RDA RES 1994-007 RESOLUTION NO. RDA 94-7 A RESOLUTION OF THE RANCHO PALOS VERDES REDEVELOPMENT AGENCY ADOPTING THE OPERATING AND CAPITAL IMPROVEMENT BUDGET FOR FISCAL YEAR 1994-95. I/ WHEREAS, the Board of the Rancho Palos Verdes Redevelopment Agency desires to adopt the following resolution adopting the capital budget for the 1994-95 fiscal year. NOW, THEREFORE, BE IT RESOLVED, THAT THE BOARD OF THE RANCHO PALOS VERDES REDEVELOPMENT AGENCY DOES HEREBY ADOPT THE FOLLOWING 1994-95 OPERATING AND CAPITAL BUDGET. SECTION 1: The 1994-95 Revenue Budget is hereby adopted, establishing the following revenue levels: 1994-95 PROGRAM ADOPTED BUDGET Portuguese Bend Project Area $ 35, 380 Abalone Cove Project Area 280, 000 Abalone Cove Maintenance Trust 48, 000 RDA Housing Set Aside Fund 82, 000 Abalone Cove Debt Service Fund 305, 000 TOTAL REVENUES $ 750, 380 SECTION 2: An operating and capital budget for Fiscal Year 1994-95 is hereby adopted as contained in the Annual Budget of the Rancho Palos Verdes Redevelopment Agency attached hereto and incorporated and referenced as part of this resolution. The following expenditure levels are hereby established: 1994-95 PROGRAM ADOPTED BUDGET Portuguese Bend Project Area Administration $ 37, 630 RA Engineering 18, 500 Agency Attorney 12, 000 Operations and Maintenance 63, 300 Capital Projects 276, 850 Abalone Cove Project Area Administration $ 33,700 RA Engineering 12, 000 Agency Attorney 30, 000 Operations and Maintenance 15,500 Capital Projects 4, 595, 500 Panel of Experts 6 0, 0 0 0 Abalone Cove Maintenance Trust 2 , 400 Abalone Cove Debt Service Fund 64, 000 TOTAL OPERATING AND CAPITAL EXPENDITURES $ 5,221, 380 SECTION 2: Upon adoption of said Budget, the Board may revise and /or update said Budget in part or in its entirety, depending on the Agency's fiscal resources, circumstances, and needs. SECTION 3: The Executive Director of the Rancho Palos Verdes Redevelopment Agency shall be responsible for administration and execution of said Budget. PASSED, APPROVED, AND ADOPTED THE 21ST DAY OF JUNE, 1994. ATTEST: L AGENCY SECRETARY GENCY CHAIRPERSON State of California County of Los Angeles )ss City of Rancho Palos Verdes ) I, JO PURCELL, Agency Secretary of the Rancho Palos Verdes Redevelopment Agency, hereby certify that the above Resolution No. RDA 94 -7 was duly and regularly passed and adopted by the said Redevelopment Agency at regular meeting thereof held on June 21, 1994. GENCY SECRETARY � CITY OF RANCHO PALOS VERDES � REDEVELOPMENT AGENCY � ANNUAL BUDGET for the fiscal year ending June 30, 1995 AGENCY OFFICIALS ' Steven T. Kuykendall Chair Lee Byrd Vice Chair Board Members Susan Brooks ' Marilyn Lyon John McTaggart Paul D. Bussey Executive Director 1 1 1 1 1 TABLE OF CONTENTS ' ADOPTED 1994-95 ANNUAL BUDGET RANCHO PALOS VERDES REDEVELOPMENT AGENCY Executive Director's Transmittal Letter Recap of Loans from City to Redevelopment Agency v ' Portuguese Bend Fund (375) 1 Abalone Cove Fund (380) 17 Abalone Cove Maintenance Fund (895) 35 RDA Housing Set Aside Fund (118) 37 Abalone Cove Debt Service Fund (210) 39 I •• 1 1 1 1 1 - 21111 /MEMORANDUM RANCHO PALOS VERDES HONORABLE CHAIRMAN AND RDA BOARD MEMBERS TO. FROM: EXECUTIVE DIRECTOR JULY 1, 1994 I DATE: SUBJECT ADOPTED 1994-95 FISCAL YEAR BUDGET After a number of years without the required funding or having an approved prioritization of activities from the Abalone Cove Panel of Experts, the Redevelopment Agency is now in a position to move forward towards accomplishing major landslide abatement work in both the Abalone Cove and Portuguese Bend areas. A preliminary schedule for the capital improvement project work has been included in the budget as a reference document. During the fiscal year it is anticipated that some elements of the schedule will require adjustment and staff will keep the Agency Board apprised of major changes as they occur. ABALONE COVE: In February 1993 the Abalone Cove Panel of Experts established a series of priorities for work to be accomplished. Although money was included in the 1993-94 fiscal year budget to begin work on the Panel's priority list, for the most part the only work accomplished was to begin the required environmental review and planning process. The exception to this was the installation of one of the proposed de-watering wells which is now in full operation. The purpose of all projects (except the shoreline protection study) is to remove water from the slide or to prevent the water from reaching the slide plain. The 1994-95 fiscal year should see construction work begin on the following projects. • Altamira Canyon Drainage Improvements • Kelvin Canyon Drainage Improvements • Abalone Cove Drainage Improvements • Sanitary Sewer System • De-watering Well Installation In addition to the above construction projects, the Shoreline Protection Feasibility Study will begin under the auspices of the U.S. Army Corps of Engineers. This study will take approximately three years to complete. Shore protection is one of the priorities established by the Panel of Experts to assist in stabilizing the landslide. Only a pro rata portion of the City's share of the Feasibility Study is budgeted in the Abalone Cove portion of the RDA budget. The remaining portion of the City's share is budgeted in the Portuguese Bend budget. i PORTUGUESE BEND: All of the money for landslide abatement work in