AMG and Associates Inc (Change Order 32)City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov CHANGE ORDER MEMORANDUM TO: RAMZI AWWAD, DIRECTOR OF PUBLIC WORKS FROM: ERIN JONES, GRIFFIN STRUCTURES DATE: MAY 19, 2023 SUBJECT: LADERA LINDA COMMUNITY PARK CONSTRUCTION CHANGE ORDER NUMBER: 32 Description of Construction Change Order This change order is for the cost to install additional L-angle for the restroom countertop support post connections to the underside of the metal roof deck. Justification RFI 51 requested details for fabrication and installation of the restroom countertop support steel, as the drawings did not call out specific sizing of the steel, method of fabrication and attachment to the building structure. The engineer’s response clarified items shown on the plans, and also increased the quantity of L-angle required to attach the support posts to the underside of the metal roof deck. Cost Analysis Johnson Favaro and Griffin Structures reviewed the proposal scope and pricing. Reference the attached pricing analysis. The contractor is not charging for the added steel L-angle material. They are only charging for the labor to cut, layout, and attach it to the building structure (including tack welding). Schedule Analysis No time extension was requested by the contractor, and work is expected to be completed within the original construction timeframe. Attachments: Construction Contract Change Order Form Construction Contract Change Order Summary Sheet Contractor’s Change Order Proposal DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 8405 11 0 0 11 0 0 0 0 0 0 0CO#10 $42,918.80 Working Days 11/09/22 CO#8 $6,437.02 Working Days 09/27/22 CO#9 $1,818.52 Working Days 11/09/22 CO#6 $824.34 Working Days 09/01/22 CO#7 $10,202.36 Working Days 09/27/22 CO#4 $8,558.42 Working Days 09/01/22 CO#5 -$5,378.25 Working Days 09/01/22 CO#2 $12,628.58 Working Days 08/09/22 CO#3 $53,526.25 Working Days 08/31/22 CHANGE ORDER NUMBER COST AMOUNT SCHEDULE EXTENSION DATE CO#1 $54,534.52 Working Days 05/27/22 ORIGINAL COMPLETION DATE:07/27/23 TOTAL SCHEDULE CHANGE ORDERS:Working Days NEW CONTRACT COMPLETION DATE:08/11/23 $1,029,075.00 TOTAL CHANGE ORDERS COST:$538,993.71 NEW CONTRACT AMOUNT:$14,259,993.71 REMAINING CONTINGENCY AMOUNT:$490,081.29 PURCHASE ORDER NUMBER:20220215 ACCOUNT NUMBER:330-400-8405-8403 ORIGINAL CONTRACT AMOUNT:$13,721,000.00 ORIGINAL CONTINGENCY AMOUNT: PREPARED BY:JAMES O'NEILL CONTRACTOR NAME:AMG & Associates, Inc. CONTRACT NUMBER:FY2022-050 CONSTRUCTION CHANGE ORDER SUMMARY SHEET PROJECT NAME:Ladera Linda Community Park DATE:05/19/23 PROJECT CODE: 1 of 2 DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 6/6/2023 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CO#31 $2,104.03 Working Days 05/18/23 CO#32 $2,291.43 Working Days 05/19/23 CO#29 $1,055.31 Working Days 05/09/23 CO#30 $3,682.06 Working Days 05/18/23 CO#27 $136,226.21 Working Days 05/03/23 CO#28 $10,819.96 Working Days 05/05/23 CO#25 $8,909.82 Working Days 04/06/23 CO#26 $21,061.12 Working Days 04/25/23 CO#23 $4,094.67 Working Days 02/23/23 CO#24 $19,573.51 Working Days 03/07/23 CO#21 $10,075.07 Working Days 02/21/23 CO#22 $3,178.42 Working Days 02/22/23 CO#19 $17,562.82 Working Days 02/09/23 CO#20 $3,679.17 Working Days 02/16/23 CO#17 $12,582.87 Working Days 02/03/23 CO#18 $16,546.62 Working Days 02/09/23 CO#15 -$3,117.01 Working Days 01/17/23 CO#16 $59,788.90 Working Days 02/02/23 CO#13 $0.00 Working Days 12/30/22 CO#14 -$20,112.42 Working Days 12/30/22 CO#11 $33,868.27 Working Days 12/01/22 CO#12 $9,052.32 Working Days 12/01/22 CHANGE ORDER NUMBER COST AMOUNT SCHEDULE EXTENSION DATE 2 of 2 DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 GRIFFIN STRUCTURES PRICING ANALYSIS - ESTIMATED COST OF WORK RFI 51 - Restroom Counter Supports Labor rates are DIR rates and do not include subcontractor burden Equipment rates are CalTrans Description Qty Unit Rate Cost Note Steel Ceiling Support for Partition 20 LF 160.24 3,204.80 Means 051223102400 - Subtotal 3,204.80 Subtotal Subcontractor Work 3,204.80 Subcontractor Markup 3,525.28 AMG OH&P 246.77 AMG Insurance 48.07 AMG Bond 35.00 TOTAL 3,534.64 AS