever, including fees of
accountants, attorneys, or other professionals and all costs associated therewith and the
payment of all consequential damages (collectively "Claims"), in law or equity, whether
actual, alleged or threatened, which arise out of, are claimed to arise out of, pertain to, or
relate to the acts or omissions of CONSULTANT, its officers, agents, servants,
employees, subcontractors, materialmen, contractors or their officers, agents, servants
or employees (or any entity or individual that CONSULTANT shall bear the legal liability
thereof) in the performance of this Agreement, including the Indemnitees' active or
passive negligence, except for Claims arising from the sole negligence or willful
misconduct of the Indemnitees, as determined by final arbitration or court decision or by
the agreement of the Parties. CONSULTANT shall defend the Indemnitees in any action
or actions filed in connection with any Claim with counsel of the Indemnitees' choice, and
shall pay all costs and expenses, including all attorneys' fees and experts' costs actually
incurred in connection with such defense. CONSULTANT shall reimburse the
Indemnitees for any and all legal expenses and costs incurred by the Indemnitees in
connection therewith.
(b) CONSULTANT shall pay all required taxes on amounts paid to
CONSULTANT under this Agreement, and indemnify and hold CITY harmless from any
and all taxes, assessments, penalties, and interest asserted against CITY by reason of
the independent contractor relationship created by this Agreement. CONSULTANT shall
fully comply with the workers' compensation law regarding CONSULTANT and
CONSULTANT's employees. CONSULTANT shall indemnify and hold CITY harmless
from any failure of CONSULTANT to comply with applicable workers' compensation laws.
CITY may offset against the amount of any fees due to CONSULTANT under this
Agreement any amount due to CITY from CONSULTANT as a result of CONSULTANT's
failure to promptly pay to CITY any reimbursement or indemnification arising under this
Subparagraph (b).
(c) CONSULTANT shall obtain executed indemnity agreements with
provisions identical to those in this Section 3.1 from each and every subcontractor or any
other person or entity involved by, for, with or on behalf of CONSULTANT in the
performance of this Agreement. If CONSULTANT fails to obtain such indemnities,
CONSULTANT shall be fully responsible and indemnify, hold harmless and defend the
Indemnitees from and against any and all Claims in law or equity, whether actual, alleged
Page 3 of 12
Agreement for On-Call Professional/Technical Services
R6876-0504\1859634v2.doc
or threatened, which arise out of, are claimed to arise out of, pertain to, or relate to the
acts or omissions of CONSULTANT's subcontractor, its officers, agents, servants,
employees, subcontractors, materialmen, contractors or their officers, agents, servants
or employees (or any entity or individual that CONSULTANT's subcontractor shall bear
the legal liability thereof) in the performance of this Agreement, including the Indemnitees'
active or passive negligence, except for Claims arising from the sole negligence or willful
misconduct of the Indemnitees, as determined by final arbitration or court decision or by
the agreement of the Parties.
3.1.3 Workers' Compensation Acts not Limiting. CONSULTANT's
obligations under this Article 3, or any other provision of this Agreement, shall not be
limited by the provisions of any workers' compensation act or similar act. CONSULTANT
expressly waives its statutory immunity under such statutes or laws as to CITY, its
officers, agents, employees and volunteers.
3.1.4 Insurance Requirements not Limiting. CITY does not, and shall not,
waive any rights that it may possess against CONSULTANT because of the acceptance
by CITY, or the deposit with CITY, of any insurance policy or certificate required pursuant
to this Agreement. This hold harmless and indemnification provisions in this Article 3
shall apply regardless of whether or not any insurance policies are determined to be
applicable to the Liabilities, Claims, tax, assessment, penalty or interest asserted against
CITY.
3.1.5 Survival of Terms. The indemnification in this Article 3 shall survive
the expiration or termination of this Agreement.
3.2 Insurance
3.2.1 General Liability Insurance
CONSULTANT shall at all times during the term of the Agreement carry,
maintain, and keep in full force and effect, a policy or policies of Commercial General
Liability Insurance, with minimum limits of one million dollars ($1,000,000) for each
occurrence and two million dollars ($2,000,000)general aggregate for bodily injury, death,
loss or property damage for products or completed operations and any and all other
activities undertaken by CONSULTANT in the performance of this Agreement. The policy
or policies shall be issued by an insurer admitted or authorized to do business in the State
of California and rated in A.M. Best's Insurance Guide with a rating of A:VII or better.
3.2.2 Professional Liability Insurance
CONSULTANT shall at all times during the term of this Agreement, carry,
maintain, and keep in full force and effect a policy or policies of professional liability
insurance with a minimum limit of one million dollars ($1,000,000) per claim and
aggregate for errors and/or omissions of CONSULTANT in the performance of this
Agreement. The policy or policies shall be issued by an insurer admitted or authorized to
do business in the State of California and rated in Best's Insurance Guide with a rating of
Page 4 of 12
Agreement for On-Call Professional/Technical Services
R6876-0504\1859634v2.doc
A:VII or better. If a "claims made" policy is provided, such policy shall be maintained in
effect from the date of performance of work or services on CITY's behalf until three (3)
years after the date of work or services are accepted as completed. Coverage for the
post-completion period may be provided by renewal or replacement of the policy for each
of the three (3) years or by a three-year extended reporting period endorsement, which
reinstates all limits for the extended reporting period. If any such policy and/or policies
have a retroactive date, that date shall be no later than the date of first performance of
work or services on behalf of CITY. Renewal or replacement policies shall not allow for
any advancement of such retroactive date.
3.2.3 Automobile Liability Insurance
CONSULTANT shall at all times during the term of this Agreement obtain,
maintain, and keep in full force and effect, a policy or policies of Automobile Liability
Insurance, with minimum of one million dollars ($1,000,000) per claim and occurrence
and two million dollars ($2,000,000) in the aggregate for bodily injuries or death of one
person and five hundred thousand dollars ($500,000) for property damage arising from
one incident. The policy or policies shall be issued by an insurer admitted or authorized
to do business in the State of California and rated in A.M. Best's Insurance Guide with a
rating of A:VII or better.
3.2.4 Worker's Compensation Insurance
CONSULTANT agrees to maintain in force at all times during the
performance of work under this Agreement worker's compensation insurance as required
by the law. CONSULTANT shall require any subcontractor similarly to provide such
compensation insurance for their respective employees.
3.2.5 Notice of Cancellation
(a) All insurance policies shall provide that the insurance coverage shall
not be cancelled or modified by the insurance carrier without thirty (30) days prior written
notice, or ten (10) days notice if cancellation is due to nonpayment of premium.
CONSULTANT shall provide immediate notice to CITY, if CONSULTANT receives a
cancellation or policy revision notice from the insurer.
(b) CONSULTANT agrees that it will not cancel or reduce any required
insurance coverage. CONSULTANT agrees that if it does not keep the insurance in full
force and effect, CITY may either immediately terminate this Agreement or, if insurance
is available at a reasonable cost, CITY may take out the necessary insurance and pay,
at CONSULTANT's expense, the premium thereon.
3.2.6 Entire Policy and Certificate of Insurance
At all times during the term of this Agreement, CONSULTANT shall maintain
on file with the City Clerk both a copy of the entire policy and a certificate of insurance
showing that the policies are in effect in the required amounts. The commercial general
Page 5 of 12
Agreement for On-Call Professional/Technical Services
R6876-0504\1859634v2.doc
liability policy shall contain endorsements naming CITY, its officers, agents and
employees as additional insureds.
3.2.7 Primary Coverage
The insurance provided by CONSULTANT shall be primary to any coverage
available to CITY. The insurance policies (other than workers compensation and
professional liability) shall include provisions for waiver of subrogation.
ARTICLE 4
TERMINATION
4.1 Termination of Agreement
(a) This Agreement may be terminated at any time, with or without
cause, by CITY upon ten (10) days prior written notice or by CONSULTANT upon ninety
(90) days prior written notice. Notice shall be deemed served if completed in compliance
with Section 6.15.
(b) CONSULTANT shall cease all work under this Agreement on or
before the effective date of termination specified in the notice of termination. In the event
of termination or cancellation of this Agreement by CONSULTANT or CITY, due to no
fault or failure of performance by CONSULTANT, CONSULTANT shall be paid
compensation for all services performed by CONSULTANT, in an amount to be
determined as follows: for work satisfactorily done in accordance with all of the terms
and provisions of this Agreement as determined by CITY, CONSULTANT shall be paid
an amount equal to the percentage of services performed prior to the effective date of
termination or cancellation in accordance with the work items; provided, in no event shall
the amount of money paid under the foregoing provisions of this paragraph exceed the
amount which would have been paid to CONSULTANT for the full performance of the
services described in this Agreement.
ARTICLE 5
OWNERSHIP OF DOCUMENTS
5.1 Ownership of Documents and Work Product
All final documents, plans, specifications, reports, information, data,
exhibits, photographs, images, video files and media created or developed by
CONSULTANT pursuant to this Agreement ("Written Products") shall be and remain the
property of CITY without restriction or limitation upon its use, duplication or dissemination
by CITY. All Written Products shall be considered "works made for hire," and all Written
Products and any and all intellectual property rights arising from their creation, including,
but not limited to, all copyrights and other proprietary rights, shall be and remain the
property of CITY without restriction or limitation upon their use, duplication or
dissemination by CITY. CONSULTANT shall not obtain or attempt to obtain copyright
protection as to any Written Products.
Page 6 of 12
Agreement for On-Call Professional/Technical Services
R6876-0504\1859634v2.doc
CONSULTANT hereby assigns to CITY all ownership and any and all
intellectual property rights to the Written Products that are not otherwise vested in CITY
pursuant to the paragraph directly above this one.
CONSULTANT warrants and represents that it has secured all necessary
licenses, consents or approvals to use any instrumentality, thing or component as to
which any intellectual property right exists, including computer software, used in the
rendering of the services and the production of all Written Products produced under this
Agreement, and that CITY has full legal title to and the right to reproduce the Written
Products. CONSULTANT shall defend, indemnify and hold CITY, and its elected officials,
officers, employees, servants, attorneys, designated volunteers, and agents serving as
independent contractors in the role of CITY officials, harmless from any loss, claim or
liability in any way related to a claim that CITY's use of any of the Written Products is
violating federal, state or local laws, or any contractual provisions, or any laws relating to
trade names, licenses, franchises, copyrights, patents or other means of protecting
intellectual property rights and/or interests in products or inventions. CONSULTANT shall
bear all costs arising from the use of patented, copyrighted, trade secret or trademarked
documents, materials, equipment, devices or processes in connection with its provision
of the services and Written Products produced under this Agreement. In the event the
use of any of the Written Products or other deliverables hereunder by CITY is held to
constitute an infringement and the use of any of the same is enjoined, CONSULTANT, at
its expense, shall: (a) secure for CITY the right to continue using the Written Products
and other deliverables by suspension of any injunction, or by procuring a license or
licenses for CITY; or (b) modify the Written Products and other deliverables so that they
become non-infringing while remaining in compliance with the requirements of this
Agreement. This covenant shall survive the termination of this Agreement.
Upon termination, abandonment or suspension of the Project, the
CONSULTANT shall deliver to CITY all Written Products and other deliverables related
to the Project without additional cost or expense to CITY. If CONSULTANT prepares a
document on a computer, CONSULTANT shall provide CITY with the document both in
a printed format and in an electronic format that is acceptable to CITY.
ARTICLE 6
GENERAL PROVISIONS
6.1 Representation
The CITY representative shall be the Director of Public Works or his or her
designee, and CONSULTANT shall notify CITY of CONSULTANT's designated
representative. These individuals shall be the primary contact persons for the parties
regarding performance of this Agreement.
6.2 Fair Employment Practices/Equal Opportunity Acts
In the performance of this Agreement, CONSULTANT shall comply with all
applicable provisions of the California Fair Employment Practices Act (California
Page 7 of 12
Agreement for On-Call Professional/Technical Services
R6876-0504\1859634v2.doc
Government Code Sections 12940-48), the applicable equal employment provisions of
the Civil Rights Act of 1964 (42 U.S.C. 200e-217), and the Americans with Disabilities Act
of 1990 (42 U.S.C. § 11200, et seq.).
6.3 Audit
The CITY or its representative shall have the option of inspecting, auditing
or inspecting and auditing all records and other written materials used by CONSULTANT
in preparing its billings to CITY as a condition precedent to any payment to
CONSULTANT. CONSULTANT will promptly furnish documents requested by CITY.
Additionally, CONSULTANT shall be subject to State Auditor examination and audit at
the request of CITY or as part of any audit of CITY, for a period of three (3) years after
final payment under this Agreement.
6.4 Personnel
CONSULTANT represents that it has, or shall secure at its own expense,
all personnel required to perform CONSULTANT's services under this Agreement. Any
person who performs engineering services pursuant to this Agreement shall be licensed
as a Civil Engineer by the State of California and in good standing. CONSULTANT shall
make reasonable efforts to maintain the continuity of CONSULTANT's staff who are
assigned to perform the services hereunder and shall obtain the approval of the Director
of Public Works of all proposed staff members who will perform such services.
CONSULTANT may associate with or employ associates or subcontractors in the
performance of its services under this Agreement, but at all times shall CONSULTANT
be responsible for its associates and subcontractors' services.
6.5 CONSULTANT's Representations
CONSULTANT represents, covenants and agrees that: a) CONSULTANT
is licensed, qualified, and capable of furnishing the labor, materials, and expertise
necessary to perform the services in accordance with the terms and conditions set forth
in this Agreement; b) there are no obligations, commitments, or impediments of any kind
that will limit or prevent CONSULTANT's full performance under this Agreement; c)to the
extent required by the standard of practice, CONSULTANT has investigated and
considered the scope of services performed, has carefully considered how the services
should be performed, and understands the facilities, difficulties and restrictions attending
performance of the services under this Agreement.
6.6 Conflicts of Interest
CONSULTANT agrees not to accept any employment or representation
during the term of this Agreement or within twelve (12) months after completion of the
work under this Agreement which is or may likely make CONSULTANT "financially
interested" (as provided in California Government Code Sections 1090 and 87100) in any
decisions made by CITY on any matter in connection with which CONSULTANT has been
retained pursuant to this Agreement.
Page 8 of 12
Agreement for On-Call Professional/Technical Services
R6876-0504\1859634v2.doc
6.7 Legal Action
(a) Should either party to this Agreement bring legal action against the
other, the validity, interpretation, and performance of this Agreement shall be controlled
by and construed under the laws of the State of California, excluding California's choice
of law rules. Venue for any such action relating to this Agreement shall be in the Los
Angeles County Superior Court.
(b) If any legal action or other proceeding, including action for
declaratory relief, is brought for the enforcement of this Agreement or because of an
alleged dispute, breach, default or misrepresentation in connection with this Agreement,
the prevailing party shall be entitled to recover reasonable attorneys' fees, experts' fees,
and other costs, in addition to any other relief to which the party may be entitled.
(c) Should any legal action about a project between CITY and a party
other than CONSULTANT require the testimony of CONSULTANT when there is no
allegation that CONSULTANT was negligent, CITY shall compensate CONSULTANT for
its testimony and preparation to testify at the hourly rates in effect at the time of such
testimony.
6.8 Assignment
Neither this Agreement nor any part thereof shall be assigned by
CONSULTANT without the prior written consent of CITY. Any such purported assignment
without written consent shall be null and void, and CONSULTANT shall hold harmless,
defend and indemnify CITY and its officers, officials, employees, agents and
representatives with respect to any claim, demand or action arising from any unauthorized
assignment.
Notwithstanding the above, CONSULTANT may use the services of
persons and entities not in CONSULTANT's direct employ, when it is appropriate and
customary to do so. Such persons and entities include, but are not necessarily limited to,
surveyors, specialized consultants, and testing laboratories. CONSULTANT's use of
subcontractors for additional services shall not be unreasonably restricted by CITY
provided CONSULTANT notifies CITY in advance.
6.9 Independent Contractor
CONSULTANT is and shall at all times remain, as to CITY, a wholly
independent contractor. Neither CITY nor any of its agents shall have control over the
conduct of CONSULTANT or any of the CONSULTANT's employees, except as herein
set forth, and CONSULTANT is free to dispose of all portions of its time and activities
which it is not obligated to devote to CITY in such a manner and to such persons, firms,
or corporations as the CONSULTANT wishes except as expressly provided in this
Agreement. CONSULTANT shall have no power to incur any debt, obligation, or liability
on behalf of CITY or otherwise act on behalf of CITY as an agent. CONSULTANT shall
not, at any time or in any manner, represent that it or any of its agents, servants or
Page 9 of 12
Agreement for On-Call Professional/Technical Services
R6876-0504\1859634v2.doc
employees, are in any manner agents, servants or employees of CITY. CONSULTANT
agrees to pay all required taxes on amounts paid to CONSULTANT under this
Agreement, and to indemnify and hold CITY harmless from any and all taxes,
assessments, penalties, and interest asserted against CITY by reason of the independent
contractor relationship created by this Agreement. CONSULTANT shall fully comply with
the workers' compensation law regarding CONSULTANT and its employees.
CONSULTANT further agrees to indemnify and hold CITY harmless from any failure of
CONSULTANT to comply with applicable workers' compensation laws. The CITY shall
have the right to offset against the amount of any fees due to CONSULTANT under this
Agreement any amount due to CITY from CONSULTANT as a result of its failure to
promptly pay to CITY any reimbursement or indemnification arising under this Article.
6.10 Titles
The titles used in this Agreement are for general reference only and are not
part of the Agreement.
6.11 Entire Agreement
This Agreement, including any other documents incorporated herein by
specific reference, represents the entire and integrated agreement between CITY and
CONSULTANT and supersedes all prior negotiations, representations or agreements,
either written or oral. This Agreement may be modified or amended, or provisions or
breach may be waived, only by subsequent written agreement signed by both parties.
6.12 Construction
In the event of any asserted ambiguity in, or dispute regarding the
interpretation of any matter herein, the interpretation of this Agreement shall not be
resolved by any rules of interpretation providing for interpretation against the party who
causes the uncertainty to exist or against the party who drafted the Agreement or who
drafted that portion of the Agreement.
6.13 Non-Waiver of Terms, Rights and Remedies
Waiver by either party of any one or more of the conditions of performance
under this Agreement shall not be a waiver of any other condition of performance under
this Agreement. In no event shall the making by CITY of any payment to CONSULTANT
constitute or be construed as a waiver by CITY of any breach of covenant, or any default
which may then exist on the part of CONSULTANT, and the making of any such payment
by CITY shall in no way impair or prejudice any right or remedy available to CITY with
regard to such breach or default.
Page 10 of 12
Agreement for On-Call Professional/Technical Services
R6876-0504\1859634v2.doc
6.14 Severability
If any term or portion of this Agreement is held to be invalid, illegal, or
otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of
this Agreement shall continue in full force and effect.
6.15 Notice
Except as otherwise required by law, any notice, payment or other
communication authorized or required by this Agreement shall be in writing and shall be
deemed received on (a) the day of delivery if delivered by hand or overnight courier
service during CITY's regular business hours or (b) on the third business day following
deposit in the United States mail, postage prepaid, to the addresses listed below, or at
such other address as one party may notify the other:
To CITY:
Responsible Person: Michael Throne, Director of Public Works
City of Rancho Palos Verdes
30940 Hawthorne Boulevard
Rancho Palos Verdes, CA 90275
To CONSULTANT:
Responsible Person: Shahnawaz Ahmad, P.E. President
SA Associates
1130 West Huntington Drive, Unit 12
Arcadia, CA 91007
Page 11 of12
Agreement for On-Call Professional/Technical Services
R6876-0504\1859634v2.doc
IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the
date and year first above written.
Dated: Ajw* �� �01S' SA Associates. a California corporation
("CONSULTANT")
Slc h-4/7
By:
Printed Name: 5Ah, w' Ahmad
Title: Pp-e.s,'.lr,rfr
By: kit"/""11 Al' 1""41
Printed Name: Siitth rv,wAa- Ahma4
Title: Secret-Art
Dated: s,- /5'. CITY OF RANCHO PALOS VERDES
("CITY")
By: �
ayor
ATTEST: APPROVED AS TO FORM:
By: / ' i,‘ �-� By:
City Clerk City Attorney
Page 12 of 12
Agreement for On-Call Professional/Technical Services
R6876-0504\1859634v2.doc
Exhibit A
Consultant's Statement of Qualifications, including Schedule of Hourly Rates
R6876-0504\1859634v2.doc
I
LIU) RECEIVED
City of Rancho Palos Verdes
II JUN 15 2015
IPUBLIC WORKS DEPARTMENT
CITY OF RANCHO PALOS VERDES
I PUBLIC WORKS DEPARTMENT
I STATEMENT OF QUALIFICATIONS
FOR
I ON-CALL LIST
I JUNE15, 2015
t _„..
-I, =�
C 44 4 ' ''' .
- A- ei...... . _ _.
,• ,-,-„;:,.._-- ,-' - 1*----. 4, ..- -,-----1"r*-47j1P!...411! .._ ,,iii 4--,._ I _
-
.....,, ,..,.. `.144,11;11 71 ' ' '-- ---161:4:441-#4::
. fi=r
1 '.!? km;I -, , ,,
- -
N-..,t,,. . `V ''',A. .
;
I iiiii! --iis•",., ,-0,*_...
t • 'rill:-
,_
o.:-----1' - ' kis.* 4---
-—4:,-, --:-'4--::,,,, _-, :-'-...„_
...--..................
‘ _
w,.s,„ ----i.,-. .
, - ../.7 A 'i..-• . • :`-_,,,,...
..
-410.3''
limpsirt-'74 _ ,'_,.: ,: ::.,._ r:, I,_ 4 _.., i. _ ;
I
I
I
I SA
DELIVERING VALUE...COMMITTED TO EXCELLENCE
A ` 7✓ i
June 15, 2015
Mr. Ron Dragoo, Principal Engineer
City of Rancho Palos Verdes
Public Works Department
30940 Hawthorne Boulevard
Rancho Palos Verdes, CA 90275-5391
Attention: Pam Mitchell, Administrative Staff Assistant
Subject: Statement of Qualifications for On-Call Services
Dear Mr. Dragoo:
In accordance with your Request for Qualifications, we are pleased to submit our qualifications to provide On-Call
Engineering Services for Public Works Department.
SA Associates was established in May, 1989, and is a principal-owned engineering firm with services specializing
in planning, design, program management, construction management, and inspection. We provide complete civil
engineering services for municipalities, public and private water agencies, sanitary districts, and flood control
districts. We are committed to engineering excellence and principal involvement. The size of our firm allows us to
provide personalized service to our clients.
SA Associates is classified as a Disadvantaged Business Enterprise (DBE) by Caltrans and other agencies. We
are also classified as a Minority Business Enterprise (MBE) and Small Business Enterprise (SBE) by local, state,
and federal agencies.
SA Associates has extensive experience in design and construction of water, sewer, storm drain, and street
facilities. We have been responsible for the design and construction of over 33 miles of streets for a construction
cost of approximately $81 million, over 162 miles of sewer and storm drain lines for a construction cost of
approximately$40 million, and over$110 million of construction management and inspection projects.
1 We provided construction inspection services on an as-needed basis to the City of Rancho Palos Verdes from
1997 to 2003 and from November of 2013 to May of 2014. We also provided construction management and
construction inspection services for the City's FY 2001-02 Residential Street Overlay and Slurry Seal Project.
During that time, we have developed a good working relationship with the City and inspected a variety of projects.
In addition, we prepared the Infrastructure Report Card in 2014. We are, therefore, very familiar with the policies,
procedures, and personnel of the City.
1 We would like to be considered for Design, Construction Management, and Inspection opportunities.
We thank you for the opportunity and hope our proposal meets your interest and approval. Should you have any
questions or require any further information, please do not hesitate to contact the undersigned.
Very truly yours,
gr.tpri4A,\/N., e3r. kt-7W--Vrg
Shahnawaz Ahmad, P.E.
President
sahmad@saassociates.net
enclosures:
1130 W. Huntington Drive, Unit 12,Arcadia, CA 91007 • TEL 626.821.3456 • FAX 626.445.1461 • www.saassociates.net
I
All
Statement of Qualifications for On-Call Services SA
I
TABLE OF CONTENTS
ITRANSMITTAL LETTER
ISECTION I: COMPANY BACKGROUND
SECTION II: RELATED EXPERIENCE
I
• ON-CALL SERVICES
• STREET AND PARK PROJECTS
• SEWERS
• DRAINAGE
• CONSTRUCTION MANAGEMENT AND INSPECTION
SECTION III: PROJECT TEAM AND RESUMES
I
SECTION IV: HOURLY CHARGE RATE AND EXPENSE REIMBURSEMENT SCHEDULE
I
I
I
I
I
I
I
I
I
I
I
I
TABLE OF CONTENTS Page 1 of 1
SA
AI
Statement of Qualifications for On-Call Services
SECTION I: COMPANY BACKGROUND
INTRODUCTION TO SA ASSOCIATES
SA Associates was established in May, 1989 as a principal-owned SA Associates is
engineering firm with offices in Los Angeles and Orange Counties. SA classified as DBE, MBE
Associates is a California Corporation and "SA Associates" is our full legal and SBE by local, state
name. SA Associates services cover a broad spectrum of engineering from and federal agencies
investigation and feasibility reports to design, construction administration, and
construction observation. The firm provides complete civil engineering services for municipalities,
public and private water agencies, sanitary districts, and flood control districts. SA Associates is
classified as a Minority Owned Business Enterprise (MBE), Disadvantaged Business Enterprise (DBE),
and Small Business Enterprise (SBE) by local, state, and federal agencies.
Our main fields of specialty are:
• Construction Management and Construction Inspection Services
• Civil Engineering
• Water Supply Projects
• Wastewater Facilities Projects
• Feasibility Studies
• Survey Services
• Flood Control and Drainage Projects
Mr. Shahnawaz Ahmad is the primary contact and the authorized signatory on behalf of the firm.
