CC RES 1984-010RESOLUTION N0. 84 -10
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO PALOS
VERDES ADOPTING BUILDING, ELECTRICAL, MECHANICAL, AND PLUMBING
CODES FEES
THE CITY COUNCIL OF THE CITY OF RANCHO PALOS VERDES, CALIFORNIA DOES
HEREBY ORDAIN AS FOLLOWS:
Section l: That fees are established to cover the costs incurred
for issuance, processing,and inspecting Building, Electrical, Plumbing
and Mechanical permits.
Section 2: That the fees are as collected in 1983 and set forth
in Exh ib it "A" .
Section 3: The City Clerk shall within 15 days of adoption hereof
post copies of this Resolution in at least four (4) public places in
the City of Rancho Palos Verdes designated for the posting of City
Ordinances and shall file proof of such posting in the official records
of said City Clerk,
PASSED, APPROVED AND ADOPTED -this 7th day of February, 1984.
in
Mayor
ATTEST:
C y Clerk
State of California )
County of Los Angeles ) ss
City of Rancho Palos Verdes
I, JO LOFTHUS, City Clerk of the City Council of the City of
Rancho Palos Verdes, hereby certify that the above Resolution-No was duly
and regularly passed and adopted by the said City Council at a regular meeting
thereof held on the 7th day of FEBRUARY, 1984.
:r
City Clerk, city Rancho los Verdes
cnYcFRMaoPAltv!P1s
SCHEDULE CE' FMS
EFFECTIVE JANUARY 1, 1983
Standardized Plan plan check of Building Plan Check
Energy Plan Check (ixriresidential) ...........2�� Building Plan Check or
`L°minima. 'Me ndnimm
will govern for valuations of
*100,000 and less.
Inspection: A-4 Structure "74.5D
Inspection: Chapter 66 Structure
First Structure.... .............. ......$.74'.50
Each Additional structiae..............;_ t215
Inspection: Denelitian.. ............. r7Si5plus $1(0.00 issuance fee
*Inspection: Occupancy:
Less than 5,000 sq. ft. ................$122.ZSplus $l6soO issuance fee
5,001 to 10,000 sq. ft. ................stucSOplus $t4oO issuance fee
10,000 to 100,000 sq. ft...............$SZ(.p0 plus $ &.oO issuance fee
Above 100,000 sq. ft...................�13.001us $1640 issuance fee
Relocation Building Investigation:
Less than 5,000 sq. ft.................�• (66.T5°
More than 5,000 sq. ft.................$ Vet.50
Inspection Rep.: Substandard Structure......$1q(SD plus -$lG..00 issuance fee ' •`
Inspection Demo.: Substandard Structuae......$rj3.l$'Plus $ 4oOissuace fee
Inspection: Site (Geology)..................$l2. cpi $j& o issuance fee
Inspection or permit: Irbbilehane............$'SO.oD 8x40 and larger)6TATr FEs.)
Inspection or Permit: Trailer Coach.....•:•.$11.50
Search and Single Copy of Permit............. -(Q'.40 •
Rehabilitation Rehearing Fee.................$* 01.150
Approval in Concept (1976 Coastal Act).......$ ''SQhOO
sw 1 M m iwoCi mot, comg%.Je.b Yc2iM11 T••• BLb .PEPMr4 Ifo,bb
PAGE 1 EXHIBIT "A" RESOL. NO. 84-10
9ALUATION .
NOT PLAN
OVER CHECK
C�n
RANCHO PADS VERDES
PLAN CHECK AND BUDDING PERMIT FEES
EFFECT VE JANUARY
a•
BLDG. ISSUANCE NOT PLAN BLDG, ISSUANCE
PERMIT + FEE OVER CHECK PERMIT + FEE
200
11.10
13.85
400
14.50
18.10
?o0
18.75
23.40
1000
22.15
27.65
THEN
BY THOUSANDS
2
33.15
41945
3
43.40
54.25
4
54.40
68.00
5
65.50
81.85
b
75.74
94.60
?