the Portuguese Bend portion of the landslide comes from the City's General Fund or from outside grants such as the county administered Community Development Block Grant Program (CDBG) . Although the majority of the CDBG funds have historically been expended on landslide related programs in the Portuguese Bend area, the actual funding is shown in the City's annual budget rather than in the RDA budget. In 1994-95 the following CDBG projects will be accomplished. • Palos Verdes Road South Reconstruction • Portuguese Bend Canyon Drainage/Grading • Portuguese Bend General Grading One of the difficulties in working with CDBG funds is that the timing of the County approval process makes it difficult to budget in the proper fiscal year. The first two items listed above were originally intended for the 1993-94 fiscal year budget but project approval was received too late to begin construction in that fiscal year. They have therefore been rescheduled for the 1994-95 fiscal year. The third project (Portuguese Bend Grading) is in the City's 1994-95 CDBG application. It is hoped that the approval process will proceed at a faster pace than last year, but it is anticipated that actual grading will occur no earlier than the third quarter of the fiscal year and could slide into the 1995-96 fiscal year. The Portuguese Bend RDA budget includes two additional capital projects; the recondition and relocation of portions of the 1/2 round drain system found inland of Palos Verdes Drive South, and the reconstruction of the Paintbrush canyon debris basin. As in the Abalone Cove portion of the budget, a pro rata share of the U.S. Army Corps of Engineers Feasibility Study is included in the Portuguese Bend Budget. In summary, this year staff expects the Redevelopment Agency construction activity to be more dynamic than at any time since it began its landslide abatement efforts; certainly more so than during the last four years. In Abalone Cove this is made possible largely due to the funding made available through the Horan Settlement Agreement and the culmination of the Panel of Experts work in establishing priorities. Portuguese Bend budget activity is still dependent on loans from the City. This year, due to a favorable City General Fund balance, staff is able to recommend increased funding. However, for future planning and budgeting purposes staff has begun putting together a comprehensive outline of all the projects ii ' necessary to control the Portuguese Bend landslide. This will be submitted to the Agency and when approved will become the ' blueprint for future Portuguese Bend landslide abatement activity. ' Respectfully Submitted, 1 PauILO'. -ffnsey) ' Executive Director 1 1 1 ' iii FY 94-95 REDEVELOPMENT AGENCY PROJECTS Task Name Duration Start End 1994^ 1995 1996 -- _ — .---- -Complet Q2_ Q3 Q4 Q1 Q2 Q3 Q4 Q FY 94-95 RDA Projects 377.00 d 01/Jun/94 22/Nov/95 4 Portuguese Bend 329.00 d 01/Jun/94 15/Sep/95 1 CDBG 329.00 d 01/Jun/94 15/Sep/95 3 FEMA 70.00 d 15/Jul/94 21/Oct/94 0 111111■1111 Rel. Well Dis. 1/2 Round 59.00 d 01/Aug/94 21/Oct/94 0 Debris Basin Paint Brush 59.00 d 15/Jul/94 06/Oct/94, 0 mom! Remove Gabions 35.00 d 01/Aug/94 19/Sep/94 0 Army Corp Feasibility Study 250.00 d 01/Jul/94 26/Jun/95 0 Sewer EIR On Hold 0.00 d 01/Jul/94 01/Jul/94 0 Bentonite Removal EIR 88.00 d 01/Aug/94 05/Dec/94 0 =MIN= Abalone Cove 377.00 d 01/Jun/94 22/Nov/95 6 Sanitary Sewers 331.00 d 05/Aug/94 22/Nov/95__ 0 Altamira Cyn. Drainage 212.00 d_ 01/Jun/94 31/Mar/95 5 �,. Storm Drainage Improvemen 157.00 d 01/Jun/94 11/Jan/95 7 � Kelvin Canyon Drainage 175.00 d 01/Jun/94 07/Feb/95 12 Dewatering Wells _87.00 d 01/Jun/94 03/Oct/94 20 PVDS- Narcissa To Pepper Tr 166.00 d 01/Jul/94 27/Feb/95 0 Global Positioning System 255.00 d 01/Jun/94 01/Jun/95 36, Milestone Z1 Summary NM I RECAP OF LOANS FROM CITY TO REDEVELOPMENT AGENCY . I I 1990-91 1991-92 1992-93 1993-94 1994-95 Total PORTUGUESE BEND IBeginning loan balance 1,279,152 1,745,781 2,091,682 2,439,946 2,754,261 1,279,152 Plus: Loan advance from City 318,400 165,000 133,000 133,000 300,000 1,049,400 IInterest 148,229 180,901 215,264 181,315 209,653 935,362 Less: I Principal repayment 0 0 0 0 0 0 Interest repayment 0 0 0 0 0 0 Ending loan balance 1,745,781 2,091,682 2,439,946 2,754,261 3,263,914 3,263,914 I 1990-91 1991-92 1992-93 1993-94 1994-95 Total IABALONE COVE Beginning loan balance 200,332 737,566 0 0 0 200,332 I Plus: Loan advance from City 499,025 0 0 0 0 499,025 Interest 38,209 49,774 0 0 0 87,983 I Less: Principal repayment 0 (699,357) 0 0 0 (699,357) IInterest repayment 0 (87,983) 0 0 0 (87,983) Ending loan balance 737,566 0 0 0 0 0 I I I I I v (This page left intentionally blank) 1 i 1 1 1 1 vi � DEPARTMENT/ACCOUNT: FUND: RDA - PORTUGUESE BEND RDA - PORTUGUESE BEND (375) YEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET 1991-92 1992-93 1993-94 1993-94 1994-95 .............................................................................................................................................................................................................................................................................................................................................................................................. REVENUES 347.10 INTEREST EARNINGS 1,707 3,787 0 8,000 8,000 REVENUE FROM OTHER AGENCIES 0 10,900 42,000 30,600 27,380 TRANSFERS 395.50 LONG TERM LOAN FROM CITY 165,000 133,000 133,000 133,000 300,000 ................................................................................................................................................................................................................................................................................................................................................................ ��:�����............