CC RES 2007-104 RESOLUTION NO. 2007 -104 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO PALOS VERDES, AMENDING RESOLUTION 2006-41, THE BUDGET APPROPRIATION FOR FY06-07, TO REDUCE THE BUDGET FOR THE APPROVED CONTINUING APPROPRIATIONS. WHEREAS, Section 3.32 of the Rancho Palos Verdes Municipal Code provides that all expenditures in excess of budgeted allocations must be by supplemental appropriation of the City Council: and WHEREAS, on June 6, 2006, the City Council of the City of Rancho Palos Verdes adopted Resolution 2006-41, approving a spending plan and authorizing a budget appropriation for FY06-07: and WHEREAS, certain projects included in the FY06-07 budget will be carried over as continuing appropriations to FY07-08 (listed in the attached Exhibit A); and WHEREAS, the City Council desires that the FY06-07 budget be reduced for each of the continuing appropriations carried over to FY07-08. BE IT, THEREFORE, RESOLVED BY THE CITY COUNCIL OF THE CITY OF RANCHO PALOS VERDES: The following adjustments are made to the FY06-07 budget per the attached Exhibit A: Decrease the General fund budget as follows: Emergency Prep #101-1026-32-00 Professional/Technical $ 13,000 Emergency Prep #101-1026-61-00 Supplies/Minor Equipment $ 112,500 Finance #101-2020-32-00 Professional/Technical $ 23,945 Public Works Adm #101-3001-32-00 Professional/Technical $ 31,357 Public Works Adm #101-3001-69-00 Miscellaneous Expenditures $ 25,000 Traffic Management #101-3006-73-00 Traffic Calming Improvements $ 19,500 Storm Wtr Quality #101-3007-43-00 Maintenance $ 50,139 Building Maint#101-3008-43-00 Maintenance $ 71,161 Parks/Trails Maint #101-3009-43-00 Maintenance $ 73,601 Planning #101-4001-32-00 Professional/Technical $ 216,817 Building & Safety #101-4002-32-00 Professional/Technical $ 37,015 NCCP #101-4005-32-00 Professional/Technical $ 81,490 Rec Special Events #101-5040-61-00 Minor Equipment $ 2,200 Recreation PVIC #101-5060-61-00 Minor Equipment $ 27,811 Decrease the Street Maintenance fund budget as follows: Street Landscape #202-3003-43-00 Maintenance $ 123,775 Street Landscape #202-3003-43-00 Supplies $ 24,000 Port Bend Road #202-3005-43-00 Maintenance $ 77,879 Decrease the Beautification fund budget as follows: HOA Beautification #212-3012-93-00 Grants To Others $ 134,095 Decrease the Public Safety Grants fund budget as follows: CLEEP Tech Equip #217-2017-69-00 Miscellaneous $ 45,816 Decrease the Habitat Restoration fund budget as follows: Re-Veg & Maint #222-3022-73-00 Improvements $ 50,000 Decrease the Abalone Cove Sewer Maintenance District fund budget as follows: Install Generator #225-3025-43-00 Maintenance $ 26,600 Decrease the RPV TV Channel 33 fund budget as follows: Web Hosting #225-3025-32-00 Professional/Technical $ 4,800 Equip Purchase #225-3025-94-10 Equipment Replacement Charges $ 23,742 Decrease the Community Development Block Grant fund budget as follows: ADA Compliance #225-3025-32-00 Improvements $ 63,774 Decrease the Capital Improvement Projects fund budget as follows: Administration#330-3030-32-00 Professional/Technical $ 21,575 Pavement #330-3030-73-00 Improvements $3,362,888 Street Improv #330-3031-73-00 Improvements $ 270,710 Storm Drains #330-3032-73-00 Improvements $ 53,927 Sewer Improv #330-3035-32-00 Professional/Technical $ 18,000 Decrease the Affordable Housing In-Lieu fund budget as follows:, Affordable Housing #337-4037-73-00 Improvements $1,000,000 Decrease the Water Quality Flood Protection fund budget as follows: Storm Drains #501-3052-32-00 Professional/Technical $ 271,672 Storm Drains #501-3052-43-00 Maintenance $ 39,924 Storm Drains #501-3052-73-00 Improvements $3,190,195 Decrease the Equipment Replacement fund budget as follows: Computer Equip #681-2082-61-00 Minor Equipment $ 33,000 Furniture & Equip #681-6083-61-00 Minor Furniture & Equipment $ 25,000 Furniture & Equip #681-6083-75-10 Furniture & Equipment $ 50,906 Decrease the Building Replacement fund budget as follows: Building Improv #686-3086-73-00 Improvements $ 316,962 PASSED, APPROVED, AND ADOPTED THE 18th day of September 2007. ,ill , Mayor ATTEST: &-)A_ / ; la--1 City Clerk State of California ) County of Los Angeles )ss City of Rancho Palos Verdes ) I, Carla Morreale, City Clerk of The City of Rancho Palos Verdes, hereby certify that the above Resolution No. 2007-104 was duly and regularly passed and adopted by the said City Council at regular meeting thereof held on September 18, 2007. dChi M.,k_ W--ed-C____. City Clerk Resolution No. 2007-104 Page 2 of 2 FY06 -07 Continuing Appropriations Page 1 of 8 Resolution 2007 -104 Exhibit A FY0 -07 FY6 -07 F06 -07 Amount Description Account Number Budget Spent Available Requested Justification Standardized Emergency Management System (SEMS) /National Incident Staff requests to continue on -call consultant services from Management System (NIMS) Plan & Gerard Quinn Associates for cost recovery efforts Federal Emergency Management associated with 2004/2005 federal and state disaster Agency (FEMA) /Federal Highway claims. In addition, continued consultant services are Administration (FHWA) Claims needed for completion of City's Emergency Operations Preparation 101- 1026- 421 -32 -00 747645 617494 137151 137000 Plan /NIMS update during FY07 -08. The remaining FY06 -07 appropriation should be carried forward for miscellaneous supplies and equipment, such as a protective fence around the base of the antenna Disaster Communications Facility 101 - 1026- 421 -61 -00 347206 217358 127848 127500 tower. The Management Plan and Inventory was approved by City Council on August 21, 2007. Procurement of Emergency Supply Caches 101 - 1026- 421 -61 -00 1057100 57353 997747 1007000 supplies will begin in FY07 -08. Staff requests to continue the remaining professional services appropriation in the Finance program. Staff believes that additional consulting services will be required to follow up with the cable franchise fee examination. In addition, Staff would like to use the remaining appropriation for other revenue examinations Revenue Examinations 101 - 2020 - 411 -32 -00 2327267 2087322 237945 23,945 during FY07 -08. Carryover of this remaining appropriation will provide for ongoing City engineering investigations, including exploration of a long -term solution for the Palos Verdes Drive South roadway in the landslide area. In addition, the City is required to integrate its Sanitary Sewer Master Plan (SSMP) with the County's plan by November 1, 2007. Staff will utilize a portion of this continuing Engineering Professional Services 101 - 3001 - 431 -32 -00 1047967 737610 317357 31,357 appropriation to pay for the necessary plan integration. The F06 -07 miscellaneous expenditure was appropriated to pay for the City's Storm Drain User Fee, as well as assistance programs related to the Fee. Staff requests to Infrastructure Theme Layers - continue a portion of the unused appropriation for Graphic Information System (GIS) 101 - 3001 - 431 -69 -00 757000 107412 647588 257000 additional infrastructure theme layers within the City's GIS. Page 1 of 8 Resolution 2007 -104 Exhibit A FY06 -07 Continuing Appropriations Page 2 of 8 Resolution 2007 -104 Exhibit A FY0 -07 FY6 -07 F06 -07 Amount Description Account Number Budget Spent Available Requested Justification Installation of the traffic control improvements began in Via Rivera Traffic Calming August 2007. Staff expects to complete the project in Improvements 101- 3006 - 431 -73 -00 197500 - 197500 197500 September 2007. The County has only partially invoiced the City for services Catch Basin Cleaning in Parking Lots performed during FY06 -07. Once the final invoices are & Streets 101 - 3007 - 431 -43 -00 567712 67573 507139 507139 received, this appropriation will be expended in FY07 -08. Painting and carpeting projects, as well as modifications City Building Interior Painting & to the City Manager's and City Clerk's offices are Flooring 101 - 3008 - 431 -43 -00 1157000 437839 717161 717161 underway. Staff expects completion