Please contact Mr. Ahmad at sahmad@saassociates.net.
Our office locations are as follows:
CORPORATE OFFICE ORANGE COUNTY OFFICE
1130 West Huntington Drive, Unit 12 1661 N. Raymond Ave, Suite 100
Arcadia, CA 91007 Anaheim, CA 92801
Tel: 626.821.3456 Tel: 714.871.9083
Fax: 626.445.1461 Fax: 714.871.3652
BACKGROUND EXPERIENCE
SA Associates has been providing services in the Southern California area since 1989. Our experience
was gained through providing these services to several cities and agencies in the greater Los Angeles
area throughout the past 31 years. All of SA Associates completed (or currently ongoing) projects are
for public agencies. Our team of engineers and professionals are aware of the requirements of most
public agencies and are familiar with public procedures.
We are proud to say we continue to provide services for repeat Clients. This indicates we are providing
quality services on time and within budget.
The following is a list of selected clients SA Associates has worked with:
SECTION I: COMPANY BACKGROUND Page 1 of 3
AI
ItaL46,
Statement of Qualifications for On-Call Services SA
I
I
Partial Client List- SA Associates
City of Alhambra City of Duarte City of Moreno Valley City of Torrance
City of Anaheim City of Diamond Bar City of Murrieta City of Tustin
City of Arcadia City of Glendale City of Norwalk City of Whittier
City of Azusa City of Glendora City of Pasadena City of Yucaipa
City of Baldwin Park City of Hawaiian Gardens City of Pico Rivera CA Dept. of Corrections
City of Bellflower City of Hermosa Beach City of Pomona Crescenta Valley WD
City of Beverly Hills City of Huntington Park City of Rancho Palos Verdes East Pasadena Water Co.
City of Burbank City of Inglewood City of Rialto Elsinore Valley MWD
City of Carson City of Irvine City of Riverside Irvine Ranch Water District
City of Cerritos City of Irwindale City of San Bernardino Kinneloa Irrigation District
City of Chino City of La Habra City of San Dimas L.A. County Parks & Rec.
City of Chino Hills City of La Palma City of San Fernando L.A. County Public Works
City of Colton City of La Verne City of Santa Monica Long Beach Water Dept.
City of Commerce City of Loma Linda City of Sierra Madre L.A. County Comm. Dev.
City of Compton City of Lomita City of Simi Valley Mesa Water District
City of Covina City of Lynwood City of South Gate San Diego Co. Water Auth
City of Culver City City of Manhattan Beach City of South Pasadena West Basin MWD
City of Cypress City of Mission Viejo City of Thousand Oaks Veolia Water Services
QA/QC PROGRAM
It is the goal of SA Associates to present clients with a superior design product and responsive service.
We are aware we can only continue to grow and remain a viable influence in the consulting engineering
profession if we produce an excellent product. That's why we have established "excellence in
engineering" as our credo.
To achieve that, a sound company policy that emphasizes technical strength, professional conduct,
efficiency and communication is applied to each project. This policy is the bases of our Quality
Assurance/ Quality Control Program
To ensure quality, a uniform review and checking procedure for all completed projects is adopted. This
procedure ensures all work is reviewed and checked prior to submitting it to the client. Each member of
our team makes it his/her responsibility to perform the services the best way possible, and to ensure
that what is stated in writing or shown on drawings is correct, cost effective, and in conformance with
SA Associates' standards.
Since the date it was established, SA Associates has had an enviable record of doing its job well and is
determined to maintain that record through the continuous Quality Assurance / Quality Control
Procedures
COST CONTROL
SA Associates' staff performs at a level of proficiency that minimizes redundant or unnecessary activity.
Meeting deadlines and attention to detail are primary objectives. Cost control is exercised with the
same importance dedicated to technical problem solving.
Staff engineers apply value analysis/investigation techniques in a systematic approach to obtain
optimal value for any marginal cost increase. The result of this approach is to lower total and life cycle
costs without sacrificing quality, performance, or reliability.
SECTION I: COMPANY BACKGROUND Page 2 of 3
I
All
Statement of Qualifications for On-Call Services SA
Project costs are reviewed on weekly basis by the Project Manager. These costs are reviewed against
the budget and schedule. The effort required to complete the project is estimated. In this way, if the
I
budget is close to being exceeded, steps can be taken to remedy the situation.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
SECTION 1: COMPANY BACKGROUND Page 3 of 3
sA
41111
Statement of Qualifications for On-Call Services
SECTION II: RELATED EXPERIENCE
RELATED EXPERIENCE: ON-CALL PROJECTS
SA Associates has provided on-call services for the following Clients: City of Anaheim, City of Azusa, Crescenta
Valley Water District, City of Irvine, Kinneloa Irrigation District, City of La Palma, Long Beach Water Department,
Mesa Water District, County of Los Angeles, City of Moreno Valley, City of Murrieta, City of Norwalk, City of
Rancho Palos Verdes, City of Riverside, City of San Bernardino, City of Torrance, and City of Yucaipa.
CITY OF ANAHEIM
Provided professional on-call services for a three-year period and are currently under contract for a 4th three-year period.
The projects to be assigned include water pipeline design to support the Public Utilities Department's Engineering Division
Capital Improvement Program.
CITY OF AZUSA
Currently providing miscellaneous inspection for various housing developments and electrical inspection for the new
Goldline Alameda Parking Structure.
CRESCENTA VALLEY WATER DISTRICT
Provided As-Needed On-Call Consulting Services. The first project is preparation of a Recycled Water Feasibility Study for
Two-Strike Park.
CITY OF GLENDALE
Currently providing Inspection Services for on-call electrical projects in the City including Glendale Ave. Wastewater
Capacity & Street Improvement, Canada Blvd. Infrastructure Improvements & Honolulu Blvd. Rehabilitation, Arden Ave.
Rehabilitation, San Fernando Rd. Lighting Project, Wilson Streetlight & Traffic Signal upgrades, Doran/Central
Development, Upcoming projects will be Colorado Blvd. Parking Lot 10, and Verdugo Rd./Honolulu Ave. Intersection.
CITY OF IRVINE
SA Associates was contracted by the city of Irvine, to provide professional on-call engineering services for:
- Pavement Rehabilitation, Project Management, Construction Management and Inspection Services for a three year
period (2010—2013)
- Civil Engineering Design and Design Plan Check/Street Improvement Plan Check Services for one year period (2013)
We were also under contract to provide On-Call Construction Management and Inspection Services for from 2007-2010
CITY OF MANHATTAN BEACH
SA Associates was selected to provide On-Call Utility Design Services for water. sewer. and storm drain projects for
a two year term through May 4, 2017.
CITY OF NORWALK
SA Associates was selected to provide On-Call Construction Management and Inspection Services for a 6-year term
through June 30, 2021.
CITY OF MORENO VALLEY
SA Associates was contracted by the city of Moreno Valley to provide Professional Consultant Services in the following
categories:
- Civil Engineering Design
- Construction Management and Peer Review Services
- Contract Administrative Professional Services
- Project Management Services
These contracts were for a term of one year.
YEAR COMPLETED: 2013
CONSTRUCTION COST: Various
PROJECT MGR.: Deepak Solanki
SECTION II: RELATED EXPERIENCE Page 1 of 12
1
Statement of Qualifications for On-Call Services SA
I
Project Management services to the city of Moreno Valley for the Capital Projects Division
Provided Project Management services to the city of Moreno Valley for the Capital Projects Division. One engineer is
assigned full time to City Hall to serve as an extension of City Staff to assist in a variety of street projects. Current projects
include the following:
- Infill Project - Main Library
- Frederick Median - Fire Station No. 58
- Civic Center Site - Emergency Operations Center
- Iris Avenue Sidewalk - Fire Station Exhaust System
-Sheila Street Improvements - PSB Expansion
-Aqueduct Bikeway - Neighborhood Park
-Street Improvement Program - Fire Station No. 110 Request for Proposal
-5 Year Capital Improvement Report - Misc. Fire Station Requests for Proposal
CITY OF POMONA
SA Associates is currently contracted by the city of Pomona to provide professional on-call engineering services for the
following categories:
- Civil Engineering Design
- Project Management
- Construction Inspection
These contracts are for a term of three years through October 31, 2017
CITY OF RANCHO PALOS VERDES
YEAR COMPLETED: 2014
CONSTRUCTION COST: Various
PROJECT MGR.: Shahnawaz Ahmad
ENGINEER: Phillip West
INSPECTOR Rocky Hale
As Needed Construction Inspection Services. Provided public works inspection including sewers, storm drains, curb
and gutter,sidewalks, and utilities.
CITY OF SAN BERNARDINO
SA Associates is currently contracted by the city of San Bernardino, to provide On-Call Construction Management and
Inspection Services for Public Works Projects for one year June 2012 to June 2013 and was extended for one year to June
30, 2014 and extended again until June 30, 2015 with a provision that two additional years may be authorized.
CITY OF YUCAIPA
111
SA Associates is currently contracted by the city of Yucaipa, to provide On-Call Project Coordination and
Inspection Services for Various Public Works Projects for Fiscal Years 2012/2013 and 2013/2014
RELEVANT EXPERIENCE: STREET AND PARK PROJECTS II
CITY OF MANHATTAN BEACH
YEAR COMPLETED: 2005
CONSTRUCTION COST: $400,000
PROJECT MGR.: Shahnawaz Ahmad
Civic Center/Metlox Street Improvement Project
Prepared plans and specifications for the. This project consisted of street improvements design along several streets within
the City of Manhattan Beach. The work included pavement grinding, overlay, and capping; new stairway and catch basin;
and street widening.
CITY OF AZUSA
YEAR COMPLETED: 2014
CONSTRUCTION COST: $400,000
PROJECT MGR.: Shahnawaz Ahmad
ENGINEER.: Phillip West
Gladstone Elementary Safe Routes to School Project
Prepared preliminary plans for the Gladstone Elementary Safe Routes to School Project. The project involved base plans
showing cut-sheets, elevations, cross sections, etc.from which the City would plan the remainder of the project.
SECTION II: RELATED EXPERIENCE Page 2 of 12
Statement of Qualifications for On-Call Services SA
CITY OF BALDWIN PARK
YEAR COMPLETED: Various
CONSTRUCTION COST: Various
PROJECT MANAGER: Shahnawaz Ahmad
ENGINEERS: Randy Seto, Deepak Solanki, Sam Nabbout, Phillip West
Improvement of Olive Street
Preparation of plans and specifications for improvement of Olive Street from west of Merced Avenue to Maine Avenue for
approximately 4,000 feet. The project entailed grinding 2 inches A.C. for the entire width of the street and overlaying with 3
inches A.C. The work also included traffic striping, repair of curb and gutter, modification of driveways, and providing
handicapped ramps.
Rehabilitation of Athol Street, Monterey Avenue, and Cavette Place
Project involved the preparation of plans and specifications for street n. Plan and profile drawings were prepared for three
streets, Athol Street, Monterey Avenue, and Cavette Place for a total of approximately 3,100 feet. The work consisted of
removal and disposal of existing asphalt concrete pavement and replacing it with a new 3" A.C. pavement over existing
aggregate base.
Rehabilitation of Several Streets
Preparation of plans and specifications for rehabilitation of approximately 12,900 feet of streets. Plan of profile drawings
were prepared for twelve streets. The work consisted of removal and disposal of existing asphalt cement pavement and
replacing with a new 2" A.C. pavement with fabric over existing aggregate base, or 4" A.C. pavement over existing
aggregate base.
Rehabilitation of Athol Street, Fairgrove Street, and Nubia Street
A fifth project included three streets, Athol Street, Fairgrove Street, and Nubia Street, with an approximate length of 6,000
feet. The work included replacing existing A.C. pavement with 4" of new asphalt concrete pavement and new 4" crushed
aggregate base. The work also included traffic striping, repair of curb and gutter, modification of driveways, and providing
handicapped ramps
Reconstruction of approximately 4,000 feet of Streets on Fairgrove Street, Mangum Street, and La Rica Avenue
Preparation of plans and specifications for reconstruction of approximately 4,000 feet of streets on Fairgrove Street.
Mangum Street, and La Rica Avenue. The work involves reconstruction of 3" asphalt over a 4" aggregate base. The plans
will locate necessary repairs/alterations to the existing PCC improvements in the sidewalk, curbs and/or gutters, cross
gutters, and driveways. The work also included traffic striping, modifications of driveways, and providing handicapped
ramps.
Evaluation of Arterial and Collector Streets for the City's Pavement Management System(PMS).
Evaluation of arterial and collector streets for the City's Pavement Management System (PMS). The information was input
into the City's existing PMS database in Microsoft Access. The work included driving City streets and determining the
condition of various street segments. A Pavement Distress Data Form was completed for each segment. Damaged and/or
missing sidewalk and curb and gutter were also included.
CITY OF HAWAIIAN GARDENS
YEAR COMPLETED: 2007
CONSTRUCTION COST: $150,000
PROJECT MGR.: Shahnawaz Ahmad
ENGINEERS.: Sam Nabbout, Phillip West, Deepak Solanki
Safe Rto ol - edde MdomProj
Preparedoute plansSchoand speciFficationsidandleSchprovidedolImproveconstructionent management and inspection
services for the City's Safe Route to School - Fedde Middle School Improvement Project. We
provided street improvement plans around Fedde Middle School and the intersections adjacent
and near the school.
I
SECTION II: RELATED EXPERIENCE Page 3 of 12
4111
L
Statement of Qualifications for On-Call Services SA
I
I
CITY OF LOMITA
YEAR COMPLETED: 2006
CONSTRUCTION COST: $50,000
PROJECT MGR.: Shahnawaz Ahmad
ENGINEERS.: Sam Nabbout, Phillip West, Deepak Solanki
_,-.,-,.:4,
City Alleyway Reconstruction Project1
Iltr _ Prepared plans and specifications for the City Alleyway Reconstruction Project. This project
consisted of providing engineering services for alleyway reconstruction, approximately 300 feet
long, and 15 feet wide. The work included Clearing and Grubbing; A.C. pavement , P.C.C.
- x gutters, and any alley improvement deemed necessary to provide a complete reconstructed and
resurfaced pavement,with adequate drainage.
CITY OF POMONAI
YEAR COMPLETED: 2006
CONSTRUCTION COST: $1,280,000
PROJECT MGR.: Shahnawaz Ahmad
ENGINEERS.: Sam Nabbout, Phillip West, Deepak Solanki
-- Rehabilitation of Reservoir Street from Mission Boulevard to County Road
Prepared plans and specifications for the rehabilitation of Reservoir Street from Mission
' i
L.,:-yt. 4. Boulevard to County Road; approximately 10,560 lineal feet, and Ellen Place from Reservoir
-T. - Street to Marquette Avenue; approximately 530 lineal feet. The work included pavement
- rehabilitation and pavement overlay; adjustment of utilities to grade; striping; repair and
construction of broken and missing sidewalks, curbs, gutters, pedestrian access ramps at
i: - street intersections and street lights.
YEAR COMPLETED: 2005
CONSTRUCTION COST: $300,000
PROJECT MGR.: Shahnawaz Ahmad
ENGINEERS.: Sam Nabbout, Deepak Solanki
Construction of missing and/or broken sidewalk and ADA ramps on Mountain View
74"11111L*--4,
Avenue
- - Pre aration of and s ecifications for the construction of and/or broken sidewalk
fP plansP missing
and ADA ramps on Mountain View Avenue from Phillips Boulevard to Grand Avenue;
approximately 1,320 lineal feet. The work also included a portion of Grand Avenue,
;-,-,,:,-::4,- approximately 200 feet, at the intersection of Grand Avenue and Mountain View Avenue
CITY OF SAN DIMAS
YEAR COMPLETED: 2011
CONSTRUCTION COST: $2,970,000
PROJECT MGR.: Shahnawaz Ahmad
ENGINEERS.: Deepak Solanki, Phillip West
Rif Igptir- - ,. ,ir.- I 4r--_-,7--: Rehabilitation of San Dimas Canyon Road
Prepared plans and specifications for approximately 3,000 feet for the Rehabilitation of San
-" Dimas Canyon Road from Foothill Boulevard to Romola Avenue for the city of San Dimas. The
y work includes removal and replacement of existing AC with 4" AC and 6" Class A Crushed
i Aggregate Base (CAB). All non-compliant handicapped ramps within the project limits to be
comply replaced to with ADA.
IP
I
SECTION II: RELATED EXPERIENCE Page 4 of 12
I
till
Statement of Qualifications for On-Call Services SA
YEAR COMPLETED: 2007
CONSTRUCTION COST: $900,000
I PROJECT MGR.: Shahnawaz Ahmad
ENGINEERS.: Deepak Solanki, Sam Nabbout, Phillip West
Foothill Boulevard Street Resurfacing and Pavement Restoration Project
w
Prepared plans and specifications for the Foothill Boulevard Street Resurfacing and Pavement
I I. ' 4„...„4, , .
>r ,
Restoration Project. This project consisted of resurfacing and pavement restoration of Foothill
Boulevard from Cataract Avenue to approximately 300 feet east of San Dimas Canyon Road in
;got,''''.4-.11;.'il� the city of San Dimas. The total length is approximately 5,800 lineal feet. The work included
9.
' ,A, pavement rehabilitation and pavement overlay; adjustment of utilities to grade; striping; repair
and construction of broken and missing sidewalks, curbs, gutters, pedestrian access ramps at
. street intersections; and replacement of survey monuments.
-
I CITY OF SOUTH PASADENA
YEAR COMPLETED: 2013
CONSTRUCTION COST: $200,000
I PROJECT MGR.: Phillip West
ENGINEERS.: Phillip West
South Pasadena Arroyo Park Playground
b• '4-. _* Provided engineering services for preparation of a Construction Specification Manual
-� ` ' 0...:,t,,-,..:14.. '` and Site Plan for the Arroyo Park Playground Improvements project. The project is
. 4 Y y9 P P j P j
located just north of the Pasadena Freeway and is bounded to the north by baseball
fields,•
to the south bysoccer/softball fi
e ds, to the west by the Pasadena Drainage
Channel, and to the east by a hillside. The project site consists of multiple large
°_ y maple trees while the rest of the park site is clear of trees for recreational activities.
Design elements to consider included sloping of the site, protection of utilities, and
prevention of flooding from runoff. The project consisted of removing the existing
playground equipment and installing new playground equipment and swing area,
I west of the existing location. Grading and drainage was evaluated. The work also
includes paving and restriping of the parking lot.
CITY OF LA PALMA
YEAR COMPLETED: Various
CONSTRUCTION COST: Various
PROJECT MGR.: Shahnawaz Ahmad
I Various City streets SA Associates was responsible for the preparation of the specifications for slurry sealing of various
City streets. The project also included removal and replacement of AC pavement&crack sealing.
Reconstruction of Moody Street SA Associates also provided support services during construction to the City for the
reconstruction of Moody Street from Sharon Drive to Orangethorpe Avenue and for Orangethorpe Avenue from Moody
I Street to the Coyote Creek Channel. This was a joint project with the city of Cerritos.
Rehabilitation of Thelma Avenue Support services during construction were also provided to the city of La Palma for the
rehabilitation of Thelma Avenue from Walker Street to Valley View Avenue. Coordination was maintained during this
project with the city of Buena Park.
I
RELEVANT EXPERIENCE: SEWERS
CITY OF BALDWIN PARK
YEAR COMPLETED: 2010
CONSTRUCTION COST: $600,000
I CONSTRUCTION MGR.: Shahnawaz Ahmad
City's Syracuse Storm Drain Project
Provided construction management and inspection services for the City's Syracuse Storm Drain Project. The project involved
federal funding and labor compliance. The project consisted of the installation of 2,250 linear feet of reinforced concrete pipe.
I manholes, catch basins, transition structures, and connector pipes, cross gutter, curb, gutter, sewer laterals. paving, and
striping. Responsible for attending the pre-construction meeting; reviewing contractor(s) submittals, responding to RFIs,
reviewing and preparing CCOs; supervising labor compliance and monitoring services; recommending progress invoice
I payments to the City; coordinating field inspection, material acceptance/testing, traffic control and lane closures; final job walk
and preparation of the punch list.
SECTION II: RELA TED EXPERIENCE Page 5 of 12
elStatement of Qualifications for On-Call Services SA
YEAR COMPLETED: 1992
CONSTRUCTION COST: $200,000
PROJECT MGR.: Shahnawaz Ahmad
800 feet of 8-inch Diameter Sewer
Design of approximately 800 feet of 8-inch diameter sewer from Merced Avenue along Ohio Street, Kenmore Avenue, and
private property to Walnut Street. This sewer to be financed through an assessment district to serve several residences.
CITY OF CYPRESS
YEAR COMPLETED: 2005
CONSTRUCTION COST: $300,000
PROJECT MGR.: Shahnawaz Ahmad
ENGINEER: Sam Nabbout
DESIGNER: Randy Seto
Modification of Sewer System at the Intersection of Lincoln Avenue and Moody Street
Prepared plans and specifications for Modification of Sewer System at the Intersection of Lincoln Avenue and Moody Street.
The work includes analysis of existing sewer system capacity, new sewer mains, and new manholes.
CITY OF HERMOSA BEACH
YEAR COMPLETED: 2003
CONSTRUCTION COST: $1,200,000
PROJECT MGR.: Shahnawaz Ahmad
ENGINEER: Deepak Solanki
Reconstruction/rehabilitation of a sewer on Pacific Coast Highway between 24th Street and Gould Avenue
The work included removal and replacement of the existing 8-inch concrete sewer. A portion of the sewer was rehabilitated
using Insituform. Plans and specifications were prepared.
YEAR COMPLETED: 2003
CONSTRUCTION COST: $570,000
PROJECT MGR.: Shahnawaz Ahmad
ENGINEER: Sam Nabbout
DESIGNER: Randy Seto
Sewer Reconstruction for the City's Loma Area Improvements Project
Preparation of plans and specifications for approximately 2,679 feet of sewer reconstruction for the City's Loma Area
Improvements Project.
CITY OF IRWINDALE
YEAR COMPLETED: 2010
CONSTRUCTION COST: $200,000
CONSTRUCTION MGR.: Shahnawaz Ahmad
Martin Road Sewer Lift Station Project
Provided construction management and inspection services for the Martin Road Sewer Lift Station Project for the City of
Irwindale.This project included the construction of a replacement sewer lift station to replace the existing deteriorated wet well
sewer pump station.
CITY OF LA HABRA
YEAR COMPLETED: 2004
CONSTRUCTION COST: $1,500,000
PROJECT MGR.: Shahnawaz Ahmad
ENGINEER: Sam Nabbout
DESIGNER: Randy Seto
Rehabilitation of Two Mobile Home Parks in the City of La Habra
Preparation of plans and specifications for the rehabilitation of two mobile home parks in the city of La Habra. The work
includes drainage, sewer, water, and pavement rehabilitation. Drainage work included evaluation of sump pump, curb and
gutter, system capacity, and determination of properties that are subject to flooding during rainy seasons. Sewer work
involves reviewing the sewer report and replacing sewer laterals, mainline, and cleanouts. The water work encompasses the
installation of 6,000 feet of 8-inch PVC pipe, 300 pressure reducing valves, and two 8-inch water master meters. Streets will
be cold milled and overlaid at both parks.
SECTION II: RELATED EXPERIENCE Page 6 of 12
I
Jill
Statement of Qualifications for On-Call Services SA
CITY OF LYNWOOD
YEAR COMPLETED: 2009
I CONSTRUCTION COST: $500,000
PROJECT MGR.: Shahnawaz Ahmad
ENGINEER: Phillip West
I Sewer Main Replacement Project in the Intersection of Imperial Highway and Long Beach Boulevard
Prepared plans and specifications for a sewer main replacement project in the intersection of Imperial Highway and Long
Beach Boulevard. The project includes the design of 8-VCP to replace an existing 8-inch sewer. Total length of replacement
for the project is approximately 400 feet. Construction Cost: $500,000
CITY OF NORWALK
YEAR COMPLETED: 2008
CONSTRUCTION COST: $150,000
I PROJECT MGR.: Shahnawaz Ahmad
ENGINEER: Phillip West
Replacement of the Pumps at the Curtis& King Sewer Lift-Station
I Preparation of plans for: the replacement of the pumps at the Curtis & King sewer lift-station. The project included both civil
and electrical aspects. The work consisted of removing and replacing two 18-yr-old pumps at the end of Curtis &King road.
y
•
'VI i 1
it ( .4., 1
t-p s
f 5044'.`.--'4' 1
i -_,--,,,-,,.:---''
I CITY OF POMONA
YEAR COMPLETED: 2011
CONSTRUCTION COST: $3,500,000
I PRINCIPAL-IN-CHARGE: Shahnawaz Ahmad
PROJECT MGR.: Peter A. Heye
INSPECTOR Eric Schoenen
Three(3)Contracts associated with the City's FY 2008-09 Water&Sewer CIP I Viek Provided construction management services for 3 contracts associated with the City s
FY 2008-09 Water & Sewer CIP. The projects included Phillips Ranch Water Service
Laterals, Potable and Recycled Water Fire Hydrants, and Flush Tank/Lampholes #. t'=4 _,
Replacement and New Manholes. y-
�t 'x 1•y - -,
1--''F-' - .........21..
ter- -.. Yt __j - 7
I
YEAR COMPLETED: 2012
CONSTRUCTION COST: $204,000
I PRINCIPAL-IN-CHARGE: Shahnawaz Ahmad
CONSTR.MGR./INSPECTOR Eric Schoenen
Sewer Replacement D Project No. 586-86018
Provided construction management and inspection services for Sewer Replacement D Project No. 586-86018. Project
I included replacement of 772 linear feet existing VCP with VCP(facility replacement), remove and replace 120 linear feet
existing VCP with VCP(point replacement). Project was comprised of three(3)sewer main replacements; 316 linear ft at 12
ft deep, 256 linear ft at 9.5 ft deep, and 200 LF at 7' deep. It also included nine(9)Sewer main spot repairs; six(6)at 10
linear ft, depth range between 8 ft to 12 ft and three(3)at 20 linear ft, depth 7.5ft, 10 ft and 7.8ft.