�1��...�'#�.t��E�����.....................:..........................:....:.............................�-..�.�.�.�.�.�.�.�.�.�.�.�.�.�.�.-...�.�.��...��I.t;?�....................�..��,�Q. ..�...�.�.�.�.�...:.�..��..� .�.�.�...�.�.-.......�..3�,dam..-.�.�.�.�.�.�...-..-.�fti0 OQ�3.. .:.:.:.:.:.:. PROGRAM SUMMARY PORTUGUESE BEND ADMINISTRATION (720) 37,793 26,883 42,400 41,230 37,630 RDA ENGINEERING (721) 26,097 10,475 19,000 17,000 18,500 AGENCY ATTORNEY (722) 5,737 1 1,279 7,190 3,000 12,000 OPERATIONS & MAINTENANCE (724) 38,137 33,368 40,200 33,000 63,300 CAPITAL PROJECTS (725) 1,280 42,313 112,810 78,500 276,850 ...............................�.....................#�.��.....................-.-:..............:.........................................:....9.......4..:.::......:..'I......3..:........:.:.:..2...:..60....:.:.......:1:...:......:�:::::::::...:-:.:..$:�..$...::: :::.....................................................A.O..:-...........................................-........-..........:.8 :.:.:.......:..3:.:..$:2........:.::::::::::::::::..=$.1.$:...::...........9�X90:2:.:::::::::::::::::::::::::::=:::7.....::: 1 I I I I I (This page left intentionally blank) I I 1 I I I I I I I I I 2 I DEPARTMENT/ACCOUNT: FUND: RDA - PORTUGUESE BEND - ADMINISTRATION (720) RDA - PORTUGUESE BEND (375) YEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET 1991-92 1992-93 1993-94 1993-94 1994-95 OPERATIONS &MAINTENANCE .37 PUBLIC WORKS CONTRACTOR 14,615 6,897 20,000 20,000 11,000 .39 PROFESSIONAL&CONSULTING SERVICES 11,625 11,150 9,000 9,000 12,400 .50 OPERATING SUPPLIES 0 314 500 500 1,500 .53 POSTAGE 0 6 0 0 0 .71 MEETINGS AND CONFERENCES 2,888 3,880 2,500 1,500 2,500 .72 MEMBERSHIPS AND DUES 8,665 4,636 10,400 10,230 10,230 ........................................................................................................................... ....................... .... 3 Department/Account: RDA Portuguese Bend Administration (375-720) Code Description Amount . 37 PUBLIC WORKS CONTRACTOR 11, 000 The decrease in the FY 94-95 budget is because administration of the Army Corps of Engineers Shorelines Feasibility is included in the "Capital Projects" budget. This line item provides for all administrative support for the Portuguese Bend portion of the RDA with the exception of capital projects. Also provides for time spent with the Army Corps of Engineers for the development of projects other than the Shoreline Protection project. . 39 PROFESSIONAL AND CONSULTING SERVICES 12 , 400 The increase in the FY 94-95 budget is due to the addition of audit expenses. The FY 94-95 budget provides for: Services of Washington lobbyist related to Army Corps projects. ($9, 000) Annual auditing services. ($3 , 400) . 50 OPERATING SUPPLIES 1,500 The increase in the FY 94-95 budget is due to consolidation of these activities into one Portuguese Bend Redevelopment Agency account. A corresponding decrease was made in the other line items. The overall budget remains the same. This line item provides for miscellaneous supplies. .71 MEETINGS AND CONFERENCES 2 ,500 The decrease in the FY 93-94 year-end estimate is because fewer meetings were held than anticipated. Increased activity is anticipated in FY 94-95. This line item provides for landslide stabilization conferences and meetings. 4 . 72 MEMBERSHIPS AND DUES 10, 230 This line item provides for the following annual assessments: Abalone Cove Landslide Abatement District $ 5, 560 Klondike Canyon Geologic Hazard Abatement District 3 , 100 California Redevelopment Association 865 California Marine Affairs and Navigation Conference 650 Portuguese Bend Community Association 55 $10, 230 5 I I I I I (This page left intentionally blank) 1 1 I I I I I 1 I I I I I 6 I IDEPARTMENT/ACCOUNT: FUND: RDA - PORTUGUESE BEND - RDA ENGINEERING (721) RDA - PORTUGUESE BEND (375) ' YEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET ' 1991-92 1992-93 1993-94 1993-94 1994-95 OPERATIONS&MAINTENANCE .37 PUBLIC WORKS CONTRACTOR 567 5,805 3,500 3,000 3,500 ' .39 PROFESSIONAL&CONSULTING SERVICES 22,530 4,670 15,000 14,000 15,000 .42 CONSTRUCTION SERVICES 3,000 0 0 0 0 .50 OPERATING SUPPLIES 0 0 500 0 0 .. .Q...7. ;;;; 'ES..QO >:< 'E.,..00 I9,5.0 1 t 1 7 Department/Account: RDA Portuguese Bend - Engineering (375-721) Code Description Amount . 37 PUBLIC WORKS CONTRACTOR 3 , 500 This line item provides for the coordination of annual land surveys. . 39 PROFESSIONAL SERVICE 15, 000 This line item provides for two monitoring surveys of the Portuguese Bend Landslide Area monumentation. . 50 OPERATING SUPPLIES -0- The decrease in the FY 93-94 year-end estimate is because no supplies were required. The FY 94-95 budget was eliminated because all supply costs for Portuguese Bend Redevelopment Agency have been consolidated in Administration. 