during FY07 -08. Staff is currently in process of ordering picnic benches made from recycled material. As the benches will be Point Vicente Interpretive Center delivered in FY07 -08, Staff requests to continue this (PVIC) Picnic Tables & Benches 101 - 3009 - 431 -43 -00 107000 17875 83125 83125 appropriation. The County provides annual weed abatement and fire protection maintenance, and has only partially invoiced the City for services rendered during FY06 -07. Staff will use the continued appropriation to pay the remaining Weed Abatement 101 - 3009 - 431 -43 -00 947825 297349 657476 657476 FY06 -07 invoices during FY07 -08. The City Council has directed staff to proceed with drafting proposed amendments to the City's General Plan as recommended by the General Plan Update Steering Committee. The City has hired a consultant that is currently working on the General Plan Update. It is expected that the General Plan Update will first be presented to the Planning Commission in early 2008. Staff expects that the General Plan update will be General Plan 101- 4001 - 441 -32 -00 2007000 57199 1947801 1947801 completed in FY07 -08. Staff continues to work with the Public Use Master Plan Conceptual Trails Plan 101 - 4001 - 441 -32 -00 227016 - 227016 227016 (PUMP) Committee to develop the Conceptual Trails Plan. The consultant is currently studying water intrusion as it relates to the landslide area. Staff expects to report to Landslide Moratorium Geologic Study 101 - 4002 - 441 -32 -00 507000 127985 377015 377015 City Council in January 2008. The NCCP has not yet received a final approval from the resource agencies. Staff recently met with Natural Communities Conservation representatives of the resource agencies and agreed to a Plan (NCCP) Professional Services 101 - 4005 - 441 -32 -00 837388 17898 817490 817490 plan that would complete the NCCP by Summer 2008. Page 2 of 8 Resolution 2007 -104 Exhibit A FY06 -07 Continuing Appropriations Page 3 of 8 Resolution 2007 -104 Exhibit A FY0 -07 FY6 -07 F06 -07 Amount Description Account Number Budget Spent Available Requested Justification An order for special event supplies was placed for delivery in June 2007 using FY06 -07 budget. The goods (stage, skirting, and caddy) were not received until July 2007. Therefore, the budget must be carried over to FY07 -08, Recreation Special Events Supplies 101 - 5040 - 451 -61 -00 107000 67100 37900 27200 when the expenditure will be recognized. Due to the greater than anticipated popularity of the PVIC and the resulting challenge of purchasing all necessary supplies, equipment, and furniture for an expanded facility during its first full year of operation, a number of PVIC- related items and projects were not acquired or completed PVIC Minor Equipment 101 - 5060 - 451 -61 -00 1777559 1427912 347647 277811 in FY06 -07, necessitating a carryover to FY 07 -08. Total General Fund 633,906 785,536 The continued appropriation will be combined with the FY07 -08 budget for a large -scale project that will begin in Sidewalk Program 202 - 3003 - 431 -43 -00 1637574 397799 1237775 1237775 October and completed in November 2007. Palos Verdes Drive South (PVDS) Staff expects installation of the landslide signs to be Roadway Landslide Signs 202 - 3003 - 431 -61 -00 247000 - 247000 247000 complete in October 2007. Work on a major phase of rehabilitation was completed in Portuguese Bend Road Maintenance 202 - 3005 - 431 -43 -00 3837652 3057773 777879 777879 August 2007. Total Street Maintenance Fund 225,654 225,654 The homeowners associations are expected to complete Homeowner Association their projects and request grant disbursement during Fall Beautification Grants 212 - 3012 - 431 -93 -00 3227621 1887526 1347095 1347095 2007. Total Beautification Fund 134,095 134,095 The City recently spent about $16,000 to purchase two all Hi -Tech Safety Expenditures terrain vehicles for the Lomita Sheriff's station. The (Certified Law Enforcement Executive remaining appropriation available for future