Loading...
LAC Metropolitan Transportation Authority No LOA.P000F1506 (Amendment No. 1) Los Angeles County One Gateway Plaza 213.922.2000 Tel Metropolitan Transportation Authority Los Angeles,CA 90012-2952 metro.net RECEIVED et ro City of Rancho Palos Verdes JAN 3 0 January 28, 2014 PUBLIC WORKS DEPARTMENT City of Rancho Palos Verdes Dept. of Public Works 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 Attention: Nicole Jules, Senior Engineer SUBJECT: EXECUTED MENDMENT NO. 1 TO THE LETTER OF AGREEMENT FOR BIKE COMPATIBLE ROADWAY SAFETY AND LINKAGE ON PALOS VERDES DR. SOUTH (LOA.P000F1506) iup- t- Dear es, Attached is the EXECUTED Amendment No. 1 to the Letter of Agreement (LOA) for the BIKE COMPATIBLE ROADWAY SAFETY AND LINKAGE ON PALOS VERDES DR. SOUTH (LOA.P000F1506) project. The City must continue to work with Caltrans to complete the necessary documentation to receive the authorized funds (See LOA Attachment D and F) and meet Metro's Timely Use of Funds requirements. Should you have any questions please feel free to call me. I can be reached at (213) 922-7675 or by email at jusaya@metro.net. Sincerely, Anthon usay Los Angeles County Metropolitan Transportation Authority (Metro) Transportation Planning Manager One Gateway Plaza, MS 99-22-2 Los Angeles, CA 90012 Enclosures 1111 0 FTIP#: LAF1506 CFP#F1506 AMENDMENT NO.1 LOA.P000F1506 AMENDMENT NO. 1 LETTER OF AGREEMENT BETWEEN RANCHO PALOS VERDES AND THE LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY This Amendment No. 1 to Letter of Agreement (this "Amendment"), is dated as of November 25, 2013, by and between City of Rancho Palos Verdes ("Project Sponsor"), and the Los Angeles County Metropolitan Transportation Authority ("LACMTA"). RECITALS: A. Project Sponsor and LACMTA entered into that certain Letter of Agreement No. LOA.P000F1506, dated November 24, 2008, (the "Existing LOA"), which Existing LOA provides for the Bike Compatible.Roadway Safety and Linkage on Palos Verdes Drive South, ("the Project"); and B. Whereas, LACMTA Board on July 25, 2013, desires to extend the lapsing date of Funds programmed for Fiscal Year (FY) 2010-11 to June 30, 2014; and C. Whereas, LACMTA Board on July 25, 2013, approved changes in scope of work. D. Project Sponsor and LACMTA desire to amend the Existing LOA as provided herein. Rev: 08.07.13 1 LOA Amendment Lapsing Date Extension 1 so • FTIP#: LAF1506 CFP#F1506 AMENDMENT NO.1 LOA.P000F1506 AGREEMENT: NOW, THEREFORE, for good and valuable consideration, the receipt and adequacy of which are hereby acknowledged, the parties hereby agree as follows: 1. Part II, Paragraph 6.1(ii) of the Existing LOA is hereby amended by deleting it in its entirety and replacing it with the following: "Funds programmed for FY 2008-09 are no longer available. Funds programmed for FY 2010-11 are subject to lapse on June 30, 2014. Project Sponsor shall allocate or obligate these Funds by the lapsing date." 2. Attachment C of the Existing LOA is hereby replaced by Attachment C- 1, attached. 