SUBMITTED PCO 23R1 - RFI 51 - Restroom Counter Supports MATERIAL LABOR EQUIP QTY Rate Cost Hrs Rate Cost Qty Rate Cost 1 150.00 150.00 13 125 1625 4 25 100 0.00 0 0.00 0 0 0.00 1625 100 150.00 tax 10.25 tax 15.38 SUBTOTAL 1,875.00 Sales Tax 25.63 Markup SUB 190.06 SUBCONTRACTOR TOTAL 2,090.69 SUBTOTAL (rounded up)2,091.00 AMG OH&P 146.37 AMG Insurance 31.37 AMG Bond 22.69 TOTAL 2,291.42 31 DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 8405 32 0.0 LS 1.0 LS 1.0 LS 0.0 LS 1.0 LS 1.0 LS 0.0 LS 1.0 LS 1.0 LS 0.0 LS 1.0 LS 1.0 LS 0 11 0 NEW CONTRACT AMOUNT:$14,259,993.71 NEW COMPLETION DATE:08/11/23 TOTAL OF CHANGE ORDER #1-31:$536,702.28 TOTAL OF TIME EXTENSIONS #1-31:Working Days TOTAL OF CHANGE ORDER #32:$2,291.43 TOTAL OF TIME EXTENSIONS #32:Working Days Totals $2,291.43 0 A TIME EXTENSION OF WORKING DAYS WILL BE ALLOWED FOR THIS WORK ORIGINAL CONTRACT AMOUNT:$13,721,000.00 ORIGINAL COMPLETION DATE:07/27/23 4 012600 AMG Bonding $22.69 $22.69 0 3 012600 AMG Insurance $31.37 $31.37 0 2 012600 AMG Overhead $146.37 $146.37 0 ADDITIONAL WORKING DAYS 1 051200 AMG PCO 23R1 - RFI 51 - Restroom Countertop Supports $2,091.00 $2,091.00 0 This change order is for the cost to install additional L-angle for the countertop post connections to the underside of the metal roof deck. Reference RFI 51 and AMG PCO 23R1. SUMMARY OF QUANTITY CHANGES ITEM NO. SPEC CODE DESCRIPTION ORIGINAL QUANTITY NEW QUANTITY QUANTITY DIFFERENCE UNIT PRICE PRICE DIFFERENCE CHANGE ORDER NUMBER:DATE:05/19/23 CONTRACTOR NAME:AMG & Associates, Inc. DESCRIPTION AND LOCATION OF PROPOSED WORK CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER:FY2022-050 PROJECT NAME:Ladera Linda Community Park PURCHASE ORDER NUMBER:20220215 PROJECT CODE: DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca.gov 32 Recommended: Erin Jones Date: Construction Manager, Griffin Structures Signature City:Date: Signature Date: Public Works Director Signature Ara Mihranian Date: City Manager Signature Lincoln Lo Contract Officer Ramzi Awwad By signing this Change Order, Contractor understands and agrees that it is accepting the specified sums and adjustment of contract time of completion (if any) set forth herein as full, final and complete satisfaction of any and all claims by Contractor for all costs and expenses of Contractor and anyone for whom Contractor may be responsible for the work referred to herein, including but not limited to costs or expenses of the Contractor or any of its subcontractors, materials suppliers, vendors or anyone else for whom Contractor is responsible, for labor, materials, services or equipment, no matter how characterized, whether known or unknown to Contractor, including but not limited to, all field and home office overhead, delay costs/claims, acceleration costs/claims, unabsorbed or under-absorbed home office overhead, extended field costs, general conditions, claim preparation costs, inefficiencies, or the like, no matter how characterized. Contractor further understands and agrees by signing this Change Order that any attempt by Contractor to purportedly reserve rights to claim additional time or compensation for the work referred to herein, is void. Except as set forth, all terms and provisions of the contract and all prior change orders remain in full force and effect. Execution of this Change Order by both parties constitutes a binding agreement. This document constitutes the entire agreement between the parties. The person signing this Change Order for Contractor hereby represents and warrants that he/she is fully authorized to sign this Agreement on behalf of Contractor. Accepted and Executed by: PURCHASE ORDER NUMBER:20220215 CHANGE ORDER NUMBER:PROJECT CODE:8405 CONTRACTOR NAME:AMG & Associates, Inc. CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER:FY2022-050 PROJECT NAME:Ladera Linda Community Park 5/19/23 Contractor:Date: Signature Anthony R. Traverso Vice President/Secretary/Treasurer Anthony R. Traverso Digitally signed by Anthony R. Traverso Date: 2023.05.22 08:16:28 -07'00' DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 6/5/2023 6/6/2023 6/7/2023 AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 