ISECTION ll: RELATED EXPERIENCE Page 7 of 12
All
L
Statement of Qualifications for On-Call Services
SA I
I
YEAR COMPLETED: 2002
CONSTRUCTION COST: $2,300,000
CONSTRUCTION MGR.: Shahnawaz Ahmad
INSPECTORS: Boytrese Osias
Sewage Pump Station No. 3
Construction Management and Inspection Services for replacement of Sewage Pump Station No. 3. The work included
construction of a below grade pump room and wet well, an above ground generator building, 2,000 feet of 10" gravity sewer
line, 400 feet of 21" gravity sewer line, relocation of 20" water main, replacement of approximately 50,000 square feet of
concrete street, and miscellaneous connections. Change orders were less than 4%.
CITY OF SOUTH PASADENA
YEAR COMPLETED: 2012
CONSTRUCTION COST: $620,000
PROJECT MGR.: Shahnawaz Ahmad
INSPECTOR: Eric Schoenen
Sewer Improvements on Arroyo Drive, Huntington Drive, Marengo Avenue, and Meridian Avenue.
SA Associates provided construction management and inspection services for the sewer improvements at four (4) locations
(total of 4,174 ft) as follows: Arroyo Drive from Arroyo Square to Sterling Place (8-inch VCP, 1,632 ft), Huntington Drive from
Wayne Avenue to Court Avenue (10-inch VCP, 440 ft), Marengo Avenue from Bank Street to Rollin Street (8-inch VCP, 131
ft), and Meridian Avenue from Rollin Street to Gillette Crescent South (8-inch VCP, 1,971 ft).
YEAR COMPLETED: 20001
CONSTRUCTION COST: $200,000
CONSTRUCTION MGR.: Shahnawaz Ahmad
INSPECTOR: Jim EpperlyI
Sewer Repairs on Huntington Drive, Diamond Avenue, and Glendon Way
SA Associates provided construction inspection of various sewer repairs on Huntington Drive, Diamond Avenue, and Glendon
Way. The work also included contract administration services and preparation of as-built drawings.
WEST BASIN MUNICIPAL WATER DISTRICT
YEAR COMPLETED: 2007
CONSTRUCTION COST: $66,000
PROJECT MGR.: Shahnawaz Ahmad
INSPECTOR: Chuck Sihler
Anza Avenue Recycled Water Lateral at Sepulveda Boulevard
Provided construction management and inspection services for the Anza Avenue ,'I -
Recycled Water Lateral at Sepulveda Boulevard. This project is located in the city -! • 71
of Torrance and construction involves installation of approximately 200 feet of 6-
inch diameter PVC recycled water pipeline on Anza Avenue at the Sepulveda - 111!6- - • it
Boulevard intersection. The work includes coordination meetings, daily inspection -_ A,
reports, coordination with the West Basin Municipal Water District (WBMWD) -.— --
and other involved parties, coordination of shop drawing review, progress �� I ,. - $1100
• ;tet
payment review, monitoring of schedule, change order review and processing, "✓ �
response to RFI's and RFC's, establishment of a punchlist, and start-up services.
YEAR COMPLETED: 1999
CONSTRUCTION COST: $4,114,000
PROJECT MGR.: Shahnawaz Ahmad
DESIGNER: Randy Seto
Design of Brine Line for the Carson Regional Recycling Water Plant
SA Associates prepared plans and specifications for the design of approximately 27,000 feet of 14-inch brine line for the
Carson Regional Recycling Water Plant. The work consists of the design of a brine disposal line extending from a new water
reclamation plant to the Joint Water Pollution Control Plant operated by the Los Angeles County Sanitation Districts in the city
of Carson.
I
SECTION II: RELATED EXPERIENCE Page 8 of 12
Statement of Qualifications for On-Call Services SA
YEAR COMPLETED: 1998
CONSTRUCTION COST: $309,000
PROJECT MGR.: Shahnawaz Ahmad
DESIGNER: Randy Seto
El Segundo Lateral Project
SA Associates prepared plans and specifications for the design of approximately 5,900 feet of PVC/reclaimed water pipelines
water mains for the El Segundo Lateral in the city of El Segundo
RELATED EXPERIENCE: DRAINAGE
CITY OF MANHATTAN BEACH
Civic Center-Metlox Street Improvement Project
Prepared plans and specifications for Civic Center-Metlox Street Improvement Project. This project included the construction
of a new catch basin, storm drain manhole, 18" RCP storm drain line, 12" diameter SDR 35 P.V.C. storm drain line, curb and
gutter, pavement overlay, curb ramp, v-gutter, sidewalk, and the relocation of signs, signal poles, and pull boxes.
CITY OF TORRANCE
Reconstruction of Alleys
Prepared plans and specifications for the reconstruction of approximately 20,000 feet of alleys. The work includes surveying,
drainage, V-gutters, and AC pavement.
CITY OF ARCADIA
Deficiency Study of the Sewer and Drainage System
Prepared a deficiency study of the sewer and drainage system (system length of 145 miles). The work included preparation
of alternative design solutions for each deficiency including concept plan, cost estimate, and written report. For the Sewer
Master Plan, a hydraulic model data base for 222,000 feet of trunk sewer lines was prepared.
CITY OF BALDWIN PARK
Francisquito Avenue Storm Drain Project
Prepared plans and specifications for storm drain project that included approximately 1/4 mile of mainline storm drain facilities
and appurtenances on Francisquito Avenue between the Southern Pacific Railroad right-of-way and the Big Dalton Wash.
and all necessary storm drain laterals that discharge into the mainline storm drain. This was a FAU-funded project.
CITY OF CALABASAS
Juan Bautista de Anza Park
Prepared plans and specifications for design of Juan Bautista de Anza Park in the city of Calabasas. The work included
topographic survey, grading and drainage plans, utility plan, paving plan, specifications, and construction cost estimates.
The park includes a nature/recreation center building, outdoor classroom, trail systems, group picnicking, play areas. a small
water feature, low level lighting, access for the disabled, and parking. The work was performed for a landscape architect.
JET PROPULSION LABORATORY
Jet Propulsion Laboratory
Prepared a concept study for the Jet Propulsion Laboratory to determine the flood protection measures needed to protect
Building 298 from potential damage caused by flooding and/or debris. Included in this study were the preliminary layout of
debris basin and its costs.
CITY OF LA HABRA
Rehabilitation of Two Mobile Home Parks
Prepared plans and specifications for the rehabilitation of two mobile home parks in the city of La Habra. The work includes
drainage, sewer, water, and pavement rehabilitation. Drainage work included evaluation of sump pump, curb and gutter,
system capacity, and determination of properties that are subject to flooding during rainy seasons. Sewer work involves
reviewing the sewer report and replacing sewer laterals, mainline, and cleanouts. The water work includes the installation of
6,000 feet of 8-inch PVC pipe, 300 pressure reducing valves, and two 8-inch water master meters. Streets are cold milled
and overlaid at both parks.
CITY OF LA PALMA
Construction of Drainage Devices for the city of La Palma
Prepared plans and specifications for the Construction of Drainage Devices for the city of La Palma. The project consists of
construction of drainage devices to intercept irrigation and reclaimed water and prevent ponding along Andrew Drive,
Houston Avenue, and La Palma Avenue. The work included PVC laterals from sewer mains to gutters, catch basins with
SECTION II: RELATED EXPERIENCE Page 9 of 12
1
IL
Statement of Qualifications for On-Call Services SA
1
1
metal •rates, and ca•s to •revent flow of storm water into the sewer distribution s stem durin• the rain season.
CITY OF Los ANGELES
Sunset Plaza Drive and Evanview Drive Storm Drain
Prepared plans and specifications for the Sunset Plaza Drive and Evanview Drive Storm Drain in the Hollywood Hills area of
Los Angeles. The storm drain alignment was selected after five alternatives were considered on costs, hydraulics, utility
conflicts, and environmental concerns. The project included the preparation of plans and specifications for approximately
2,000 feet of storm drain, varying in size from 24-inch to 42-inch diameter. This was a FAU-funded project.
COUNTY OF Los ANGELES
Flormount Drain
Prepared plans and specifications for the design of approximately 8,200 feet of the Flormount Drain for the County of Los
Angeles in the City of Downey. The storm drain varied in size from 69 inches in diameter to 15' X 5' box. The project
involved extensive utility relocation, public participation, and traffic control. The project was not constructed due to public
opposition.
North Hollywood/Sun Valley area—Flooding Problems Concept Report
Prepared a concept report for the County of Los Angeles. This report investigated the flooding problems in the North
Hollywood/Sun Valley area and recommended a phase construction of storm drain improvements.
Dexter County Park in the San Fernando area
Prepared plans and specifications for the County of Los Angeles Department of Parks and Recreation. It involved grading,
drainage, paving, specifications, and construction cost estimates for the Dexter County Park in the San Fernando area. The
park includes a recreation building, trail systems, group picnicking, play areas, access for the disabled, and parking. This
work was performed for a landscape architect
CITY OF MONTEREY PARK
Edgley Drive Improvement Project111
Prepared plans and specifications for the Edgley Drive Improvement Project. This work included the design of approximately
1,000 feet street improvements and approximately 600 feet of storm drain improvements.
CITY OF POMONA1
Price Street Storm Drain and Phillips Drive Sanitary Sewer
Prepared plans and specifications for the Price Street Storm Drain, Phillips Ranch Open Space Area Storm Drain, and
Phillips Drive Sanitary Sewer, a total of approximately 3,000 feet. The project was located in hillside areas.
111
CITY OF SAN DIMAS
Storm Drain on Juanita Avenue
Prepared plans and specifications for the design of approximately 2,900 feet of 24" through 51" diameter storm drain onIII
Juanita Avenue from east of Valley Center to the end of Juanita Avenue. A hydraulic study for all areas tributary to the
project was conducted. A MTD permit was also obtained from the Country of Los Angeles
RELATED EXPERIENCE: CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES
CITY OF AZUSA
YEAR COMPLETED: 20101
CONSTRUCTION COST: $964,000
CONSTRUCTION MGR.: Shahnawaz Ahmad
FEDERAL FUND MGR:: Fred Alamolhoda
INSPECTOR: Mordecai Nickerson
Citrus Avenue Reconstruction Project
Provided construction management and inspection services for the Citrus Avenue Reconstruction Project,from Alosta Avenue
north to the northerly city limits, approximately 2,500 feet. The work includes installation of new sidewalk, curb,gutter,ADA
111
ramps, restriping of the entire length to match the existing striping, reinstallation of traffic loops, adjustment of water valves
and manholes to final grade. The work also included labor compliance services. The project was funded by the
American Reinvestment and Recovery Act(ARRA). Project was completed on time,within budget, and to the City's
satisfaction.A successful audit was also completed with Caltrans.
CITY OF BALDWIN PARK
YEAR COMPLETED: 2011
CONSTRUCTION COST: $1,300,000
SECTION II: RELATED EXPERIENCE Page 10 of 12
sAStatement of Qualifications for On-Call Services
CONSTRUCTION MGR.: Shahnawaz Ahmad
INSPECTOR: Ernie Roldan
Proposition 1 B Citywide Street Improvement Project
Provided construction inspection services for the City's Proposition 1B Citywide Street Improvements Project— Phase II. The
work involved miscellaneous concrete repairs, pavement repairs, striping and the application of slurry and cape seal
throughout various City locations. Streets included Olive Street, Los Angeles Street. La Rica Avenue. Project was completed
on time, within budget, and to the City's satisfaction.
YEAR COMPLETED: 2010
CONSTRUCTION COST: $600,000
CONSTRUCTION MGR.: Shahnawaz Ahmad
ASST.CONSTR.MGR.: Fred Alamolhoda
FUNDING COORDINATOR: Fara Tavassoli
INSPECTOR: Charles"Chuck" Sihler, , Tomas Ramirez, Jr,
Syracuse Storm Drain Project
Provided construction management and inspection services for the City's Syracuse Storm Drain Project. The project involved
federal funding and labor compliance. The project consisted of the installation of 2,250 linear feet of 24" through 48" diameter
reinforced concrete pipe, manholes, catch basins, transition structures, and connector pipes, cross gutter, curb, gutter. sewer
laterals, paving, and striping. Responsible for attending the pre-construction meeting; reviewing contractor(s) submittals,
responding to RFIs, reviewing and preparing CCOs; supervising labor compliance and monitoring services; recommending
progress invoice payments to the City; coordinating field inspection, material acceptance/testing, traffic control and lane
closures; final job walk & preparation of the punch list. Project was completed on time, within budget, & to the City's
satisfaction.
CITY OF BELLFLOWER
YEAR COMPLETED: 2014
CONSTRUCTION COST: $380,000
CONSTRUCTION MGR.: Shahnawaz Ahmad
INSPECTOR: Rocky Hale
Palo Verde Avenue Pavement Rehabilitation Project
Provided construction management and inspection services for the City's Palo Verde Avenue Pavement Rehabilitation
Project. The work included installation of new sidewalk, curb,gutter, ADA ramps, restriping of the entire length to match the
existing striping, reinstallation of traffic loops, adjustment of water valves and manholes to final grade. The work also
included labor compliance services. The project was funded by the American Reinvestment and Recovery Act
(ARRA). Project was completed on time,within budget, and to the City's satisfaction. A successful audit was also completed
with Caltrans
CITY OF BURBANK
YEAR COMPLETED: 2006 to 2014
CONSTRUCTION COST: Various
PROJECT MANAGER: Shahnawaz Ahmad
INSPECTORS: Ken Salehpour, Mordecai Nickerson, Nick Herzog, Boytrese Osias. John Rosolanka
Safe Route to Schools — Federal Cycle 1 (Phases 1 & 2) Provided construction inspection services The work includes
work involves construction inspection services for the construction of new PCC sidewalk, replace existing asphalt pavement,
curb and gutter, driveway, and pedestrian ramps (bulb outs), traffic signal modifications (8 locations), traffic signing and
striping; and traffic control.
Alameda Avenue and Buena Vista Street intersection Improvement Project—2011 Provided construction inspection
services. The inspection work included ensuring compliance with ADA requirements, coordinating &scheduling sampling &
testing of construction materials, soil and AC compaction tests. The inspector also monitored contractor's safety program &
SWPPP compliance.
Olive Avenue and Alameda Avenue Intersection Improvements Project—2007 Provided construction inspection services.
The work included construction of traffic signals and pedestrian crossing ramps, decomposed granite AC pavement, cold
milling, and 2"ARHM paving. SA Associates also provided coordination with different utility agencies and provided public
relations with businesses to encourage community participation, responded to requests for information, and submitted daily
reports. In addition, the work included assisting with project management for technical issues. Construction cost: $1.3 million.
Magnolia Park and Parking Lot Improvement Project Phase 5—2006 Provided construction inspection services for the
repair and replacement of pavement and CMU wall fence. Project involved construction of parking spaces, repair and
replacement of pavement and CMU wall fence for the Magnolia Park Improvement Project Phase 5. The work involved
realignment of curb and gutter, sidewalk repair, parking spaces, and utility line adjustments. In addition to inspection services,
the work included coordination with utility services, responses to requests for information, daily reports, public relations, and
SECTION 11: RELATED EXPERIENCE Page 11 of 12
All
Statement of Qualifications for On-Call SeSA I
rvices
Y
assisting with project management for technical issues. Construction Cost: $600,000.
Buena Vista Street Improvement Project—2007 Provided construction inspection services involved construction of curb
and gutter; sidewalks, 2"cold milling, 2"ARHM paving, and other street structures. The work included inspection services,
coordination with utility agencies, responses to requests for information, daily reports, and assisting with project management
for all technical issues. Construction Cost: $1,500,000.
Various Street Improvements—2007 Construction Observation for Various Street Improvements, Sidewalk Repair Projects,
and Miscellaneous Permit Projects
Johnny Carson Park Restroom Restoration project—2007 Inspection of concrete placement for footings for the Johnny
Carson park Restroom Restoration project for the City's Park, Recreation, and Community Services Department
Pacific Park—2006 Construction inspection services, Geotechnical Investigations for construction of new light poles for
sports lighting at Pacific Park for City's Park, Recreation, &Community Services Department.
I
CITY OF GLENDALE
YEAR COMPLETED: Ongoing
CONSTRUCTION COST: $175,000
PROJECT MGR.: Shahnawaz Ahmad
ENGINEER: Phillip Wets
INSPECTOR Heustace Lewis
Miscellaneous Inspection Services
Currently providing Inspection Services for on-call projects in the City: Glendale Avenue Wastewater Capacity & Street
Improvement, Canada Blvd. Infrastructure Improvements & Honolulu Ave. Rehabilitation, San Fernando Road Lighting
Project, and Arden Avenue Rehabilitation. The work included inspection of traffic signals
CITY OF INGLEWOOD
YEAR COMPLETED: July, 2010
CONSTRUCTION COST: $3.2 million
CONSTRUCTION MGR.: David Mochizuki
FUNDING COORDINATOR:: Fred Alamolhoda
LEAD INSPECTOR: Vernon Nickerson
Rehabilitation of Manchester Boulevard 4,
Provided construction management services for the rehabilitation of approximately 2.9 miles on 1111 . 1!.,_
Manchester Boulevard between Ash Street and Van Ness Avenue.The section from Ash Street to " - ' `"' '=er,war e
Crenshaw Boulevard was federally funded through ARRA(American Recovery& Reinvestment '.
Act of 2009) and the section from Crenshaw Boulevard to Van Ness Avenue was Redevelopment
Agency funded. The project encompasses 1,080,000 square feet of 0"to 2"grinding and 28,000
tons of asphalt rubber hot mix(ARHM)for the overlay. The paving work was done in the night
time.The work also included labor compliance services. Project was completed within budget and
to the City's satisfaction. A successful audit was completed with Caltrans.
CITY OF LA PALMA
YEAR COMPLETED: 2008
CONSTRUCTION COST: $200,000
CONSTRUCTION MGR.: Shahnawaz Ahmad
Indigo Ave. Storm Drain . f:^�,
Prepared plans and specifications and assisting in evaluating material - � �' 14
options for the design of the Indigo Ave. storm drain. The project r '°x'
consists of runoff water calculations, a utilities investigation, a ,�; j "ir
topographic survey, and construction cost estimates. The work includes . ' n
the installation of approximately 375 feet of storm drain along Indigo r; l� �+.
Avenue from Andrew Drive to Shirley Drive. Also providing construction ;, "`-�
support services for this project.
Tables showing our Street, Sewer, and Construction Management & Inspection Services follow in this section.
I
I
SECTION II: RELATED EXPERIENCE Page 12 of 12
MI ars 1 M OM - 1 - 1 OM 1 r E OM r MI OM - s
SA STREET EXPERIENCE
Services Provided
No Length Constr.Cost Year Site Cost Constr. Constr. Constr.
Agency Project Name Street(s) Type Desi
(Feet) ($) Completed Study gn Eat. Mng. Eng. Inspec.
1 Ci of Pomona Intersection Reconfiguration at Monroe Street and Orange Monroe Street and Orange Grove - Intersection Reconfiguration at Monroe Street and Orange Grove
Grove Avenue Avenue Avenue. 116,000 On-Going X
2 City of Bellflower Palo Verde Avenue Pavement Rehabilitation Palo Verde Avenue that extends from 2,600 Rehabilitation/Fesurfacing 380,000 On-Going X X
Artesia Blvd.to the South City Limit
3 City of South Pasadena Arroyo Park Playground - - Preparation of site plan,paving,and restriping of the paring lot. 200,000 Ongoing X X
4 City of San Dimas Rehabilitation of San Dimas Canyon Road Sam Dimas Canyon 3,000 Replace of AC with CAB 2,970,000 2011 X X X
5 City of Baldwin Park Proposition 1B Citywide Street Improvement Project Phase II Various(Olive Street,Los Angeles - Miscellaneous Repairs 1,300,000 2011 X
Street&La Rica Avenue)
6 City of Azusa Citrus Avenue Reconstruction Roject Citrus Avenue 2,500 Installation of new sidewalk curb,gutter,ADA ramps,adjsutemnt of 964,000 2010 X X X
water valves&manholes
7 City of Burbank Alameda Avenue and Buena Vista Street Intersection - - Intersection Improvement 850,000 2010 X
Improvement Project
8 City of Inglewood Rehabilitation of Manchester Boulevard Manchester Boulevard 15,312 Rehabilitation 3,200,000 2010 X
9 City of Baldwin Park City's Syracuse Storm Drain Project - 2,250 Storm drains including streets 600,000 2010 X
10 Los Angeles County ippAtlantic Boulevard at 60 Freeway
Department of Public -AsConstruction hspection and Technical Sort - includes roads,bridges,traffic signals,flood control,sewer 8bvater Various 2009 X
Works Staffing Services 111th Street in the City of Hawthorne
11 City of Burbank Olive Avenue and Alameda Avenue Intersection Olive Avenue -
Improvements Projects Intersection Improvement 1,300,000 2007 X
Alameda Avenue
12 City of Lomita Storm Drain Improvement on 262nd 3reet and Eshelman - 300 Storm drains including streets 200,000 2007 X X
Avenue
13 City of Burbank JohnnyCarson Park Restroom Restoration Project - - Restoration-restrooms - 2007 X
14 City of Burbank Pacific Park - - Lighting - 2007 X
15 City of Baldwin Park Evaluation of Arterial and Collector Streets for the City's Park Arterial and Collector - Evaluation of Street Condition 2007
Pavement Management Sjstem(PMS)
16 City of Burbank Magnolia Park Improvement Project Phase 5 Magnolia Park - Park improvement 600,000 2007 X
17 City of Burbank Buena Vista Street Improvement Project Buena Vista Street - Street Improvement 1,500,000 2007 X
18 City of Burbank Construction Observation for Various Street Improvements Various Streets - Street Improvement - 2007 X
19 City of Murrieta PM&CM Services for the City's CIP for 2005-2007(O�+er 91 Various - Includes storm drains 50,000,000 2007 X X
Projects)
20 City of Lomita City Alleyway Reconstruction Roject Alleyway 300 Reconstruction 50,000 2006 X X X X X
Reservoir Street 10,560 Pavement Rehabilitation&overlay,adjustment of
21 City of Pomona Rehabilitation of Reservoir Street and Ellen Place utilities,striping,repair of sidewals,curbs,gutters&pedestrian acess 1,280,000 2006 X X
Ellen Place 530 ramps
Foothill Boulevard Street Resurfacing and Pavement Pavement resurfacing,rehabilitation and overiayadjustment of
22 City of San Dimas Restoration Project Foothill Boulevard 5,800 utilities,striping,repair of missing/brolen sudewalls,curbs,gutters, 900,000 2006 X X X
pedestrian ramps&replacement of surveymonuments
23 City of Pomona Rehabilitation of Franldin Avenue Franklin Avenue 1,200 Street Rehabilitation 430,000 2006 X X X
24 City of Hawaiin Gardens Fedde Mddle School Improvement Project(City's Safe Route Around Fedde Mddle School - Improvement 150,000 2006 X X
to School)
25 City of Pomona Rehabilitation of Gbbs Street Gibbs Street 1,950 Rehabilitation including drainage 400,000 2006 X X X
26 City of Murrieta Washington AuenueJ"B"Street Fistoric Downtown Washington Arenue"B"Street - Historic Improvement Project 4,000,000 2006 X
Improvement Roiect
27 City of Santa Monica FY 2005 Street Lighting Project Various Streets - Street&Park lighting 2,100,000 2006 X
28 City of Malibu City of Malibu aumirez Drive Project Pacific Coast Highway - Pavement Resurfacing 500,000 2005 X
29 City of San Dimas Rehabilitation of Bonita Avenue Bonita Avenue 1,200 Goetechnical hv.,survey,pavement rehabilitation,Ai overiay& 200,000 2005 X X X
striping
30 Ciry of Torrance Reconstruction of Various Alleys Various Alleys 20,000 Survey,Drainage,V gutters and AC Pavement 590,000 2005 X X X
31 City of Pomona Construction of missing and/or brolen sidewalk and ADA Mountain View Ave 1,320 Construction of missing and/or brolen sidewalks 300,000 2005
ramps on Mountain View Avenue Grand Avenue 200 X X X
32 City of Manhattan Beach Civic Center/Metlox Street Improvement Project Various Streets - Street Improvement 400,000 2005 X X X
33 City of La Habra Rehabilitation of Two Mobile Home Parks Rehabilitation including pavement,sewer,water and drainage 1,500,000 2004 X X X
City of Rancho Palos Includes roads,permits,ocean trails,sewer,storm drains,medians,
34 Verdes Construction hspection Services on As-Needed Basis Various Streets/Sites - fiber optics&sidewalk repairs
- 2003 X
35 City of Moreno Valley FY 2003/2004 Annual Pavement Resurfacing Program. Total of six(6)Streets 26,100 Resurfacing 600,000 2003 X
36 City of Hermosa Beach City of Loma Area Street Improvement Project Various Streets 8,960 Street Improvement 1,450,000 2003 X X
Page 1 of 2
Services Provided
No Agency Project Name Street(s) Length Type Constr.Cost Year Site Desi Cost Constr. Constr. Constr.
(Feet) ($) Completed Study Desi...
Est. Mng. Eng. Inspec.