86.75-
108.45
8
97-v80
122925
9
108.85
136.05
10
119.10
148.85
11
130.10
162.65
12
141.15
176.45
13
152.25
190.30
14
162040
203.00
15
173.50
216.85
16
184.55
230. 70
17
194.75
243.45
18
205.80
257.25
19
216.90
271.10
20
227990
284,v90
21
238010
297.65
22
249.15
311.45
23
260.20
32.25
24
20.40
338.00
25
281.50
351.85
26
290.85
363.55
�7
299.35
374.20
28
308o7O
385.90
�9
318.05
397.55
30
326.55
408.20
31
335.90
419.90
32
344,40
430.50
334
696925
w+2.2o
363.10
58
453.9 0
35
371.60
464.50
16.00
36.
381.00
476.25
16.00
16.00
37,
389.50
486.85
16.00
16.00
38-
39$•85
498.55
16.00
16.00
39
407.35
509.20
16.00
16.00
40
416.70
520.90
16.00
41
426.00
532.55
16.00
16.00
42
434.55
5+3.20
16.00
16900
43
X3.90
554.90
16.00
16.00
44
43,30
566.60
16900
16.00
45
461.75
577.20
16.00
16.00
46
471.10
588.90
16.00
16900
47
479.60
599.50
16.00
16900
48
489.00
611925
16.00
16.00
49
498.30
622990
16.00
16.00
50
506.85
633.55
16.00
16.00
51
514.50
6+3.10
16.00
16.00
52'
521.30
651.60
16.00
16.00
53
529.00
661.20
16.00
16.00
54
535.75
669.70
16.00
16.00
55
542.55
678920
16.0
16.00
56'
550.20
687.75
16.0
16.00
57
557.00
696925
16900
16.00
58
564.65
705.85
16.00
16.00
59"
571.50
714.35
16.00
16.00
60
579.10
723.90
16.00
16.00
61
585.90
732.40
16.00
16.00
62
593.60
X42.00
16900
16.00
63-
600.40
750.50
16.00
16.00
64
608.05
?b0.05
16.00
16.00
65
614.85
766.55
16.00
16.00
66
622.50
%78.Z0
16.00
16900
67
629oxD
'786.60
16.00
16:00
68
636915
795.20
16.00
16.00
69
643.75
804.70
16.00
16.00
70'
651935
814.20
16.00
16.00
71
658.20
822.75
16.00
16900
72�
665.9
832.35
16.00
16.00
3,
�J4'1'
672970
840.85
16.00
16900
680.35
850940
16.00
16.00
75
687.10
856.90
15.00
PAGE 2 EXHIBIT "A" RESOL. NO. 84 -10
s
ROT
PLAN
BLDG,
ISSUANCE
NOT
PLAN
BLDG.