purchases of Program or CLEEP) 217 - 1027 - 421 -69 -00 457816 - 457816 457816 law enforcement equipment will be about $30,000. Total Public Safety Grants Fund 455816 45,816 Staff requests a continuing appropriation for current and Miscellaneous Habitat Monitoring & future habitat monitoring and re- vegetation, including Re- vegetation 222- 3022 - 431 -73 -00 1627567 197014 1437553 507000 biological studies, for Public Works construction projects. Total Habitat Restoration Fund 143,553 50,000 New lift station pumps have been ordered. Staff expects Abalone Cove Sewer District - Lift the pump installation will be completed during September Station Pumps 225 - 3025 - 431 -43 -00 1 647341 1 317966 1 327375 1 267600 2007. Page 3 of 8 Resolution 2007 -104 Exhibit A FY06 -07 Continuing Appropriations Page 4 of 8 Resolution 2007 -104 Exhibit A FY0 -07 FY6 -07 F06 -07 Amount Description Account Number Budget Spent Available Requested Justification Total Abalone Cove Sewer District Fund 32,375 26,600 Channel 33 has entered into a Website hosting Channel 33 Web Hosting Service 226- 1007 - 411 -32 -00 47800 - 47800 47800 agreement with Bwyze for FY07 -08. The continued equipment appropriation will provide for the TelVue Virtual Television Networks (TVTN) contract authorized by City Council on May 15, 2007 and purchase of additional computer equipment related to Channel 33 Channel 33 Equipment Charges 226- 1007 - 411 -94 -10 447000 207258 237742 237742 operations. Total RPV TV Channel 33 Fund 28,542 28,542 The FY06 -07 ADA compliance project was refurbishment of the Hesse Park public restrooms. The project has been completed. Staff requests to continue the remaining Community Development Block Grant appropriation for a project to improve ADA access to /from (CDBG) - Americans with Disabilities the City Hall parking lot. Staff expects that a parking lot Act (ADA) Compliance Projects 310 - 3093 - 461 -73 -00 1347838 717064 637774 637774 access project could be completed by Spring 2008. Total CDBG Fund 63,774 635774 Infrastructure Administration & Staff requests to continue the remainder of the FY06 -07 Maintenance - Investigation of San "on- call" services budget to allow for continued Ramon Cracks 330 - 3030 - 461 -32 -00 257000 37425 217575 217575 investigation of the San Ramon cracks. Caltrans authorization to proceed was received in June 2007. The project was awarded in August, and will be under construction in September 2007. Staff expects the Arterial Overlay 330- 3030 - 461 -XX -00 176807874 237401 176577473 176577473 project will be completed in November 2007. The project is currently under construction and will be Residential Overlay 330 - 3030 - 461 -73 -00 177057415 - 177057415 1,7057415 completed in September 2007. Palos Verdes Drive East (PVDE) Changes to the guardrails are in progress. Staff expects Equestrian Access Improvements 330 - 3031 - 461 -73 -00 137700 - 137700 137700 the project will be completed in September 2007. This appropriation will be combined with the FY07 -08 appropriation for a single larger project. The combined appropriation may become a source of matching funds for an Metropolitan Transit Authority (MTA) Pedestrian Grant that would provide for sidewalk and landscape Hawthorne Median Project 330 - 3031 - 461 -73 -00 1507000 - 1507000 150,000 improvements. Staff is currently pursuing the grant. PVDS /PVDE Roadside Landscaping Improvements 330 - 3031 - 461 -73 -00 1207000 127990 1077010 107,010 Landscaping work is being completed in September 2007. Page 4 of 8 Resolution 2007 -104 Exhibit A FY06 -07 Continuing Appropriations Description Capital Improvement Projects (CIP) Fund Storm Drain Improvements - McCarrell Canyon Interim Improvements & PVDE Drainage Inspection Account Number 330 - 3032 - 461 -73 -00 FY0 -07 Budget 1737140 FY6 -07 Spent 1197213 F06 -07 Available 537927 Amount Requested 537927 Justification Staff requests that the remaining drainage appropriations in the CIP fund be continued to FY07 -08 and transferred