City of Rancho Palos
37 Verdes FY 2001-02 Residential Street Overlay and Slurry Seal Project Various Streets — Overlay&Slurry sealing 200,000 2002 X X
38 City of Baldwin Park Rehabilitation of Twelve(12)Sreets Various Streets 12,900 Replacement of asphalt cement pavement with 2"C.with fabric — 2000 X X X
over aoareoate base or 4"A.C.pavement over=remits base
Fairgrove Street Reconstruction of 3"asphalt over 4"aggregate base,repairs to
39 City of Baldwin Park Rehabilitation of Three(3)Steels Mangum Street 4,000 sidewalks,curbs,gutter,cross gutter&driveways. Traffic striping, — 2000 X X X
La Rica Avenue modifications of driveways and handicapped ramps
40 City of San Dimas Rehabilitation of Various Streets in the City of San Dimas Various Streets 2,700 Asphalt pavement restoration&ovelay 200,000 2000 X X X
(within Cityd Maintenance Zone"D")
Los Angeles County Materials report for alternative methods of pavement rehabilitation.
41 Department of Riblic Accelerated Road Construction Program:Irwindale,Et Al. Five(5)Street Rehabilitation Projects 10,000 Asphalt rubber hot mixwas used 800,000 2000 X X X
Works
Los Angeles County Materials report for alternative methods of pavement rehabilitation.
42 Department of Riblic Accelerated Imad Construction Program:Avenue G.Et Al. Five(5)Street Rehabilitation Projects 26,400 Asphalt rubber hot mixwas used 800,000 2000 X X X
Works
Athol Street
43 City of Baldwin Park Rehabilitation of Athol Street,MontereyAvenue and Cavette MontereyAvenue 3,100 Replacement of asphalt concrete pavement with 3"A.C.over 1999 X X X
Place aggregate base
Cavette Place
Athol Street Replacement of AC.pavement with 4"of new asphalt concrete&new
44 City of Baldwin Park Rehabilitation of Athol Street,Fairgrove Street and Fairgrove Street 6,000 4"crushed aggregate base,traffic string,repair of curb 8gutter, 1999 X X X
Nubia Street driveways&provision of handicapped ramps
45 City of San Fernando Rehabilitation of Earthquake Damaged Streets Various locations — Rehabilitation 265,000 1998 X X
46 City of Sierra Madre Rehabilitation of Mchillinda Avenue Michillinda Avenue 1,850 Rehabilitation 82,500 1998 X X
47 City of Baldwin Park Improvement of Clive Street Olive Street 4,000 Grinding,Overlaying,Traffic Striping,repair of curb and gutter, 1997 X X X
modification of driveways&handicapped ramps
48 City of Duarte Survey of Buena Vista Street Buena Vista Street — Survey — 1996
Bess Avenue
49 City of Baldwin Park Rehabilitation of Bess Avenue,Frazier Street and Puente Frazier Street Replacement of asphalt concrete pavement with 5"C.over native 1994 X X X
Avenue material,handicapped ramps&striping
Puente Avenue
50 City of Diamond Bar Golden Springs Drive Median Island Project Golden Springs Drive — Storm drains including streets — 1994 CM&
PM
52 City of La Palma Rehabilitation of Thelma Avenue Thelma Avenue — Rehabilitation 1992 X X
52 City of Carson Improvement of Avalon Boulevard Avalon Boulevard — Improvement 200,000 1992 X X
53 City of La Palma Slurry Sealing of Various City Streets Various Streets — Slurry sealing 1991 X X
Moody Street
54 City of La Palma Reconstruction of IVbodyStreet and Orangethorpe Avenue -- — Reconstruction 1991 X X
Orangethorpe Aueue
55 County of Los Angeles Walnut Park Parking Lot No.2 — Rehabilitation 50,000 1991 X X X
172,432 Linear Feet $81,627,501
33 Miles
Page 2 of 2
- OM - - 11111 I OM - MI OM MI r - MI 111111 - - - NM
111111 MI NM 111111 IIIIIII MI MO IIIIII SIMI gm no me or we me NE mg imi uni
SA
SEWER EXPERIENCE
Length Size Constr.Cost Complet Services Provided
No. Agency Project (Feet) (Inches) Material ($) e(Year) Site Design Cost Constr.Constr.Constr.
Study Est. Man. Eng. Inspec.
1 City of South Pasadena Sewer Improvements on Arroyo Drive,Huntington Drive,Marengo Avenue and 4,200 4,6,8,10 VCP 620,000 2012 X X
Meridien Avenue _
2 City of Pomona Sewer Replacement D Project No.586-86-18 _ 800 8 VCP 204,000 2012 X X
3 City of Arcadia Baldwin Avenue Sewer Capacity Improvement Project 900 15 VCP 500,000 2012X
_
4 City of Irwindale Martin Road Sewer Lift Station ---- - ---- 900,000 2010 _ X X
5 City of Lynwood Sewer Main Replacement Project in the intersection of Imperial Highway and Long 400 8 VCP 500,000 2009 X X
Beach Boulevard
6 City of Norwalk Replacement of the Pumps at the Curtis&King Sewer Lift-Station ---- - ---- 150,000 2008
7 West Basin Municipal Water District Anza Avenue Recycled Water Lateral at Sepulveda Boulevard 200 6 PVC 66,000 2007
8 City of La Palma Sewer Master Plan for the City of La Palma ---- NA NA ---- 2005 X
9 City of Cypress Modification of Sewer System at the Intersection of Lincoln Avenue and Moody Street 300 8 VCP 300,000 2005 X X
10 City of La Habra Rehabilitation of Two Mobile Home Parks 300 6 VCP 1,500,000 2004 _ X X
11 City of Hermosa Beach Reconstruction/Rehabilitation of Sewer on Pacific Coast Highway between 24th Street 1,000 8 VCP 1,200,000 2003 X X
and Gould Avenue _
12 City of Hermosa Beach Sewer Reconstruction for the City's Loma Area Improvements Project 2,700 6,8,12 VCP 570,000 2003 _ X X
13 City of Pomona Sewage Pump Station No.3 Replacement 2,400 10,21 VCP 2,300,000 2002 _ X X
14 City of South Pasadena Sewer Repairs on Huntington Drive,Diamond Avenue,and Glendon Way 1,000 6,8 VCP 200,000 2000 X X X
15 City of South Pasadena Construction Engineering Services for Sewer System Improvement Phase I 1,500 6,8 VCP 300,000 1999 _ X
16 West Basin Municipal Water District Design of Brine Line for the Carson Regional Recycling Water Plant 27,000 14 DIP 4,114,000 1999 X X
17 West Basin Municipal Water District Design of PVC/Reclaimed Water Pipelines Water Mains for the El Segundo Lateral in 5,900 12 PVC 309,300 1998 X X
the City of El Segundo
18 City of Arcadia Deficiency Study of the Sewer and Drainage System and Preparation of Hydraulic ____ Various Various ---- 1998 X X X
Model Data Base for Trunk Sewer Lines
19 City of Compton 8-inch through 15-inch Diameter Sewer Mains 7,700 8,15 VCP 1,200,000 1992 X X
20 City of Baldwin Park 8-inch Diameter Sewer from Merced Avenue along Ohio Street,Kenmore Avenue, 800 8 VCP 200,000 1992 X X
and Private Property to Walnut Street
21 City of Compton Prioritized Sewer Improvement Program for the entire 150 miles of the City's sewer 792,000 Various Various 24,000,000 1991 X X X
system.
22 City of Cerritos Construction of 7,700 feet of 6-inch Diameter Reclaimed Water Pipelines in Three 7,700 6 PVC 350,000 1991 X X
Different Streets
TOTAL= 856,600 Feet $39,483,300
162 Miles
ill i I - M - = MI E N - i OM all MN a - M -
SA CONSTRUCTION MANAGEMENT AND INSPECTION EXPERIENCE
No. Agency Project Name Project Constr. Year Services Provided
Type Cost Compl. Constr. Constr. Constr.
($) Man. Inspec. Support
1 City of Glendale Street Inspection: Glendale Avenue and Canada Blvd. Streets N/A 2015 X
2 City of Rancho Palos Verdes Miscellaneous Utility Inspections and City Projects Various N/A 2014 X
3 Long Beach Water Department Sewer Cement Pipe Rehabilitation/Replacement Group 2 _ Sewer 333,000 2014 X X X
4 City of Pomona Sewer Pipeline Replacement-Citywide)Phase II) Sewer 266,000 2014 X X X
5 City of San Bernardino Pine Trails Tract Street,Sewer,SD N/A 2014 X
6 City of San Bernardino Cajon Storm Drain Installation Storm Drain 4,000,000 2014 X
7 City of San Bernardino Traffic Signal Installations _ Streets 3,000,000 2014 X X
8 City of San Bernardino _Mt.Vernon Bridge Shoring Project w-BNSF Streets 350,000 2014 _ X X
9 City of Burbank Safe Route to Schools Streets 350,000 2014 X
10 City of Bellflower Palo Verde Avenue Pavement Rehabilitation Streets 210,000_ 2014 X _ X X
11 City of South Pasadena South Pasadena Glendon Way&El Centro Street Rail Crossing Modification Project Sreets Rail Crossing 300,000 On-Going X X
12 City of South Pasadena Sewer Improvements on Arroyo Drive,Huntington Drive,Marengo Avenue,and Meridian Avenue Sewer 620,000 2012 X X
13 City of Arcadia Baldwin Avenue Sewer Improvements Sewer 500,000 2012 X
14 City of Santa Monica 3rd Court Water Main Replacement Project Water Main 900,000 2012 X X
15 City of Azusa W-265 Water Main Replacement Project Water Main 1,430,000 2012 X X
16 City of Pomona Service Lateral and Sewer Replacement Projects Water&Sewer 590,000 2012 X X X
17 City of Baldwin Park Proposition 1B Citywide Street Improvement Project Streets 1,300,000 2011 X X
18 City of Azusa Light&Water Department .W-266A Water Main Replacement Project Water Main 1,200,000 2011 X X
19 City of Pomona Three(3)Contracts associated with the City's FY 2008-09 Water&Sewer CIP Water&Sewer 3,500,000 2011 X X X
20 City of Burbank Alameda Avenue and Buena Vista Street intersection Improvement Project Streets 850,000 2011 X
21 City of Azusa Citrus Avenue Reconstruction Project Streets 964,000 2010 X X X
22 City of Inglewood Rehabilitation of Manchester Boulevard Streets 3,200,000 2010 X X _ X
23 City of Baldwin Park City's Syracuse Storm Drain Project Storm Drain 600,000 2010 X X X
24 City of Irwindale Martin Road Sewer Lift Station Project Sewer 200,000 2010 X X X
25 County of Los Angeles As-needed Construction Inspection and Technical Support Staffing Services All Utilities Various 2009 X
26 City of Azusa ,WVF-243 Water Main Replacement Project in San Gabriel Canyon Boulevard and Daybreak Drive Water Main 1,600,000 2009 X X
27 City of La Palma Indigo Ave.Storm Drain Storm Drain 200,000 2008 X
28 City of Azusa Light&Water Department WVF-243 Water Main Replacement Project Water Main 1,600,000 2008 X X
29 City of Burbank Olive Avenue and Alameda Avenue Intersection Improvements Project Streets 1,300,000 2007 X
30 City of Burbank Magnolia Park Improvement Project Phase 5 Parks 600,000 2006 X
31 City of Burbank Buena Vista Street Improvement Project Streets 1,500,000 2007 X
32 City of Burbank Various Street Improvements Streets Various 2007 X
33 City of Burbank Johnny Carson park Restroom Restoration project Parks 300,000 2007 X
34 City of Burbank Pacific Park Parks 300,000 2006 X
35 City of Murrieta Safe Route to Schools(SR2S)Sidewalk Improv.(PM&CM Services for CIP for 2005-2007) Streets 2007 X
36 City of Murrieta MVUSD Rd.Improvements(PM&CM Services for CIP for 2005-2007) Streets 2007 X
37 City of Murrieta Fig St Improvements(PM&CM Services for CIP for 2005-2007) Streets 2007 X
38 City of Murrieta Scott Rd.Improvements(PM&CM Services for CIP for 2005-2007) Streets 2007 X
39 City of Murrieta Washington Ave.Improvements(PM&CM Services for CIP for 2005-2007) Streets 2007 X X
Page 1 of 2
No. Agency Project Name Project Constr. Year Services Provided
Type Cost Compl. Constr. Constr. Constr.
($) Man. Inspec. Support
40 City of Murrieta Old Town Streets Overlay(PM&CM Services for CIP for 2005-2007) Streets 50,000,000 2007 X
41 City of Munieta Western Historic Murrieta Storm Drain System(PM&CM Services for CIP for 2005-2007) Streets 2007 X
42 City of Murrieta Adams Ave.Improvements(PM&CM Services for CIP for 2005-2007) Streets 2007 X
43 City of Murrieta Vineyard Pkwy.Widening(PM&CM Services for CIP for 2005-2007) Streets 2007 X
44 City of Murrieta Stepp Rd.Improvements(PM&CM Services for CIP for 2005-2007) Streets 2007 X
45 City of Murrieta _Whitewood Rd.Improvements(PM&CM Services for CIP for 2005-2007) Streets 2007 X
46 City of Lomita Storm Drain Improvements on 262nd Street and Eshelman Avenue Storm Drain 200,000 2007 X X X
47 Long Beach Water Department Two Alley Service Connection Conversion Projects Water Main 630,000 2007 X X X
48 West Basin Municipal Water District Anza Avenue Recycled Water Lateral at Sepulveda Boulevard in the City of Torrance Reycled Water 66,000 2007 X X X
49 City of Murrieta Washington Avenuef'B"Street Historic Downtown Improvement Project All Utilities 4,000,000 2006 X X X
-
50 City of Hawaiian Gardens Safe Route to Schools(SR2S)Fedde Middle School Improvement Project Streets 150,000 2006 X X X
51 City of Santa Monica City's Fiscal Year 2005 Street and Park Lighting Project Streets&Lighting 2,100,000 2006 X _
52 City of Alhambra Water Master Plan Main Line Replacement Project Water Main _ 1,240,000 2006 X X _
53 City of Anaheim Katella Avenue 12"Water Main Project Water Main 350,000 2006 X
54 Long Beach Water Department Osgood&DeForest Large Valve and Tie-Ins Project Water Main 680,500 2006 X X X
55 Long Beach Water Department Water Main Bridge Crossings Repair Project Water Main 2,300,000_ 2006 X
56 City of Pomona Districts 4,5,&6 Water Main Replacement Project Water Main 2,700,000 2006 X X X
57 City of Malibu Zumirez Drive Project Streets 500,000 2005 X
58 City of Alhambra Water Main Line and Valve Replacement Projects Water Main 530,000 2005 X X
-
59 City of Pomona Priority 1 Group 3 Projects(Districts 1,3,&6) Water Main 2,000,000 2005 X X X
60 City of Torrance 1-25 Water Main Replacement Project Water Main 2,000,000 2005 X X X
61 Long Beach Water Department Alamitos Reservoir Site Improvement Project Site Improvement 1,953,000 2004 X X X
62 City of Moreno Valley Resurfacing of Six(6)Streets-2003/2004 Annual Pavement Resurfacing Program Streets 600,000 2003 X
63 Long Beach Water Department Replacement of a Cast Iron Water Main along Long Beach Boulevard Water Main 600,000 2003 X X X
64 City of Pomona _Sewage Pump Station No.3 Sewer 2,300,000 , 2002 X X X
65 City of Riverside Arroyo Drive Water Main Projects Water Main 600,000 2002 X X X
66 City of Riverside Highgrove Water Main Project Water Main 900,000 2002 X X X
67 City of South Pasadena Sewer Repairs on Huntington Drive,Diamond Avenue,and Glendon Way Sewer 200,000 2000 X X
68 City of Torrance Project under Priority 2 of the Water Main Replacement Program Water Main 1,800,000 1995 X X X
69 City of South Pasadena Construction Engineering Services for Sewer System Improvement Phase I Sewer X
70 City of Diamond Bar Golden Springs Drive Median Island Project Streets Various 1994 X X
71 City of Rancho Palos Verdes Housing Development for the Sub-Region I project(As Needed Construction Inspection Services) All Public Works X
72 City of Rancho Palos Verdes Miscellaneous Encroachment Permits(As Needed Construction Inspection Services) Encroachment X
73 City of Rancho Palos Verdes Ocean Trails(As Needed Construction Inspection Services) All Public Works X
74 City of Rancho Palos Verdes Sea Breeze(a tract of 68 homes)-(As Needed Construction Inspection Services) Sewer&Storm Drain Various Various X
75 City of Rancho Palos Verdes Median Project(As Needed Construction Inspection Services) Streets X
76 City of Rancho Palos Verdes Fiber Optics Project(As Needed Construction Inspection Services) Streets X
77 City of Rancho Palos Verdes Sidewalk Repair Program(As Needed Construction Inspection Services) Streets X
78 City of La Palma City Yard Reservoir Reservoir X
Total Construction Cost $110,462,500
Page 2 of 2
M - - - - - - OM I OM I - - - 11■r E MO r -
All
Statement of Qualifications for On-Call Services SA
SECTION III: PROJECT TEAM
ORGANIZATION CHART
CITY OF
RANCHO PALOS VAS
Project/Construction Managers!
SHAHNAWAZ AHMAD,P.E.,QSD
ERIC SCHOENEN,P.E,QSD
FRED ALAMOLHODA,P.E.
Engineers ago CAD Designer
ERIC SCHOENEN,P.E.,QSD RANDY SETO
PHILLIP WEST,P.E.,QSD/QSP SCOTT WALZ
DEEPAK SOLANKI,E.I.T.
JORGE LOVO,P.E.,LEED GA Survey
MEL SUKOW,P.E. ROBERT MARTINEZ,P.E.,L.S.
ADAM ROESCH,E.I.T.,QSD/QSP
Federal Funding Labor Compliance
FRED ALAMOLHODA,P.E. K�V MEADOWS
Construction Inspectors Construction Inspectors
CIROS GANJI ROBERT PETERS
SHANNON LEONARD KEN SALEHPOUR
HEUSTACE LEWIS ERIC SCHOENEN,P.E.,QSD
KEN MANERA CHARLES"CHUCK"SIHLER
ART ORTEGA
Support Staff
Resumes for our Project Team are included in this section.
SECT/ON V/: PROJECT TEAM Page 1 of 1
I SA
ISHAHNAWAZ AHMAD, P.E., QSD
Project/Construction Manager
I OVERVIEW:
Mr. Ahmad serves as principal-in-charge and/or project manager for projects related to
water and sewer system master planning;water resources;water supply and treatment;
water reuse; wastewater collection, treatment, and disposal; storm drainage; design of
water and wastewater treatment plants, water pipelines, sewers, pumping stations,
wells, storage reservoirs, and water reclamation systems; studies of water and
wastewater treatment processes; and industrial waste problems.
EDUCATION: PROJECT EXPERIENCE
University of Karachi,Pakistan,B.E.,
Civil Engineering, 1969 CITY OF AZUSA
University of California, Berkeley,M.S., Provided construction management services for the Citrus Avenue Reconstruction
Sanitary Engineering, 1971 Project, from Alosta Avenue north to the northerly city limits, approximately 2,500
feet. The work included installation of new sidewalk, curb, gutter, ADA ramps,
REGISTRATION: restriping of the entire length to match the existing striping, reinstallation of traffic
Registered Civil Engineer,California
I No.23712 loops, adjustment of water valves and manholes to final grade. The project was
funded by the American Reinvestment and Recovery Act(ARRA).
MEMBER: CITY OF BALDWIN PARK
American Academy of Environmental
Engineers,Diplomate . Provided construction management services for the City's Syracuse Storm Drain
I American Public Works Association Project for the city of Baldwin Park. The project consists of installing 2,250 feet of
American Society of Civil Engineers 24" through 48" diameter reinforced concrete pipe. This project was federally
American Water Works Association funded.
California Water Environment
Association CITY OF BELLFLOWER
Southern California Water Utilities Provided construction management and inspection services for Palo Verde Avenue
Association Pavement Rehabilitation project. The project comprises the rehabilitation/resurfacing
Water Environment Federation of the segment of Palo Verde Avenue that extends from Artesia Blvd. to the South
I City Limit(approximately 2,600 ft). The project consisted of grinding and overlay of
the two segments, possible reconstruction of curb ramps, pavement striping,
replacement of vehicle detection loops, placement of bicycle detection loops, and
coordination with utilities and other concerned agencies/residents/businesses. The
I project was a federally funded STP-L project. The project was administered in
accordance with Caltrans Local Assistance Procedures Manual (LAPM), Local
Assistance Program Guidelines (LAPG) and Federal Highway Administration's
(FHWA)requirements.
I CITY OF BURBANK
. The Buena Vista Street Improvements Project, involved construction of curb and
gutter; sidewalks,2"cold milling, 2"ARHM paving, and other street structures. The
I work included inspection services, coordination with utility agencies, responses to
requests for information, daily reports, and assisting with project management for
all technical issues.
CITY OF INGLEWOOD
Provided construction management and inspection services for the Manchester
Boulevard Corridor Roadway Improvement project which runs from Ash Street to
Van Ness Avenue, approximately 2.9 miles. The section from Ash Street to
Crenshaw Boulevard was ARRA funded and the section from Crenshaw Boulevard
I to Van Ness Avenue was Redevelopment Agency funded. The project
encompassed 1,080,000 square feet of 0"to 2"grinding and 28,000 tons of asphalt
rubber hot mix(ARHM)for the overlay.
I CITY OF LA PALMA
. Providing construction support services for the Indigo Ave. storm drain project.The
project consists of runoff water calculations, a utilities investigation, a topographic
survey, and construction cost estimates. The work included the installation of
I approximately 375 feet of storm drain along Indigo Avenue from Andrew Drive to
Shirley Drive. Also prepared plans and specifications and assisted in evaluating
material options for the design of for this project.
I
111 Page 1 of 3
I
SA
SHAHNAWAZ AHMAD, P.E., QSD, Project/Construction Manager
CITY OF IRWINDALE
. Provided Construction Inspection Services for the Martin Road Sewer Lift Station Project. This project includes the
construction of a replacement sewer lift station to replace the existing deteriorated wet well sewer pump station.
I
CITY OF LA HABRA
. Prepared plans and specifications for the rehabilitation of two mobile home parks. The work included sewer, water,
pavement, and drainage rehabilitation. The water work involved the installation of 6,000 feet of 8-inch PVC pipe, 300
pressure reducing valves, and two 8-inch water master meters to increase fire protection capabilities. Sewer work involved
reviewing the sewer report and replacing sewer laterals, mainline, and cleanouts. Streets were cold milled and overlaid at
both parks.
CITY OF LOMITA
. Prepared plans and specifications for the City Alleyway Reconstruction Project. This project consisted of providing
engineering services for alleyway reconstruction, approximately 300 feet long, and 15 feet wide. The work included
Clearing and Grubbing; A.C. pavement , P.C.C. gutters, and any alley improvement deemed necessary to provide a
complete reconstructed and resurfaced pavement,with adequate drainage.
CITY OF LA PALMA
. Provided Project management services to the city of La Palma from 1989-92. The work included assisting the Public
Works Director/City Engineer as-needed for various assignments. This involved spending one to two days per week at
City Hall. We have also been contracted by the City to provide engineering services for current projects. Services
included the following:
-Assisting the City in obtaining funding for street -Preparation of specifications for slurry sealing of
projects streets
-Providing construction inspection services - Providing plan check services
-Working with Operations &Maintenance field - Preparation of specifications for demolition of houses
crew for engineering issues so as to construct affordable housing
-Providing construction inspection services - Preparation of Annual Water Quality Control Reports
-Providing management of construction projects - Preparation of Urban Water Management Plans
-Preparation of Annual Water Quality Control - Preparation of specifications for demolition of houses
Reports so as to construct affordable housing
- Demolition of Swager Well -Walker Well
-City Yard Pipeline - Updating of City Standards
- Design of Drainage Devices
CITY OF MURRIETA
. Provided Program Management and Construction Management Services to assist the City in the design and construction
of various projects. The City has over 91 projects in the CIP for 2005-07, at a cost of approximately $50 million. The
Program Manager is assigned full time to City Hall to serve as an extension of City Staff to assist in a variety of projects
including:
-Safe Route to Schools(SR2S)Sidewalk Improv. -Western Historic Murrieta Storm Drain System
-MVUSD Rd. Improvements -Adams Ave. Improvements
-Fig St. Improvements -Vineyard Pkwy.Widening
-Scott Rd. Improvements -Stepp Rd. Improvements
-Washington Ave. Improvements -Whitewood Rd. Improvements
-Old Town Streets Overlay -MHSR Widening-Warm Springs Ck.To Margarita
-Clinton Keith Road Rehabilitation
CITY OF POMONAI
. Prepared plans and specifications for design of Franklin Avenue rehabilitation project which is approximately 1,200 feet,
from Garey Avenue to Park Avenue.
. Prepared plans and specifications for the rehabilitation of Reservoir Street from Mission Boulevard to County Road;
approximately 10,560 lineal feet, and Ellen Place from Reservoir Street to Marquette Avenue; approximately 530 lineal
feet.The work included pavement rehabilitation and pavement overlay; adjustment of utilities to grade; striping; repair and
construction of broken and missing sidewalks, curbs, gutters, pedestrian access ramps at street intersections and street
lights.
. Prepared plans and specifications for the construction of missing and/or broken sidewalk and ADA ramps on Mountain
View Avenue from Phillips Boulevard to Grand Avenue; approximately 1,320 lineal feet. The work also included a portion
of Grand Avenue,approximately 200 feet,at the intersection of Grand Avenue and Mountain View Avenue.
Page2of3
I
SA
SHAHNAWAZ AHMAD, P.E.,QSD, Project/Construction Manager
. Provided construction management services for 3 contracts associated with the City's FY 2008-09 Water & Sewer CIP.
The projects include Phillips Ranch Water Service Laterals, Potable and Recycled Water Fire Hydrants, and Flush/
ILampholes Tanks Replacement and New Manholes.