8 tDEPARTMENT/ACCOUNT: FUND: RDA - PORTUGUESE BEND - AGENCY ATTORNEY (722) RDA - PORTUGUESE BEND (375) YEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET ' 1991-92 1992-93 1993-94 1993-94 1994-95 OPERATIONS&MAINTENANCE .40 LEGAL SERVICES 5,737 11,279 7,190 3,000 12,000 3.Of30 .; .�EP�[�'l'i�t�i�'f 7bTA ...... >< <. 5,'�'3x 'E 1 �fi8 '�..t:.t. ...,flOQ:: • 9 II Department/Account: RDA Portuguese Bend - Agency Attorney (375-722) I Code Description Amount I .40 LEGAL SERVICES 12, 000 ' The increase in the FY 94-95 budget is due to the addition of the grading project. This line item provides for legal services for the ' Redevelopment Agency Attorney. II II II II II II II II 10 11 I DEPARTMENT/ACCOUNT: FUND: RDA - PORT BEND - OPERATIONS & MAINTENANCE . (724) RDA - PORTUGUESE BEND (375) I YEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET I1991-92 1992-93 1993-94 1993-94 1994-95 OPERATIONS&MAINTENANCE .20 LIGHT AND POWER 5,559 7,504 6,700 6,700 6,900 .25 MISCELLANEOUS CONTRACTUAL SERVICE 14,310 12,694 12,000 9,000 2,400 .37 PUBLIC WORKS CONTRACTOR 2,780 1,390 6,000 6,000 6,000 .42 CONSTRUCTION SERVICES 0 0 3,000 2,500 36,000 .50 OPERATING SUPPLIES 1,032 151 500 300 0 I .58 VEHICLE & EQUIPMENT RENTAL 4,997 0 0 0 0 .60 EQUIPMENT REPAIR & MAINTENANCE 9,459 1 1,629 12,000 8,500 12,000 .�i 33 r:::::::::::::::.:::::::::::::::O.EPARTMENTIOTA: ::::::::::::::::::::::::::::::::::::::::::.:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::48A07::::::::::::::::::::::::::................................................................................................................................................... I I I I I I I I I I I11 Department/Account: RDA Port. Bend - Operations & Mtnc (375-724) Code Description Amount, . 20 LIGHT AND POWER 6, 900 The increase in the FY 94-95 budget is due to an anticipated rate increase. This line item provides for electrical power to de-watering wells in the Portuguese Bend Landslide Area. . 25 MISCELLANEOUS CONTRACTUAL SERVICES 2 ,400 The decrease in the FY 94-95 budget is because drainage facility maintenance and repair has been consolidated with other repair activity in "Construction Services. " This line item provides for contract assistance to regularly monitor the de-watering wells in the Portuguese Bend Landslide area. . 37 PUBLIC WORKS CONTRACTOR 6, 000 This line item provides for supervision and inspection for general operation and maintenance. . 42 CONSTRUCTION SERVICES 36, 000 The increase in the FY 94-95 budget is due to consolidation of maintenance and repair activity previously budgeted in "Miscellaneous Contractual Services" , to an increase in maintenance costs for the lower drain pipe, and to the addition of the gabion removal project. This line item provides for: 1. Contractor support for removal of up to 2 ,200 linear feet of damaged gabions. This does not include replacement activity. This repair is funded with Federal Emergency Management Agency funds. This is a one-time expenditure. ($20, 000) 2 . Contractor support for the maintenance and repair of the storm/well water drainage facilities in the Portuguese Bend Landslide area. ($13 , 000) 3 . Heavy equipment support for erosion control, retention basin cleaning and storm/well water drainage facility alignment in the Portuguese Bend Landslide area. ($3 , 000) 12 . 50 OPERATING SUPPLIES -0- The decrease in the FY 94-95 budget is due to consolidation of all supply costs for Portuguese Bend Redevelopment Agency activities in Administration. . 60 EQUIPMENT REPAIR AND MAINTENANCE 12 , 000 The decrease in the FY 93-94 is due to less maintenance required than anticipated. The full amount was budgeted again in FY 94-95 because actual maintenance costs will vary from year to year. 13 (This page left intentionally blank) 1 14 ' DEPARTMENT/ACCOUNT: FUND: RDA - PORTUGUESE BEND - CAPITAL PROJECTS (725) RDA - PORTUGUESE BEND (375) YEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET 1991-92 1992-93 1993-94 1993-94 1994-95 OPERATIONS&MAINTENANCE .37 PUBLIC WORKS CONTRACTOR 1,280 1,624 1 1,500 1 1,500 10,000 .39 PROFESSIONAL& CONSULTING SERVICES 0 0 6,600 6,600 213,250 .54 PRINTING AND ADVERTISING 0 0 310 400 600 .......................................................................................................................................................................................................................................................... CAPITAL OUTLAY .82 IMPROVEMENTS OTHER THAN BUILDINGS 0 40,689 94,400 60,000 53,000 ......................................................................................................................................................................................................................................................... .. :.:.: 8..8...-.-.::: 15 Department/Account: RDA Portuguese Bend Capital Projects (375-725) Code Description Amount . 37 PUBLIC WORKS CONTRACTOR 10, 000 The FY 94-95 budget increased due to increased professional and consulting service activity. This line item provides for contractor staff time associated with the capital projects identified below. . 