RDA RES 1994-010 RESOLUTION NO. RDA 94-10
A RESOLUTION OF THE REDEVELOPMENT AGENCY BOARD OF
THE CITY OF RANCHO PALOS VERDES ADOPTING A
MITIGATED NEGATIVE DECLARATION AND MITIGATION
MONITORING PROGRAM IN ASSOCIATION WITH
ENVIRONMENTAL ASSESSMENT NO. 659 FOR SIX DEWATERING
WELLS IN THE ABALONE COVE LANDSLIDE AREA, PURSUANT
TO THE CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA)
AND THE CITY'S LOCAL CEQA GUIDELINES
WHEREAS, the City of Rancho Palos Verdes Redevelopment Agency
(RDA) submitted Environmental Assessment No. 659 to initiate the
environmental review of the installation of six new dewatering
wells in the Abalone Cove Landslide Area, all located within the
boundaries of the City's Redevelopment Project Area; and,
WHEREAS, pursuant to the provisions of the California
Environmental Quality act, Public Resources Code Sections 21000 et
seq. ("CEQA") , the State CEQA Guidelines, California Code of
Regulation, Title 14, Sections 15000 et seq. , the City's Local
CEQA Guidelines, and Government Code Section 65952 .5(e) (Hazardous
Waste and Substances Statement) , the City authorized the
preparation of an Initial Study which determined that, by
incorporating mitigation measures into the Negative Declaration and
project scope, there was no substantial evidence that the proposed
project would have a significant effect on the environment.
Accordingly, a draft Mitigated Negative Declaration and Initial
Study were prepared and notice of that fact was given in the manner
required by law; and,
WHEREAS, the Draft Mitigated Negative Declaration and Initial
Study were circulated for a 20-day public review period, beginning
on June 22, 1994, at which time comments were submitted by certain
individuals and public agencies, and a duly noticed public hearing
was held before the Redevelopment Agency Board of the City of
Rancho Palos Verdes to consider the Draft Mitigated Negative
Declaration on July 5, 1994, at which time public comments on the
Draft Mitigated Negative Declaration and Initial Study were
received by the Redevelopment Agency Board.
NOW, THEREFORE, THE REDEVELOPMENT AGENCY BOARD OF THE CITY OF
I/ RANCHO PALOS VERDES DOES HEREBY FIND, DETERMINE, AND RESOLVE AS
FOLLOWS: •
Section 1: The Redevelopment Agency Board has reviewed and
considered the Initial Study, the proposed Mitigated Negative
Declaration, and the public comments received for them, and finds,
based upon the review and independent judgement of the
Redevelopment Agency Board, that: 1) the Mitigated Negative
Declaration was prepared in the manner required by law; 2) the
mitigation measures identified in the Mitigated Negative
Declaration, summarized in the Mitigation Monitoring Program and
agreed to by the Redevelopment Agency (RDA) , would mitigate the
effects of the project to a point where no significant effect on
the environment should occur; and, 3) that there is no substantial
evidence in light of the whole record before the Redevelopment
Agency Board, that the proposed project, with proper mitigation,
may have a significant effect on the environment.
Section 2: Based on the foregoing, the Redevelopment Agency
Board finds that the adoption of the Draft Mitigated Negative
Declaration and Mitigation Monitoring Program, made a part hereto
and attached as "Exhibit A", are in the public interest.
Section 3: For the foregoing reasons and based upon the facts
contained in this Resolution, the Staff Reports, Environmental
Assessment No. 659, the Initial Study and Mitigated Negative
Declaration, the public comments received by Staff and the
Redevelopment Agency Board, and other components of the legislative
record; the Redevelopment Agency Board hereby adopts the proposed
Mitigated Negative Declaration and Mitigation Monitoring Program
associated with Environmental Assessment No. 659 for the project
known as the Abalone Cove Dewatering Wells Project.
Section 4: The time within which judicial review of the
decision reflected in this Resolution, if available, must be sought
is governed by Section 1094. 6 of the California Code of Civil
Procedure.
PASSED, APPROVED, and ADOPTED this 2nd day of August 1994.
AiAld / 1 ,
C
ATT ST:
the /
AGE Y S CRETARY
STA E OF CALIFORNIA }
COUNTY OF LOS ANGELES } SS
CITY OF RANCHO PALOS VERDES }
I, Jo Purcell, Agency Secretary of the Rancho Palos Verdes
Redevelopment Agency hereby certify that the above Resolution No.