ISSUANCE
OVER
CHECK
PERMIT +
FEE
OVER
CHECK
PERMIT +
FEE
76
694.80
.868.50
16.00
106
893.70
1117.10
16.00
77
701,v60
8 77.00
16.00
10'7
897.95
1122.45
16.00
78
709.20
886.50
16.00
108
902.25
112.80
16.00
79
716.00
895.00
16.00
109
906*50
1133.15
16000
80
?22.80
903.50
16.00
110
910.80
1138.50
16.00
81
'730.40
913.00
16.00
111
915.10
1143.85
16.00
82
73 7•20
921.50
16.00
112
919.35
1149920
16.00
83
'744.80
931.00
16. 00
113
923.65
1151 -. 55
16000
84
?51.60
939.50
16.00
114
X27.90
1159.90
16.00
85
?59.20
949.00
16.00
115
932.20
1165925
16.00
86
766.80
958.50
16.00
116
936.50
1I79. f,0
16.00
87
?73.60
967.00
16°00
117
940.75
1175.95
16.00
88
780.80
96.00
16.00
118
945.05
1181.30
16.00
89
788.40
985.50
16000
1.19
949.30
1186.65
16.00
90
795.0
994*00
16.00
120
953.60
1192900
16.00
91
X02.80
1003.50
16.00
121
957.9
1197.35
16.00
92
809960
1012.00
16.00
122
962.15
1202.70
16000
93
817.20
1021.50
16.00
123
966.45
1208.05
16900
94
824.00
1030.00
16900
124
970.70
1213.40
16,00
95
831.60
1039.50
16.o0
125
975.00
1218.75
16.00
96
838.40
1048,00
16.00
126
979.30
1224.10
16.00
97
846.00
1057.50
16.00
127
983.55
1229945
16000
98
852.80
1066.00
16.00
128
987.85
1234.80
16000
99
860.40
1075.50
16.00
129
992.10
1240.15
16000
100
868.00
1085.00
16,00
130
996.40
1245.50
16900
101
872.30
1090.35
16.00
131
1000.70
1250.85
16.00
102
876.55
1095.70
16.00
132
1004.95
1256.20
16.00
103
880.85
1101905
16900
133
1009.25
1261.55
16.00
104
885.10
1106.40
16.00
134
1013.50
1266.90
16900
105
889.40
1111.75
16.00
135
1017.80
1272.25
16.00
For a
quick check
of those
large amounts
OVER 135,0000000 5.35
times
the valuation
in thousands
plus $550.00
will
equal
the permit
fee in
dollars. Plan
check fee equals
80%
of the
permit fee.
EXAMPLE: $299,200
(Raise
to 300,000)
Permit
fee = 300
x 5.35 +
550.00
2155.00 +16.00= 2171900
Plan
check fee..,.$2155.00x(.8)=
X1724.00
NOTE:
Do not
add $16.00
issuance
fee to
permit
amount When
calculating
the
plan check
fee..
ENVIRONMENTAL EXCISE TAXES
Residential ...............1 bedroom...................... 675.00
Residential ..........,....2 bedrooms or more ............$1349.00
Commercial, industrial ............. ......................$0.41 /FT2
PAGE 3 EXHIBIT "A" RESOL. NO. 84 -10
. • omm CF ux
. _ DUAYaMEN7
IBMWIM AND SAY EIY DIVISION
GRADIM TTRIIZT AND NG FW
CITY OF PAIX-VERDES OMY
j - isSUANC'E FEE
4
EXHIBIT "A"
PAGE 4
RESOL. NO.
VOLUME
(cu.yas.)
?.OT
OVER
TEES _ VOLUME
GRADING PERMIT NOT
pR FLAN CHECK - OVER
FEES
GRADING PERN,IT
Oil PLAN CHECK
VOLUME
(cu.yas)
NOT
OVER
FEES
GRADING PERMI
0K PLAN CHECK
• 50
82000
26
1141000
61
2008.00
100
136.00
27
1165.00
62
2032.00
200
169.00
.28
1191.00
53
2058.00
•300
203.00
29
1215.00
- 64
2082.00
1+00
237.00
30
.1239. o0
65
2107. o0
$m
271.00
•60D
305.00
31
1265.00
66
2132.00
.70D
338.00
32
1289.00