39 PROFESSIONAL AND CONSULTING SERVICE 213 , 250 The increase in the FY 94-95 budget is due to the addition of the feasibility study environmental processing project and expansion of sewer system design activity. This line item provides for: Participation in Army Corp of Engineers shoreline protection feasibility study. The amount budgeted reflects the pro-rata share for Portuguese Bend, with the remainder budgeted in Abalone Cove. ($162 , 000) Environmental processing of grading project to remove bentonite rock material. This cost may be reimbursed, however no agreement has been reached yet. ($30, 000) Preparation of sewer system environmental documents. The amount budgeted reflects the pro-rata share for Portuguese Bend, with the remainder budgeted in Abalone Cove. ($21, 250) .82 IMPROVEMENTS OTHER THAN BUILDINGS 53 , 000 The FY 93-94 year-end estimate is lower because two projects were not completed and were rebudgeted in FY 94-95. Federal Emergency Management Agency Grant funds have been received and will be used for these projects. The FY 94-95 budget includes: Reconstruct debris basin in Paintbrush Canyon. This project is necessary to keep debris from being deposited in the canyon. This is an improvement to an existing temporary basin which will require periodic maintenance to remove debris. ($33 , 000) Recondition and relocate 1/2 round drainage pipe. This drain serves as a temporary measure designed to divert water away from the landslide area. ($20, 000) 16 IDEPARTMENT/ACCOUNT: FUND: RDA - ABALONE COVE RDA - ABALONE COVE (380) YEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET' 1991-92 1992-93 1993-94 1993-94 1994-95 :e���:�:�:���::: ��:::�A:LA�C�:::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::C11t69:Sr......6X694:10..........A.>:008:44� ....:.65 %5 I REVENUES 347.10 INTEREST EARNINGS 415,136 312,458 150,000 280,000 280,000 393.20 PROCEEDS FROM SPECIAL ASSESSMENT 10,000,000 0 0 0 0 I 393.20 REPAY COUNTY PRINCIPAL (1,450,000) 0 0 0 0 393.20 REPAY COUNTY INTEREST (7,550) 0 0 0 0 :::::::::::::::::::::TOT.AL:::R:ESOLIRtES-:.:-:-:.:::::-:-::::::.:.:-:::: :::::::::::::.:::::::::::::�:-::::::::i:::::0::::::...$.7:85 X9.1...... F 8$Z 3............5.. .. . .. ...... --...>.... .,........ IPROGRAM SUMMARY ADMINISTRATION (730) 181,748 14,289 31,600 31,600 33,700 RDA ENGINEERING (731) 6,903 5,400 12,000 11,000 12,000 I AGENCY ATTORNEY (732) 31,431 92,218 30,000 30,000 30,000 OPERATIONS &MAINTENANCE (734) 13,908 16,034 12,000 8,200 15,500 CAPITAL PROJECTS (735) 126,755 45,707 2,350,000 180,000 4,595,500 I PANEL OF EXPERTS (738) 67,887 153,155 61,000 10,500 60,000 7:1::==4 :::::::--: 4:04. ::-. I TRANSFERS OUT 391.20 TRANSFER TO MAINTENANCE TRUST FUND 1,000,000 0 0 0 0 391.20 REPAY CITY LOAN TO GENERAL FUND 787,340 0 0 0 0 ........................................................................................................................................................................................................................................................ :...........746,7-. I I I I I17 I I I I I (This page left intentionally blank) I I I I I I I 1 I I I I I 18 I I IDEPARTMENT/ACCOUNT: FUND: RDA - ABALONE COVE - ADMINISTRATION (730) RDA - ABALONE COVE (380) YEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET I 1991-92 1992-93 1993-94 1993-94 1994-95 OPERATIONS&MAINTENANCE .25 MISCELLANEOUS CONTRACTUAL SERVICE 135,614 0 0 0 0 I .37 PUBLIC WORKS CONTRACTOR 42,601 8,712 20,000 20,000 20,000 .39 PROFESSIONAL&CONSULTING SERVICES 3,375 0 1 1,000 1 1,000 12,000 .50 OPERATING SUPPLIES 137 0 500 500 1,200 .53 POSTAGE 21 • 15 100 100 500 I .72 MEMBERSHIP AND DUES 0 5,562 0 0 0 I I I I I I I I I I I I19 Department/Account: RDA Abalone Cove - Administration (380-730) Code Description Amount . 37 PUBLIC WORKS CONTRACTOR 20, 000 Activity levels vary from year to year. Provides for administrative support for Abalone Cove funded by the Los Angeles County Improvement bonds with the exception of administration of any capital projects. . 39 PROFESSIONAL AND CONSULTING SERVICES 12 , 000 This line item provides for an annual tax increment study as required by the settlement. . 50 OPERATING SUPPLIES 1, 200 Increase in FY 94-95 budget due to consolidation of these activities into one Abalone Cove Redevelopment Agency account. Provides for miscellaneous blueprints and supplies for the general administration of the Los Angeles County Improvement Bonds for Abalone Cove. . 53 POSTAGE 500 Activity levels vary from year to year. The FY 94-95 budget increase due to an increased number of proposed projects. Provides for mailings to residents and other related correspondence. 20 DEPARTMENT/ACCOUNT: FUND: RDA -ABALONE COVE - RDA ENGINEERING (731) RDA - ABALONE COVE (380) YEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET 1991-92 1992-93 1993-94 1993-94 1994-95 OPERATIONS&MAINTENANCE .37 PUBLIC WORKS CONTRACTOR 1,322 1,347 1,000 1,000 1,000 .39 PROFESSIONAL&CONSULTING SERVICES 5,581 4,053 11,000 10,000 1 1,000 21 Department/Account: RDA Abalone Cove - Engineering (380-731) Code Description Amount . 37 PUBLIC WORKS CONTRACTOR 1, 000 Provides for coordination of land surveys with Los Angeles County Public Works (Survey Division) to conduct two land surveys of the monumentation in the Abalone Cove Landslide area. . 39 PROFESSIONAL AND CONSULTING SERVICES 11, 000 FY 1993-94 Year End estimate lower due to lower than anticipated costs. Surveying costs are expected to increase in FY 1994-95. This line item provides for two annual land surveys of the monumentation in the Abalone Cove Landslide area to determine amount of movement and effectiveness of any mitigation measures. 