Prime Contract Potential Change Order #023: CE #055 - RFI #51 Restroom Counter Supports TO: City of Rancho Palos Verdes 30940 Hawthorne Blvd. Rancho Palos Verdes, California 90275 FROM: AMG & Associates, Inc. 26535 Summit Circle Santa Clarita, California 91350 PCO NUMBER/REVISION: 023 / 1  CONTRACT:City Project No. 8405 - Ladera Linda Community Park Project   REQUEST RECEIVED FROM: John Henin (TrussWorks International, Inc.) CREATED BY: Christopher Tumasone (AMG & Associates, Inc.) STATUS: Pending - In Review CREATED DATE: 11/7/2022 REFERENCE: PRIME CONTRACT CHANGE ORDER:  None   FIELD CHANGE: No   LOCATION: ACCOUNTING METHOD: Amount Based   SCHEDULE IMPACT: PAID IN FULL: No   EXECUTED:No SIGNED CHANGE ORDER RECEIVED DATE:   TOTAL AMOUNT: $2,291.43 POTENTIAL CHANGE ORDER TITLE: CE #055 - RFI #51 Restroom Counter Supports CHANGE REASON: RFI #51 POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #055 - RFI #51 Restroom Counter Supports The steel subcontractor issued RFI #51 requesting additional information regarding the restroom counter supports. Architectural and Structural details did not provide enough information on how to fab and install. The design team responded with additional information regarding quantities and installation methods. After review of the response, the method for the attachment to the deck using the angel iron was added from the design team through the RFI response. This detail was not part of the original contract documents/scope of work. Package revised with the T&M ticket for welding and L-angle attachments to the steel and decking.  ATTACHMENTS: PCO #023 R1 - RFI 51 Restroom Counter Supports.pdf , PCO #023 - RFI #51 Restroom Counter Supports.pdf , COR502 - Counter Supports (Option 2-R2).pdf #Budget Code Description Amount 1 05-100.S Structural Metals.Commitment cost to fab and deliver material for counter supports per RFI #51. $2,091.00 Subtotal:$2,091.00 Overhead (7.00% Applies to all line item types.):$146.37 Insurance (1.50% Applies to all line item types.):$31.37 Bonding  (1.00% Applies to all line item types.):$22.69 Grand Total:$2,291.43    City of Rancho Palos Verdes  AMG & Associates, Inc.  30940 Hawthorne Blvd. 26535 Summit Circle    Rancho Palos Verdes, California 90275  Santa Clarita, California 91350             ProcoreArchitectSignHere ProcoreArchitectSignedDate  ProcoreOwnerSignHere ProcoreOwnerSignedDate  ProcoreGeneralContractorSignHere ProcoreGeneralContractorSignedDate SIGNATURE DATE  SIGNATURE DATE  SIGNATURE DATE AMG & Associates Inc.Page 1 of 1 Printed On: 5/19/2023  07:38 AM PCO #023 DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 To:Date:02/24/23 Chris Tumasone TWI Project #683 AMG & Associates, Inc.Purchase Number Ladera Linda Community Park Cost Reference For:RFI#51 R1 30940 Hawthorne Blvd Other Ref.:E-mail Phone Rancho Palos Verdes, CA90275 Site Fax:CHANGE ORDER REQUEST NO.:COR506 - R2 Description of Work: CAT Qty.Unit Material Description Unit Cost C/C Extension 0 lot Additional material for increase plate length -$ 0 -$ 1 lot Welding wire 150.00$ 0 150.00$ 0 -$ 0 -$ 0 -$ 0 -$ 0 -$ Subtotal Material Cost:150.00$ Sales Tax:10.25%15.38$ Subtotal:165.38$ Mark Up:10.00%16.54$ Material Total:181.91$ CAT Qty.Unit Labor Description Unit Cost C/C Extension 0 hours Detailing / Engineering 120.00$ 0 -$ 0 -$ 0 hours Fabrication (Workshop)95.00$ 0 -$ 0 -$ 13 hours Installation (Field Work per attached time sheets )125.00$ 0 1,625.00$ 0 -$ Subtotal Labor Cost:1,625.00$ Mark Up:10.00%162.50$ Labor Total:1,787.50$ CAT Qty.Unit Equipment Description Unit Cost C/C Extension 4 hours Allowance for Welding Rig 25.00$ 0 100.00$ 0 hours Allowance for Scissorlift/Boomlift 35.00$ 0 -$ 0 Allowance for additional Installation equipment 0 -$ Subtotal Equip. Cost:100.00$ Sales Tax:10.25%10.25$ Subtotal:110.25$ Mark Up:10.00%11.03$ Equipment Total:121.28$ CAT Qty.Unit Miscellaneous Description Unit Cost C/C Extension Hour Small Tools & Consumables 2.35$ 1468 -$ Hour Company Truck 5.00$ 2015 -$ Day Travel Expenses (Subsistence / Zone Pay)2216 -$ Hour Fabrication Equipment / Machinery 3.40$ 1923 -$ 0 Lot Delivery Charge 360.00$ 