Loading...
RDA RES 1987-030 RESOLUTION NO. RDA 87-30 A RESOLUTION OF THE RANCHO PALOS VERDES REDEVELOPMENT AGENCY MAKING CERTAIN FINDINGS IN CONNECTION WITH ITS EFFORTS TO ABATE THE IMPENDING PERIL FROM GRADUAL EARTH MOVEMENT IN AND AROUND THE PORTUGUESE BEND LANDSLIDE THE RANCHO PALOS VERDES REDEVELOPMENT AGENCY HEREBY FINDS, DETERMINES , RESOLVES, AND ORDERS AS FOLLOWS: Section 1 . In 1984, the Rancho Palos Verdes Redevelopment Agency ("Agency") formed a technical committee composed of a large number of geotechnical experts, including geologists, engineers, and engineering geologists. The Technical Committee advises the Agency as to all matters concerning the Portuguese Bend Landslide and recommends various landslide abatement methods. Registered Geologist and Certified Engineering Geologist Dr. Perry Ehlig, Professor of Geology at California State University, Los Angeles, is a member of the Technical Committee. In the expert opinion of Dr. Ehlig and the Committee as a whole, the Portuguese Bend Landslide, an ancient landslide which was reactivated in 1956, is gra- dual earth movement resulting in impending peril to persons or property. Since 1956, said landslide has destroyed a significant number of residen- tial structures and public improvements and damaged a significant number of residential structures and public improvements. Unless halted, stabilized or abated, the landslide threatens to destroy or damage additional residen- tial structures or public improvements. Based upon the foregoing, and upon the expert opinions of the members of the Technical Committee, including. Dr. Ehlig, the Agency hereby finds that the gradual earth movement caused by the Portuguese Bend Landslide presents a grave and impending peril to persons and property located within and adjacent to Portuguese Bend. Section 2. Without appropriate remedial action to stop the Portuguese Bend Landslide, the gradual earth movement will continue and worsen. Public necessity requires that some action be taken to lessen the danger to persons or property. To avoid impending peril to persons or pro- perty as a result of such gradual earth movement, the Technical Committee has recommended landslide abatement and earth stabilization programs , including the installation of dewatering wells , the construction of drainage control devices, and the redistribution of mass within the landslide. Phase 1 of the Agency' s drainage control and earth stabiliza- tion project includes: the redistribution of approximately 600,000 cubic yards of earth from the upper regions of the slide, where it acted as a driving force causing gradual earth movement, to the lower regions of the slide, where it acts as a resisting force to gradual earth movement; exten- sive grading; and construction of drainage facilities. Such remedial action has been completed. Phase 2 of the project, as proposed, will con- 709CP RDA Reso1.87-30 sist of reestablishing the drainage on approximately one mile of Palos Verdes Drive South and controlling the street runoff so that it does not exacerbate gradual earth movement, redistributing mass from the east- central portion of the slide to the southwest portion of the slide and relocation of Palos Verdes Drive South to a more stable location within the landslide where it will, to some extent, act as a resisting force to gra- dual earth movement. Due to greater stability at the proposed location, drainage control will be more effective at the proposed location. Based on the foregoing, and upon the expert opinions of the members of the Technical Committee, including Dr. Ehlig, the Agency hereby determines that the measures recommended by the Technical Committee, including but not limited to Phase 1 and Phase 2, as described above, constitute appropriate remedial action to halt, stabilize, or abate the impending peril described in Section 1 hereinabove. Section 3. Based upon the foregoing, and based upon the expert opinions of the members of the Technical Committee, including Dr. Ehlig, the Agency has undertaken to implement the remedial action as described in Section 2 hereinabove. The Agency hereby resolves to proceed as quickly and safely as possible to implement the remedial measures described above. PASSED, APPROVED, AND ADOPTED this 17th day of December , 1987. ar - .,- A.A. ! .A. ,_ ..._,...- Chairwoman ATTEST: 4,0 I . / / 1 Ag-ency Secretary STATE OF CALIFORNIA ) COUNTY OF LOS ANGELES ) ss CITY OF RANCHO PALOS VERDES ) I , JO PURCELL, Agency Secretary of the Rancho Palos Verdes Redevelopment Agency hereby certify that the above Resolution No. RDA 87-30 was duly and regularly passed and adopted by the said Redevelopment Agency at a regular meeting thereof held December 17, 1987. It 1 1! iv 0 , ./._.I'_ 0 _ Agency Secretary 709CP RDA Reso1.87-30