22 DEPARTMENT/ACCOUNT: FUND: RDA - ABALONE COVE - AGENCY ATTORNEY (732) RDA - ABALONE COVE (380) YEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET ' 1991-92 1992-93 1993-94 1993-94 1994-95 OPERATIONS&MAINTENANCE .37 PUBLIC WORKS CONTRACTOR 55 0 0 0 0 ' .40 LEGAL SERVICES 31,376 92,218 30,000 30,000 30,000 �'ti�'At Op�a�7'IOfUS;&i�i�#N7'�t�A�f�� _ 8t,43� B,� X18 �Ltxfl� ;.3t��il34 �t?400 ' ,:..... ..f..AEiT....T1'dTAt . 3:1 �E3 . 3 ..1'1$ 3tJ.0t'30 <$f?;QC3t1 3..OfiB 1 1 1 1 1 ' 23 Department/Account: RDA Abalone Cove - Agency Attorney (380-732) , Code Description Amount ' .40 LEGAL SERVICES 30, 000 Provides for legal assistance on an as_needed basis. 1 1 24 ' • I DEPARTMENT/ACCOUNT: FUND: RDA - ABALONE COVE - OPERATIONS & MAINTENANCE (734) RDA - ABALONE COVE (380) YEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET I 1991-92 1992-93 1993-94 1993-94 1994-95 OPERATIONS &MAINTENANCE .25 MISCELLANEOUS CONTRACTUAL SERVICE 250 151 500 500 2,000 I .37 PUBLIC WORKS CONTRACTOR 1,652 3,648 2,000 1,500 2,000 .39 PROFESSIONAL& CONSULTING SERVICES 4,500 1 1,900 9,000 6,000 9,000 .42 CONSTRUCTION SERVICES 7,1 17 0 0 0 0 .50 OPERATING SUPPLIES . 389 335 500 200 0 I .60 EQUIPMENT REPAIR AND MAINTENANCE 0 0 0 0 2,500 1:3;:90 1; 000 $:200::=>:: ..'.......O:: I I I I I I I I I25 Department/Account: RDA Abalone Cove - Operations & Maint (380-734) Code Description Amount . 25 MISCELLANEOUS CONTRACTUAL SERVICES 2 , 000 The FY 94-95 budget increased due to the addition of well monitoring of the newly installed wells. Emergency maintenance previously budgeted here was moved to "Equipment Repair and Maintenance. " This line item provides for general operation and monitoring of the de-watering wells in the Abalone Cove Landslide area. ($2 , 000) . 37 PUBLIC WORKS CONTRACTOR 2 , 000 Provides administration and supervision of monitoring and repair activity. . 39 PROFESSIONAL AND CONSULTING SERVICES 9, 000 The FY 93-94 year-end estimate is lower because fewer monitorings were conducted than expected. The FY 94-95 budget is increased because it is anticipated that six monitorings of the geological instrumentation in Abalone Cove will be required. . 50 OPERATING SUPPLIES 0 The decrease in the FY 94-95 budget is because all supply costs for Abalone Cove Redevelopment Agency activities have been consolidated in "Ab Cove - Administration" . . 60 EQUIPMENT REPAIR AND MAINTENANCE 2 , 500 This is a newly added line item in FY 94-95 to provide for maintenance of newly installed wells. FY 94-95 projects include: Well maintenance and repair. ($2 , 000) Contractor support for emergency maintenance and repair of the storm water drainage facilities. ($500) 26 I DEPARTMENT/ACCOUNT: FUND: RDA - ABALONE COVE - CAPITAL PROJECTS (735) RDA - ABALONE COVE 13801 IYEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET I1991-92 1992-93 1993-94 1993-94 1994-95 OPERATIONS &MAINTENANCE .25 MISCELLANEOUS CONTRACTUAL SERVICE 79,274 19,705 27,000 27,000 10,000 I .37 PUBLIC WORKS CONTRACTOR 17,701 22,294 135,000 47,000 1 19,500 .39 PROFESSIONAL&CONSULTING SERVICES 12,940 3,708 440,000 86,000 326,000 .41 GEOLOGIC SERVICES 500 0 0 0 0 .42 CONSTRUCTION SERVICES 14,030 0 0 0 159,000 I .50 OPERATING SUPPLIES 285 0 0 0 1,000 .75 CONTINGENCY 0 0 48,000 0 0 ���. S 0 6 .::......:...�'Lti�AI.�::d#�g1�:1�rt�ofi:•:�.::�11��:�i:T�N:�kNgp - 124-7.4�.....::::.. ........ �'a................. ...�. ICAPITAL OUTLAY .82 IMPROVEMENTS OTHER THAN BUILDINGS 2,025 0 1,700,000 20,000 3,980,000 I ::::20 0 ::::: B 00 ::�:::::::i::::1`c'�`A L:::C:�0.pE`�1�L:::t�U1`�.Alf•.•......... ...•........•...•......................•..•.•.....2�•:�:��.;.;.:..�::.:.....::•.•:..:•:...................�........;.......... . ........�...............>...-----� .. . �+P k R * -t. .........•.....•....•.•1 6:•:• ••+c ... :.:•[��.0. .....•.• $9 �=�600::: :::::::::::::::}:�:�:�:�:�:��Ci",it iY�ilff��.�.•.���A•L.•.•.•.•.•.•.::..:.:.:.:...•.;:;.;.}:.;. ;:;.;.;.;:;.;.;{{{.:.;.}..;.•..•.•..•.....•...•.•.•.•.•.........•.�.•��.�.1•�.7•.•.:..............������.•.•.•._.•..,.rGt.��i.�.r� .•.•.•.-.........�.��ji.7�7�........[.......f I I I I I I I I 2.7 Department/Account: RDA Abalone Cove - Capital Projects (380-735) Code Description Amount . 25 MISCELLANEOUS CONTRACTUAL 10, 000 FY 93-94 projects included completion of design of sewer system. FY 94-95 budget provides for special projects requiring technical support in the soils, geotechnical and engineering areas, on an as-needed basis. . 37 PUBLIC WORKS CONTRACTOR 119 , 500 The FY 93-94 year end estimate is lower due to delays in implementing various projects due to environmental processing. The FY 94-95 budget provides for staff support for obtaining easements, preparing bid documents, general and construction administration of the following projects: Abalone Cove Sanitary Sewer Project - Provides for administration of environmental review, design, and construction. This is a carry-over project from FY 93-94 . ($43 , 000) Altamira Canyon Drainage Improvements - Provides for review, obtaining easements, and administration of environmental processing and construction. This is a carry-over project from FY 93-94 . ($33 , 000) Shoreline Protection Feasibility Study - Provides for administration of this joint project with the Army Corps of Engineers. This is a new project. ($16, 000) Abalone Cove Drainage Improvements - Provides for administration of construction. This is a carry-over project from FY 93-94. ($10, 0 0 0) Kelvin Canyon Drainage Improvements - Provides for administration of environmental processing, design, obtaining easements, and construction. This is a carry-over project from FY 93-94 . ($9, 000) Dewatering and Observation Wells - Provides for administration of environmental processing, design and construction. This is a new project. ($8, 500) 28 . 