RDA 94-10 was duly and regularly passed and adopted by the said
Redevelopment Agency Board at a regular meeting eld on August 2,
1994.
411 / / / 0
AGCY SE-RETARY
(jhr#6 ccres.dww)
Resolution No. RDA 94-10
Page 2 of 2
EXHIBIT "A"
Abalone Cove Dewatering Wells Project Guidelines
In addition to the mitigation measures identified in the Mitigation
Monitoring Program, the following project guidelines/procedures
will be adhered to by the RDA Staff:
1) If the transport of heavy construction equipment using
oversize vehicles on state highways becomes necessary, a
Caltrans Transportation Permit will be required.
2) With the exception of the drilling rig(s) , if large size
trucks are required to transport construction materials or
equipment, it is recommended that they be limited to off-peak
commute periods.
3) If found to be required, a Discharge Permit from the
California Regional Water Quality Control Board will be
obtained prior to well activation.
4) Approval to construct improvements within an L.A. County Sewer
Districts' sewer easement and/or over a Districts' sewer is
required before construction may begin in said areas.
5) Prior to placing any wells on private property, permission
will be obtained from the appropriate property owner(s) .
6) If some vegetation clearing is desired by the RDA Staff to
facilitate the placement of the wells, the mitigation measures
identified in the Mitigation Monitoring Program that protect
sensitive plants shall be adhered to.
7) All appropriate City Building and/or Electrical permits will
be obtained prior to any construction of the wells.
(jhr#6 cc8294x.dww)
Exhibit "A" RESOL. NO. RDA 94-10
Draft 6/23/1994
Final 7/--/1994
ABALONE COVE DEWATERING WELLS PROJECT
MITIGATED NEGATIVE DECLARATION
RANCHO PALOS VERDES, CALIFORNIA
MITIGATION MONITORING PROGRAM
PREPARED FOP.:
CITY OF RANCHO PALOS VL 9ES •
30940 HAWTHORNE BOULEVARD
RANCHO PALOS VERDES, CALIFORNIA 90274-5391
PREPARED BY:
EDAW, INC.
. 1920 MAIN STREET, SUITE 450
IRVINE, CA LIFORN7.24 11'
JULY --, 1994
EXHIBIT "A" RESOL. NO. RDA 94-10
P:`4 N01801\94062345•W P4
TABLE OF CONTENTS
I. Introduction 1
II. Management of the Mitigation Monitoring Program 2
Roles and Responsibilities 2
Mitigation Monitoring Program Procedures 2
Mitigation Monitoring Operations 3
III. Mitigation Monitoring Program Checklist 4
P:MN01801\94062345.WP4 11
RESOL. NO. RDA 94-10
I. INTRODUCTION
PURPOSE
This Mitigation Monitoring Program(MMP), for the Abalone Cove Dewatering Wells Project
in the City of Rancho Palos Verdes, responds to Section 21081.6 of the Public Resources
Code. Section 21081.6 requires a lead or responsible agency that approves or carries out a
project where a Mitigated Negative Declaration has identified significant environmental
effects, to adopt a "reporting or monitoring program for adopted or required changes to
mitigate or avoid significant environmental effects." The City of Rancho Palos Verdes is
acting as lead agency for the Abalone Cove Dewatering Wells project.
An Initial Study/Mitigated Negative Declaration was prepared to address the potential
environmental impacts of the project. Where appropriate, this environmental document
recommended mitigation measures to mitigate 01 avoid impacts identified. Consistent with
Section 21080 (2)(c) of the Public Resources Code, a mitigation reporting or monitoring
P ro is required to ensure that the adopted mitigation measures under the jurisdiction of
program �
the City are implemented. The City will adopt this MMP when adopting the Mitigated
Negative Declaration.
ENVIRONMENTAL PROCEDURES
This MMP has been prepared in accordance with the California Environmental Quality Act
of 1970 (CEQA), as amended (Publi' Resources Code Section 21000 et seq.) and the State
Guidelines for Implementation of ..':Cti. (CEQA Guidelines), as amended (California
Administrative Code Section 15000 et seq.). This MMP complies with the rules, regulations,
and procedures adopted by the City of Rancho Palos Verdes for implementation of CEQA.