67
2157.00
WD
372.00
33
1314.00
68
2181.00
soo
406.00
34
1339.00
0
220.00
1000
440 . oo
35
1364 , oo
70
2231. o0
7HE?J BY
. nHousarIDS
'36
1388000
71
2256 . o0
• 2
44.00
37
1414.00
72
2281.00
3
50'7.00
38
1438.00
73
2306.00
• �+
541'o00
39
1463e00
74
2330900
S
575.00
40
148 7.00
75
2356.00
6
609.00
41
1513.00
76
2380.00
7
627.00
42
1537.00
77
2405.00
8
676. C0
43
1562900
78
2429.00
9
710o00
44
1587. o0
79
2454, o0
10
744.00
43
1612.00
so
2479.00
li
769.00
45
1636.00
81
2503.00
12
794.00
47
1661.00
82
2529.00
13
819.00
48
1686.00
83
2553•Qo
14
843.00
49
1710.00
84
2578.00
13
868.00
50
1736.00
BS
2603.00
16
X93.00
51
1 760.00
86
2628.00
17
917.00
52
1785.00
87
2652.00
18
943.00
33
1809900
88
2678.00
19
967.00
54
1835.00
89
2702.00
20
992.00
35
1859.00
90
2727.00
21
1016.00
56
1885.44
91
2752.00
22
1042.00
57
1909.00
92
2777.00
23
1066.00
Sg
1934.00 �
93
280.00
Y4
1091.00
1116000
39
1��8.00
1 4.00
94
282 .00
25
60
95-
285.00 __
£7, C7?n SIDE M V2 Z GRE'ATfR 7M 95,000 CUBIC YPRDS
VOLUME FEES
(cu .yds .) •
NOT GRADING PERMIT
OVER PLAT` CHECK
R 0 1r:", 0 -N/0
ISSUANCE FEE - S 14@00
t v�
VOLUME VOLUME FEES
(cu .,yds a.) (cu .yds . )
NOT A GRADING PERMIT NOT GRADING PE
OVER PLAN CHECK OVER • FLAN CHECK
96
28 75.00 �
414
5083.00
760
6735.00
97
2900.00
420
5151.00
770
6775.00
98
2925.00
430
5219.00
780
6815
99
2950.00
440
5287e00-
Igo
6855. 00
100
2975.00
450
5355.00:
soo
6895.00.
ilo
` 304.3.00
460
5423.00
810
693�j.0o
120
3111.00
470
.5491.00
820
6975.00
1�
1247900 i9.00
�
X5559.00
830
7015.00
isa
�
.5627.00
840
X055.00
3315.
.5695* 00
850
7095*00
16o
3383ioPO
Sio
5735*00
860
7135e00
1 i0
3451.00
520
5775*00
870
7175.00
180
3519*00
530
'5815* 00
'880
7215*00
190
3587*00
540
890
7255e00
200
3655.00
Sso
; 5895. oo
7295.00
210
3723.00
Sbo
;5935.00
910
7335.00
220
3791*OU
570
, 6oi5
7375e00
2�
3859*00
Sso
. o0
9 0
7415e00
240
3927.00
590
6055.00
940
7455.00
250
3995.00
600
6095.00
950
7495.00
260
4063.00
610
;6135.00
960
7535.00
270
4131.00
620
X6175.00
970
7575.00
280
4199.00
630
X6215.00
980
'7615.00
290
42 7 . oo
too
;5255. o0
990
7655*00
300
X335. o0
650
X295.00
i,00K)
7695.00
310
4403 . o0
660
.6335* 00
19010
7735*00
320
4471900
670
6375* 00
1,020
7775*00
330
4539 , o0
680
5415*00
19030
7815*00
340
4607.00
690
6455.00
1,040
7855.0
350
4675. o0
700
8495900
11050
7895*00
360
4'743, o0
710
6535. o0
19060
7935*00
370
4811.00
720
6575900
19070
7975*00
380
4879.00
730
6615.00
19080
8015.00
390
4947900
740
6655* 00
11090
8055e00
400
5015.00
750
6695.00
i,lo0
8095.00
FUR VOLL S EXCEEDING 1,10Q,00D CUBIC YARDS
For each additional 10,000 cubic yards or fraction thereof (use the next
higher full ten thousand number) add $ A-c.00to the Permit Fee and add $A0,00r
to the Plan Check fee .
Permit fee for 1,363,000 cu. yds . _ $Z 005' PLUS 27 x 4-0. c c m s .