39 PROFESSIONAL AND CONSULTING SERVICES 326, 000 Abalone Cove Sanitary Sewer Project - Provides for design and environmental review. ($65, 000) Altamira Canyon Drainage Improvements - Provides for design. ($66, 000) Shoreline Protection Study - Provides for a pro-rata share of the costs to participate in the Army Corps of Engineers feasibility study. The remaining portion is budgeted in Portuguese Bend. ($130, 000) Abalone Cove Drainage Improvements - Provides for design services. ($15, 000) Kelvin Canyon Drainage Improvements - Provides for design services. ($50, 000) . 42 CONSTRUCTION SERVICES 159 , 000 Provides for inspection services for the following projects: Sewer System $80, 000 Altamira Canyon 44 , 000 Kelvin Canyon 12 , 000 Abalone Cove Drainage 12 , 000 Dewatering Wells 11, 000 . 82 IMPROVEMENTS OTHER THAN BUILDINGS 3 , 980, 000 The FY 93-94 year-end estimate is lower because lengthy environmental processing caused a delay in each project. The FY 94-95 budget provides for construction of improvements, which were listed as priorities by the Panel of Experts. The projects will help to control and reduce ground water seepage into the landslide area. The FY 94-95 budget includes the following projects: Abalone Cove Sanitary Sewer System project. This is a new project which will provide sanitary sewers for the entire Abalone Cove area above Palos Verdes Drive South. (2 , 000, 000) 29 Altamira Canyon Drainage Improvements - The Altamira Canyon project includes the construction of a new debris basin, channel lining (grouted rip-rap) and storm drain improvements in the project area. This project is designed to provide permanent improvements to the channel area. Maintenance will consist of normal debris basin and channel lining cleaning. This is a carry-over project from FY 93-94 . ($1, 100, 000) Kelvin Canyon Improvements - The project includes , the development of a system to capture spring water from the canyon. This project is designed to be a permanent solution to prevent seepage from this source into the groundwater table. Maintenance will consist of normal debris basin and channel lining cleaning. This is a carry-over project from FY 93-94 . ($300, 000) Dewatering and Observation Wells - Provides for the installation of new dewatering and observation wells. This is a permanent project which will require monthly maintenance. It will also require periodic electrical and pump repairs. This is a new project. ($280, 000) Abalone Cove General Drainage Improvements (Developed Area) - Provides for the installation of new storm drains and culverts in the existing developed area. ($300, 000) 30 MO 1994-95 RDA-ABALONE COVE CAPITAL IMPROVEMENT PROJECTS Project Cost (.25) (.37) (.39) (.42) (.82) Total Project Description Tech Supt Cntract Adm Dsgn/Env Inspection Construction Cost Abalone Cove Sanitary Sewer System * 43,000 65,000 80,000 2,000,000 2,188,000 Altamira Canyon Drainage Improvements 33,000 66,000 44,000 1,100,000 1,243,000 Kelvin Canyon Drainage Improvements 9,000 50,000 12,000 300,000 . 371,000 Dewatering and Observation Wells 8,500 11,000 280,000 299,500 Shoreline Protection Feasibility Study 16,000 130,000 146,000 w Abalone Cove Drainage Improvements 10,000 15,000 12,000 300,000 337,000 N Special Projects -Technical Support 10,000 10,000 TOTALS 10,000 119,500 326,000 159,000 3,980,000 4,594,500 Footnote: * $2,192,000 total project cost, $27,000 spent in FY 1993-94 1 (This page left intentionally blank) 1 t 1 1 1 32 ' DEPARTMENT/ACCOUNT: FUND: RDA - ABALONE COVE - PANEL OF EXPERTS (738) RDA - ABALONE COVE (380) • YEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET 1991-92 1992-93 1993-94 1993-94 1994-95 OPERATIONS&MAINTENANCE • .37 PUBLIC WORKS CONTRACTOR 9,365 33,931 10,000 5,000 10,000 .41 GEOLOGIC SERVICES 58,453 1 19,224 50,000 5,000 50,000 .50 OPERATING SUPPLIES 69 0 1,000 500 0 .............................................................................................. 33 Department/Account: RDA Abalone Cove - Panel of Experts (380-738) Code Description Amount . 37 PUBLIC WORKS CONTRACTOR 10, 000 The FY 93-94 year-end estimate was lower because fewer Panel meetings were held than anticipated. The FY 94-95 budget is higher because additional meetings are anticipated. This line item provides for administrative support for all Technical Panel related matters and meetings. This includes attendance at the meetings and the preparation of Panel meeting agendas and minutes. . 41 GEOLOGIC SERVICES 50, 000 The FY 93-94 year-end estimate was lower because fewer Panel meetings were held than anticipated. A delay in completing the capital projects due to environmental processing delayed the need for the Panel to meet. The FY 94-95 budget is increased because additional meetings are anticipated. This line items provides for: Technical Panel Review of Project implementation and monitoring. ($26, 000) Panel member expenses to attend Technical Panel meetings. ($24, 000) . 