Loading...
Linscott Law & Greenspan Engineers J L NSCOTT LAW GREE PAN engineers October 13, 2009 Engineers&Planners Traffic RECEIVED Transportation Mr. Joel Rojas Parking Director of Planning OCT 14 2009 Building and Code Enforcement Greenspan,a & i�eerpant Engineers City of Rancho Palos Verdes PLANNING,BUILDING AND 236 North Chester Avenue 30940 Hawthorne Blvd. CODE F,NPOOCEIVIENT Suite 200 Rancho Palos Verdes, CA 90275 Pasadena,CA91106 626.796.2322 T LLG Reference: 1-096340-1 626.792.0941 F www.fgengineers.com Subject: Proposal to Provide Traffic Engineering Design Services for the Palos Verdes Drive West and Point Vicente Driveway Intersection Pasadena City of Rancho Palos Verdes,California Costa Mesa San Diego Las Vegas Dear Mr. Rojas: As requested, Linscott, Law & Greenspan, Engineers (LLG) is pleased to submit this revised proposal to provide traffic engineering design services related to the Palos Verdes Drive West and Point Vicente Driveway Intersection Project, in the City of Rancho Palos Verdes, California. The proposed project is located at 31501 Palos Verdes Drive in the City of Rancho Palos Verdes, California. As you may know, LLG has been providing transportation planning and design consultation services for private and public sector projects throughout Southern California for more than four decades. We look forward to the opportunity to provide traffic engineering design services related to the proposed project. We understand that the City of Rancho Palos Verdes and the Applicant of the Annenberg at Lower Point Vicente Project have requested a review of safety-related issues at the existing access points along Palos Verdes Drive West. Furthermore, there is an interest in seeking consultation from a traffic engineer to review existing conditions at the intersection and prepare as needed concept plans to depict potential safety improvement alternatives for the intersection. We have reviewed the aerial website link that was forwarded to us by the Applicant and concur that it would be beneficial to review this location from a traffic safety perspective and develop concept plans to depict various potential alternatives with the goal of enhancing Philip M.Linscott,PE;,s2i.20 , safety at the intersection. Jack M.Greenspan,PE(Ra) William A.Law,PE(Ret) Our original proposal (dated July 10, 2009), was prepared based on the assumption Paul W.Wilkinson,PE that the main work products would be a summary of existing conditions, one John P.Keating,PE conceptual plan and one formal signing and striping design plan. The scope has David S.shender,PE varied since authorization, thus, this proposal supersedes the July 10, 2009 proposal John k Barman,PE and clarifies the current scope of LLG services. It should also be noted that a Clare M.Look-Jaeger,PE Richard E.Barretto,PE Keil D.Maberry,PE i In ,11,\ '\iiiuitiiiicnt 1 t 1 l.cilit,)Jo, An LG2WB Company Founded 1966 110 Mr. Joel Rojas L I NSC TT Director of Planning AW Building and Code Enforcement GREENSPAN ................... ..... ........... ............ October 13, 2009 Page 2 engineers topographic file in AutoCad format is not available for the subject location, thus, a separate task for preparation of the project roadway alignment base plan is also now included in our Scope of Work. As such, LLG's Scope of Work now includes preparation of a roadway alignment base plan for the project, up to four(4) conceptual roadway signing and striping plans depicting various intersection improvement alternatives, required coordination with City of Rancho Palos Verdes staff, preparation of a traffic assessment memorandum that summarizes the technical aspects of LLG's review of existing and proposed conditions, and preparation of a final concept plan representing the preferred intersection improvement alternative(s). The proposed alternatives depicted on the concept plans will be developed based on a review of existing traffic conditions, including intersection geometries, sight distance, accident data history, prevailing speed, and available traffic count data. Upon preparation of the concept plans, we will coordinate with the City of Rancho Palos Verdes to review the various potential alternatives and obtain consensus for the overall recommended intersection improvements. Upon obtaining consensus, LLG will prepare one (1) final concept plan layout that will depict the preferred alternative(s). Preparation of additional plans, that may be required