4, t c i s suance fee. The Pl an Check Fee i s $ ' g J 0 S, 0 a ,
�
PAGE 5 EXHIBIT "A" RESOL. NO. 84 -10
BUILDING AND SAFETY
MECHANICAL
EFFECTIVE FEBRUARY 1, 1984
PERMIT FEES
Forthe issuance of each permit..,............,... .... .........................$16.00
For the installation, alteration or relocation of each refrigeration compressor
or absorption unit, and for each fuel burning furnace, heater, boiler, and
ted decorative appliance including vents attached thereto:
Up to and including 100,000 BTU................. .........................$23.50
More than 100,000 BTU to and including 1,000,000 BTU..................... $45975
More than 1 !D 00 , 0 00 BTU . . . . . . . . . . . . . . . . . . go****** . . . . . 00 go**** . . . . . . . . . 00$68,00
For each air inlet and air outlet served by any air conditioning system..$ 3.10
Or for each 1,000 square feet or fraction thereof of conditioned area .... $25.00
NOTE: when a permit is applied for and the total number of air
inlets and air outlets is unknown, the fees shall be
based on the square feet of conditioned area.
For the instal 1 ation., relocation or replacement of each appliance vent
installed and not included in an appliance permit . ....................... $ 9.00
For the installation or alteration of each air handling unit for air
conditioning including ducts attached thereto:
Up to and including 2,000 CFM
Eachunit up to 10 ............... ..............................$ 9.00
Eachunit over 10 ..... . . ......... ..............................$ 2.15
More than 2,000 CFM to and including 10,000 CFM .....................$23.50
More than 10,000 CFM................. ...... ........................,$44.50
NOTE: This fee shall not apply to an air handling unit which is a
portion of a factory assembled air conditioned appliance for
which a permit is required elsewhere in this Code.
For each evaporative cooler other than portable type...........,.........$13.80
For required ventilation fans which serve a single register:
Eachfan up to 10..,.................. .... ..........................$ 9100
Eachfan over 10... ................... ..............................$ 2.15
PAGE 65 EXHIBIT "A" RESOL. NO. 84 -10
RANCHO PALOS VERDES
BUILDING AND SAFETY
For each required ventilation system which is not a portion of any air
conditioning system of which a permit is required elsewhere in this
Code............. . . . . . . . . . . . . . . . . . . . . . . . . . . 0 . . . . . . . • . • • . . . . . . . . . . 00 . . . . . 0$18,10
For the installation of each commercial kitchen hood or spray booth
served by mechanical exhaust, including the fans and ducts attached
thereto. . . . . . . . . . . • 0:00 .. . .. . . . . . . . . . . . • ! . . . . . • . . . . . 00 • . . . . . . . . . . . . . . . . . . . $23.50
For the installation of each fire damper .. ............................... $ 6.00
For the alteration of an existing duct system for which a permit is
not required elsewhere in this Code............. . ........................$13.80
NOTE: 1) For a -refrigeration system rating one horsepower,one
ton, or 12,000 BTU per hour shall mean the same quantity.
2) For steam boilers rated in boiler horsepower, one horse-
power shall equal 50,000 BTU per hour.
PLAN CHECK FEE REQUIREMENTS
Ordinance No. 9544, the Mechanical Code requires any plan check fee to be paid at the
time of submitting plans and specifications for the installation of comfort heating
and cooling systems, refrigerating and ventilating systems and hoods for installation
where the aggregate BTU input /capacity for either comfort heating or comfort cooling
is 1,000,000 BTU and over, food
_processing establishments containing a commerc i al
type , hood., or installations containing a single heating or comfort cooling air handling
system with a capacity of 10,000 cubic feet per minute or more.
The plan check fee required is 50% of the permit fee shown below with the following
exceptions:
1. Identical appliances of 100,000 BTU or less, installed in a single building:
Up to and including 10.... ........... .................50% of the permit fee
Over10 ................ ............................... 5% of the permit fee
2. When identical mechan i cal design is evident in more than one building on a
single project and the Chief Mechanical Inspector so finds, plan check fees
may be waived for other than the representative sample.