. Provided Construction Management and Inspection Services for construction of five Priority 1 Pipeline Replacement
Projects. The length of the project was approximately 28,000 feet and involved three contractors. The work consisted of
I removal and disposal of existing A.C. pavement along the water main and sewer trench, and replacement with new 4"
A.C. pavement over existing aggregate base.
. Construction Management and Inspection Services for replacement of Sewage Pump Station No. 3. The work will
I commence soon and includes construction of a below grade pump room and wet well,an above ground generator building,
2,000 feet of 10" gravity sewer line, 400 feet of 21" gravity sewer line, relocation of 20" water main, replacement of
approximately 50,000 square feet of concrete street, and miscellaneous connections.
I CITY OF SAN DIMAS
. Prepared plans and specifications for approx. 3,000 feet for the Rehabilitation of San Dimas Canyon Road from Foothill
Boulevard to Romola Avenue for the city of San Dimas.The work includes removal and replacement of existing AC with 4"
AC and 6" Class A Crushed Aggregate Base (CAB). All non-compliant handicapped ramps within the project limits to be
Ireplaced to comply with ADA.
CITY OF SOUTH PASADENA
Provided engineering services for preparation of a Construction Specification Manual and Site Plan for the Arroyo Park
Playground Improvements project.Grading and drainage were evaluated. The site plan was prepared considering existing
above-ground topography and below-ground utilities (i.e. drainage, irrigation, telephone) and attempted to minimize cut
and fill(earthwork)activities. The work also includeds paving and restriping of the parking lot.
I CITY OF TORRANCE
. Provided Project Management Services to the city of Torrance from 1992-94. This involved spending one day per week at
City Hall to assist the City in managing several water projects and to serve as the contract Division Engineer for Water
I Resources in the City's Engineering Department. services included:
- Preparation of plans and specifications for specific -Attendance at City Council meetings if required
capital improvement projects
- Preparation of reports for City Council meetings -Attendance at Water Commission meetings
-Attendance at staff meetings - Attendance at pre-proposal and pre-construction
meetings
- Review of capital improvement project budgets -Providing plan check services
- Review of staffing needs - Review of traffic control plans for construction of
water projects
- Being available to respond to technical questions - Preparation of requests for proposals
- Working with Operations & Maintenance field - Providing construction management/inspection
crew for engineering issues services as needed
- Management of consultants for various projects - Negotiation of consultant fees
- Providing surveying services as needed - Providing in-office management and technical
II
I
I
I
I
Page 3 of 3
I SA
IFRED ALAMOLHODA, P.E.
Project/Construction Manager/Federal Fund Manager
IOVERVIEW:
Mr. Alamolhoda has over 24 years of experience working for small contract service and
full service cities, redevelopment agencies, state and private consultant firms. The
I experiences include managing street, highway, redevelopment, parks and recreation
projects, land development as well as operational services and programs; budget
preparation & monitoring; Extensive experience in dealing with Cities, Counties,
Caltrans, other State/Federal, Municipal Planning Organizations, Consultants,
I EDUCATION: Railroads, Utility Companies,Contractors, Developers and Public.
California State Polytechnic University,
Pomona,CA As Assistant Manager of the Engineering Section for the Community Development
B.E.,Civil Engineering, 1982 Commission of the Los Angeles County (CDC), Fred Alamolhoda was in charge of the
I M.S.,Civil Engineering,1990
REGISTRATION: design development and construction management for capital projects funded by the
Community Development Block Grant(CDBG)funds.
Registered Civil Engineer,California , The Engineering Section's portfolio of projects included CDBG funded Public Works
I License No.41685 Projects such as the installation of waterlines, storm drains, street improvements, traffic
MEMBERSHIP: signal installation within the redevelopment areas of unincorporated Los Angeles
American Public Works Association County Communities; affordable housing, special needs housing; parks, community and
American Society of Civil Engineers senior centers, childcare centers, and other community-based projects. As Assistant
I CVAG's Technical Advisory committee's Manager, Mr. Alamolhoda was also responsible for providing construction management
Attendee services for the Commission's numerous residential rehabilitation programs, community
Riverside County Transportation storefront revitalization programs, and capital improvements for Public Housing owned
Commission or operated by the Housing Authority. Mr. Alamolhoda's responsibility included
I San Gabriel Council of Governments supervision of the sections'labor compliance administration activities.
San Bernardino Associated
Governments
American Water Works Association PROJECT EXPERIENCE
I California Water Environment
Association
Southern California Water Utilities Preparation of Quality Assurance Program (QAP), DBE Compliance, Project
Programming, Environmental Approvals, Right-of Way Certifications, CTC
Association Allocations, Request for Authorizations for Environmental, Preliminary
Water Environment Federation Engineering/Design, Right-of-Way, Utility Relocations, Construction, Construction
I Management, Construction award Packages, Invoicing, Labor Compliance
Services, Closure Packages Caltrans and FHWA Reviews and Audits
. Provided the above mentioned and other Funding Assistance Services to SANBAG
I (since 2010), Cities of Chino, Montclair, Hemet, Claremont San Dimas, Diamond
Bar,Signal Hill, Riverside County Departments of Transportation and Public Health,
and other Cities and Public Agencies since 2005.
Involved in the following Active Transportation Program(ATP)Cycle I projects for the
Cities of Jurupa Valley, Pomona, San Jacinto, Riverside County department of Public
Health,and SANBAG:
Foothill Blvd./Sumner Ave., Indio—Safe Routes to School Program
. Jurupa Valley - Safe Routes to School Program, Perris - Safe Routes to School
Program, Pyrite Street Safe Routes to School Project
The Metro link Station Accessibility Improvement Project
. Troth Street Safe Rotes to School Project, Safe and Active San Jacinto — Safe
Routes to School.
Since the Highway Safety Improvement Program (HSIP) was introduced, Mr.
I Alamolhoda has been involved in securing funds, implementation and/or delivery of the
following projects for the Cities of Chino, Diamond Bar (DB), Downey, Montclair,
Pomona and Signal Hill (SH): Cherry Ave./20th St. (SH), Firestone Blvd. (2- projects in
Downey), Golden Springs Dr. (DB), Intersection of Central Ave. / San Bernardino St.
I (Montclair), Intersection of Chino Ave. / Ramona Ave. (Chino), Edison Ave. Traffic
Signal Modifications (Chino), Mission Blvd. (Pomona), Paramount Blvd. (2 - Projects in
Downey),and Pathfinder Rd.(DB)
Page 1 of 3
SA
FRED ALAMOLHODA, P.E., Project/Construction Manager, Federal Fund Manager
In recent years, Mr. Alamolhoda has been involved in the following Highway Bridge Program (HBP) funded projects:
Florence Avenue over Rio Hondo Channel Bridge Replacement project(Downey), Florence Avenue Bridge replacement at the
San Gabriel River Project(Downey), Stetson Ave. Bridge Replacement(Hemet), Central Ave. Bridge Replacement(Montclair),
and Bikeway Improvements on Foothill Blvd.at San Dimas Wash(San Dimas).
Mr. Alamolhoda has been providing various staff augmentation services from LAE's or the Cities/Agencies for the following
Cities and other Public Agencies since 2007: Diamond Bar, Hemet, Montclair, San Dimas,Signal Hill,as well as SANBAG.
CITY OF AZUSA: CITRUS AVENUE RECONSTRUCTION PROJECT
Federal Fund Manager for the Citrus Avenue Reconstruction Project, from Alosta Avenue north to the northerly city limits,
approximately 2,500 feet.The project is funded through the American Reinvestment and Recovery Act(ARRA).
CITY OF CULVER CITY: BALLONA CREEK BIKEWAY PROJECT
Federal Fund Manager for the Ballona Creek Bikeway project. The project was funded by the American Recovery and
Reinvestment Act(ARRA)and the Environmental Enhancement& Mitigation Programs Grant. The project complied with
federal requirements, Caltrans Local Assistance Procedures Manual (LAPM) and other Federal Highway Administration
(FHWA)guidelines.
CITY OF INGLEWOOD: MANCHESTER BOULEVARD CORRIDOR ROADWAY IMPROVEMENT PROJECT
Federal Fund Manager for the Manchester Boulevard Corridor Roadway Improvement project which runs from Ash Street
to Van Ness Avenue, approximately 2.9 miles. The section from Ash Street to Crenshaw Boulevard is funded through the
American Reinvestment and Recovery Act (ARRA) and the section from Crenshaw Boulevard to Van Ness Avenue is
Redevelopment Agency funded. The project encompasses 1,080,000 square feet of 0"to 2" grinding and 28,000 tons of111
asphalt rubber hot mix(ARHM)for the overlay.
CITY OF DIAMOND BAR: ZONE 3 AND ZONE 4 ARTERIAL STREET REHABILITATION PROJECT FOR FY 2008-2009
This is a Federally funded project under the American Recovery Reinvestment Act(ARRA). The work to be performed or111
executed under these plans and specifications consists of and includes AC/AB removal, reconstruction of asphalt
pavement; crack, chip, and slurry sealing; construction of access ramps, parkway drain, curb gutter replacement, concrete
sidewalk; and other incidental and appurtenant work necessary for the proper construction of the contemplated
improvement.The project is subject to Davis-Bacon requirements.
CITY OF BELLFLOWER
Provided construction management and inspection services for Palo Verde Avenue Pavement Rehabilitation project. The
project comprises the rehabilitation/resurfacing of the segment of Palo Verde Avenue that extends from Artesia Blvd.to the
South City Limit (approximately 2,600 ft). The project consists of grinding and overlay of the two segments, possible
reconstruction of curb ramps, pavement striping, replacement of vehicle detection loops, placement of bicycle detection
loops,and coordination with utilities and other concerned agencies/residents/businesses. The project is a federally funded
STP-L project. The project is being administered in accordance with Caltrans Local Assistance Procedures Manual 111
(LAPM), Local Assistance Program Guidelines(LAPG)and Federal Highway Administration's(FHWA)requirements.
CITY OF POMONA
. Provided Limited Construction Support Services for Intersection Reconfiguration at Monroe Street and Orange Grove
Avenue. The project included the closure of Monroe Street at Orange Grove Avenue for construction of a cul-de-sac and
related improvements. The primary construction management and construction inspection will be provided by the City.
The project is funded with Federal Highway Safety Improvement Program (HSIP) Fund, and shall comply with the federal
requirements outlined in Caltrans Local Assistance Procedures Manual (LAPM). Our services included review the federal
requirements, specifications, and the City's Quality Assurance Program (QAP), prepare contract award package for the
City Project Manager's review, signature, and submission to Caltrans, Organize and file project documents in accordance
with the LAPM filing guidelines, review City inspector's daily inspection reports and Weekly Statement of Working Days,
Labor Compliance Administration, attend project progress meetings, review progress payment and Contract Change Order
(CCO)requests,evaluate the CCOs for federal eligibility, prepare progress invoice for reimbursement of federal funds from
Caltrans/FHWA,attend final project walk, prepare the final invoice and completion package for submission to Caltrans,and
attend audit review meetings with Caltrans/FHWA and the City staff.
. CITY OF SAN DIMAS: RECONSTRUCTION, REHABILITATION,&LANDSCAPE MEDIAN PROJECT
This was a Federally funded project under the American Recovery Reinvestment Act(ARRA). The work to be performed
generally consisted of street reconstruction, landscaping, traffic, signal modifications, striping, and storm drain
modifications on San Dimas Avenue from Foothill Boulevard to Gladstone Street. This project was subject to Davis-Bacon
requirements.
. CITY OF CLAREMONT:ARRA AND OTHER FEDERALLY FUNDED PROJECTS INCLUDE THE FOLLOWING:
- Citrus Regional Bikeway/Pathway
- Arrow Highway Rehabilitation-ARRA Project No. ESPL 5162(007)
Page 2 of 3
Silk
FRED ALAMOLHODA, P.E., Project/Construction Manager, Federal Fund Manager
111
- Restoration of Mt Baldy Road-Emergency Relief Project No.4207037
- Pedestrian&Bike Facility-ARRA TEA Funding Project
. CITY OF BALDWIN PARK: SYRACUSE AVE. STORM DRAIN PROJECT,CONSTRUCTION ADMINISTRATION
The project consisted of the installation of 2,250 linear feet of reinforced concrete pipe, manholes, catch basins, transition
structures, and connector pipes, cross gutter, curb, gutter, sewer laterals, paving, and striping. Responsible for attending
the pre-construction meeting; reviewing contractor(s) submittals, responding to RFIs, reviewing and preparing CCOs;
supervising labor compliance and monitoring services; recommending progress invoice payments to the City; coordinating
field inspection, material acceptance/testing, traffic control and lane closures; final job walk and preparation of the punch
list.
. CITY OF DIAMOND BAR: GRAND AVENUE STREET IMPROVEMENTS PROJECT, PHASE II, CONSTRUCTION
MANAGEMENT
The project consisted of reconstruction and rehabilitation of the street, landscape and irrigation improvements in center
medians, minor drainage improvements,signage and striping plans. Mr.Alamolhoda was the project manager in charge of
the pre-construction meeting, preparing minutes and weekly resident engineer reports; notifying the utility companies;
retaining geotechnical consultants for the City; coordinating distribution of notices to the residents and impacted
businesses; responding to RFI's, reviewing and preparing CCOs; supervising labor compliance and monitoring;
recommending progress invoice payments to the City, invoicing Caltrans for reimbursement of the federal funds;
coordinating field inspection, material acceptance and testing, traffic control and lane closures; and final job walk and
closing the project. Construction
. CITY OF SAN DIMAS: FOOTHILL BOULEVARD OVERLAY AND REHABILITATION PROJECT, PROGRAM
MANAGEMENT/CONSTRUCTION OVERSIGHT
The project consisted of grinding and overlay of approximately 2-miles of Foothill Boulevard within the City of San Dimas.
Provided contract monitoring and federal compliance services for this$2 million federally funded public works project.
. CITY OF MONTCLAIR: RAMONA AVENUE GRADE SEPARATION PROJECT—PROGRAM MANAGEMENT
The project consists of construction of a grade separation project within the City of Montclair. Mr. Alamolhoda has been
involved in the project since December 2006. He provides limited project management, and contract compliance with the
federal requirements of this $9 million project. The project is being administered by SANBAG. Construction Cost: $9
Million
Page 3 of 3
i SA
ICIROS GANJI
Construction Inspector
IOVERVIEW:
Mr. Ganji has over 18 years of experience in construction inspection, geotechnical
testing, and design on a number of projects for local cities, government agencies, and
I private developers. He has successfully completed many Capital Improvements
Projects (CIPS), numerous mainline underground utility projects and commercial tract
developments. He has been responsible for inspecting and reviewing proper traffic
EDUCATION: control plans, detecting and locating faulty material, maintaining daily inspection reports,
California State University,Long Beach preparing final punch lists, and assuring that projects met plan standards, specifications,
B.S.,Civil Engineering and guidelines. Mr. Ganji has prepared reports, monitored construction budgets,
scheduled field inspections, maintained records, prepared and processed change
CERTIFICATIONS: orders and field design changes,and set pre-construction meetings. In addition, he has
I American Concrete Institute Certificate: maintained project documents in order including labor and equipment records and labor
Stormwater Pollution Prevention Plan compliance reports.
(SWPPP)
National Pollutant Discharge Elimination PROJECT EXPERIENCE
I System(NPDES)
2012-2013 Atlantic& Firestone Intersection Improvements Project-City of South
Gate Provided Construction Management and Inspection services to the City of South
Gate for a $6 million dollar project. The scope of work included checking grinding and
I placing ARHM overlay, inspecting the construction of approximately 50,000 square feet
(SF) of sidewalk, inspecting the construction of approximately 1,850 lineal feet (LF) of
curb and gutter, inspecting the construction of 2,100 LF of Ductile Iron Pipe (DIP)
waterlines and 2,840 LF of recycled waterline, inspecting the construction of
I approximately 4,656 LF of median island curb with decorative landscaping and the
construction of a city monument sign. This was a Federally funded project.
2011-2012 Residential Rehabilitation Project-City of Hawaiian Gardens
I Provided Inspection services to the City of Hawaiian Gardens on the CDBG-funded
2011-2012 Residential Rehabilitation Project. The project spanned 3,200 LF, across
four segments: Seine Avenue, from 226th Street to Civic Center Drive; Wareham
Avenue, from 223rd Street to 221st Street; Elaine Avenue, from 215th Street to North
I End; and 216th Street,from Norwalk Boulevard to Bolshie Avenue. The scope included
variable-depth grind and overlay, ARHM cap, installing 14 ADA-compliant ramps,
upgrading 7 ramps, adjusting 14 manholes and 12 valve lids, installing curb, gutter,
sidewalk, a commercial driveway,and a speed bump.
IRoman Avenue Street Improvement-city of Palm Springs, County of Riverside
Served as s senior Inspector to the County of Riverside on this project. Work included a
retaining wall, removing and replacing curb and gutter, concrete sidewalks, cross-
!'
ADA-compliant ramps, driveways, installing water and sewer lines, and slurry
and chip sealing. He inspected work each day, conducted a final inspection with the
Contractor,generated and followed up on a punch list,and prepared"as-built"records.
I Foothill to Cypress/Randall to Merrill Street & Traffic Signal Project - City of
Fontana As Construction Inspector, responsible for performing daily construction
inspection on projects including trenching and installing fiber optic cable for traffic signal
I installations. also inspected detours and verified detour routes with the City Traffic
Engineer.Additionally, prepared progress payments and scheduled the pre-construction
meeting. Inspections also included street construction, asphalt, utility trench backfill,
curb, gutters, sidewalks, driveways, curb ramps, scheduling all required construction
I testing,and storm water installation on Randall&Merrill Avenue.
Mission Spring Water District-City of Indio
As Construction Inspector, responsible for inspecting pipeline installations, line and
I grade verification, documenting daily work with photographic evidence, and detailed
daily notes of work performed. Additionally, ensured the Contractor complied with the
SWPPP and NPDES permit requirements, including proper BMP implementation.
Lastly, responsible for ensuring that all work performed by the contractor was in
compliance with the contract plans and specifications.
Page 1 of 2
SAC I ROS GANJI, Construction Inspector
Jurupa Hills Project-City of Fontana
Served as senior inspector on this $2.8 million project. The work included inspecting line grade, size, elevations, and
improvements to sidewalks, driveway approaches and retaining walls on Citrus, Solver and Santa Ana Avenue.
Also assisted with progress pay and contract change order reviews,and developing as-built drawings.
The Cove Project-City of Palm Springs(Caltrans-District 8)
Served as senior Inspector on this$4.2 million project including being responsible for inspections of all construction activities to
ensure contractor compliance with contract plans and specifications are recording detailed daily inspections. Oversee inspect
monitor field work, work schedules and inspection phases. Participated in numerous safety programs and strictly enforced
safety and health requirements on the site.
Fire Station 71 -City of Fontana
As one of the Construction Inspector on this $29 million dollar design-build project, he was responsible for conducting detail
inspections of construction work to ensure contract compliance with plans and specification, inspecting installation new sewer
and water main and storm drain installations, writing weekly inspection reports to ensuring complying with erosion control and
storm water management plans, completing and maintaining records pertaining to construction progress including daily reports,
monthly pay estimates and job expenditures and checking and inspecting irrigation and landscaping for Miller park east of
project. This was a Federally funded project.
Page 2 of 2
I SA
ISHANNON LEONARD
Construction Inspector
I OVERVIEW:
Ms. Leonard has over 23 years of experience in construction inspection of water,sewer,
and street projects. She is qualified to interpret and enforce Uniform Building Codes,
I Caltrans Standards, Greenbook, W.A.T.C.H. Traffic Control Manual, and OSHA
Standards. She has provided inspection for public right-of-way projects.
PROJECT EXPERIENCE
I CERTIFICATIONS CITY OF SANTA MONICA
Graduate Building Inspection . Currently providing nighttime construction management and inspection services for
Technology(B.I.T.)Butte College, the Water Main Replacement/Upgrade Project (SP 2297)which includes replacing
1992. and/or upgrading existing facilities and the abandonment of old facilities. The
CAL-OSHA Construction Safety for ro ect consists of approximately 10,000 ft. of 6"to 21" PVC pipe Olympic Blvd.,
Managers and Supervisors p pp y p p
40 Hour, University of California,San Lincoln Ct., Pennsylvania Ave., 16th Ct., 17th Ct., 18th Ct., 20th Ct. Euclid Ave.,
Diego Extension,certified and Ocean Ave.
P.O.S.T.Penal Code 832, Powers of CITY OF BUENA PARK(Senior Public Works Inspector—2014)
Arrest/Right o Entry,certified
State of California Code Enforcement Inspection of City paving project, include surface grinding to full removals and
Officer
OSHA Job Site Safety 8 hour,certified replacement,with rubberized finish. Off site work for new housing development with
I utility placement, remove and replace City sidewalk, curb and gutter, catch basin
and miscellaneous paving work. Extensive traffic control issues in heavy industrial
area.Trenchless PVC sewer line rehab.
CITY OF SANTA MONICA(Senior Public Works Inspector 2005-2011)
As the Senior Public Works Construction Inspector for the City of Santa Monica,
oversaw most projects in the Public right of way including but not limited to; alley
construction, compaction issues, mainline utilities sidewalk, curb, gutter, driveway
construction, rubberized asphalt. In addition, daily duties also included resolving
I right of way violations, encroachment violations, work without permits, trip and fall
accidents, illegal signs,weed abatement,outdoor dining, illegal discharge etc.
LOS ANGELES COUNTY SANITATION DISTRICTS
I (Construction Inspector 2003-2005)
. Inspection of various Los Angeles County Department of Sanitation projects
including; Inspector of record for 4,000 ft. of 114" existing RCP rehab, with PVC T-
Lock liner and SPR Spiral Liner. Removals, surface prep, liner installation, steel
I reinforcement and pressure grout.
MILL VALLEY STREET REHABILITATION(2002-2003)
Contracted and St. Mary's Road Rehab Town of Moraga:
Oversaw complete removals and replacement of several City streets (AC Paving),
Curb & Gutter, Flood Control structures, new Storm Drain, etc. Environmentally
sensitive projects with strict SWPPP & NPDES requirements as well as complex
traffic control issues.
I PLAYA VISTA PROJECT(Field Engineer 2001-2002)
. Oversaw and inspected the installation of wet and dry line utilities, including water
(16"), mainline sewer(18"VCP)plus all laterals and mainline gas. The project also
I included several miles of new streets (grading, base, compaction, paving, striping,
curb, gutter & sidewalk). Oversaw infrastructure construction on this highly
environmentally sensitive project, including: Major channel inlet structures,
miscellaneous flood control structures, RCP, box culvert, catch basins, major
I concrete structures in a marine environment. Enforce strict erosion control policies
on this highly visible, environmentally sensitive project with extreme public
opposition.
LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS (Construction
I Inspector 1994-2001)
. Inspection of various projects large and small within the public right of way,
including water, sewer, gas, dry utilities, reinforced concrete construction,
structures. Mainline utilities. Streets, curb & gutter, sidewalk, catch basins.
I Coordinate specialty testing as required. Enforce traffic control plans& procedures
per the WATCH Manual and CAL/OSHA Safety Standards,SWPPP regulations.
Page 1 of 1
I SA
IHEUSTACE LEWIS
Construction Inspector
IOVERVIEW:
Mr. Lewis provides construction inspection services to public agencies for municipal
public works projects. He is an experienced Maintenance Manager, Traffic Signal
I Technician and Construction Inspector for roadways,traffic signals,street lights,asphalt
and concrete PCC paving, concrete structures, buildings and municipal public works
construction. His responsibilities include shop drawing reviews; supervision of
construction inspection, and testing; contract administration; schedule reviews and
I EDUCATION: monitoring progress. As Senior Construction Inspector for on-call inspection services
College of Arts,Science&Technology contracts, Mr. Lewis also served as liaison between owner, designer, and contractor for
Kingston,Jamaica field and design issues. Mr. Lewis is a recipient of Level III Certification, the highest
AA,Science&Technology, 1979 certification from International Municipal Signal Association (I.M.S.A.) for Traffic Signal
Cleveland Institute of Technology/ Technician and Electrician.
Institute of Transportation Studies
Cleveland,OH PROJECT EXPERIENCE
I REGISTRATION: CITY OF GLENDALE
Electrical C-10 Contractor Currently providing Inspection Services for on-call electrical projects in the City
CA No.959209
including Glendale Ave. Wastewater Capacity&Street Improvement, Canada Blvd.
Infrastructure Improvements & Honolulu Blvd. Rehabilitation, Arden Ave.
I CERTIFICATES: Rehabilitation, San Fernando Rd. Lighting Project, Wilson Streetlight & Traffic
Certified Level III, International
Municipal Signal Association(IMSA) Signal upgrades, Doran/Central Development, Upcoming projects will be Colorado
Los Angeles Department of Blvd. Parking Lot 10,and Verdugo Rd./Honolulu Ave. Intersection.
I Transportation, National Environ-
mental Asbestos Safety,Asbestos
OSHA Certificate CITY OF CULVER CITY, COMBINED STREETLIGHT IMPROVEMENT PROJECT
. As On-Call Electrical Inspector for City's Combined Streetlight Improvements,
MEMBER: responsible for overseeing replacements and upgrades of obsolete streetlight
I Transportation Security Administration system. Project limits were along Washington Boulevard between Marcasel
(TSA) Avenue and Berryman Avenue and Washington Place between Sepulveda
Refrigeration Service Engineers Society Boulevard and Albright Avenue. The scope of work included the replacement of the
(RSES) conduits, wiring, and the removal and replacement of twelve (12) existing non-
I standard streetlights with new 28-foot-high `Cobra-head' streetlights to include new
fixtures with energy efficient 250 W Induction lamps, and the replacement of fifty-
one (51) luminaries with new fixtures and 250 W Induction lamps on existing
'Cobra-head'streetlights.