depending on the outcome of the proposed concept development phase, such as preparation of a design- level signing and striping plan, traffic signal plan and/or construction traffic control plans, are not included in this proposal. Preparation of additional plans may be added to our Scope of Work at a later time,via a contract amendment, if required. This proposal summarizes the work tasks associated with a review of existing traffic conditions at the subject intersection (i.e., including intersection geometries, sight distance, accident data history, prevailing speed, and available traffic count data), preparation of a project base plan, preparation of four (4) conceptual signing and striping plans that will be submitted to the City of Rancho Palos Verdes for review, preparation of a summary memorandum, respective coordination with the City of Rancho Palos Verdes, and preparation of one (1) final concept plan layout for the subject intersection. PROJECT SCOPE AND ASSUMPTIONS This Proposal assumes the following: 11 The City of Rancho Palos Verdes will make any readily available information available to LLG. Our understanding is that only as-built plans for the south side roadway of Palos Verdes Drive are available. l)l.>I(,. Amendment C• •109010-((CI.J-atts)dei , ( I • • Mr. Joel Rojas L1NSCOTT Director of Planning LAW Building and Code Enforcement GREENSPAN October 13, 2009 Page 3engineers ■ Any changes or revisions in project access locations, project scope, or design schemes, once our conceptual design effort has begun will be considered to be outside the current Scope of Work and may require an addition to the Fee maximum. • The project is located within the limits of the City of Rancho Palos Verdes. The City of Rancho Palos Verdes will be the sole reviewing and approving agency. • The plans will be prepared using Imperial units of measurement. SCOPE OF WORK CONCEPT DEVELOPMENT Task 1: Project Mobilization 1.1 Coordinate with the City of Rancho Palos Verdes to obtain City record as- built plans for existing street improvements. 1.2 Contact the City of Rancho Palos Verdes Public Works department staff to discuss the proposed project and confirm pertinent traffic issues and concerns. 1.3 Coordinate with City of Rancho Palos Verdes to obtain accident history data and traffic count data for the subject intersection, if available. Coordinate with the LLG planning staff to obtain available traffic counts conducted with the Annenberg at Lower Point Vicente EIR traffic impact study work effort. Task 2: Review of Existing Traffic Conditions 2.1 Visit the project site, photograph, measure and verify pertinent existing surface conditions, and traffic signing and striping elements. 2.2 Perform a field sight distance survey to confirm existing intersection and stopping sight distance. Please note that due to intersection visibility constraints, a two-person crew will be required to conduct the intersection stopping sight distance survey. 2.3 Conduct a field sample speed survey to confirm prevailing speeds of traffic on Palos Verdes Drive. Task 3: Conceptual Signing and Striping Base Plan 3.1 Prepare one (1) conceptual signing and striping base plan for the access points associated with the Point Vicente Interpretive Center (PVIC) site. The conceptual signing and striping base plan will depict the existing roadway signing and striping elements as well as the results of the intersection sight I Di S1C,N(“-)fi(uncr:►;t \nnendn,ent CA-10%•4(I.3(C1.J-edit)do Mr. Joel Rojas L1NSCOTT Director of Planning AW & Building and Code Enforcement GREENSPAN October 13, 2009 Page engineers g eni distance analysis for the various traffic movements. Our concept base plan will be prepared at 40 scale (1" = 40') using the latest version of AutoCAD drafting software. 3.2 Submit the base concept plan to the City of Rancho Palos Verdes engineer for initial review and comments. 