PAGE 7: EXHIBIT "A" RESOL. NO. 84 -10
BUILDING AND SAFETY
ELECTRICAL PERMIT FEE SCHEDULE
EFFECTIVE FEBRUARY 1, 1984
IssuingPe rm i t s , Each.............. . . . . . . . . . . . . . . . . . . . . . . . . . . . 00 . . . . . . . . . . . . . 0$16.00
SYSTEM FEE SCHEDULE
For New Multi - Family Residential Buildings (Apartments & Condominiums)
Three Units or More not including attached garages or carports
persquare foot ....................... ..............................$ .045
For New Single and Two - Family Residential , Buildings not including
garages, carports, accessory buildings, per square foot..... .............$ .055
For Other Types of Occupancies and Alteration, Additions and Modifications
to Existing Buildings, Use Unit Fed Schedule
For New Residential Swimming Pools, Each ......... ........................$56.50
For Spas, Hot Tub, Above Grade Swimming Pools, Alterations to Existing
Pools*** 00000 ooe000*0000 *o 000e000*000*0000 oo 9$38*25
Carnivals and Circuses
For electric generators and electrically driven rides, Each........ . $23.40
For mechanically driven rides and walk-through attractions with
lighting, Each ........................ ...,..........................$ 6990
For area and booth lighting, . 6i 6.90
For permanently installed rides, booths. displays, and attractions ,
use Unit Fe-e Schedule
Temporary Power Service
For temporary service pole or Pedestal and Appurtenances, Each $23.40
For temporary power distribution system, Each ....................... $ 6.90
UNIT FEE SCHEDULE
For Receptacle, Switch, Lighting Outlets, first 20, Each .................$ 1.10
Additional, Each.......... ............ ..............................$ .70
For Lighting Fixtures, Sockets, or Other Lamp Holding Devices, First 20
Each.................................... 1.. ..............................$ 1.10
Additional Fixtures, Each ............. ..............................$ .70
For Pole or Platform Mounted Lighting Fixtures , Each.. 0900009000* ***o 966 0 $ 1.10
For Theatrical-type Lighting Fixtures or Assemblies, Each......***** *****$ 1010
For Fixed Residential Appliances not Exceeding 1HP, Each .................$ 5.65
NOTE: For other types of air conditioners and other motor driven
appliances having larger electrical ratings, See Power Apparatus,
PAGE 8 EXHIBIT "A" RESOL. NO. 84 -10
For Fixed Factory Wired Non - Residential Appliances Not Exceeding 1 HP, KW
orKVA, Each. ............................. ............................... 5065
NOTE: For other types of air conditioners and other motor driven
appliances having larger electrical ratings, See Power Apparatus.
Power Apparatus
For Motors, Generators, Transformers, Rectifiers, Converters, Capacitors.
Industrial Heating,-Air Conditioners and Heat Pumps, Cooking or Baking
Equipment, and Other Apparatus, As Follows:
Rating in HP, KW, KVA, KVAR, or refrigeration -tons.
Up to and including 1, Each...... ..... ..............................$ 5965
Over1 and not over 10, Each.... . . . . . .. . , . .. . . . . . . . . . . . . . . . • . . . . .. . 0$11.30
Over 10 and not over 50, Each... ........... .........................$28.15
Over 50 and not over 100, Each.......... ... .........................$56.30
Over100, Each ............................. .........................$90.35
NOTE: 1. For equipment or appliances having more than one motor,
transformer, heater, etc., the sum of the combined ratings
may be used.
2. These fees include all switches, - ci rcui t breakers, contractors,
thermostats, relays and other directly related control equip-
ment.