50 OPERATING SUPPLIES 0 The decrease in the FY 94-95 budget is because all supply costs for Abalone Cove Redevelopment Agency activities have been consolidated in "Ab Cove - Administration. " 34 DEPARTMENT/ACCOUNT: FUND: ABALONE COVE MAINTENANCE FUND 1895) AB COVE MAINT FUND (895) YEAR—END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET 1991-92 1992-93 1993-94 1993-94 1994-95 ............ ... ...........A LA.O......:.:.:-:.:.:.:.:.:.:=:::::.:..:::.:.:.:.:.:.:.:.:.......:.......:.......:.................-........-........:...1..........9.1...:...........1. 2 REVENUES 347.10 INTEREST EARNINGS 57,812 52,357 60,000 48,000 48,000 � ����� .�A.L$�������...................... ................................��8.1.�..............5�$��..............�0 Q�..............�4$��..............4B O�.. .................................. ......................................................................................................................................................................................................................................................... TRANSFERS 391.10 TRANSFERS IN FROM CIP FUND 1,000,000 0 0 0 0 ........................................................................................................... .................................................................................................................................................................................................... .................................................... ............. $ : ::: 1:: :.$=...#: ==.. : :.< { ..:::: :: EXPENDITURES OPERATIONS &MAINTENANCE .60 EQUIPMENT REPAIR AND MAINTENANCE 0 0 0 0 2,400 .................................................................................................................................................................................................... ..................................................... ���:������'`:t��A����J#��$�A�':E�����$s��a4��1"���iEtiI�;E���::�:����������:����������:�:�::�::��=�:�:::�������:�=�:�:���:�::�::=�:=�:���:::::���:��������:�����������3:�:•:•: ::•:••:::::::::�:•:��:�:::•:••:•:::::•�Z=�� �;: CAPITAL OUTLAY .82 IMPROVEMENTS OTHER THAN BUILDINGS 0 0 0 0 0 ' Alf ......................................................................................................................................................................................................................................................... ........................................................................................................................................................................................................................................................ •......:.: .F. i . .. .. .. (.:... ... :...:.:: $ .1:.:1:..9..1.6 .........=::. $:-..... 35 Department/Account: RDA Abalone Cove - Maintenance Fund (895-895) Code Description Amount . 60 EQUIPMENT REPAIR AND MAINTENANCE 2 , 400 This is a newly added line item that provides for the share of costs for well water discharge line maintenance witri the Abalone Cove Landslide Abatement District. • 36 DEPARTMENT/ACCOUNT: FUND: RDA HOUSING SET-ASIDE RDA HOUSING SET-ASIDE (118) YEAR-END ADOPTED ACTUAL. ACTUAL BUDGET ESTIMATE BUDGET 1991-92 1992-93 1993-94 1993-94 1994-95 :BEG1:N:IW:IWG::: N :: MANGE:: ..:. .::.. 1.; .. ... . =.. $ : .9.. =?. ....:...:: ... +4: REVENUES 311.10 PROPERTY TAX INCREMENT 214,945 67,850 50,000 64,000 64,000 347.10 INTEREST EARNINGS 6,335 10,194 15,000 12,000 18,000 ......................................................................................................................................................................................................................................................... ........................................... ............................................................................................................................................................................................................. •::. :::::::: _457: ........................................................................................................................................................................................................................................................ k��� #1 /A F �i E 221 2( r�J� :47:>• :375,32:a::::::::= <-457:....::: :�:�:........•:•:•EN:�I['tiirZ•:�FU7?��:�:BJ!''�.[�A�V��•:�:•:�. •...: •...• :•.........:.......� ..:.........•:.:�4rr:•�:j�S�.....:..........�C�✓.9:►5:6•!"f•:.•.•.�.�..•.•...�.../���5�..:�:........_ .... 37 I I I I I (This page left intentionally blank) I I I I I I I I I I I I I 38 I DEPARTMENT/ACCOUNT: FUND: DEBT SERVICE - ABALONE COVE DEBT SERVICE - AB COVE (210) YEAR-END ADOPTED ACTUAL ACTUAL BUDGET ESTIMATE BUDGET 1991-92 1992-93 1993-94 1993-94 1994-95 .......................................................................................................................... REVENUES 311.10 PROPERTY TAX INCREMENT 613,646 271,402 175,000 260,000 260,000 347.10 INTEREST EARNINGS 19,954 32,463 40,000 40,000 45,000 :::.......•••• >> .:=::: '..': >:.::...:.:.:,:. .:.,:.:_:.:....:.:.>:.:.:.:.:.:.:.:.:.:.:.:.:.:.:,:.:.:.:.:.:.:.:..:.:.:.:.:.:.:.:.:.:.:.:.:.> ..•, •: .•••: ...:`..: ..='.Lt :.:.:.:=:==:.:•-.. .:`$Q :.> EXPENDITURES PASS THRU TO L.A. COUNTY 0 63,658 0 64,000 64,000 ...... .. ..:•.. •• .•.....•............. .•• ... . •.. :.. •::,. O7::::::::.::::..I::,:17.=80 :.:.:.:=:.:.:.:1:.,:•. =9. 7:.: • 39 1 (This page left intentionally blank) 1 40 ,