Laserfiche WebLink
Project: Storm Drain Point Repair Design Project <br /> Change Order# 2 <br /> Attention:William Young <br /> CrrYOFtttaf�uosrs CWE Corporation <br /> 30940 Hawthorne Blvd. 1561 E.Orangethorpe Ave.,Suite 240 <br /> Rancho Palos Verdes,CA 90275 Fullerton,CA 92831 <br /> Explanantion for Change Order <br /> Increase in contract value and extension of expiration date to provide design and construction <br /> document preparation services for two additional locations per project scope in contract awarded on <br /> December 15,2015.The two new sites are known as 6309 Via Colinita and Sacred Cove crossing at <br /> PVDS. <br /> Itemized Description Quantity Unit Price Amount <br /> Time and materials-Project Management and Meetings 1 7,500.00 7,500.00 <br /> Time and materials-Review Existing Records and Data 1 5,932.00 ( 5,932.00 <br /> Time and materials-Perform Hydrologic and Hydraulic Analyses 1 4,224.00 4,224.00 <br /> Time and materials-Topographic Survey 1 2,580.00 2,580.00 <br /> Time and materials-Geotechnical Investigation for two additional sites 1 690.00 690.00 <br /> Time and materials-Environmental Compliance and Permits 1 4,548.00 i 4,548.00 <br /> Time and materials-Plans,Specification and&Estimate for two additional sites 1 42,338.00 i 42,338.00 <br /> These estimates and costs may be moved between tasks such that the Total value is not to • <br /> excceded without further written aurthorization from the City Total 67,812.00. <br /> Original Contract Value 449,660.00 149,956.00 �f <br /> Total Value of all Previous Change Orders 54,770.00 <br /> Total Revised Contract Sum Prior to this Change Order 2043440 204,726.00 <br /> Value of this Change Order 67,812.00 <br /> New Contract Sum V27144700 272,538.00fr <br /> Change in Contract Days 60 <br /> Accepted: CWE Corporation <br /> By . <br /> Principalflirater-e€-- <br /> Date: February 13,2017 <br /> Authorized: Rancho Palos Verdes .. <br /> By <br /> Contract Manager <br />