ICITY OF CULVER CITY, ROBERTSON BOULEVARD PEDESTRIAN/TRANSIT
CONNECTION IMPROVEMENT PROJECT, P-943
Provided construction inspections for pedestrian lighting street improvements, a
reconstruction project to enhance pedestrian access between the future transit
center and the Expo Station area and provide ADA compliant accessibility to
pedestrian and transit riders. Improvements were made to sidewalk and street
I trees uplighting to enhance the transit rider and pedestrian environment.
CITY OF CULVER CITY, WASHINGTON BOULEVARD/BOISE AVENUE
PEDESTRIAN CROSSING SIGNAL PROJECT, P-934
Performed electrical and general construction oversight for installations of traffic
signals and street light interconnects; inspected traffic signal standards, equipment
and modifications to ensure compliance with project plans and specifications. As
project inspector, prepared Daily Construction Reports (DCRs) and Weekly
I Statements of Working Days (WSWDs), reporting day-to-day field operations and
tracking progression of work days completed. Conducted employee wage
interviews to ensure compliance with contract requirements, and coordinated flow
of information between contractor and City Project Manager.
ICITY OF CULVER CITY, EXPOSITION METRO LIGHT RAIL TRANSIT PROJECT
. As alternate On-Call Inspector for The Exposition LRT Project, provided
construction inspections on an as-needed basis; monitored a variety of quality
I assurance tests including soil compaction, street modifications, and traffic signal
installations. This project had been in progress since 2008, and involved
construction of Segment C,which extended the transit line from the limits of Ballona
Page 1 of 2
SHEUSTACE LEWIS,Construction Inspector
111
Creek to the east, the northerly City limits adjacent to Venice Boulevard to the west, along National Boulevard within the
boundaries of Culver City. The scope of work consisted of general inspections for street improvements, traffic signals,
street lighting, signing and striping, drainage, sanitary sewer and relocation of utilities in the public right-of-way. Other
related work included "over the shoulder" inspections of the construction of bike paths and pedestrian connections, part of
the project and located on the Metro right-of-way.
CITY OF CULVER CITY, FOX HILLS AREA TRAFFIC SIGNAL SYNCHRONIZATION, P-852
. As City Maintenance Operations Manager, responsible for coordination of signal systems and timing,traffic engineering and
road design standards as they related to traffic signals and lighting equipment for Capital Improvement Projects. The Fox
Hills area project upgraded the remaining 11 signalized intersections within the City into a traffic control system and hookup
to the Automated Traffic Surveillance and Control (ATSAC) System. Other responsibilities included making
recommendations for equipment and costs involved in scheduled work; providing analysis on project-wide issues regarding
suitability of street lighting and traffic signal implementation; assisting with development and modification of contract plans
for traffic signal upgrades and transportation enhancement, and supervision of personnel assigned to repair and install
multiple lighting systems.
Page 2 of 2
I SA
1 JORGE LOVO, P.E.
Engineer
IOVERVIEW:
Mr. Lovo has overl4 years of experience designing and managing a variety of water-
related projects and programs ranging from water, wastewater, recycled water, and
I storm water facilities including conveyance, water quality & treatment, pump stations,
and storage. Providing technical leadership on small to large sized projects; supporting
teams winning new business; interacting with clients, agencies and other consulting
firms; preparing detailed engineering calculations, CAD drawings, estimates, master
I EDUCATION: planning, facilities condition assessment, construction support, preparation of plans,
B.S.Civil Engineering specifications and others documents for permitting and construction.
University of Hawaii
PROJECT EXPERIENCE:
I REGISTRATION:
Registered Civil Engineer,California CRESCENTA VALLEY WATER DISTRICT
No.C75632 • Conducting a preliminary feasibility study to use recycled water at Los Angeles
Registered Civil Engineer,Canada County's Two-Strike Park.
I Board of Professional Engineers
CERTIFICATION: ROSE HILLS MEMORIAL PARK
LEED Green Associates-Green • Recently designed the recycled water retrofit for 600 acres of Rose Hills Memorial
Building Certification Institute, ID No. Park and Cemetery. The design included approximately 4,500 LF of 8" potable
I 10779963 water/fire protection pipeline, 8,000 LF of 4" and 8" potable water pipeline, and
Construction Management,University of modifications to the four(4)on-site wells and four(4) reservoirs. The project team
Quebec,Canada is coordinating with Rose Hills staff, Upper San Gabriel Valley Municipal Water
Professional Studies in Technique of District, Los Angeles County Sanitation Districts, San Gabriel Valley Water
I Architecture,College of Old Montreal Company, Los Angeles County Department of Public Health, and the Los Angeles
County Fire Department. This project is funded by DWR Proposition 84, Round 3-
Drought Grant and MWD On-Site Recycled Water Retrofit.
I WET INFRASTRUCTURE FACILITIES AND LAND DEVELOPMENT FOR THE CITIES
OF TORRANCE, COMPTON, EL SEGUNDO,AND AZUSA
Civil Engineer for a variety of wet infrastructure projects ranging from water supply,
wastewater collection, drainage and hydrology studies, storm water conveyance, pump
I stations, recycled water, site grading, access roads design, pre and post land
development run-off, BMPs, LID,and storage facilities.
• Water resources studies for groundwater and well construction,Santa Clarita,CA.
• Groundwater assessment, well design, pumps layout, wellhead treatment options,
I &water rights allocations.
STRATEGIC PLANNING ASSESSMENT FOR REGIONAL USE OF RECYCLED
WATER
I • Strategic planning & design for up to 200 mgd of purified recycled water from the
Los Angeles County Sanitation District to the Main San Gabriel Basin. The
assessment included advanced water technologies (UV, RO, MF), ground water
I replenishment(GWR), spreading grounds, water quality, extraction wells, wellhead
treatment pumping requirements,conveyance,as well as, reservoir reconnaissance
studies(RA).
• Delta Wetlands Project, San Joaquin-Sacramento Delta Islands, CA (Western
I Development):
• Revamping of two Delta islands into reservoirs capable of storing 215,000 acre-feet
of water; fatal flaw analysis; construction techniques and preparation of technical
documents; project sensitivity analysis; coordination with agencies, internal teams,
Iand other participant consulting firms.
ROWLAND WATER DISTRICT SUPPLY LA PUENTE VALLEY COUNTY WATER
DISTRICT:
• Water Resources Engineer for planning, design, bid and construction for the
conveyance, treatment, and storage of 3000 gpm local groundwater including
production wells, pump stations, eight miles of pipe, best available treatment
technologies for removal of contaminants and disinfection (LGAC, IX, UV,
I Chlorination,Chloramines),and storage.
• OCSDgroundwater replenishment, Edward C. Little recycling facility,Tillman water
reclamation plant,San Jose Creek water reclamation plant.
Page 1 of 1
I SA
IKEN MANERA
Construction Inspector
I OVERVIEW:
Mr. Manera has over 40 years of experience working for small contract service and full
service Cities, San Bernardino County as well as private consultant firms. The
experiences include public works inspection, field and office engineering of street
I improvements, sewer,waterline, storm drain, parks, airports, commercial and residential
land development, irrigation and landscaping, underground facility installations projects.
Extensive experience in ensuring compliance with contract documents, state laws, local
EDUCATION: ordinances, NPDES standards,and proper construction practices.
San Bernardino Valley College,Drafting
Technology Courses
California Polytechnic University, PROJECT EXPERIENCE
Pomona,Courses in Construction
Technology and Methods of Inspection CALTROP Engineering Corp.: Public Works Inspector
Inspected the required infrastructure work associated with construction of tract homes in
LICENSE: the City of Fontana. The projects consisted of the construction of street improvements,
Nuclear Gage Operation Certificate, curbs, gutters, asphalt paving, sewer, Flood Control channel, storm drain, and other
State of California General Engineering improvements.The infrastructure project's total cost was$11M.
Contractors License-A
Additionally, inspected the construction of a $5M Ball Park improvements which
CERTIFICATION: included three baseball enclosures,tots play area,canopy picnic areas,sound wall,and
American Concrete Institute Certificate:111
the placement of a pre-fabricated structure having restrooms and snack bar within. In
Field Testing Technician Grade I
APWA Certificate: Infrastructure conjunction with the Parks Department's Inspector, the inspection included the parking
Inspector CPII lot, sewer, water connections, sidewalks, catch basins, grading, paving, concrete
placement,street light foundations parking stalls,and striping.
I COURSES:
Public Works Construction Inspection City of Ontario:Senior Public Works Inspector
Course,State Certification:Hazardous Capital Projects & Construction Inspector. Reviewed and applied the general
Substance Removal and Remedial requirements of the construction plans,and contract specifications to State, Federally or
I Action locally funded projects. Inspection included, but not limited to the following:wet and dry
San Bernardino County Storm Water construction, excavation and the placement of various size sewer and water mains,
Program,Construction of Quality Hot street construction, (new or rehabilitated paving),
Mix Asphalt Pavement p g), concrete construction
San Jacinto Storm Water Program, (curbs/gutters/sidewalks/catch basins/junction structures and reinforced concrete
"2002 Level 1 N.P.D.E.S.Workshop boxes), earthwork (roadbed preparation, trench excavation and backfilling), electricalStorm Water Best Management (streetlights and signal installation), and soils testing with the nuclear gage as needed.
Practices" Worked in conjunction with the City of Los Angeles' Airports Inspector in the
Riverside County DAMP,Storm water construction of the infrastructure for Ontario International Airport.
I Management Team,
Airport Pavement Workshop: Design, San Bernardino Co. Public Work Agency(PWA): Contract Inspector
Construction and Maintenance. Performed construction inspection to ensure that the public works projects were being
constructed in accordance with the plans and specifications. Duties included inspection
I of the construction activities within the County right-of-way, which consisted of
inspection of commercial and residential developments as well as county capital
projects.
I San Bernardino Co. PWA: Senior Eng.Tech./Env. Report Writer
Prepared the environmental impact reports for the San Bernardino County
Transportation Department for new construction. Duties included the inspection and
evaluation of the site and its inhabitants(Kangaroo Rat, Desert Tortoise)and the effect
I that new construction would impose upon them. A Draft Environmental Impact Report
followed along with Public Hearing for the public comments. The Draft reports were
submitted to the State and Federal Clearinghouse for review.
I San Bernardino Co. PWA: Eng.Tech.11I Design Draftsman
Under supervision, designed and prepared construction drawings related to the
construction and/or reconstruction of the County streets. Drawings included plan, profile,
and construction notes and, detailed layout sketches. The work required collecting and
I analyzing an array of diverse recorded information; field and survey data needed to
complete the design. Work encompassed County streets, drainage structures, new
roadway construction and/or its realignment. Duties required the knowledge of the
principles of civil engineering design.
Page 1 of 1
I SA
I
KAREN MEADOWS
Labor Compliance
IPROJECT EXPERIENCE
2010—Present Riverside County Transportation Authority
Consultant
I Review various labor compliance and contract award documents, concerning the Rte
74/215 Separation Project in Riverside County. Prepare written reports of various
violations and make recommendations for remedies and penalty assessment
I AWARDS: 2010—Present San Bernardino Association of Governments
Caltrans Construction "Outstanding Consultant
Employee of the Year" Review various labor compliance and contract award documents, concerning the 1-210
Construction and Landscape Project in San Bernardino County. Prepare written reports
I CERTIFICATES: of various violations and make recommendations for remedies and penalty assessment.
Prevailing Wage Seminars from 2007—Present San Bernardino Association of Governments
both the Department of Industrial Consultant
I Relations and the Federal Highway Review various labor compliance and contract award documents concerning the San
Administration Bernardino 5th Street Bridge and continuing with Rte 215. Prepare written monthly
TRAINING: reports of labor compliance violations or missing payroll documents and make
Taught classes for Caltrans Labor recommendations for remedies and penalty assessment.
Compliance Officers from all over 2005 San Bernardino Association of Governments
the State Reviewed various labor compliance and contract award documents, concerning the San
Was Speaker at Valley College for Bernardino portion of the 1-210 Construction Project. Prepared a written report of
I Labor Compliance Enforcement on violations and made recommendations for remedies and penalty assessment.
Public Works Contracts 2003—January 2005 Keenan &Associates
Assisted representatives from the Senior Labor Compliance Officer—Consultant
Federal Highway Administration in Keenan&Associates is a Third Party Administrator for AB 1506 School Bond Program,
putting on training classes in San and in May of 2003, upon my retirement from Caltrans, I was hired to train and develop
Bernardino and Riverside Counties their labor compliance program.
Produced a video for the firm for labor compliance training; wrote various procedure
ACCOMPLISHMENTS: manuals; developed all labor compliance forms; did presentations at pre-bid and pre-
I Developed along with Joe Baca the construction conferences; and had oversight of the entire labor compliance office,
first"Minority Enterprise consisting of three labor compliance officers and 12 on-site inspectors. I performed
Development Week", in San audits of contractor's records, to substantiate payment of prevailing wages and the
Bernardino and was a speaker at requirements of apprenticeship programs. Participated in several outreach activities and
the seminar on Labor Compliance training for contractors preparing to bid on the construction projects.
and Minority participation on Public In the two years that I consulted for Keenan & Associates, we contracted for seventy-
Works Contracts. eight contracts with a construction value of over$250 million.
I 1972—2003 State of California
Labor Compliance Officer(San Bernardino&Riverside Counties)
Supervised a staff of five labor compliance officers until retirement on March 1,2003.
I . Conducted audits of contractor payroll records and prepared formal labor wage
violation cases. Attended hearings and testified in court proceedings
■ Analyzed and interpreted federal and state laws regarding labor compliance, and
made determinations based on findings. Reviewed and interpreted over thirty
I collective bargaining agreements.
■ Participated in writing the California Transportation (Caltrans) procedures manual
for labor compliance, which included the Disadvantaged Business Enterprise
I Program(DBE)and the Equal Employment Opportunity(EEO)Section.
■ Had oversight responsibility of the local agency contracts in Riverside and San
Bernardino Counties with federal aid regarding the Davis Bacon/State Prevailing
Wage requirements, DBE,and the Sub-Letting Sub-Contracting Act.
I . Trained and advised the local agency representatives concerning applicable state
and federal laws.
■ Audited local agency records for conformance to federal procedures and made
recommendations for release of payment. Acted as a consultant to the local
I agencies regarding the proper subcontracting substitution procedures.
■ Participated in hearing for contractors who were in violation of the Fair Practices
Act or misuse of DBE listed contractors.
Page 1 oft
SA
ART ORTEGA
Construction Inspector
OVERVIEW:
Mr. Ortega has been in the public works construction field for over 38 years. For 17
years he was with the Los Angeles County Department of Public Works, Road
Maintenance Department. He gained hands on experience in road construction, which
included asphalt paving, grading, concrete finishing, and operated various construction
equipment. He held the positions of Road Maintenance Worker and Crew Leader. For
the last 18 years, Mr. Ortega worked for Los Angeles County as a Construction
Inspector, Senior Construction Inspector, and Head Construction Inspector, retiring in
2009. The last 2 1/2 years were spent at the Bridge Section of the Construction
Division, providing inspection at bridge seismic retrofit projects.
Mr. Ortega has gained experience in the inspection and contract compliance of various
construction projects that involved excavation,grading/compacting subgrade, placement
of base material,and A.C. paving. He has also set forms and placed concrete sidewalk,
curb/gutter, curb ramps, cross-gutters, concrete pavement, bus pads, storm drain catch
basins,and various other parkway improvements.
He has inspected and monitored the removal and replacement of underground and
above-ground fuel tanks, and the installation of the required pump dispensing
equipment, and overhead canopies. He also inspected the construction of bike paths
which included slope grading,rip-rap, landscaping and irrigation systems.
Bridge retrofit projects included the construction of pier extensions, shear keys, girder
seat extenders, reinforced steel work,and C.I.D.H. piles.
Mr. Ortega coordinated activities between the Contractor, the Agency's survey crews,
Materials Testing Lab, utility owners, as well as other cities and/or agencies. He
inspected the installation of new traffic striping at the completion of the project. He
made recommendations or changes as needed, negotiated and wrote change orders,
processed monthly payments and wrote final reports at the completion of a project.
He monitored projects for environmental compliance procedures (SWPPP's & BMP's).
He trained new inspectors and supervised 2 to 3 inspectors at various times when the
workload required assistance of Contract Inspectors. He resolved disputes between the
Contractor,Subcontractors, and the Agency,and others involved in the project.
PROJECT EXPERIENCE
Inspection of Bridge Retrofit Projects including:
• Slauson Avenue over the L.A. river, City of Maywood, construction cost of
$1,397,000
Construction of 72" and 24" C.I.D.H. piles, reinforced concrete beams, steel girder
stiffeners,abutment seat extenders
■ Florence Avenue over Rio Hondo Channel,construction cost of$224,000
Seismic retrofit, installed girder shear keys, abutment seat extenders, supervised
other inspectors
■ First Street over White Avenue Bridge, City of Pomona,construction cost:$218,000
Add shear keys,seat extenders
• Garey Avenue under Union Pacific Railroad Bridge, City of Pomona, construction
cost:$160,000
• Towne Avenue under Union Pacific Railroad Bridge, City of Pomona, construction
cost: $226,000 Seismic retrofit, reinforced concrete pier extension, girder shear
keys,and abutment walls
Road Construction:
Fair Oaks Avenue, north of Woodbury Avenue, City of Altadena, construction cost:
$2,719,000
Page 1 of 1
I SA
IROBERT H. PETERS
Construction Inspector
OVERVIEW:
Mr. Peters has over 37 years in waste water and treatment plant construction. He has
inspected 5 below ground pump stations along with primary and secondary and digester
I tanks. He also has inspected sewer piping from 4" to 90" in treatment plants and
throughout Orange County. He has inspected a fuel service station and a channel
rehabilitation for the City Of Irvine. Also completed for the Butterfield Park Reclaimed
Water line which included directional drilling and open cut construction for the City of
I EDUCATION: Corona.
Saddleback College,Mission Viejo
General Education PROJECT EXPERIENCE
I TRAINING: CITY OF POMONA
Completed 10&30-hour OSHA Training • Provided construction inspection services for the Sewer Pipeline Replacement -
and Multiple Seminars in Surveying and
Construction Technology Citywide(Phase II)project.
ICITY OF CORONA-BUTTERFIELD PARK RECLAIMED WATER LINE
• Inspected the directional drilling and installation of 24"fusion bonded HDPE piping
under the Butterfield Airport. Also inspected the excavation and installation of 20"
I ductile iron piping, and installation of all valves, fire hydrants, blow off value units
and cathodic protection along with backfilling and testing. Also inspected all street
repairs as called for on plans and specifications.
I CITY OF IRVINE,CA-SAN DIEGO CREEK IMPROVEMENTS
• Inspected all earthwork and the re-build of 5 grade structures with replacing existing
and imported rip rap for approx. 5,000 feet of channel. Inspected all replacement of
reinforcement steel and the placing of shotcrete on slopes of channel as called for
on plans and in specifications. Replaced 1,500 linear feet of asphalt trail that was
damaged by contractor along with concrete driveways and walkways. Inspected
the installation of all new fence post and wire cable.
I CITY OF IRVINE. - REMOVAL AND REPLACEMENT OF UNDERGROUND FUEL
TANKS
• Inspected the demo of existing concrete, asphalt concrete, piping, fuel tanks and
monitoring system and all related appurtenances. Inspected the installation of new
I 30,000 gal fuel tank with all new piping and monitoring system. The installation of
new day tank for emergency generator for City Hall, along with new asphalt and
concrete as called for on plans and specifications.
I ORANGE COUNTY SANITATION DISTRICTS, FOUNTAIN VALLEY, CA
• Assist consultants, contractors and project managers with all phases of highly
complex construction and rehabilitation projects at water and sewage treatment
I facilities. Review construction plans and drawings for accuracy, constructability,
compatibility, errors and omissions. Identify problem areas and possible conflicts,
and suggest solutions. Assist Resident Engineer with approval and/or tracking of
any change orders.
• Assist Project Engineer with cost estimates of design changes forced by
construction problems. Coordinate construction isolation requirements and
schedule plant shut-downs with other departments. Advise all necessary parties on
the impact of construction on plant maintenance and the waste treatment process.
I Work closely with safety representatives to analyze job hazards, monitor progress
and ensure the safety of all employees throughout the construction process. Start-
up and test all new and existing facilities after construction is complete. Conduct
Ion-site inspections of mechanical pumps, heating, ventilation and air conditioning
(HVAC) equipment, force main pumping and all related equipment. Inspect
coatings, shorings, water proofing, reinforced steel, concrete, mechanical devices
and building masonry. Inspect sandblasting, painting, and force-main-to-gravity
piping from 10"to 42". Inspect all VCP,concrete,ductile and HDPE piping.
Page 1 of 2
I
SA
ROBERT H. PETERS, Construction Inspector
• Manage multiple outside laboratories for testing purposes, while carefully adhering to all submittal requirements. Maintain
accurate records and documentation of all inspection reports, design changes,field test results and project logs.
• Served as Lead Inspector and provided guidance to a staff of junior inspectors. Oversaw the excavation and construction
of multiple below-ground pump stations in the City of Newport Beach,valued between $9 million and$30 million. Provided
inspection during all stages of construction of the primary and secondary construction projects at both the Fountain Valley
and Huntington Beach treatment plants.
LOS ANGELES COUNTY SANITATION DISTRICTS, CITY OF CARSON, CA
• Completed regular inspections at the Carson Waste Water Treatment Plant, which processed 250 million gallons daily.
Responsible for inspecting the Primary Digesters Tanks (5 concrete pre-stressed and reinforced circular tanks along with
all mechanical piping and equipment).
• Worked extensively on the Carver-Greenfield Sludge Drying Energy Facility-a $200 million project which created steam for
electricity. Oversaw the installation of structural steel, reinforced concrete, mechanical piping, conveyors, heating, ventilation
and air conditioning equipment, masonry and roofing. Also inspected the Influent Pump Station and the Solids Processing
Facility, ensuring that all pipes, valves, conveyors, centrifuges, equipment, building and roads complied with plans and
specifications.
I
I
I
I
I
I
I
I
I
I
I
I
Page 2 of 2
I SA
IADAM ROESCH, E.I.T., CPSWQ, QSD/QSP
Engineer
IOVERVIEW:
For this project, Mr. Roesch is available for either the Assistant Engineer, Technical
Aide, or CAD Designer/Technician positions. Due to his knowledge of engineering
I principles, Mr. Roesch provides valuable engineering assistance to SA Associates.
Also, due to his past and part-time experience in environmental engineering/water
quality, Mr. Roesch provides valuable technical assistance, especially in areas related
to NPDES permitting, etc. Mr. Roesch's CAD experience is primarily in AutoCAD
I software. He has used other Bentley (Microstation) software products for water and
sewer projects. Mr. Roesch holds a Bachelor of Science in Civil Engineering as well as
EDUCATION: an Engineer-in-Training certificate.
California State University,Long Beach
I B.S.Civil Engineering PROJECT EXPERIENCE
REGISTRATION CITY OF ARCADIA
Engineer in Training,California . Assisted with preparing plans for the Orange Grove Disinfection System Upgrade
I
Project. The project involved the installation of new DIP to connect the existing
SOFTWARE: piping with three existing reservoirs. The project also involved the installation of a
Microsoft Office chlorine injector assembly, nitrate analyzers, drainage pipes, and concrete removal
Adobe and replacement.
Autodesk(AutoCAD)
ICITY OF CULVER CITY
. Assisted with preparing plans for the Washington Blvd and Washington Place
Streetlight Improvement Project. The project involved the installation of new
I streetlight poles along three street segments, new conduit and pull boxes, new
luminaries,and concrete removal and replacement.
CITY OF RIALTO/VEOLIA WATER SERVICES
Currently providing engineering services for the preparation of Specifications for
several utility replacement projects in the City of Rialto. Veolia Water has leased
the City of Rialto's water utility and is planning to replace hundreds of water
services, water meters, fire hydrants, and sewer manholes throughout the City's
Ilimits.
CITY OF SIERRA MADRE
. Currently assisting with preparing plans and technical specifications for the Grand
I View Sewer Main Improvement Project. The project involves utility research, the
coordination with outside utility agencies such as MWD, the removal and
replacement of approximately 400 linear feet of 10-inch VCP along Grand View
Avenue as well as 750 square feet of street rehabilitation.
IKINNELOA IRRIGATION DISTRICT
. Currently preparing plans for the East-West Tank Connector Pipeline Project. The
project involves improving the reliability and service of the District's water
111 distribution system by connecting the distribution system of its East Tank and West
Tank Reservoirs with a 12-inch water line. In addition to the 12-inch water main,the
project also involves the installation of a 4-inch DIP main alongside the 12-inch DIP
main in order to abandon an existing 4-inch waterline that runs through private
I properties. Mr. Roesch performed the utility research, coordinated with utility
companies within the project vicinity, and is currently assisting in preparing the
plans.
I LONG BEACH WATER DEPARTMENT
. Currently preparing plans and specification for the East 27th Street and Via Passilo
Cast Iron Water Main Replacement Project which consists of the replacement of
I approximately 4,000 feet of 6&8 inch cast iron&ductile pipe.
. Provided inspection for the Groundwater Treatment Plant Chemical Tank
Replacement Project — Phase I. The project involved the replacement of three
I existing polyethylene chemical storage tanks(two 13,500 gallon Sodium Hydroxide
Tanks and one 10,000 gallon Catonic Polymer Tank) located within LBWD's
Groundwater Treatment Plant, along with chemical piping, vent piping, liquid level
indicators,and SCADA equipment.