3. Part II, Paragraph 8 of Existing MOU is hereby amended by deleting it in its entirety and replacing it with the following: "8. COMMUNICATIONS: 8.1 Project Sponsor shall ensure that all Communication Materials contain recognition of LACMTA's contribution to the Project as more particularly set forth in "Funding Agreement Communications Materials Guidelines" available on line or from the LACMTA Project Manager. Please check with the LACMTA Project Manager for the web address. The Funding Agreement Communications Materials Guidelines may be changed from time to time during the course of this Agreement. Project Sponsor shall be responsible for complying with the latest Funding Agreement Communications Materials Guidelines during the term of this Agreement, unless otherwise specifically authorized in writing by the LACMTA Chief Communications Officer. 8.2 For purposes of this Agreement, "Communications Materials" include, but are not limited to, press events, public and external newsletters, printed materials, advertising, websites radio and public service announcements, electronic media, and construction site signage. A more detailed definition of"Communications Materials" is found in the Funding Agreement Communications Materials Guidelines. 8.3 The Metro logo is a trademarked item that shall be reproduced and displayed in accordance with specific graphic guidelines. These guidelines and logo files induding scalable vector files will be available through the LACMTA Project Manager. 8.4 Project Sponsor shall ensure that any subcontractor, induding, but not limited to, public relations, public affairs, and/or marketing firms hired to produce Project Communications Materials for public and external purposes will comply with the requirements contained in this Section. Rev: 08.07.13 2 LOA Amendment Lapsing Date Extension FTIP#: LAF1506 CFP#F1506 AMENDMENT NO.1 LOA.P000F1506 8.5 The LACMTA Project Manager shall be responsible for monitoring Project Sponsor compliance with the terms and conditions of this Section. Project Sponsor failure to comply with the terms of this Section shall be deemed a default hereunder and LACMTA shall have all rights and remedies set forth herein." 4. Part I, Paragraph 9 of Existing LOA is hereby amended to change LACMTA's project manager to Anthony jusay, mail stop "99-22-6". 5. Except as expressly amended hereby, the Existing LOA remains in full force and effect as originally executed. All rights and obligations of the parties under the Existing LOA that are not expressly amended by this Amendment shall remain unchanged. Rev: 08.07.13 3 LOA Amendment Lapsing Date Extension FTIP#: LAF1506 CFP#F1506 AMENDMENT NO.1 LOA.P000F1506 IN WITNESS WHEREOF, the parties have caused this Amendment No. 1 to be duly executed and delivered as of the above date. LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY 411 By: -dor Date:Date: ����/�� #4. =�ur T. Le.1� Chief Executive Officer APPROVED AS TO FORM: JOHN F. KRATTLI County Counsel By: 0 (1frt Date: i'-IiiIi3 Deputy City of Rancho Palos Verdes 111 By: fir- Date: Vi Les Jones II Interim Direct. of Puolic Works Rev: 08.07.13 4 LOA Amendment Lapsing Date Extension FTIP#: LAF1506 CFP#F1506 Amendment No.1 LOA.P000F1506 ATTACHMENT C-1 SCOPE OF WORK PALOS VERDES DRIVE SOUTH BIKE COMPATIBILE ROADWAY SAFETY AND LINKAGE PROJECT#F1506 LOCATION The Bike Compatible Roadway Safety and Linkage Project on Palos Verdes Drive South is located in the City of Rancho Palos Verdes, on Palos Verdes Drive South from 2,400 feet west of Schooner Drive to Conqueror Drive, as shown on the attached vicinity map. Palos Verdes Drive South is a primary east-west corridor of travel for road users on the Peninsula. The Right-Of- Way