2014 -$ Lot Fuel Surcharge 50.00$ 2017 -$ Lot Loss of Productivity -$ 3010 -$ 0 -$ -$ Mark Up:10.00%-$ Misc. Total:-$ TWI Trussworks International, Inc. Name & Title: John Henin -PM Total Tax included above:1610 25.63$ 2,090.69$ Bond:0.00%-$ ACCEPTED BY: TOTAL COR (Rounded)2,091$ Signature and Title ________________________________ SCHEDULE IMPACT:1 day(s) 909-461-3735 Extra field work related to the modification of the counter supports connection per RFI #51-R1 received on 09/16/2022 Misc. Subtotal Cost: Trussworks International INC. 1275 E Franklin Ave Pomona, CA 91766 John Henin 909-461-3112 01/23/23: 8+5=13 hrs 01/23/23: 4 hrs DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Fax: (661) 251-7405 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 Restroom Counter Supports R1 TO:Chandra Sutton (AMG & Associates, Inc.) 26535 Summit Circle Santa Clarita, California 91350 FROM:Christopher Tumasone (AMG & Associates, Inc.) 26535 Summit Circle Santa Clarita, California 91355 CREATED DATE:09/12/ 2022 STATUS:Open LOCATION:DUE DATE:09/27/2022 COST CODE:REFERENCE: COST IMPACT:SCHEDULE IMPACT: DRAWING NUMBER:SPEC SECTION: RECEIVED FROM:John Henin (TrussWorks International, Inc.) COPIES TO: Dustin Hartman (AMG & Associates, Inc.), Christopher Tumasone (AMG & Associates, Inc.) SUGGESTION: Question from Christopher Tumasone (AMG & Associates, Inc.) at 12:35 PM on 09/12/2022 Following RFI 51 response, please see questions in green and advise. Attachments: RFI 683-406 () - Restroom Counter Supports II.pdf BY DATE COPIES TO AMG & Associates Inc.Page 1 of 1 Printed On: 09/12/2022 12:36 PM RFI #51R1 Q1: What is the length of horizontal HSS supports? Refer to A2.11A Dimension plan for length of countertop and 7/A8.11 for counter height and depth. 7/A8.11 shows HSS members held back about 2" from edge of counter, which is acceptable. Q2: How many beams of this type (perpendicular to wall) is required, and on which interval? See 7/8.11--one support perpendicular to wall at every post. Number of posts per 1/A2.11. Sinks to be laid out 36" center line to centerline, with remaining counter space divided equally at each end. Posts between sinks shall be centered between sinks. Q3: Please provide connection detail Provide groove weld all around at HSS to HSS Q4: Please confirm using HSS 2x2x1/8 for these supports, else advise. Confirmed acceptable Q5: How many supports of this detail is required for the project? Number of posts per 1/A2.11 -Kim Castillo, JF, Diana Nishi, Englekirk, 9/16/22 Detail 7/A8.11 provides a section detail of counter supports, and plan 1/A2.11 shows number of restroom counter support posts. DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 TO: ☑Cost impact ☑Time impact Following the response we got to RFI #405, please find the queries below, and advise. RFI# : DATE: DATE NEEDED BY : PROJECT NAME : LL-406 9/12/2022 9/22/2022 Lader Linda Community Park REQUEST FOR INFORMATION RESPONSE TO RFI 683 TrussWorks International, Inc. 1275 E Franklin Ave. Pomona, CA 91766 Direct: 909 461 3112 | Fax: 909 461 3735 Chris Tumasone AMG Associates Inc RFI Description PROJECT # : ATTACHMENTS 1 page(s)/sheet(s) SUBMITTED BY: John Henin - Project Manager TWI QF - 0405 RESPONSE BY: Name,Title: Company :DATE: LL-405.xlsx Sheet1 Page 1 of 2 9/12/2022 12:23 PM 6 DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 ?Q2: How many beams of this type is required, and on which interval? Q1: What is the length of this HSS? Q3: Please provide connection detail Q5: How many supports of this detail is required for the project? Q4: Please confirm using HSS 2x2x1/8 for these supports, else advise. ? DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Fax: (661) 251-7405 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 Restroom Counter Supports TO:Chandra Sutton (AMG & Associates, Inc.) 26535 Summit Circle Santa Clarita, California 91350 FROM:Christopher Tumasone (AMG & Associates, Inc.) 26535 Summit Circle Santa Clarita, California 91355 CREATED DATE:07/28/ 2022 STATUS:Open LOCATION:DUE DATE:08/12/2022 COST CODE:REFERENCE: COST IMPACT:SCHEDULE IMPACT: DRAWING NUMBER:7/A8.11 SPEC SECTION: RECEIVED