Page 1 of 2
SA
ADAM ROESCH, E.I.T., CPSWQ,QSD/QSP, Engineer
ROSE HILLS MEMORIAL PARK
. Currently designing the recycled water retrofit for 600 acres of Rose Hills Memorial Park and Cemetery. The design
includes approximately 4,500 LF of 8" potable water/fire protection pipeline, 8,000 LF of 4" and 8" potable water pipeline,
and modifications to the four (4) on-site wells and four (4) reservoirs. The project team is
coordinating with Rose Hills staff, Upper San Gabriel Valley Municipal Water District, Los Angeles County Sanitation
Districts, San Gabriel Valley Water Company, Los Angeles County Department of Public Health, and the Los Angeles
County Fire Department. This project is funded by DWR Proposition 84, Round 3 — Drought Grant and MWD On-Site
Recycled Water Retrofit
CITY OF ANAHEIM
. Currently preparing plans and specifications for the 8"Water Main Replacement in County Glen Way for the replacement
of 5,300 ft.of 6&8-inch ductile iron pipe with 6&8-inch polyvinyl chloride(PVC)pipe.
CITY OF SANTA MONICA
. Provided inspection during night work for the Water Main Replacement/Upgrade Project Project. The project involves the
installation of approximately 10,000 ft. of 6" to 12" PVC C900 pipe in Olympic Boulevard and Ocean Boulevard including
additional alleys.
DISNEYLAND RESORT
. Performed on-site inspection of stormwater runoff from construction activities, adjustments to the chlorination station
control panel, documented resort-wide refrigeration systems, and calculated refrigerant volume of walk-in refrigerator units
for AQMD compliance.Various data entry and field documentation.
. Collected NPDES stormwater samples for regulatory NPDES wastewater & stormwater permits and attraction discharge
during construction activity.
. Documented resort-wide volatile chemical inventory for AQMD compliance. Included data entry and field documentation.
. Developed multiuser application for data entry of hazardous waste manifests using Microsoft InfoPath and Microsoft
SharePoint Designer.
. Collected microbiological water samples for Health&Safety monitoring program. Provided project management assistance
and contractor assistance during AQMD source testing programs.
TECHNICAL SUPPORT
. Currently providing technical support to senior engineering staff for various projects and proposal preparation. Support
services include CAD drafting, data research, proposal preparation, specification editing, utility research & coordination,
and overall project coordination.
Page 2 of 2
I SA
I
KEN SALEHPOUR
Construction Inspector
IOVERVIEW:
Mr. Salehpour has over 39 years of experience in providing engineering, construction
oversight and construction inspection services for roads, bridges, structural retaining
I walls,excavation, sewers and drainage projects for the Los Angeles County Department
of Public Works. His tenure with the Department includes serving in various capacities
as resident engineer, construction inspector, and supervisor. He has also provided
consultant services to the Los Angeles County Department of Public Works for an
I EDUCATION: additional three years. Mr. Salehpour has extensive experience working with the
Brigham Young University,Provo,Utah Caltrans Construction Manual, Standard Specifications and Standard Plans, as well as
B.S.,Civil Engineering the exceptional ability to coordinate and work effectively with multiple project leaders.
I Mr. Salehpour has provided construction inspection services for several federally
funded/Caltrans street rehabilitation projects. Many of these projects were successfully
audited by Caltrans. He also provided night construction inspection services for many
streets/freeway projects that included on ramp,off ramp,and crossroads.
IHe is familiar with Caltrans encroachment issues,federal funding requirements, NPDES
requirements and traffic control.
IPROJECT EXPERIENCE
CITY OF BURBANK
Provided construction inspection services for the Safe Route to Schools- Federal Cycle
I I (Phase 1 & 2) Project. The work includes work involves construction inspection
services for the construction of new PCC sidewalk, replace existing asphalt pavement,
curb and gutter, driveway, and pedestrian ramps(bulb outs), traffic signal modifications
(8 locations),traffic signing and striping;and traffic control.
ICITY OF POMONA
Performed construction inspection services for federally funded Ganesha Park and Ride
I Project. Project involved high retaining wall with tieback and dead man, roadway, large
parking area,and landscaping.
CITY OF SAN BERNARDINO
I Provided construction inspection for two projects:Traffic Signal Installation at 30th Street
and 210 Freeway (WB Exit Ramp- Waterman Ave.) and the Mt. Vernon Avenue
Overcrossing at the BNSF Yards.
I COUNTY OF LOS ANGELES
. Randolph Street from Holmes Avenue to Pacific Boulevard between the cities of
Los Angeles and Huntington Park. Federally funded project. Performed final
inspection services and all related documentation and interview work. Project was
I successfully audited by Caltrans.
. Freeway 60 and Hacienda Boulevard Project. Project involved night work, off
ramp,and crossroads due to heavy vehicles.
. Freeway 405 and Wilshire Boulevard Project. Project involved night work, off ramp,
Iand off ramp due to heavy traffic.
LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS
. Supervising Contract Construction(Area Supervisor),2004-2008
II Some of the projects that were executed in this period are as follows:
- La Tuna Debris Basin, Los Angeles. (Inlet construction)
- Fair Oaks Ave. Altadena. (Road reconstruction)
- Altadena Ave. Altadena. (Curb &gutter, sidewalk, cross gutter, catch basin,
I and road reconstruction)
- Bull Creek Underground storm drain channel. Granada Hills. (Storm Drain
Box Channel rehabilitation)
- Trancas Water Pollution. Malibu. (Control plant rehabilitation)
Montrose Ave. @ Rosemont. Glendale.
- San Martinez Road. Val Verde. (Catch basin and road reconstruction)
- Bouquet Canyon Road. Santa Clarita. (Cold milling and resurfacing)
Page 1 of 2
I
SA
KEN SALEHPOUR, Construction Inspector
- Pacific Crest Park Landscape improvement. Santa Clarita. (Landscaping)
- Los Angeles River Outlets. Pipe Relining.
- Los Angeles River. Los Angeles. (LA River Inlet rehabilitation)
- Montana/Wilshire Stormwater Project. Santa Monica. Drain/pump system
- Little Tujunga Canyon Road Angeles National Forest. Pile drive, reinforced concrete retaining,backfilling, road repair
- Pipe Relining. La Crescenta.Concrete pipe inside lining
- Pacific Crest Park Landscape improvement. Santa Clarita. (Landscaping)
- Los Angeles River Outlets. Pipe Relining.
. Head Construction Inspector 1996-2004
III
During this period, Mr. Salehpour not only supervised and assigned work to various inspectors, but also inspected many
tasks including complex projects. Some of the projects during this period included:
General William J. Fox Airfield. Lancaster. Runway reconstruction,drain, lime treatment/base and AC pavement
- Marina del Rey Seawall restoration project. Marina del Rey. This project had 1800+ CIDH with double tiebacks.
Concrete work,complex utility.(Electrical,cable,water,and sewer)AC Pavement.
- Montellano Ave, Et Al. Hacienda Heights (A landslide remediation contract) Reinforced retaining walls, tieback
reinforced retaining wall, and CHID piles.Slope stabilization.
- Valley Blvd. Over San Gabriel River. Bassett/EI Monte. Construction of a new bridge parallel to the old bridge and
retrofit the old bridge at the same period.
- Slurry Seal Project-single slurry seal project type II that covered 64 miles of roadways in the
- Unincorporated areas of Los Angeles County including: La Crescenta, Altadena/Pasadena, Arcadia/Monrovia,
Azusa/Covina, Charter Oak,West CovinaNalinda,and Temple City, Rowland Heights.
- Chip seal project(ARAM)Altadena/Pasadena
- Hacienda Blvd. Hacienda Heights. Roadway reconstruction and median island improvement/stamped concrete.
- E.Garvey Ave. Monterey Park.Street widening,curb and gutter,sidewalk,drain and roadway construction.
- Kays Ave. Et Al.South San Gabriel. Roadway improvement-street reconstruction, curb,gutter,walk&retaining wall.
. Field Inspector/Supervising Civil Engineer Assistant 1986-1996
Some of the projects completed during this period included:
- Leffingwell Rd. Roadway reconstruction including:Sub-base lime treatment, base and AC pavement.
- Azusa Ave. City of Industry Roadway reconstruction-all concrete pavement
- Fullerton Rd. Et Al. Rowland Heights. Sand Slurry-Type II , median landscaping.
- Big Tujunga Canyon Rd. Landslide Angeles National Forest.
- Schabarum Regional Park. Roland Height/Hacienda Heights. Landscaping
- Brea Canyon Cutoff. Rowland Heights. Road and walkway Reconstruction
- Ganesha Park and Ride. Pomona.
- San Francisquito Canyon Rd. Santa Clarita. Hal Fiker Wall,slope stabilization,mountain road construction
- Cienega Ave. Covina.Street and walk reconstruction. 111
- Pathfinder Rd. Hacienda Heights. New roadway construction(connected two segments of Pathfinder Road)
- Glendora Mountain Rd. Glendora.(Pile driving and road repair)
. Senior Construction Inspector 1981-19861
Reviewed plans, inspected roads and highways including street widening, highway alignments, road structural sections,
storm drains, grades, materials, concrete pouring and finishing along with landscaping. Prepared cost estimates, wrote
change order, daily report, and scheduling. Met with general public and representatives of various agencies. Mr.
Salehpour had been the inspector for the following projects with each having their own specific specifications directed to
new construction, reconstruction, or resurfacing:
-Stimson Ave. Hacienda Heights/City of Industry. -Gale Ave. Hacienda Heights.
-Helen Dr. East Los Angeles -Julian Rd. Bassett.
-Norwalk Blvd. Santa Fe Spring. -Nogales Street. City of Industry.
-Beverly Blvd. East Los Angeles -Valley Blvd. Bassett
-Mines Blvd. Et Al. Santa Fe Spring. -Heathercliff Rd. Malibu.
-"E"Street Drain -Badillo St. Covina
-Colima Road Hacienda Heights -Grand Ave.
-Bonita Ave. Glendora -La Madrina Dr. South El Monte
-McKinley Ave. Pomona -Longden Ave. Arcadia/Irwindale
-Balan Road -California Ave. Basset/La Puente
-Carroll Ave. Et Al. Glendora -Span Ave. Et Al.
-McBride Ave, Et Al. East Los Angeles -Donna Beth Ave. Et Al.West Covina
-7th Av. City of Industry -Inglewood Ave. Inglewood
-Washington Blvd.&Sheila St. Dr.Commerce -Percy Street Et Al. East Los Angeles
Page 2 of 2
I SA
IERIC SCHOENEN, P.E., QSD
Project/Construction Manager, Construction Inspector
IOVERVIEW:
Mr. Schoenen has over 20 years of experience with a mix of land surveying, design,
plan check,conditions of approval,strategic planning,and capital improvement projects.
I He has over 16 years of experience working for a Water Utility Franchise. Experience
includes budget estimating, scheduling, technical report writing, and City Council
Agenda Reports. Responsible for coordination with professional consultants and staff to
implement CIP projects as a project manager.
I EDUCATION:
California Polytechnic University, PROJECT EXPERIENCE
Pomona CITY OF SANTA MONICA
B.S.Civil Engineering, 1988
University of California,Riverside Currently providing construction management and inspection services for the Water
Supervisory Excellence I and II, 1998 Main Replacement/Upgrade Project (SP 2297) which includes replacing and/or
upgrading existing facilities and the abandonment of old facilities. The project
REGISTRATION: consists of approximately 10,000 ft. of 6"to 21" PVC pipe on Olympic Blvd., Lincoln
Registered Civil Engineer,California Ct., Pennsylvania Ave., 16th Ct., 17th Ct., 18th Ct., 20th Ct. Euclid Ave., and
Ocean Ave. Some nighttime work will be involved because of heavy vehicular and
pedestrian traffic on portions of the project.
I LONG BEACH WATER DEPARTMENT
. Currently providing engineering services for design of the East 27th Street and Via
Passilo Cast Iron Water Main Replacement Project which consists of the
replacement of approximately 4,000 feet of 6&8 inch cast iron&ductile pipe.
ICITY OF POMONA
. Recently provided construction management services for the Water Main
Replacement - Park Avenue to replace about 2,000 linear feet of a 12 inch steel
I water distribution main in Park Avenue between Orange Grove and McKinley
Avenue with a new 16-inch DIP main, including new hydrants and service
connections. This project also aims to remove/replace about 520 linear feet of VCP
sewer in Holt Avenue, about 220 linear feet of VCP sewer in White Avenue, and
Iabout 92 linear feet of VCP sewer in/adjacent to Via Estrella
LONG BEACH WATER DEPARTMENT
. Recently provided construction management and inspection services for the
I Groundwater Treatment Plant Chemical Tank Replacement Project — Phase I
(2014)
CITY OF LYNWOOD
Provided engineering services for the State Street and Tweedy Boulevard Water
Main Replacement Project. The project included the design of 8 and 12-inch DIP to
replace 6-inch CIP within the routes.Total length of replacement for the project was
approximately 2,900 feet.
ICITY OF POMONA
. Provided construction management and inspection services for Westmont Services
Lateral Replacement Project. The project included 20 locations. Work included
I replacing 183 existing 3/-inch polyethylene laterals with 1-inch copper tubing from
the meter connection to the water main within the right of way, replacing 23 meter
boxes and relocating 8 meter boxes to the sidewalk in addition to replacing
I cracked/damaged meter boxes and lids.
Provided construction management services for the Phillips Ranch Water Service
Laterals and Flush Tanks/Lamp Hole Replacements and New Manhole Installation
I projects under the City's FY 2008-09 Water & Sewer CIP. Project included
replacing approximately 464 service laterals ranging in size from%"to 2W.
Provided construction management and inspection services for Sewer
I Replacement D Project No. 586-86018. Project was comprised of three (3) sewer
main replacements;316 linear ft at 12 ft deep,256 ft at 9.5 ft deep, and 200 LF at 7'
deep. It also included nine(9)Sewer main spot repairs;six(6)at 10 ft,depth range
between 8 ft to 12 ft and three(3)at 20 ft,depth 7.5ft, 10 ft and 7.8ft.
Page 1 of 2
III
SA
ERIC SCHOENEN, P.E., QSD, Project/Construction Manager, Construction Inspector
. For the city of Pomona, served as Senior Water Resources Engineer. Coordinated with Water Operations and Public
Works to manage various projects. His primary task was associated with implementation of CIP design phase. He also
worked on other projects such as administration of 30" waterline construction. Prepared a response and met with DPH
regarding a DPH investigation of an SSO. Developed excel programs for operations staff to calculate flow of sewer spills,
and another to calculate fire flows. Reviewed and coordinate the completion of an SSMP. Design and stake
foundation/grading for a salt silo.Attended meetings related to outside water agencies.
. Provided construction management and inspection services for Sewer Replacement D Project.This Project was comprised
of three(3)sewer main replacements in different locations totaling 574 linear feet. It also included nine(9)sewer main spot
repairs at various locations throughout the City. This project included coordinating with operations/maintenance staff,
reviewing CCTV videos, and providing recommendations on substitute MH to MH and point repair locations for contract
II
locations that were not constructible. The inspection included ensuring SWPP best management practices were
implemented.
. Provided construction management and inspection services for Westmont Service Lateral Replacement Project. Work
included replacing 183 existing 3/-inch polyethylene water service laterals with 1-inch copper tubing from the meter
connection to the water main, meter box replacement and relocation. Many of the main line service laterals were direct tap
to an existing 12" ACP main line which required coordination with home owners, water maintenances staff, and water
quality personnel to coordinate water main shut downs. Bacteriological testing was required to be performed and submitted
to DHS when the main line experienced negative pressure during the shut downs.
CITY OF SOUTH PASADENA
. Provided QA/QC services for preparation of a Construction Specification Manual and Site Plan for the Arroyo Park
Playground Improvements project. Grading and drainage will be evaluated. The site plan will be prepared considering
existing above-ground topography and below-ground utilities (i.e. drainage, irrigation, telephone) and will attempt to
minimize cut and fill(earthwork)activities. The work also includes paving and restriping of the parking lot.
CITY OF SOUTH PASADENA
. Provided Construction Management and Inspection services for Sewer Improvements on Arroyo Drive, Huntington Drive,
Marengo Avenue, and Meridian Avenue (original contract total of 4,200 ft.). The work along Marengo Drive pertained to
slip lining 310 LF of CIPP. Subsurface boulders larger than 6"were discovered along Arroyo Drive,and wet clay that could
not meet compaction requirements was discovered during excavation of the other streets. These subsurface conditions
were not indicated on the plans or in the specifications. The presence of the unknown soil conditions changed the
contractors' process. The spoil along Arroyo Drive was screened and used for backfill. Wet clay along Meridian Avenue
and Huntington Drive was exported and crushed rock and CMB was used for backfill. There were also many unknown
utilities discovered during construction. This project required detailed documentation of the construction activities and
constant coordination with the contractor and the City regarding change orders. The inspection included ensuring SWPP
best management practices were implemented.
CITY OF CORONA
. For the city of Corona,served as Assistant Engineer,Associate Engineer,and Resource Engineer. Projects included:
- Performed Project Management for Capital Improvement Program. Administered projects while overseeing others;
Performed budget estimates, procured consultants and coordinated project designs, prepared front end specifications
and coordinated the interface with technical specifications, prepared bid packages, advertised and answered bidders
questions, coordinated preliminary construction meetings,shop drawing review and approval, requests for information,
responses to potential change orders, project close out and notice of completion.
- Participated in strategic planning. Determined existing and future needs of wastewater treatment. Assessment of
water reservoirs by zone. Developed excel programs related to engineering and scheduling. Update of sewer and
water master plans, and urban water management plan. Implementation of a groundwater management plan.
Preparation of conditions of approval for land development projects. Various engineering studies including economic
analysis of recycled water line construction.
- Performed engineering plan check. Reviewed improvement plans for South Corona on a sewer and water
infrastructure. Plan review for land development projects
•
I
I
Page 2 of 2
I SA
IRANDY SETO
AutoCAD Designer
I OVERVIEW:
Mr. Seto has served as designer for such projects as water mains, sewer systems,
grading plans,storm drains,water tanks, pump stations, reservoirs,and streets.
IPROJECT EXPERIENCE
CITY OF ANAHEIM
. Prepared design plans for the Amberwood Water Main Replacement Project. This
project consisted of the replacement of 4,600 lineal feet of 8-inch C900 PVC water
mains.
EDUCATION:
Pasadena City College,Pasadena,CA Prepared design plans for the Northfield Avenue and Willamette Drive Water Main
Replacement Project for the city of Anaheim.The work included the replacement of
approximately 4,600 feet of 8-inch C900 PVC pipe.
Prepared design plans for the Katella Avenue Water Main Replacement Project.
This project consisted of approximately 6,400 feet of ductile iron water mains on
Katella Avenue from Brookhurst Street to Euclid Street and on Brookhurst Street
from Crestwood Lane to Katella Avenue.
ICITY OF AZUSA
. Prepared design plans for approximately 6,300 feet of 30-inch diameter ductile iron
water pipelines on Dalton Avenue between Sierra Madre Avenue and 5th Street.
ICITY OF HERMOSA BEACH
. Prepared plans for approximately 8,900 feet of street rehabilitation and 2,700 feet
of sewer rehabilitation for the Loma Area Street and Sewer Rehabilitation Project.
ICITY OF POMONA
. Prepared plans for the rehabilitation of Reservoir Street from Mission Boulevard to
County Road; approximately 10,560 lineal feet, and Ellen Place from Reservoir
I Street to Marquette Avenue; approximately 530 lineal feet. The work included
pavement rehabilitation and pavement overlay; adjustment of utilities to grade;
striping; repair and construction of broken and missing sidewalks, curbs, gutters,
pedestrian access ramps at street intersections and street lights.
I . Prepared plans for design of the rehabilitation of Gibbs Street from Lincoln Avenue
to San Bernardino Avenue, approximately 1,950 lineal feet. The work included
pavement rehabilitation and pavement overlay, adjustment of utilities to grade,
I repair and construction of curbs, gutters, spandrels, pedestrian access ramps at
street and alley intersections.The work also included an evaluation of the drainage
issues at alley intersections, and a recommended design for proper drainage along
the street alignments.
I . Prepared plans for design of Franklin Avenue rehabilitation project which was
approximately 1,200 feet,from Garey Avenue to Park Avenue.
Prepared plans for the design of missing and/or broken sidewalk and ADA ramps
on Mountain View Avenue from Phillips Boulevard to Grand Avenue; approximately
1,320 lineal feet.The work also included a portion of Grand Avenue, approximately
200 feet,at the intersection of Grand Avenue and Mountain View Avenue.
Prepared design plans for the 30" Transmission Main Project. The work included
approximately 12,000 feet of 30" diameter steel transmission water mains. This
project included crossing two railroad tracks, connecting to an existing reservoir,
Iand location of pipeline in the Caltrans right-of-way.
. Prepared design plans for the Water Main Pipeline Districts 4, 5 & 6 Project. The
I project included approximately 17,730 lineal feet of 6", 8", 10", and 12" water
pipelines. The work included conducting utility and survey investigations.
Page 1 of 2
111
SA
Randy Seto,AutoCAD Designer
111
. Prepared design plans for 24,500 feet of 6-inch, 8-inch, 12-inch, and 16-inch diameter water pipelines in various locations
for their Priority Pipeline 1 Replacement Group 3 Project.
CITY OF LA HABRA
. Prepared design plans for the rehabilitation of two mobile home parks in the city of La Habra. The work included
pavement, sewer,water, and drainage rehabilitation. Sewer work involved reviewing the sewer report and replacing sewer
laterals, mainline, and cleanouts. The water work encompassed the installation of 6,000 feet of 8-inch PVC pipe, 300
pressure reducing valves,and two 8-inch water master meters.Streets will be cold milled and overlaid at both parks.
CITY OF RIVERSIDE
. Prepared design plans for the University Drive and Rumsey Drive Water Main Replacement project.The project consisted
of approximately 6,000 feet of 8-inch ductile iron water mains.
CITY OF SAN DIMAS
. Prepared design plans for the Foothill Boulevard Street Resurfacing and Pavement Restoration Project. This project
consisted of resurfacing and pavement restoration of Foothill Boulevard from Cataract Avenue to approximately 300 feet
east of San Dimas Canyon Road in the city of San Dimas. The total length is approximately 5,800 lineal feet. The work
included pavement rehabilitation and pavement overlay; adjustment of utilities to grade; striping; repair and construction of
broken and missing sidewalks, curbs, gutters, pedestrian access ramps at street intersections; and replacement of survey
monuments.
. Prepared design plans for the Bonita Avenue Resurfacing and Overlay Project. This project consisted of the rehabilitation
of Bonita Avenue from Arrow Highway to Eucla Avenue, approximately 1,200 lineal feet. The work included geotechnical111
investigation,survey, pavement rehabilitation, AC overlay,and striping.
CITY OF SIERRA MADRE
. Prepared plans that included resurfacing of approximately 1,850 feet of the easterly half of Michillinda Avenue from Orange
Grove Avenue to Sierra Madre Boulevard. The project included construction of asphalt concrete overlay on geo-textile
fabric; replacement of missing curb and gutter; modification of existing driveway approaches; and preparation of striping
plans.
CITY OF SIERRA MADRE
. Prepared design plans for the Water Main Replacement Projects. The work consisted of replacing approximately 1,940-
feet of 6-inch diameter ductile iron water mains,fire hydrant assemblies, blow-offs,and service laterals.
CITY OF TUSTIN
. Prepared design plans for the construction of approximately 4,600 feet of PVC water mains. This project is located in
residential streets.
Page 2 of 2
I SA
ICHARLES "CHUCK" SIHLER
Construction Inspector
IOVERVIEW:
Mr. Sihler retired from the city of Pomona in December, 1999 after 43+ years with the
Public Works Department, including 36 years with the Water Department. He is familiar
I with the Greenbook and has coordinated projects with the California Department of
Health Services.
PROJECT EXPERIENCE
I EDUCATION: CITY OF ARCADIA
East Los Angeles College . Provided construction inspection services for Baldwin Avenue Sewer Capacity
University of California, Riverside Improvement Project which consists of the construction of approximately 915 feet of
Mount San Antonio College,Walnut 15"VCP sewer replacement on Baldwin Avenue from Huntington Drive to Fairview
I Caffee College, Rancho Cucamonga Avenue.
University of California Extension
Courses in Civil Engineering and CITY OF IRWINDALE
Business Administration
Provided Construction Inspection Services for the Martin Road Sewer Lift Station
MEMBER: Project. This project includes the construction of a replacement sewer lift station to
American Public Works Association replace the existing deteriorated wet well sewer pump station.
American Water Works Association
I Los Angeles&San Gabriel Watershed CITY OF BALDWIN PARK
Council construction inspection services for City's Syracuse Storm Drain Project.
Society of American Military Engineers Project involved federal funding and labor compliance. Project consisted of
Southern California Water Utilities installation of 2,250 linear ft of 24"through 48" reinforced concrete pipe, manholes,
Association catch basins, transition structures & connector pipes, cross gutter, curb, gutter,
sewer laterals, paving, & striping. Responsible for attending pre-construction
meeting; reviewing contractor(s) submittals, responding to RFIs, reviewing &
preparing CCOs; supervising labor compliance & monitoring services;
I recommending progress invoice payments; coordinating field inspection, material
acceptance/testing, traffic control & lane closures; final job walk & preparation of
the punch list.
111 CITY OF ALHAMBRA
. Construction Inspector on 3,200 feet of 12-inch ductile iron pipe water mains on
Fremont Street, north of 1-10 Freeway to Mission Road for CGvL Engineering.
Fremont, in this area, is the 710 Freeway extension.
IAZUSA LIGHT AND WATER DEPARTMENT
. Currently providing electrical inspection for the new Goldline Alameda Parking
Structure and various City housing developments.
I . Provided Construction Inspection Services for the W-266A Main Replacement
Project.
Provided Construction Inspection Services for the WVF-243 Main Replacement
Project.