Buswa s
For Trolley and Plug-in Type Busways , Each 100 feet or Fraction Thereof .. $ 6.90
NOTE: An additional fee will be required for lighting fixtures,
motors and other, apppl l ances that are connected to trolley
and plug-in type busways . No fee is required for portable tools.
Signs, Outline Lighting and Marquees
For one sign and one branch circuit, Each...........***** . . .. . . . . . . . . $23.40
For additional branch circuits, Each.. ........ ......................$ 4.50
Services, Switchboard Sections., Panel boards
For services of 600 V or less and not over 200 Amps, in rating,
Each.,
For services of 600 V or less and over 200 Amps. to 1,000 Amps.
inrating, Each ...................... ............................... $56.30
For services over 600 V or over 1,000 Amps. in rating, Each. .......$112.60
For miscellaneous conduits and conductors......** so***** *o** o ** *so o *$23*40
For special inspections, per hour... 000000000eoo**00000**000**0000ee$45920
Plan check is 40% of permit fee for services, panel boards, motors,etc. ,
when 600 Amps or over.
PAGE 9 EXHIBIT "A" RESOL. NO. 84 -10
i
BUILDING AND SAFETY
PLUMBING
EFFECTIVE FEBRUARY 1, 1984
TABLE NO. 1
For issuing each permit........ . . . . . . . • . . . . . . . . . . . . . . . . . . . . . . . . . • • . . . . . . . . . 00 09$16.00
n Addition:
For each plumbing fixture or trap or set of fixtures on one trap (includ.
ing drainage, vent, water piping and backflow prevention devices
there fo r ) . . . . . . . . . . . . . . . . . . . . . . . . . • . . . . . . . . . . . . . . . . . . . . . . • . . . . . . . . . . . . . . . . $ 6. 90
For each permanent type dishwasher whether individually trapped or not...$ 6.90
For each industrial waste pretreatment interceptor including its trap
and vent, excepting kitchen type grease interceptors functioning as
fixturetraps .............................. ..............................$ 6.90
For each swimming pool drainage trap and receptor whether connected to
a building drain or a building sewer (water supply for pool not in-
cluded)... ................................. ..............................$ 6.90
For each gas piping system of one to five outlets or alteration or re-
test of existing gas piping system......... ....,...,....,............,...$ 6.90
For each additional outlet over five... .... ..........................$ 1.70
For each gas pressure regulator other than appliance regulators.......... $ 1.70
Foreach water heater and /or vent .......... ............................,.$ 6.90
For each solar potable water heating system, including water heater
andvent ........ ............................... .........................$30.00
For repair or alteration of drainage and /or vent piping ..................$ 6.90
For each piece of water- treating equipment and /or water piping instal-
ledwithout accompanying plumbing...... ....... . .................... .. . ... $ 6.90
For lawn sprinkler systems on any one meter including backflow pre-
ventiondevices therefor ................... ..............................$ 6.90
For backflow prevention devices on unprotected water supplied, pools,
tanks, vats,* etc. (including incidental water piping) one to five.......$ 6.90
AGE 10 . For each additional device over five...........
XHIBIT"A�� ......................$ 1.70
S. NO. Each building drain installed without accompanying P 1 umbi
ng ........ 6.90 4 -l0
NOTE: FOR SEW_R -__- A
TABLE NO. 2
Forissuing each permit ............................... .........................$16.00
In Addition:
(a)
(b)
For the connection of a house sewer to a public sewer or for the ex-
tension of a house lateral onto a lot for future use P ermit arate Se
� P
required for each connection or extensions ..... , . .. . .. ® . O 0 40 0 IS 0 s . . . . , . , $25.50
For each house sewer
For each installation of a section of house sewer for future use....... ..$16.00
$ 6.00
For the connection of each additional building or additional work to
ahouse sewer ............................. ............................... $16.00
For the connection of a house sewer to a private sewage disposal system.. $16.00
For each private sewage disposal system (septic tank and seepage pit
or pits and /or drainfield ................ ...............................