FROM:John Henin (TrussWorks International, Inc.) COPIES TO: Dustin Hartman (AMG & Associates, Inc.), Christopher Tumasone (AMG & Associates, Inc.) SUGGESTION: Question from Christopher Tumasone (AMG & Associates, Inc.) at 11:35 AM on 07/28/2022 The restroom counter supports only reference one detail 7/A8.11 which provides dimensions only. There are no structural details that provide the profile of the steel being used which includes welding/bolting between all the connections/related items around. Please advise. Attachments: RFI 683-405 () - Restroom Counter Supports.pdf BY DATE COPIES TO AMG & Associates Inc.Page 1 of 1 Printed On: 07/28/2022 11:36 AM RFI #51 See two attached options from Englekirk Kimberly Castillo, JF 8/4/22 Use detail 8/S1.21 with screws to deck with increased angle size L4x2x3/16 (LLV) and slotted HSS with ¾ vertical bolted connection with 2” vert. slotted holes or use HSS2x2x1/8 frame welded to 4” metal stud walls x 18 ga minimum. Englekirk 8/1/22 DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 TO: ☑Cost impact ☑Time impact QF - 0405 RESPONSE BY: Name,Title: Company :DATE: RESPONSE TO RFI 683 TrussWorks International, Inc. 1275 E Franklin Ave. Pomona, CA 91766 Direct: 909 461 3112 | Fax: 909 461 3735 Chris Tumasone AMG Associates Inc RFI Description PROJECT # : ATTACHMENTS 1 page(s)/sheet(s) SUBMITTED BY: John Henin - Project Manager TWI Restroom counter supports only have detail 7/A8.11, which provides dimensions only, without having any structrual detail to provide the profile of the steel used, and the welding/bolting between all the connections and related/adjacent items around. Please advise. RFI# : DATE: DATE NEEDED BY : PROJECT NAME : LL-405 7/28/2022 8/7/2022 Lader Linda Community Park REQUEST FOR INFORMATION LL-405.xlsx Sheet1 Page 1 of 2 7/28/2022 10:22 AM DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 Cut snip from sheet no. A8.11 DocuSign Envelope ID: BDB79120-0E67-4CCA-AC13-70E603B94CA0 Certificate Of Completion Envelope Id: BDB791200E674CCAAC1370E603B94CA0 Status: Completed Subject: Complete with DocuSign: 8405 Ladera Linda CCO 32_rev2.pdf Source Envelope: Document Pages: 17 Signatures: 3 Envelope Originator: Certificate Pages: 5 Initials: 1 James O'Neill AutoNav: Enabled EnvelopeId Stamping: Enabled Time Zone: (UTC-08:00) Pacific Time (US & Canada) 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 joneill@rpvca.gov IP Address: 72.34.97.146 Record Tracking Status: Original 6/5/2023 10:57:23 AM Holder: James O'Neill joneill@rpvca.gov Location: DocuSign Signer Events Signature Timestamp Lincoln Lo llo@rpvca.gov Public Works Deputy Director City of Rancho Palos Verdes Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 47.147.131.72 Sent: 6/5/2023 10:59:52 AM Viewed: 6/5/2023 2:12:46 PM Signed: 6/5/2023 2:20:05 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ramzi Awwad rawwad@rpvca.gov Director of Public Works City of Rancho Palos Verdes Security Level: Email, Account Authentication (None) Signature Adoption: Drawn on Device Using IP Address: 104.174.65.192 Sent: 6/5/2023 2:20:06 PM Viewed: 6/6/2023 8:54:26 AM Signed: 6/6/2023 8:55:52 AM Electronic Record and Signature Disclosure: Accepted: 3/2/2023 10:45:19 AM ID: 3242b72d-4755-489d-8e5f-7c62dc360470 Trang Nguyen tnguyen@rpvca.gov Director of Finance City of Rancho Palos Verdes Security Level: Email, Account Authentication (None) Signature Adoption: Pre-selected Style Using IP Address: 72.34.97.146 Sent: 6/6/2023 8:55:53 AM Viewed: 6/6/2023 4:51:18 PM Signed: 6/6/2023 4:52:37 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Ara Mihranian aram@rpvca.gov Security Level: Email, Account Authentication (None) Signature Adoption: Uploaded Signature Image Using IP Address: 72.34.97.146 Sent: 6/6/2023 4:52:38 PM Viewed: 6/7/2023 6:39:39 PM Signed: 6/7/2023 6:40:28 PM Electronic Record and Signature Disclosure: Accepted: 6/7/2023 6:39:39 PM ID: efdc101e-31f6-4233-8813-09fad323efbe In Person Signer Events Signature Timestamp Editor Delivery Events Status Timestamp Agent Delivery Events Status Timestamp Intermediary Delivery Events Status Timestamp Certified Delivery Events Status