3.3 Revise the base concept plan per review comments and resubmit the concept plan for review. Task 4: Conceptual Development of Alternatives 4.1 This proposal assumes the preparation of four (4) conceptual signing and striping plans to be submitted to the City of Rancho Palos Verdes for review. The alternative concepts will be reviewed in terms of the identified pros and cons as well as potential implications to Civil-related items (e.g., need for possible retaining walls, roadway widening, median improvement, sight distance enhancements, etc.). A summary of the four concepts and the plans will be included as part of the Task 5 work effort, as outlined below. Task 5: Preparation of a Summary Memorandum 5.1 Prepare a summary memorandum which details the findings associated with the existing conditions (i.e., accident data, weekday AM and PM and weekend mid-day peak hour traffic volumes, speed survey data, sight distance analysis, etc.) as well as providing a summary of each of the four conceptual alternatives. Pursuant to the City's request, this effort also entails the preparation of traffic signal warrant analysis calculations (using the Caltrans warrants outlined in the Caltrans' California Manual on Uniform Traffic is Control Devices for Streets and Highways, Chapter 4C, September 2006), for the subject location. Task 6: Coordination With the City Team 6.1 In support of the development of the conceptual alternatives phase, LLG will prepare for and attend up to three coordination conference calls with the project team and/or City of Rancho Palos Verdes staff. For budgeting purposes, two hours of Project Manager/Engineer time has been allocated for preparation and attendance at each coordinating session. LLG will establish the call-in numbers accordingly. 1 IN f(r\(,.;40(uL►tract Anrrrldnicnt('A-1091 A-109040- J-ed t)dor • Mr. Joel Rojas LIN5C TT Director of Planning LAW Building and Code Enforcement G RN A N ........................... . .... . ....... ..... .............. .. .... ............ .......... ............ .. .. . ........... October 13, 2009 Page 5 engineers Task 7: Preparation of the Recommended Conceptual Alternative Plan 7.1 Based on the coordination conducted as part of Task 6 above, prepare one (1) final conceptual plan layout for the subject location which incorporates City comments. Submit final concept plan to the City. ADDITIONAL SERVICES This Scope of Work does not include: • The preparation of a design-level signing and striping plan. • The preparation of a design-level traffic signal plan(s). • The preparation of construction traffic control plans. • The preparation of easement plans(legal descriptions)or processing. • Inspection services of any kind. • The preparation of traffic signal timing plans. • Preparation and processing of encroachment permit applications. Most of the above services can be provided via an amendment to the proposed project fee. FEE ESTIMATE We estimate that our fee for the services outlined above in Tasks 1 through 7 will not exceed $16,500.00. Our services will be billed monthly on a time and materials basis according to the attached Fee Schedule. Should the Scope of Work change or if unforeseen problems arise, a revised Scope of Work and budget may be required. SCHEDULING We have already begun work on this engagement. We estimate that the project mobilization, review of existing conditions and initial preparation of the conceptual plan can be completed and submitted for project team review 3 to 4 weeks after receiving written authorization to proceed. . The timing associated with the submittal of the final recommended conceptual alternative plan will be based upon the coordination conducted as part of Task 6. This time estimate assumes that issues of direct impact are well enough defined to allow our design process to proceed effectively. To the extent possible,our work will be completed in coordination with your schedule. Di\R.,c„Jts Contract Antendnten(A-IO9t,ia4)-[tC l.1-edstc)doe 0 • Mr. Joel Rojas UNSCOTT Director of Planning LAW Building and Code Enforcement GREENSPAN October 13, 2009 Page 6 g engineers LIABILITY We carry appropriate liability insurance, both general and professional and workman's compensation insurance. Should this proposal be accepted, the Client (represented by the signature below) agrees to limit Linscott, Law & Greenspan, Engineers' liability to the Client and to all Contractors and Subcontractors on the project due to Linscott, Law & Greenspan, Engineers' negligent acts, errors, or omissions, such that the total aggregate liability of Linscott, Law & Greenspan, Engineers, to all those named shall not exceed $50,000.00 or Linscott, Law & Greenspan, Engineers' total fee for the services rendered on this project, whichever is greater. AUTHORIZATION If this proposal is acceptable, you may indicate approval by signing in the space provided at the end of this letter and returning the original for our files. Alternatively, you may issue a