to the Water Quality Flood Protection (WQFP) fund to be added to the McCarrell Canyon backbone system design appropriation. The amount carried forward to FY07 -08 will be expended for modifications to a sewer theme layer in the City's GIS Sewer System Master Plan 330 - 3035 - 461 -32 -00 187000 - 187000 187000 system. Video inspections are currently in process. Total Capital Improvement Projects Fund 3,727,100 31727,100 The City Council has directed staff to pursue a combined program to utilize its affordable housing funds for: 1) a contribution toward development of an affordable housing component as part of the Crestridge site; and /or 2) implementation of a rental subsidy program managed by a non - profit housing agency. The priority for expenditure of the City's affordable housing funds is currently directed towards alternative 1, however, if the Crestridge project does not obtain entitlements, then under current direction, the City may move forward with the implementation of alternative 2 - developing a rental subsidy program. It appears that the Crestridge project has been stalled. As such, in the last quarter of 2007 Staff will request that the Council re -visit their earlier direction in order to determine whether to move forward with a rental subsidy program or establish additional programs to expend such funds. Based upon certain mandates pertaining to the expenditure of these funds, Staff expects that the City will Affordable Housing Projects 337 - 4037 - 441 -73 -00 170007000 - 170007000 170007000 expend some or all of the funds within FY07 -08. Total Affordable Housing In -Lieu Fund 1,000,000 1,000,000 Staff expects that the design will be complete in November 2007. Staff expects to recommend a McCarrell Canyon Ultimate construction contract award to the City Council as early as Improvements 501- 3052 - 431 -32 -00 4447085 2637557 1807528 1807528 January 2008. Page 5 of 8 Resolution 2007 -104 Exhibit A FY06 -07 Continuing Appropriations Page 6 of 8 Resolution 2007 -104 Exhibit A FY0 -07 FY6 -07 F06 -07 Amount Description Account Number Budget Spent Available Requested Justification A contract engineer is helping to manage the WQFP program in lieu of a permanent employee. Staff requests to continue the remainder of the FY06 -07 appropriation to allow for additional project management time that will be required for the McCarrell Canyon and Sunnyside Temporary Program Engineer 501- 3052 - 431 -32 -00 1137300 627881 507419 507419 projects. The GIS layer for storm drains will be completed during Storm Drain GIS Layer 501- 3052 - 431 -32 -00 427000 17275 407725 407725 FY07 -08. Storm Drain Video Inspection 501 - 3052 - 431 -43 -00 757000 357076 397924 397924 Video inspections are currently in process. The FY06 -07 appropriation is being combined with the FY07 -08 appropriation to provide for a single project with a larger scope. The project is currently being designed, Install Catch Basin Filtration Devices 501 - 3052 - 431 -73 -00 857000 - 857000 857000 and construction is expected to begin in October 2007. All miscellaneous repairs were covered with the maintenance appropriation for FY06 -07. Staff has identified a repair at Bronco Drive, and requests that this appropriation be continued to FY07 -08 for that repair. Miscellaneous Drainage Repairs 501- 3052 - 431 -73 -00 477500 - 477500 477500 Work could begin as early as October 2007. The project design is mostly complete. Staff expects that Via Colinita, Roan & Miraleste construction could begin as early as March 2008, with Canyon System 501 - 3052 - 431 -73 -00 6367463 1117410 5257053 5257053 completion in May 2008. The County has elected to construct drainage improvements on the golf course only, which only partially addresses the drainage issues. Conditions of Development for Tract 33034 are currently being reviewed to ascertain the City's responsibility for resolving drainage Los Verdes Golf Drainage 501 - 3052 - 431 -73 -00 957000 - 957000 957000 issues. This appropriation will