CITY OF LA PALMA
Provided inspection services for an On-Site Sodium Hypochlorite Generating
Systems Project at the Walker Well and City Yard Sites. The project involves civil,
mechanical, structural, architectural, and electrical engineering aspects. The work
includes a supervisory control and data acquisition system. The hypochlorite
Isystem will be located inside the existing well building.
CITY OF SAN BERNARDINO
. Provided Construction Inspection Services for three projects: 1) the Cajon
I Storm installation, a 12,200 LF+ of 48"-72" storm drain including a buried 450
ft. French drain, 2) a 1,214 ft. long 30" RCP storm drain in the BNSF right-of-
way and San Bernardino Water Department Cajon Reservoir site, including a
330 ft. long concrete "U" channel spillway, feeding into the 30" drain, and 3) a
Istreet, sewer, and storm drain improvements for the Pine Trails Tract.
IPage 1 of 2
SA
CHARLES"CHUCK"SIHLER,Construction Inspection
LONG BEACH WATER DEPARTMENT
. Provided inspection services for two alley service conversion projects for Earl & Locust Avenues and The Toledo. The
work included abandoning the existing water mains and services in the alley and installing private water service lines to
each house. The Earl and Locust Neighborhood had 195 conversions of 1" through 3" residential services. The Toledo
Neighborhood had conversion of 21 conversions of 1"through 2" residential services.
WEST BASIN MUNICIPAL WATER DISTRICT
. Provided construction inspection services for the Anza Avenue Recycled Water lateral at Sepulveda Boulevard. This
project is located in the city of Torrance and construction involves installation of approximately 200 feet of 6-inch diameter
PVC recycled water pipeline on Anza Avenue at the Sepulveda Boulevard intersection. The work includes coordination
meetings, daily inspection reports, coordination with the West Basin Municipal Water District (WBMWD) and other
involved parties, coordination of shop drawing review, progress payment review, monitoring of schedule, change order
review and processing, response to RFI's and RFC's,establishment of a punchlist,and start-up services.
CONSULTANT TO CITY OF POMONA
. Assisted project manager on water main installation and service conversion (inspection and technical advice) on two
projects: Lincoln Park III and McKinley & White Avenue. A total of 111 services were transferred from the alleys to the
front of the houses.
. Provided plan check services and constructability analysis on two projects for water main installation requiring service
conversion. A total of 124 services were involved for conversion from the alley to the front of the houses.
CITY OF POMONA PUBLIC WORKS DEPARTMENT: Engineering Associate
. City NPDES negotiator-"Environmental-Special Projects Section":
Responsible for the checking and preparation of all environmental documents for the Public Works Department, including
Storm Water Pollution Prevention Plans (SWPPP's); Negative Declarations and Mitigated Negative Declarations.
SWPPP's that we know today were refined and developed during this time frame and some of the Committees that he was
involved with helped to bring them to their current form including the Los Angeles County EAC, where he represented the
San Gabriel Valley for two+ years. Checking Environmental Reports was also his responsibility. Designed & formulated
templates that facilitated preparing the completed Negative Declarations and Mitigated Negative Declarations on the City's
construction projects.
. Engineering Construction Manager for various projects including:
Project Manager on the 15 mgd Anion Exchange Nitrate Removal Facility,one of the first municipal design-build projects in
California. Responsibilities included selecting the Construction firm [Sverdrup Engineering — St Louis], conducting weekly
design review meetings and supervising inspection. [project completed in 9 months on a 15 month contract]
. Project Manager for alley conversion projects including:
111
- Water main installation and conversion of 121 residential services in Garfield and Jefferson Streets from the alleys to
the streets
- Water main installation and conversion of 86 residential services in Columbia and Alvarado Streets from the alleys to
the streets
. Designer&Project Manager for various pipelines, including:
- Construction of 8", 12",and 16",24"Manifold Lines
- Loma Vista Replacement Line Project
- Ganesha Hills 8"and 10"Hillcrest Drive Project
Page 2 of 2
I SA
IDEEPAK SOLANKI. E.I.T.
Engineer
I OVERVIEW:
Mr. Solanki has 29 years of experience as an engineer on street, sewer, grading, and flood control
projects. He has also performed various calculations related to hydrology and hydraulics;
earthwork; construction staking; topographic field and boundary surveys, etc. He is also familiar
Iwith preparing cost estimates and legal descriptions. He has prepared plans using AutoCAD.
PROJECT EXPERIENCE
I CITY OF SAN DIMAS
Prepared plans and specifications for approximately 3,000 feet for the Rehabilitation of San
EDUCATION: Dimas Canyon Road from Foothill Boulevard to Romola Avenue for the city of San Dimas. The
I M.S.University, Faculty work includes removal and replacement of existing AC with 4" AC and 6" Class A Crushed
of Technology& Aggregate Base (CAB). All non-compliant handicapped ramps within the project limits to be
Engineering, India replaced to comply with ADA.
B.S.,Civil Engineering,
1982 Prepared design plans for the Bonita Avenue Resurfacing and Overlay Project(Arrow Hwy to
I Eucla Ave). This project consisted of approximately 1,200 lineal feet pavement rehabilitation,
REGISTRATION: geotechnical investigation,survey, AC overlay,and striping.
Engineer in Training,
California,2002 BALDWIN PARK
I . Provided professional engineering /technical plan check services to produce the Final Parcel
Map and Final Tract Map to the City.The work includes three plans for each map.
Evaluated streets for the City's Pavement Management System (PMS) using an existing PMS
database in Microsoft Access, listing various street segments. The work included driving the
City streets and determining the condition of the streets. A Pavement Distress Data Form was
completed for each segment and input into the PMS program. Damaged and/or missing
Isidewalk and curb and gutter were also included. A report was prepared for the City.
CITY OF HERMOSA BEACH
. Prepared plans and specifications for the Loma Area Sewer and Street Rehabilitation Project.
I The project consisted of approximately 8,900 feet of street rehabilitation and 2,700 feet of
sewer rehabilitation for the Loma Area Sewer and Street Rehabilitation project.
COUNTY OF LOS ANGELES
Prepared plans for six street rehabilitation projects designated as the Accelerated Road
Construction Program: Irwindale Avenue, Et Al for the County of Los Angeles. Total length is
13,600 feet. A Materials Report was also prepared with recommendations for alternate
methods of pavement rehabilitation. Asphalt rubber hot mix was used.
I . Prepared plans for five street rehabilitation projects adjacent to the cities of Lancaster and
Palmdale, designated as the Accelerated Road Construction Program: Avenue G, Et Al. The
total length was 26,400 feet. A Materials Report was prepared with recommendations for
Ialternate methods of pavement rehabilitation.Asphalt rubber hot mix was used.
CITY OF MORENO VALLEY
. Provided engineering services to the city of Moreno Valley. Mr. Solanki served as a
Management Analyst/Project Coordinator for the Capital Projects Division. He served as an
extension to City Staff,assisting in a variety of projects as follows:
- Research and preparation of a master list consisting of unimproved and unmaintained
streets within the City. Streets from the master list were further sorted and ranked using a
priority matrix consisting of different criteria.
- Preparation of a five year Capital Improvement Program for street improvements.
- Updating and creating new City Standards.
- Design of a Class II and III bikeway and street widening plans.
- Cost estimating various capital improvement projects, budgeting and assisting in preparing
applications for various grant program funds.
Prepared plans and specifications for the City's Maintenance Zone "D" Project. The project
consisted of approximately 2,700 feet of asphalt pavement restoration and overlay.
Page 1 of 1
I SA
IMELVIN SUKOW, P.E.
Engineer
IOVERVIEW:
Mr. Sukow has over forty years of professional engineering experience in project
planning, project analysis, project expediting and project design including surveying,
I mapping, planning, civil and structural aspects. He has provided consulting services for
the preparation of plans and maps for subdivision, institutional, commercial and
infrastructure type projects to land developers, agencies, architects and other engineering
firms. Plans include street,sewer,storm drain,grading and structural plans. Also providing
I EDUCATION: various surveying and mapping functions such as design surveys, construction surveys,
California State University,Fresno legal descriptions,right-of-way maps,etc.
B.S.Civil Engineering
PROJECT EXPERIENCE
I REGISTRATION:
Registered Civil Engineer,California, CITY OF LOS ANGELES, BUREAU OF ENGINEERING, LOS ANGELES, CA —
No.PE 26673 DESIGN ENGINEER
I MEMBER: Worked in the following design areas:
•
American Council of Engineering Street Design-Prepared designs for new and widening type projects. Projects
Companies of California(ACEC-CA)
State Director included associated storm drain,sewer and utility design.
City of Los Angeles-City Engineer/ Subdivision Development-The tasks included survey, mapping, planning and civil
ACEC-CA Liaison Committee •
American Society of Civil Engineers engineering aspects of projects.
• Structural Engineering-The work included bridge designs, building designs and wall
designs.
I • Construction Engineering-During the construction phase of projects provided
engineering support by reviewing shop drawing submittals, responding to request for
information and modifying plans to deal with field conditions.
ITransportation Engineering-Served as the liaison between Caltrans and the City's
Bureau of Engineering on all Caltrans'projects.
I SKIRBALL CULTURAL CENTER - Provided all mapping, surveying and civil work
including easement descriptions and parking, grading, retaining wall, site sewer, site
water,storm drain, public sewer and public street plans.
I CEDARS SINAI HOSPITAL - Provided campus wide surveying data, parking plans,
public street plans,grading plans and building placement controls.
WESTCHESTER PARKWAY—LAX- Managed design of two mile street project and
I the subdivision of 400 acres on the north side of LAX. This task included mapping,
surveying, grading, bridge plans, street plans, sewer plans, storm drain plans and
utility coordination.
I NORTHRIDGE HOSPITAL - Provided design and surveying services to reconstruct
site and site utilities after 1994 earthquake. Also, provided the surveying and site
design of new child care facilities.
I HUNTINGTON MEMORIAL HOSPITAL- Provided surveying and site design of new
generator plant facilities, provided design survey for hospital expansion, and provided
construction surveying for new parking lot.
I CITY OF BURBANK - Provided civil design for Grismer Street Center for the
Community Apartments.
I MEDICAL CENTER SIMI VALLEY - Provided the mapping, surveying and civil
engineering services to convert existing commercial center into a medical clinic.
VALLEY VILLAGE - Provided all civil plan and surveying work including grading,
retaining walls,site sewer,site water,and storm drain.
Page 1 of 2
SA
MELVIN SUKOW, P.E., Engineer
NORTH SPRING STREET BRIDGE OVER LA RIVER WIDENING, LOS ANGELES - Mr. Sukow managed the utility
coordination and the underground infrastructure design for this project. The project included the widening of a magnificent
historical arch Bridge over the Los Angeles River.The structure was built in 1928.The bridge is 680 feet long and only 45 wide.
In order to meet the standard design requirements and provide sidewalks and bike lanes, the City is widening the structure on
the south side. The bridge crosses over 4 Metrolink and UPRR tracks with minimum clearances. The City used this widening
project to include a new 12" and 16" reclaimed water line through the bridge and beyond the bridge to the limits of the total
street widening project. The project also involved the relocation of high voltage lines and communication lines that were in the
way of the widening. Storm drains and a trunk line sewer also had to be relocated as part of the project. Mr. Sukow's team 111
provided for the development of the plans needed for these and other relocations and produced a composite utility plan for the
entire project development. Mr. Sukow is also providing support services during construction.
PARK PLAZA WEST- Provided all civil plan and surveying work including grading, retaining walls, site sewer, site water,
and storm drain.
MEDIA CENTER-provided civil design for multi-phase commercial building complex in the City of Burbank located near the
Burbank Airport.Work included sewer,storm drain,grading and street design.
TRACT NO.45405,ZELZAH AVENUE-Provided grading and public improvement plans for 13 lot hillside subdivision
PARAMOUNT PICTURES-Provided design of new intersection entry at Bronson Avenue
STARBUCKS SIMI VALLEY-Provided civil design for new Starbucks including public street improvements
PARK LA BREA-provided civil design and structural design for new park facility. Provided various design for other facilities 111
within the complex including sewer, storm drain,grading and street design.
PINNACLE-provided civil design sewer, storm drain,grading and street design for seven story commercial building. Project
is Located in the City of Burbank.
TRACT NO. 4403, COUNTY OF VENTURA— 155 LOT HILLSIDE SINGLE FAMILY HOMES - Mr. Sukow was the project
manager for the development of this project. Over 155 lots were created in the hillside area of the West Oak Park area within
the County of Ventura. This included the creation of a new mapped subdivision with new roadway system to service the new
lots. Mr. Sukow, as project manager for this project, oversaw all surveying, mapping, design engineering, construction
surveying and construction engineering aspects of the project. The new streets included all underground facilities within the
street. The waterline design was done to the standards and specifications of the Metropolitan Water Company located in the
County of Ventura. The project was funded by Pardee Construction Company.
SERRAO MIXED-USE COMMERCIAL/CONDOMINIUM PROJECT- Provided the project management and design for the civil
engineering,surveying and mapping portions of the project. The project is located at the southwest corner of the intersection of
Ventura Boulevard and Woodley Avenue in the City of Los Angeles. The project involved the redevelopment of an existing site
that contained a multi story office building to remain, included the demolish of a single story commercial retail center and
provided for the construction of a combined retail/residential multi story building with underground parking. Mr. Sukow
managed his portion of the project from conception to completion of construction. This included the preparation and filing of
subdivision maps with the City, preparation of public facility plans such as street widening plans and preparation of all on-site
civil plans.
Page 2 of 2
I SA
SCOTT WALZ
AutoCAD Designer
I OVERVIEW:
Mr.Walz has eight years of experience of CADD and inspection experience.
PROJECT EXPERIENCE
ICITY OF GLENDORA
. Prepared plans for well head facilities and well pump for new well No.14. The new
well is located at Willow Springs Park near the intersection of Leadora Avenue and
I Willow Springs Lane east of Sellers School.The site is located in a residential area
and is approximately 0.5 acre. The well capacity is approximately 350 gallons per
EDUCATION: minute and the Pumping level is at 480 feet below ground surface.
Riverside Community College,Norco
I Campus CITY OF LYNWOOD
Engineering Coursework Prepared plans for pump house facilities for a new municipal supply well No. 22.
Westech College,Ontario
The site is located adjacent to a residential area and is approximately 5 000 square
AutoCAD Civil 3-D TrainingI PP Y q
California Polytechnic University feet. The well capacity is 2,500 gallons per minute and at a pumping level of about
Pomona 130 feet below ground surface. The well casing is 18 inches in diameter and the
Bachelor of Architecture well discharge piping is 12 inches in diameter.
B.S.Civil Engineering
I
CITY OF POMONA
.
REGISTRATION: Prepared plans for the District 6 Phase IV Water Main Replacement Project for
Engineer in Training
E.I.T. No. 128481 approximately 7,300 feet of 10" and 12" ductile iron water mains in Bonita and
Towne Avenues. The design includes above ground PRV station design. This
I MEMBER: project will cross railroad tracks and requires a permit from the SCRRA/Metrolink.
American Society of Civil Engineers,
Younger Member Forum . Prepared plans for the District 1, 2, and 5 Water Main Replacement Project for
Engineers Without Borders, Inland approximately 4,220 feet of 8", 10", and 12" ductile iron water mains in various
Empire Chapter streets. The design includes above ground PRV station design. This project
Kiwanis International,Circle K requires a permit from Caltrans for two freeway crossings.
KINNELOA IRRIGATION DISTRICT
Prepared plans for the Windover and Sierra Madre Villa Water Main Replacement
Project in the city of Pasadena. The work consisted of 2,210 feet of 8, 10, 12,& 16"
ductile iron pipe, new water services, and new fire hydrants. Designed an above
ground valve vault for the discharge piping from a system reservoir. The vault
I design included structural and piping revisions to improve the accessibility of the
reservoir discharge piping.
IRVINE RANCH WATER DISTRICT
Provided inspection services for IRWD's Natural Treatment Systems (NTS) El
Modena Park. The project involved implementation of a portion of the NTS Master
Plan that was intended to assist the County of Orange and various cities in meeting
the Total Maximum Daily Load (TMDL) requirements for the San Diego Creek
I Watershed as set by the Santa Ana Regional Water Quality Control Board. The
project required working closely with representatives from IRWD, the County of
Orange,the City of Orange,and the designer of records.
Provided inspection services for the IRWD's Natural Treatment Systems (NTS) In-
Lin Basins Project. This project involved implementation of a portion of the NTS
Master Plan that was intended to assist the County of Orange and various cities in
meeting the Total Maximum Daily Load (TMDL) requirements for the San Diego
ICreek Watershed as set by the Santa Ana Regional Water Quality Control Board.
CITY OF PERRIS
Prepared street improvement plans, sewer and water plans, and roadway typical
sections for Stone Ridge, a 694 acre residential development project located in the
unincorporated portion of Riverside County, just south of Perris lake and the
Ramona Expressway. The project ultimate development would contain about 2,200
I homes. The project was highlighted by the development of two detention basins;
one 25 acres and the other 6 acres. The large site was designed to contain the 100
year storm multi-day storm for the whole site and may double as a recreational part.
Page 1 of 1
SA
PHILLIP E. WEST. P.E., QSD/QSP
Engineer
OVERVIEW:
Mr. West serves as an Engineer for projects related to water and wastewater systems.
In the past few years, he has worked on a number of street rehabilitation projects for
several public agencies. Other projects include water mains, storm drain, sodium-
hypochlorite generation,and street rehabilitation projects.
PROJECT EXPERIENCE
CITY OF ANAHEIM
. Currently preparing plans and specifications for the 8"Water Main Replacement in
EDUCATION: County Glen Way for the replacement of 5,300 ft. of 6&8-inch ductile iron pipe and
California State University,Long Beach
B.S.Civil Engineering 6&8-inch polyvinyl chloride(PVC)pipe.
REGISTRATION: . Prepared plans and specifications for the Katella Ave. 8-inch Main Replacement
Registered Civil Engineer,California, Project. The project consisted of over 1,500 lineal feet of water main along Katella
No.77453 Ave.from Jean St.to Brookhurst St.and several 6-inch lateral tie-ins.The design of
the project required close coordination with the Katella Ave. Street Widening
Qualified SWPPP Developer(QSD) Project design plans to insure the design and location of the main allowed for ease
Qualified SWPPP Practitioner(QSP) of construction for existing street conditions as well as ease of access for the
Certificate No.25034 proposed conditions, which included a widened street with a raised median and
sound-proof walls for residents.
CITY OF COMMERCE
. Currently providing design services to the City of Commerce for water main (fire
flow), and pavement improvements to its Camp Commerce site in Lake Arrowhead,
CA. The scope of services include evaluation of alternative alignments,
coordination with outside agencies including Caltrans, San Bernardino County Fire
Department, and Lake Arrowhead Community Services District (LACSD), and
engineering design. The design includes a connection to an existing LACSD 8inch
main in State Hwy. 173 and structural rehabilitation of a snow drop concrete pad.
ROSE HILLS CEMETERY
. Currently designing the recycled water retrofit for 600 acres of Rose Hills Memorial
Park and Cemetery. The design includes approximately 4,500 LF of 8" potable
water/fire protection pipeline, 8,000 LF of 4" and 8" potable water pipeline, and
modifications to the four(4) on-site wells and four(4) reservoirs. The project team
is coordinating with Rose Hills staff, Upper San Gabriel Valley Municipal Water
District, Los Angeles County Sanitation Districts, San Gabriel Valley Water
Company, Los Angeles County Department of Public Health, and the Los Angeles
County Fire Department. This project is funded by DWR Proposition 84, Round 3—
Drought Grant and MWD On-Site Recycled Water Retrofit.
CITY OF GLENDORA
. Prepared plans for well head facilities and well pump for new well No.14. The new
well is located at Willow Springs Park near the intersection of Leadora Avenue and
Willow Springs Lane east of Sellers School.The site is located in a residential area
and is approximately 0.5 acre. The well capacity is approximately 350 gallons per
minute and the Pumping level is at 480 feet below ground surface.The well casing
is 18-inch diameter and the has an inflatable packer to allow isolation of
groundwater between 385 feet and 410 feet below ground in the event water quality
issues are encountered. Disinfection provisions is a temporary sodium hypochlorite
feed system utilizing a drum and drum pump. The project also involved field
verification of SWPPP/BMP items at the site.
KINNELOA IRRIGATION DISTRICT(Pasadena,CA)
. Currently preparing plans & specifications for design of the East-West Tank
Connector Pipeline consisting of 2,800 ft of 12" DIP, including connections to
existing main, Design of 960 ft of 4" DIP, including connections to existing 4" steel
tunnel line, Design of 2 Los Angeles County Flood Control Channel crossings.
Page 1 of 2
ll
SA
PHILLIP E.WEST. P.E., QSD/QSP, Engineer
111
. The Kinneloa Irrigation District contracted with SA Associates to prepare a Preliminary Design Report(PDR)to determine
design parameters, evaluate alignment options, and to provide cost estimates for the construction of approximately 2,800
ft. of 12-inch water line across hilly terrain connecting the distribution systems of its East and West Tanks. The report
included a detailed description of the existing site conditions as well as exhibits and photographs which highlight the key
issues affecting the proposed water main design and construction. The PDR concluded that the construction can be
combined as one project segment,or phased into three separate project segments.
. Prepared plans and specifications for the Windover and Sierra Madre Villa Water Main Replacement Project in the city of
Pasadena. The work consists of 2,210 feet of 8, 10, 12, &16"ductile iron pipe, new water services,and new fire hydrants.
Aided the District during the bid process
. Prepared plans and specifications for the design and construction of water mains within the Kinneloa Mesa neighborhood.
The work includes the installation of four (4) water mains in separate streets along with the installation of five (5) fire
hydrant assemblies in accordance with LA County Fire Department requirements.Aided the District during the bid process.
. Prepared detailed plans for the design and installation of a 10-inch water main along New York Drive. The work includes
the installation of a 10-inch water main, an air release valve, blow-off assembly, fire hydrant assembly, and other
connections and appurtenances.
LONG BEACH WATER DEPARTMENT
. Currently preparing plans and specification for the East 27th Street and Via Passilo Cast Iron Water Main Replacement
Project which consists of the replacement of approximately 4,000 feet of 6&8 inch cast iron&ductile pipe.
CITY OF LYNWOOD
. Prepared plans and specifications for the State Street and Tweedy Boulevard Water Main Replacement Project. The
project includes the design of 8 and 12-inch DIP to replace 6-inch CIP within the routes.Total length of replacement for the
project is approximately 2,900 feet.
CITY OF PICO RIVERA
. Prepared plans and specifications for the 3 Water Main Inter-Ties Project. The project includes the design of three (3)
interconnections between exist mains at separate locations throughout the city. The design involves pressure regulating
stations connecting the City's water system to Pico Water District's system at three separate locations for an estimated
construction cost of over$250,000.
CITY OF POMONAI
. Currently preparing plans and specifications for the Water Main Replacement- Park Avenue.to replace about 2,000 linear
feet of a 12 inch steel water distribution main in Park Avenue between Orange Grove and McKinley Avenue with a new 16-
inch DIP main, including new hydrants and service connections.This project also aims to remove/replace about 520 linear
feet of VCP sewer in Holt Avenue, about 220 linear feet of VCP sewer in White Avenue, and about 92 linear feet of VCP
sewer in/adjacent to Via Estrella.
. Prepared plans and specifications for District 6 Phase IV Water Main Replacement Project for approximately 7,300 feet of
10"and 12" ductile iron water mains in Bonita and Towne Avenues. This project will cross railroad tracks and requires a
permit from the SCRRA/Metrolink.
. Prepared plans and specifications for the District 1,2, and 5 Water Main Replacement Project for approximately 4,220 feet
of 8", 10",and 12"ductile iron water mains in various streets. This project requires a permit from Caltrans for two freeway
crossings.
CITY OF SOUTH PASADENA
. Provided engineering services for preparation of a Construction Specification Manual and Site Plan for the Arroyo Park
Playground Improvements project.Grading and drainage were evaluated. The site plan was prepared considering existing
above-ground topography and below-ground utilities (i.e. drainage, irrigation, telephone) and attempted to minimize cut
and fill(earthwork)activities. The work also includeds paving and restriping of the parking lot.
I
I
Page 2 of 2
I SA
Al
Statement of Qualifications for On-Call Services
SECTION IV: HOURLY CHARGE RATES AND EXPENSE REIMBUSEMENT SCHEDULE
RATES EFFECTIVE JULY 1, 2015 TO JUNE 30, 2018
Hourly Rates
July 1, 2015- July 1, 2016- July 1, 2017-
Position June 30, 2016 June 30, 2017 June 30, 2018
Principal-in-Charge $195.00 _ $200.00 $205.00
111 Project Manager/Construction Manager $150.00-$190.00 _ $155.00-$200.00 $160.00-$205.00
Engineer $110.00-$135.00 _ $115.00-$140.00 $120.00-$145.00
I Construction Inspector $ 90.00-$120.00 $ 95.00 -$125.00 $ 98.00-$130.00
AutoCAD Designer $ 95.00 _ $ 98.00 $100.00
Clerical $ 78.00 $ 80.00 $ 82.00
ITwo-Man Survey Crew $230.00 $235.00 $240.00
IReimbursable In-House Costs
Photo Copies $ 0.15/each
I Blueprints $ 0.50/S.F.
Vehicle mileage, between engineer's office and project site and/or client office, will be $ 0.58/mile
billed at
I
Other Reimbursables
Reproduction, special photography, printing, and any other services performed by cost+ 15%
subcontractor will be billed at
Postage, Delivery Service, Express Mail cost+ 15%
I
I
I
I
I
ISECTION IV: HOURLY CHARGE RATE AND EXPENSE REIMBURSEMENT SCHEDULE Page 1 of 1
1
SA
1130 W. Huntington Drive, Unit 12
Arcadia, CA 91007
Tel 626.821.3456
Fax 626.445.1461
www.saassociates.net