MITIGATION MONITORING PROGRAM REQUIREMENTS
Section 21081.6 of the Public Resources Code states: "When making the findings required
by subdivision (a) of Section 21081 or when adopting a negative declaration pursuant to
paragraph (2) of subdivision (c) of Section 21081, the public agency shall adopt a reporting
or monitoring program for the changes to the project which it has adopted or made a
condition of project approval in order to mitigate or avoid significant effects on the
environment. The reporting or monitoring program shall be designed to ensure compliance
during project implementation. For those changes which have been required or incorporated
into the project at the request of an agency having jurisdiction by law over natural resources
affected by the project, that agency sh?11, if so requested by the lead or responsible agency,
prepare and submit a proposed reporting or monitoring program."
P:MN01801∎94062345.'VP4 1
RESOL. NO. RDA 94-10
II. MANAGEMENT OF THE MITIGATION MONITORING PROGRAM
ROLES AND RESPONSIBILITIES
the project will be in place through all phases of the project including final
The MMP for th p � p .
o pre-grading,construction. and operation. The City will have the primary enforcement
design, pre � g, P
role for the mitigation measures.
MITIGATION MONITORING PROGRAM PROCEDURES
• • this MMP consists of. filing requirements, and
The mitigation monitoring procedures for th s
compliance verification. The Mitigation Monitoring Checklist and procedures for its use are
outlined below.
Mitigation Monitoring Program Checklist
provides rovides a comprehensive list of the required mitigation measures. In
The MMP P
addition, the .
e Mitigation Monitoring Checklist includes: the implementing action when the
' ' will occur; the method of verification of compliance; the timing of
mitigation measure
verification; the department or agency responsible for implementing the mitigation measures;and compliance verification. Section III provides the MMP Checklist.
Mitigation Monitoring Program Files,
Files shall be established to document and retain the records of this MMP. The files shall
organized, and retained by the City of Rancho Palos Verdes department of
be established. o � Y Y
Planning, Building and Code Enforcement.
Compliance Verification,
The MMP Checklist shall be signed when compliance of the mitigation measure is met
City according
to the Cit of Rancho Palos Verdes Director of Planning, Building, and Code
p
Enforcement.
The compliance verification section of the MMP Checklist shall be signed, for
r measures
mitigation requiring ongoing monitoring, and when the monitoring of a mitigation
g �
measure is completed.
PMN01801\94062345.V'P4 2 RESOL. NO. RDA 9 4-10
MITIGATION MONITORING OPERATIONS
The following steps shall be followed for implementation, monitoring, and verification of
each mitigation measure:
1. The City of Rancho Palos Verdes, Director of Planning, Building and Code
Enforcement shall designate .a party responsible for monitoring of the mitigation
measures.
2. The City of Rancho Palos Verdes, Director of Planning, Building, and Code
Enforcement shall provide to the party responsible for the monitoring of a given
mitigation measure, a copy of the MMP Checklist indicating the mitigation measures
for which the person is responsible and other pertinent information.
3. The party responsible for monitoring shall then verify compliance and sign the
Compliance Verification column of the MMP Checklist for the appropriate mitigation
measures.
Mitigation measures shall be implemented as specified by the MMP Checklist. During any
project phase, unanticipated circumstances may arise requiring the refinement or addition of
mitigation measures. The City of Rancho Palos Verdes, Director of Planning, Building, and
Code Enforcement with advice from staff or another City department, is responsible for
recommending changes to the mitigation measures, if needed. If mitigation measures are
refined, th° Director of Planning, Building, and Code Enforcement would document the
change and shall notify the appropriate design, construction, or operations personnel about
refined requirements.
P:`4N01801 X94062345.WP4 3
RESOL. NO. RDA 94-10
III. MITIGATION MONITORING PROGRAM CHECKLIST
INTRODUCTION
This section P rovides the MMP Checklist for the project as approved by the City of Rancho
Palos Verdes on July --, 1994. The mitigation measures or portions of mitigation measures
that have been changed from those presented in the Initial Study/Mitigated Negative
_ Declaration are shown with italics and/or strikeouts. The changes made during the public
review PP
rocess and approved by the City Council do not have an environmental effect and
P
do not change the conclusions of the environmental analysis in the Mitigated Negative
Declaration. They have been made to: reflect more stringent standards or more accurate
information, and/or more accurately reflect the appropriate method of timing, responsibility,
compliance or penalties.
