Laserfiche WebLink
CITY OF RANCHO PALOS VERDES <br />PROFESSIONAL SERVICES AGREEMENT <br />THIS AGREEMENT ("Agreement") is made and entered into this 5th day of March, <br />2013 by and between the City of Rancho Palos Verdes (hereinafter referred to as the <br />"CITY") and SFC Communications, Inc. (hereafter referred to as "CONSULTANT"). <br />IN CONSIDERATION of the covenants hereinafter set forth, the parties hereto <br />agree as follows: <br />ARTICLE 1 <br />SCOPE OF SERVICES <br />1.1 Project Description <br />The project (hereinafter "Project") is described as follows: CONSULTANT <br />shall provide environmental related services for the CITY's San Ramon Canyon <br />Stormwater Flood Reduction Project, in accordance with requirements of the Resource <br />Agency Permits granted to the City of Rancho Palos Verdes, Permit Numbers SPL - <br />2011 -01140 -SLP, 7011 2970 0000 0645 0174 and 1600-1600-2011-0379-R5 <br />1.2 Description of Services <br />CONSULTANT shall: produce and submit all pre -construction <br />documentation and notifications required for construction commencement approval, <br />conduct a pre -construction nesting survey and report the findings as required to the <br />appropriate agencies; review the Contractor's biologist's work plan for compliance <br />before commencement of work; review all work plans in terms with the permit <br />requirements; monitor all specific activities required by the permits, such as protective <br />measures for sensitive vegetation, the planting of the native plants in accordance with <br />the agreed pallet and Native American monitoring; verify for all compliance <br />requirements upon completion of the San Ramon Canyon Stormwater Flood Reduction <br />Project, including landscape mitigation adequacy, beach restoration, restoration of <br />conservation measures in disturbed areas and the preparation and submittal of reports <br />to each of the required agencies and the submittal of as -built plans; annual inspections <br />of the mitigated measures will be conducted and reports submitted for 5 -years after the <br />completion of the San Ramon Canyon Stormwater Flood Reduction Project; reporting; <br />and attend meetings and site visits, as described in CONSULTANT's Proposal, which is <br />attached hereto as Exhibit "A" and incorporated herein by this reference. In the event of <br />any conflict between the terms of this Agreement and any incorporated documents, the <br />terms of this Agreement shall control. <br />Page 1 of 12 <br />R6876-0001 \1 535235v2.doc Agreement for Professional Services <br />