Timestamp Carbon Copy Events Status Timestamp Erin Jones ejones@griffinstructures.com Security Level: Email, Account Authentication (None) Sent: 6/7/2023 6:40:30 PM Viewed: 6/8/2023 7:39:52 AM Electronic Record and Signature Disclosure: Not Offered via DocuSign City Clerk cityclerk@rpvca.gov Security Level: Email, Account Authentication (None) Sent: 6/7/2023 6:40:31 PM Viewed: 6/12/2023 11:32:06 AM Electronic Record and Signature Disclosure: Accepted: 2/1/2023 3:10:58 PM ID: 505eed45-7ed0-4db8-aae6-ef6eedfef03d Lorna Cloke lornac@rpvca.gov Security Level: Email, Account Authentication (None) Sent: 6/7/2023 6:40:33 PM Electronic Record and Signature Disclosure: Not Offered via DocuSign Witness Events Signature Timestamp Notary Events Signature Timestamp Envelope Summary Events Status Timestamps Envelope Sent Hashed/Encrypted 6/5/2023 10:59:52 AM Certified Delivered Security Checked 6/7/2023 6:39:39 PM Signing Complete Security Checked 6/7/2023 6:40:28 PM Completed Security Checked 6/7/2023 6:40:33 PM Payment Events Status Timestamps Electronic Record and Signature Disclosure ELECTRONIC RECORD AND SIGNATURE DISCLOSURE From time to time, City of Rancho Palos Verdes (we, us or Company) may be required by law to provide to you certain written notices or disclosures. Described below are the terms and conditions for providing to you such notices and disclosures electronicall y through the DocuSign system. Please read the information below carefully and thoroughly, and if you can access this information electronically to your satisfaction and agree to this Electronic Record and Signature Disclosure (ERSD), please confirm your agreement by selecting the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. Getting paper copies At any time, you may request from us a paper copy of any record provided or made av ailable electronically to you by us. You will have the ability to download and print documents we send to you through the DocuSign system during and immediately after the signing session and, if you elect to create a DocuSign account, you may access the documents for a limited period of time (usually 30 days) after such documents are first sent to you. After such time, if you wish for us to send you paper copies of any such documents from our office to you, you will be charged a $0.00 per-page fee. You may request delivery of such paper copies from us by following the procedure described below. Withdrawing your consent If you decide to receive notices and disclosures from us electronically, you may at any time change your mind and tell us that thereafter you want to receive required notices and disclosures only in paper format. How you must inform us of your decision to receive future notices and disclosure in paper format and withdraw your consent to receive notices and disclosures electronically is described below. Consequences of changing your mind If you elect to receive required notices and disclosures only in paper format, it will slow the speed at which we can complete certain steps in transactions with you and delivering services to you because we will need first to send the required notices or disclosures to you in paper format, and then wait until we receive back from you your acknowledgment of your receipt of such paper notices or disclosures. Further, you will no longer be able to use the DocuSign system to receive required notices and consents electronically from us or to sign electronically documents from us. All notices and disclosures will be sent to you electronically Electronic Record and Signature Disclosure created on: 6/15/2021 5:55:39 PM Parties agreed to: Ramzi Awwad, Ara Mihranian, City Clerk Unless you tell us otherwise in accordance with the procedures described herein, we will provide electronically to you through the DocuSign system all required notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you during the course of our relationship with you. To reduce the chance of you inadvertently not receiving any notice or disclosure, we prefer to provide all of the required notices and disclosures to you by the same method and to the same address that you have given