P:\4N01801\94062345.WP4 4 RE S O L. NO. RDA 94-10
tti11'['1(;A'fI()N M()NIT()RIN(;PROGRAM CHECKLIST
ABALONE COVE I)I:WATERIN(;WEI.I..S MITIGATED NEGATIVE f)N:UI.ARA'I'I()N
Mitigatiop Measure Implementing Action Method of Verification 'Tiering of Verification Responsible Department/ Compliance
Agency Verification
I A pre-construction biological survey of the Pre-construction Monitored by Director Pre-construction Director of Planning,
specific well locations shall be conducted to map biological survey Building,and Code
the locations er the sensitive plant and animal Enforcement
species. 'these locations shall be flagged to
facilitate avoidance by construction equipment and
workers. Compliance with this measure shall be
monitored by the Director of Planning, Building,
and Code Enforcement.
2 During construction.maximum effort shall he Restnction of Vehicle Monitored by Director During('onstnictiun Director of Planning,
exercised to restrict vehicle transportation routes 'fransportatin Building.and Code
and trips to a minimum number. Earth-moving Routes/Number Enforcement
equipment and drilling equipment shall be
confined to the narrowest possible corridor during
construction. Compliance with this measure shall
he.rionitored by the 1)irector of Planning,
Building,and Code Enforcement.
3. No IN-titling or construction shall occur during the Prohibit grading or Monitored by Director During grading or Director of Planning,
mating/breeding/nesting season fur the California construction from nod- construction Building,and('ode
l gnatcatcher and coastal cactus wren(mid-February February through July Enforcement
lh through July). Compliance with this measure shall
l be monitored by the Director of Planning,
!Wilding.and('ode Enforcement.
•
C
0
z
0
►g,
0
Mitigation.I Leasure Implementing Action Meshed of Verification Timing of Verification Responsible Department/ Compliance
Agency Verification
4. Prom to grading,the applicant shall provide limit construction to Review of limited Prior to grading Director of Planning,
written proof to the.')irector of Planning,Building, Monday through construction from Building,and Code
anti Code Enforcenunt from the project Saturday 7 a.m. through Monday through Enforcement
construction and grading crew that the hours of 5 p.m. Saturday 7 a.m.through
construction and grading shall be limited to the 5 p.m.
days of Monday through Saturday only,between
the hours of 7 a.m.and 5 p.m.,no construction
will be conducted on Sunday's and holidays
except during emergency situations as defined by
the City's Municipal Code.
5. Prior to grading,the applicant shall provide mailed Mail Notice of Review and Approval of Pnor to grading Director of Planning,
Notice of Construction to surrounding dwelling Construction to Notice of Construction to Building,and Code
units which includes the name of a contact person surrounding resident_ surrounding residents Enforcement
and phone number of the City's Public Works
Department
6 Prior to grading,the applicant shall ensure that Ensure the use of Approved use of Pnor to grading Director of Planning,
grading and construction vehicles and equipment effective mufflers effective mufflers Building,and('ode
shall he equipped and maintained with effective Fnforcement
muffler systems,subject to approval of the City
Engineer.
tT
7d
ti
I
0
•
0
0
Mitigation Measure Implementing Action Method of Verification 'timing of Ve.rification Responsible Compliance
I)rpartment/Agency Verification
A. Prior to grading,the applicant shall retain a Retain certified Review and approval of Prior to grading• Director of Planning,
certified archaeologist to conduct a walkover Archeologist to conduct Archeologist,further Building,and Code
survey Of the project area that will he affected by walkover actions as defined by Enforcement
grading and construction activities. 'Ube purpose Archeologist
of the survey is to determine the presence or
absence of significant archaeological resources.
Should it be determined by the archaeologist that
significant archaeological resources are present
within the project area that will be subject to
grading activity,the archaeologist shall be present
at the pre-grading conference,shall establish
procedures for archaeological resource
surveillance,and shrill establish,in cooperation
with the project proponent,procedures for
temporarily halting or redirecting work to permit
the sampling, identification,and evaluation of the
artifacts as appn►pnate. If additional or
unexpected archaeological features are discovered,
the archaeologist shall report such findings to the
project proponent and to the Director of Planning,
Building,and('ode Enforcement. If the
archaeological resources are found to be
significant,the archaeological observer shall
deiennine appropriate action,in cooperation with
the applicant, for exploration and/or savage.
These actions,as well as final mitigation and
disposition of the resources,shall be subject to the
approval of the Director of Planning. Building and
('ode Enforcement.
;o►urce: E:l)AW,
•
tri
0
z
0