is owned and controlled by the City of Rancho Palos Verdes. PROJECT DESCRIPTION The Bike Compatible Roadway Safety and Linkage Project on Palos Verdes Drive South, consists of the design and construction of a 5-to 8-foot wide bicycle lane (Class 2)with buffer constructed as part of the roadway linkage, on each side of the public right-of-way for a length of approximately 0.8 miles. The Bike Compatible Roadway Safety and Linkage Project on Palos Verdes Drive South includes median modification to increase the roadway width,minor grading, paving, striping and signage. The project is part of the Palos Verdes Peninsula Regional Bikeway network connecting the City of Rancho Palos Verdes to the Cities of San Pedro and Palos Verdes Estates. Destinations and activity centers include: Trump National Golf Course, Abalone Cove Shoreline Park, the Palos Verdes Nature Preserve, Terranea Resort, Point Vicente Interpretive Center and Golden Cove Shopping Center. This bike compatible roadway will be a link on the existing bike route along Palos Verdes Drive South through the active landslide zone extending from Narcissa Drive and 2,400 feet west of Schooner Drive. The above-mentioned activity centers are along the road and are accessible to cyclist,pedestrians and motorists. The Design, Preparation of Plans, Specifications and Construction Estimate (PS&E) will be completed in accordance with Federal, State and Metro Standards. The design of the bikeways will be in conformance with: CAMUTCD, State of California Department of Transportation Highway Design Manual on Bikeway Facilities(Chapter 1000); the Federal Americans with Disabilities Act(ADA); and MTA Rights-of-Way Preservation Guidelines. The City of Rancho Palos Verdes takes responsibility for the following milestones: Milestones for Project Tracking Begin Date End Date Duration (months) Execute Amended LOA, E-76 11/2013 2/2014 3 Bid Package Preparation 2/2014 4/2014 2 Advertise/Award Construction Contract 9/2014 11/2014 2 Construction 1/2015 5/2015 4 Project Completion Report(Final Invoice & Report) 5/2015 8/2015 3 LOA Expiration 11/2015 11/2015 0 0 0 FTIP#: LAF1506 CFP#F1506 Amendment No.1 LOA.P000F1506 Bike Compatible Roadway Safety and Linkage on Palos Verdes Dr South#F1506 Detailed Schedule Task Begin End Duration Schedule sequentially Month/Year Month/Year (months) • Develop Amended LOA Attachments w/Metro 11/2013 12/2013 2 : • Sponsor& Metro CEO signs LOA 12/2013 12/2013 1 ._ • Schedule&Conduct Field Review with Caltrans(Metro Completed a' attends) Ta c • Submit to Caltrans: "Request for Authorization to Proceed E with Preliminary Engineering," executed LOA, Request for Completed o Authorization Data Sheet, Local programs Agreement .2 (See Local Assistance Procedures Manual for required w forms). Copies to Metro Project Manager. • Environmental Clearance/Preliminary Engineering Completed ••Caltrans must issue Notice to Proceed/Program - Completed Completed Supplement Agreement E76 before starting design • Design 2/2014 4/2014 2 t • Acquisition Needs Authorization to Proceed (See Local N/A N/A N/A Q' Assistance Procedures Manual for required forms). If .o applies. m • License Agreement w/MTA(if on Metro R/W) N/A N/A N/A • Right of Way Certification (Local Ass't Manual) • Permit applications(Local Ass't Manual) • Complete all pieces of PS&E/Bid Package 4/2014 04/2014 0 • Submit to Caltrans: "Request for Authorization to Proceed 5/2014 5/2014 0 with Construction"and all required documents (See Local Assistance Procedures Manual for required forms). m co • Caltrans must issue Notice to Proceed/Program 5/2014 8/2014 3 a Supplement Agreement E76 before advertising to bid (2-6 = mos) (See Local Assistance Procedures Manual for o .; required forms). o • Advertise Bid &Award Construction Contract 9/2014 11/2014 2 2 • Construction 1/2015 5/2015 4 v • Report of Completion (See Local Assistance Procedures 5/2015 8/2015 3 Manual for required forms). s 0 0 FTIP#: LAF1506 - CFP#F1506 Amendment No.1 LOA.P000F1506 Bike Compatible Roadway Safety and Linkage on Palos Verdes Dr South#F1506 ESTIMATED PROJECT COSTS: Item# Item Description Quantity Unit Unit Cost Total Cost 1. Proiect Design, 1 LS $58,000 $58,000 2. Construction Survey 1 LS $15,000 $15,000. 3. Project Management/Construction Management 1 LS $25,000 $25,000 4. Inspection 1 LS $45,000 $45,000 Design Subtotal $143,000 5. Construction 5.1. Mobilization(5%Max) 1 LS $25,000 $25,000 5.2. Construction Area Signs • 1 LS $5,000 $5,000 5.3. Traffic Control,Work Area Safety,and Project Phasing 1 LS $30,000 $30,000 5.4. Stormwater Pollution Protection 1 LS $10,000 $10,000 5.5. Unclassified Excavation and Import Fill 900 CY $40 $36,000 5.6. Clearing and Grubbing 1 LS $15,000 $15,000 5.7. AC Pavement 1000 TN $110 $110,000 5.8. PCC Curb and Crushed Miscellaneous Base 5000 LF $25 $125,000 5.9. Irrigation Modification and Restoration 1 LS $40,000 $40,000 5.10. ARHM Pavement 1400 TN $90 $126,000 5.11. Asphalt Curb 4500 LF $10 $45,000 5.12. Signing,Striping&Pavement Markings 1 LS $10 $10,000 5.13. Landscape Restoration 1 LS $30,000 $30,000 5.14. Storm Drain Catch Basin 2 EA $10,000 $20,000 5.15. Construction Contingency 10% $83,688.04 Construction Subtotal $640,869.20 Grand Total(Design and Construction) 788,000.00 Rev: 09.25.12 3 LOA CMAQ RSTP Attachment BC-1 rD > `71 < .• o . ,., Palos Verdes Drive South 4t ra-. •• t,..) . cal 5 ; Bike Compatible Lane , t...) -ri - ..., LAF1506 . P , \ . )--.----- ------ 4, • 4 4 , t I — ,":"„; '''"'. , i . , • . 4 Landslide Limits Revised Project Limits: • . •, ,r,..„ . ,_ ...... Narcissa Drive to 2400 ft 1, 2,400 ft west of Schooner Drive .,.., Awest of Schooner Drive 1 to Conqueror Drive .,e' ;.1,,Ay,.7 -*,,7",kt , .. _, , ..... f ,41°' " 4' '4- 41%.1,..4„ ,,,4, ' f. ' ...1. .. i', . ,1/4 To . , ., /-4** . -14,..•A' ' ', ' ''''.',,, .• \ 14/ .. , ...** i , , tt, '1, , -P. . , .. . ....,,,,. I ,.. „ A. s 4 •4i,„ . "ki.".":„,;:„ N,','L,,7 , . III a `.: 14, 4. • 1) ' •• • .r ,. 4. 46 4.1" ikur. I\, iligiN ,13:1- i ' a _ss.,:- '"' - -. ..,, , 7* ft ....,1/4 \ , ,, . , , • , t#-1,„ 'I" „ . • 1.1 r Ot s' , , . ...,_ ‘, Ilhir""C:A it *''",*''' qi. 1114,. 1*.C.V. a 4*- ' 0.1., ..." ' ''..:,. \ „4 , 4,,, .., .. , t 4 , 11 . n. . 4. . * '...,' * ' .... • t .' -,, ,,,, '*.' ,..\: ' '.• .',4(1040""•114,.. , . ., ,i, ., t > C n • a 4- I, - ... i. . . A , •\ ' . .. f 1 '' L... , I '•. ' \ 4 N - ''' .. ' 'km' ' : ..:Z' 4 ' ' ' ' . • . , , - > 44k..' . \ ,.•. • I. q14,, 4-. , r 1,1' '.., , Ali , • PJ CA ..., a . i• Original Project Limits: 0 Narcissa Drive to Schooner Drive 1 , . • n 0 '71 lir.,•• k zr, .. 0 '-0 rD iiit,,•4 0 201 4,''.k..,...,ay I, .4,.4 •04-'4.\ "r1 "ri ,-, (. 1()(,.)(.(' I .''..-iearth (.11 L.T1 0 0 n - - ON G• I_,