be combined with the PVDE multi - modal use evaluation that is expected to begin in January PVD E Curb Improvements 501 - 3052 - 431 -73 -00 607000 - 607000 607000 2008. City Council awarded the 2007 Storm Drain Lining contract on August 7, 2007. Staff expects the work will be 2007 Storm Drain Lining 501 - 3052 - 431 -73 -00 7817237 1637931 6177306 6177306 completed in October 2007. Staff expects that construction could be completed as Sunnyside Ridge Storm Drain Project 501 - 3052 - 431 -73 -00 177797996 197660 177607336 177607336 early as December 2007. Total Water Quality Flood Protection Fund 31501,791 31501 :791 Page 6 of 8 Resolution 2007 -104 Exhibit A FY06 -07 Continuing Appropriations Page 7 of 8 Resolution 2007 -104 Exhibit A FY0 -07 FY6 -07 F06 -07 Amount Description Account Number Budget Spent Available Requested Justification Fourteen replacement monitors were budgeted for and ordered in FY06 -07, but were not delivered until FY07 -08. A firewall and the emergency backup server at Hesse Park was replaced during August 2007. In addition to minor replacement equipment already purchased for FY07 08, Staff expects to replace 20 uninterruptible power supply (UPS) units, 10 server class UPS units, 2 network switches, a laptop, 6 desktop printers, 2 laser color printers, and 5 desktop scanners. Continuing the remaining FY06 -07 appropriation will allow for these minor Minor Computer Equipment 681 - 2082 - 499 -61 -00 487100 157097 337003 33,000 equipment replacements during FY07 -08. Staff requests to continue the remaining FY06 -07 appropriation for purchase of replacement office furniture Minor Furniture & Office Equipment 681 - 6083 - 499 -61 -00 437327 187280 257047 257000 for several offices at City Hall during FY07 -08. City Council approved purchase of the photocopiers on Administration and Recreation August 21, 2007. Staff expects that the copiers will be Copiers 681 - 6083 - 499 -75 -10 307000 307000 307000 delivered by the end of October 2007. Due to the greater- than - anticipated popularity of the PVIC and the resulting challenge of purchasing all necessary supplies, equipment, and furniture for an expanded facility during its first full year of operation, a number of PVIC- related items and projects were not acquired or completed PVIC Furnishings & Equipment 681- 6083 - 499 -75 -10 507933 367027 147906 147906 in FY06 -07, necessitating a carryover to FY 07 -08. The amount carried forward to FY07 -08 would be spent for the permanent installation of a projector and screen in the Multi- Purpose Room at Hesse Park for presentation of PowerPoint Screen 681- 6083 - 499 -75 -10 67000 - 67000 63000 PowerPoint images during meetings. Total Equipment Replacement Fund 1087966 108,906 The moisture remediation project was completed during FY06 -07. Staff requests to continue the remaining appropriation to FY07 -08 for the City Hall Remodel project. A number of minor building modifications are needed, and will be wrapped into the painting and flooring Hesse Park Moisture Remediation 686- 3086 - 461 -73 -00 597000 57725 537275 53,275 project to be completed in FY07 -08. Hesse Park Ceiling Project 686 - 3086 - 461 -73 -00 207000 - 207000 20,000 The scope of this project is currently being evaluated. Page 7 of 8 Resolution 2007 -104 Exhibit A FY06 -07 Continuing Appropriations Page 8 of 8 Resolution 2007 -104 Exhibit A FY0 -07 FY6 -07 F06 -07 Amount Description Account Number Budget Spent Available Requested Justification The contract for this work was awarded in June 2007. Retrofit Park Site Light Fixtures 686- 3086 - 461 -73 -00 507000 - 507000 507000 Work will be completed during FY07 -08. This project is on hold until completion of the City Hall Master Plan. The generator has been purchased, and is currently being stored. Work is expected to begin during City Hall Emergency Generator 686 - 3086 - 461 -73 -00 2667325 727638 1937687 1937687 FY07 -08. Total Building Replacement Fund 3169962 3169962 Page 8 of 8 Resolution 2007 -104 Exhibit A