us. Thus, you can receive all the disclosures and notices electronically or in paper format through the paper mail delivery system. If you do not agree with this process, please let us know as described below. Please also see the paragraph immediately above that describes the consequences of your electing not to receive delivery of the notices and disclosures electronically from us. How to contact City of Rancho Palos Verdes: You may contact us to let us know of your changes as to how we may contact you electronically, to request paper copies of certain information from us, and to withdraw your prior consent to receive notices and disclosures electronically as follows: To contact us by email send messages to: terit@rpvca.gov To advise City of Rancho Palos Verdes of your new email address To let us know of a change in your email address where we should send notices and disclosures electronically to you, you must send an email message to us at terit@rpvca.gov and in the body of such request you must state: your previous email address, your new email address. We do not require any other information from you to change your email address. If you created a DocuSign account, you may update it with your new email address through your account preferences. To request paper copies from City of Rancho Palos Verdes To request delivery from us of paper copies of the notices and disclosures previously provided by us to you electronically, you must send us an email to terit@rpvca.gov and in the body of such request you must state your email address, full name, mailing address, and telephone number. We will bill you for any fees at that time, if any. To withdraw your consent with City of Rancho Palos Verdes To inform us that you no longer wish to receive future notices and disclosures in electronic format you may: i. decline to sign a document from within your signing session, and on the subsequent page, select the check-box indicating you wish to withdraw your consent, or you may; ii. send us an email to terit@rpvca.gov and in the body of such request you must state your email, full name, mailing address, and telephone number. We do not need any other information from you to withdraw consent.. The consequences of your withdrawing consent for online documents will be that transactions may take a longer time to process.. Required hardware and software The minimum system requirements for using the DocuSign system may change over time. The current system requirements are found here: https://support.docusign.com/guides/signer-guide- signing-system-requirements. Acknowledging your access and consent to receive and sign documents electronically To confirm to us that you can access this information electronically, which will be similar to other electronic notices and disclosures that we will provide to you, please confirm that you have read this ERSD, and (i) that you are able to print on paper or electronically save this ERSD for your future reference and access; or (ii) that you are able to email this ERSD to an email address where you will be able to print on paper or save it for your future reference and access. Further, if you consent to receiving notices and disclosures exclusively in electronic format as described herein, then select the check-box next to ‘I agree to use electronic records and signatures’ before clicking ‘CONTINUE’ within the DocuSign system. By selecting the check-box next to ‘I agree to use electronic records and signatures’, you confirm that:  You can access and read this Electronic Record and Signature Disclosure; and  You can print on paper this Electronic Record and Signature Disclosure, or save or send this Electronic Record and Disclosure to a location where you can print it, for future reference and access; and  Until or unless you notify City of Rancho Palos Verdes as described above, you consent to receive exclusively through electronic means all notices, disclosures, authorizations, acknowledgements, and other documents that are required to be provided or made available to you by City of Rancho Palos Verdes during the course of your relationship with City of Rancho Palos Verdes.