$50.00
For each cesspool, overflow seepage pit, percolation test pit, swim-
ming pool drywel1 , or draiofield extension or replacement....... 000000000$25-50
For disconnection, abandonment, alteration or repair of any house
sewer or private sewage disposal system or part thereof .................. $16.00
PLAN CHECK FEE
A single building containing more than 25% of Plumbing* * PERMIT FEE required
216 drainage fixture units.
A potable water 1 i ne servi ngs one or more
buildings with an aggregate demand of more
than 180 water fixture antis or 100 GPM
(excluding buildings under item "a" and
minor accessory buildings).
(C) A fuel gas line serving one or more
buildings with an aggregate demand of
29000,000 BTU's or more (excluding
buildings under item "a" and minor ac-
cessory buildings).
(d) A sewer collection system serving more
than one building with an aggregate load
of more than 216 drainage fixture units
(excluding minor accessory buildings).
$29.55 + 1.50 for each additional
building over one.
$29.55 + 1.50 for each additional
building over one.
$14.80 + 1.50 for each additional
building over one.
PAGE 11 EXHIBIT "A" RESOL. NO. 84 -10
BUILDING AND SAFETY
SCHEDULE OF FEES
EFFECTIVE FEBRUARY 1, 1984
S 14ndardized Plan Plan Check .. ............... . ......70� of Building Plan Check
Erwrgy Plan Check (nonresidential).. of Building Plan Check or
$446.50 minimum. The minimum
will govern for valuations of
$400,000 and less.
Inspection: A -4 Structure....... .. ....................$74.50
Inspection, Chapter 66 Structure
FirstStructure.0.........................$74.50
Each Add i tti►onal Structure ................. $12.75
Inspection: Demolition.... ..... .......................$53.15 plus $16.00 issuance fee
Inspection: Occupancy
Less than 5,000 sq. ft ....................$122.25
+
$16.00
issuance fee
5,001 to 10,000 sq. ft ....................$244.50
+
$16.00
issuance fee
10,001 to 100,000 sq . - ft• • • • • • . • ..........
$521.00 +
$16.00
issuance fee
Above 100,000 sq. ft ......... .............$813.00
+
$16.00
issuance fee
Relocation Building Investigation:
Less than 5,000 sq. ft..06.06.460660600003180.75
More than 5,000 sq. ft .................... $361.50
Inspection Rep.: Substandard Structure .................$191.50 + $16.00 issuance fee
Inspection Demo.: Substandard Structure... 9*9****e*****$53*15 + $16.00 issuance fee
Inspection: Site (geology)... 9*9$122.25 + $16.00 issuance fee
Inspection or permit: Mobilehome .......................$80.00 (8 x 40 and larger)
Inspection or permit: Trailer Coach ....................$77.50
Search and Single Copy of Permit ........ ............. $l 4.00
Rehabilitation Rehearing FQe ..... .......................$191.50
Approval in Concept (1976 Coastal Act) ..................$34.00
Swimming Pool Combined Permit........** . . . . . . . . . . . . . . . ..$45-00 per sq ft + $16.00 issuance fee
PAGE 12 EX111IEIT "A" tinq + Electrical + Pl umbinq
BUILDING AND SAFETY-
REHAB FEES
EFFECTIVE FEBRUARY 1, 1984
Preparation of Job Specs. $ 139.00
City Council Approval . . . . . . . . . . . . 0 0 . . . . . . 85.50
Contract Performance Inspection. . . . . . , , , , , , , . , . . , 0 85.50
Billing. . . 01 . . .. . . . . . . . . . . . . . . . . . . . . . . 53.50
Record Assessment . . . . . , . . . . , . . . . . . . . . . . : . . .53.50
File Assessment. . . . . . . . . . . . . . . . . a e . . . . 53.50
PAGE 13 EXHIBIT "A" RESOL. NO. 84- -10