purchase order or consultant agreement with this proposal attached as an exhibit. A copy of this proposal is enclosed for your convenience. This proposal is valid for 90 days from the date of this letter. Please note that for the purposes of preparing contract paperwork, Linscott, Law & Greenspan, Engineers, is a DBA for LG2WB Engineers, Inc., a California corporation. TERMINATION The services covered by this proposal may be terminated by either party at any time by written notice. Upon termination, Linscott, Law & Greenspan, Engineers will stop all activities immediately, notify all subcontractors (if any) to stop work, and prepare an invoice for any services rendered but not already submitted to the client. We appreciate the opportunity to submit this proposal and look forward to working with you on this project. Please call us at 626.796.2322 if you have any questions or comments regarding this proposal. Sincerely, Linscott,Law & Greenspan,Engineers 4,..„024, w Pastor E. Casanova,P.E. Senior Transportation Engineer California Registration: TR 1923 1 1)1',KA,0 4.1(.ntract kniindro3f C -109o140.I in j.edits)do r � r Mr, Joel Rojas L I N SCOT T Director of Planning LAW Building and Code Enforcement G 5 P N ......................... .. ...... ........ ............................................................ ......... ............ . . . .......... ............. ........... ... .. ................ October 13, 2009 ......................... .......... ... ... .. ....................................................... .. ................................. ..................... .................................... ..................... ....... .. ...... . . .. ...... ......... Pagel engineers PROPOSAL ACCEPTED FOR TASKS 1 THROUGH 7 AS OUTLINED ABOVE FOR A FEE NOT TO EXCEED $16,500.00 WITHOUT PRIOR AUTHORIZATION. drop • . orized Agent) (Title) Ovri Palckto 'Rt.05Ntaw5 (Firm) (Federal I.D.#) )49140 RAV4-11144%145 10 ' 41 . 01 (Address) (Date) 1. 1)1.�I(,\0.;•10(.iraci Aniettciment C'.\-1U4t.i•)0.I(C'I.J-c Jtts)do LINSCOTT LAW FEE SCHEDULE GREENSPAN engineers Effective November 1, 2008 TITLE PER HOUR Principals Principal Engineer $ 252.00 Associate Principal Engineer $ 216.00 Planning/Design Manager $ 201.00 Transportation Engineers Senior Transportation Engineer $ 178.00 Transportation Engineer III $ 158.00 Transportation Engineer II. $ 133.00 Transportation Engineer I $ 114.00 Transportation Planners Senior Transportation Planner.. $ 158.00 Transportation Planner III. $ 133.00 Transportation Planner II $ 114.00 Transportation Planner I $ 102.00 Technical Support Engineering Associate Il $ 113.00 Engineering Associate I $ 109.00 Engineering Computer Analyst II .... $ 108.00 Engineering Computer Analyst I $ 85.00 Senior CADD Drafter $ 109.00 CADD Drafter IIL $ 102.00 CADD Drafter II $ 90.00 CADD Drafter I $ 77.00 Senior Engineering Technician $ 109.00 Engineering Technician IL $ 102.00 Engineering Technician I. $ 77.00 Word Processor/Secretary $ 72.00 Engineering Aide I. $ 55.00 Public Hearing and litigation support may be charged at 125%of the base rate. Consultation in connection with litigation and Court appearances will be quoted separately. Project-related mileage will be billed at the prevailing standard mileage rate as determined by the IRS. Subcontractors and other project-related expenses will be billed at cost plus 15%. The above schedule is for straight time. Overtime will be charged at 1.50 times the standard hourly rates. Interim and/or monthly statements will be presented for completed work. These will be due and payable upon presentation unless prior arrangements are made. A finance charge of 1.5%may be charged each month on the unpaid balance. REC1VED LINSCOTT AUG 27 2Uu LAW & TRANSMITTAL PLANNING,BUILDING AND GREENSPAN CODE ENFORCEMENT engineers To: Ara M. Mihranian Date: August 26, 2009 Engineers&Planners Company: City of Rancho Palos Verdes LLG Ref: 1-096340-1 Traffic Transportation Address: 30940 Hawthorne Boulevard Parking Rancho Palos Verdes, CA 90275 Linscott,Law& Greenspan,Engineers Subject: Lower Point Vicente 236 N.Chester Avenue Suite 200 Pasadena,CA 91106 Transmitted Via: Courier x Mail Overnight 626.796.2322 T Purpose: For Approval Your Use x As Requested 626.792.0941 F For Review&Comment Other wwwilgengineers.com Pasadena Copies Date Description Costa Mesa 2 8-25-09 Agreement San Diego Las Vegas Message: Signed: Clare Look-Jaeger, P.E. Principal cc: File Document2