AMG and Associates Inc (Change Order 08)City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.i)ublicworks(@rDvca.P-ov CHANGE ORDER MEMORANDUM TO: RAMZI AWWAD, DIRECTOR OF PUBLIC WORKS FROM: ERIN JONES, GRIFFIN STRUCTURES DATE: OCTOBER 27, 2022 SUBJECT: LADERA LINDA COMMUNITY PARK CONSTRUCTION CHANGE ORDER NUMBER: 8 Description of Construction Change Order The work includes changes to the kitchenette as follows: - Delete stainless steel open shelf and replace with upper cabinets. - Delete stainless steel countertop and backsplash and replace with solid surface countertop and tile backsplash. Justification During final review of the building color boards, the City Manager proposed adding upper cabinets in the kitchenette to provide more storage, and changing the backsplash and countertop materials. Cost Analvsis Both Griffin Structures and Johnson Favaro reviewed the proposed cost and determined that the cost of the 16 LF of added cabinets is in close alignment with the cost used in the project estimate. Reference the estimate comparison notes on the attached subcontractor quote. Schedule Analvsis No time extension was requested by the contractor, and work is expected to be completed within the original construction timeframe. Attachments: Construction Contract Change Order Form Construction Contract Change Order Summary Sheet Contractor's Change Order Proposal City of Rancho Palos Verdes Department of Public Works LA 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www. publicworks r vca.go� CONSTRUCTION CHANGE ORDER SUMMARY SHEET PROJECT NAME: Ladera Linda Community Park PROJECT CODE: 8405 PREPARED BY: JAMES O'NEILL CONTRACTOR NAME: AMG & Associates, Inc. CONTRACT NUMBER: FY2022-050 PURCHASE ORDER NUMBER: 20220215 ACCOUNT NUMBER. 330-400-8405-8403 ORIGINAL CONTRACT AMOUNT: $13,721,000.00 .f TOTAL CHANGE ORDERS COST: $141,333.24 ✓ to DATE: 9/27/22 ORIGINAL CONTINGENCY AMOUNT: $1,029,075.00 .l� NEW CONTRACT AMOUNT: $13,862,333.24 REMAINING CONTINGENCY AMOUNT: $887,741.76 ORIGINAL COMPLETION DATE: 07/27/23 TOTAL SCHEDULE CHANGE ORDERS: 11 Working Days NEW CONTRACT COMPLETION DATE- 08/11/23 CHANGE ORDER NUMBER COST AMOUNT I SCHEDULE EXTENSION DATE C0#1 $54,534.52 0 Working Days 05/27/22 CO#2 $12,628.58 0 Working Days 08/09/22 CO#3 $53,526.25 11 Working Days 08/31/22 CO#4 $8,558.42 0 Working Days 09/01/22 CO#5 -$5,378.25 0 'Working Days 09/01/22 CO#6 $824.34 0 Working Days 09/01/22 CO#7 $10,202.36 0 Working Days 09/27/22 CO#8 $6,437.02 0 Working Days 09/27/22 CO#9 1 lWorking Days C0#10 1Working Days 1of1 City of Rancho Palos Verdes Department of Public Works LA 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www. Du b I i c wo r < s kP rpvca.gov_ CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER: FY2022-050 PURCHASE ORDER NUMBER: 20220215 CHANGE ORDER NUMBER: 8 CONTRACTOR NAME: AMG & Associates, Inc. DESCRIPTION AND LOCATION OF PROPOSED WORK PROJECT NAME: Ladera Linda Community Park PROJECT CODE: 8405 to DATE: Wi'27/221?110 The work includes changes to the kitchenette as follows: - Delete stainless steel open shelf and replace with upper cabinets. - Delete stainless steel countertop and backsplash and replace with solid surface countertop and tile backsplash. SUMMARY OF QUANTITY CHANGES ITEM SPEC ORIGINAL NEW QUANTITY UNIT PRICE ADDITIONAL NO. CODE DESCRIPTION QUANTITY QUANTITY DIFFERENCE PRICELFFERENCE WORKING DAYS AMG PCO 13 - RFP 03- ASI 15 - Kitchenette 1 62000 casework changes 0.0 LS 1.0 LS 1.0 LS $6,437.02 $6,437.02 0 0 0.0 0 $0.00 0 0.0 0 $0.00 0 0.0 0 $0.00 0 0.0 0 $0.00 0 0.0 0 $0.00 Totalsl $6,437.02 0 A TIME EXTENSION OF 0 WORKING DAYS WILL BE ALLOWED FOR THIS WORK ORIGINAL CONTRACT AMOUNT: $13,721,000.00 ORIGINAL COMPLETION DATE: 07/27/23 TOTAL OF CHANGE ORDER #1-7: $134,896.22 TOTAL OF TIME EXTENSIONS 41-7: 11 Working Days TOTAL OF CHANGE ORDER #8: 1 $6,437.02 TOTAL OF TIME EXTENSIONS #8: 0 Working Days NEW CONTRACT AMOUNT: $13,862,333.24 NEW COMPLETION DATE: 08/11/23 1of2 City of Rancho Palos Verdes Department of Public Works LA 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www. ublicworks aF7r vca. av CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER: FY2022-050 PURCHASE ORDER NUMBER: 20220215 CHANGE ORDER NUMBER: 8 CONTRACTOR NAME AMG & Associates, Inc. PROJECT NAME: Ladera Linda Community Park PROJECT CODE: 8405 By signing this Change Order, Contractor understands and agrees that it is accepting the specified sums and adjustment of contract time of completion (if any) set forth herein as full, final and complete satisfaction of any and all claims by Contractor for all costs and expenses of Contractor and anyone for whom Contractor may be responsible for the work referred to herein, including but not limited to costs or expenses of the Contractor or any of its subcontractors, materials suppliers, vendors or anyone else for whom Contractor is responsible, for labor, materials, services or equipment, no matter how characterized, whether known or unknown to Contractor, including but not limited to, all field and home office overhead, delay costs/claims, acceleration costs/claims, unabsorbed or under -absorbed home office overhead, extended field costs, general conditions, claim preparation costs, inefficiencies, or the like, no matter how characterized. Contractor further understands and agrees by signing this Change Order that any attempt by Contractor to purportedly reserve rights to claim additional time or compensation for the work referred to herein, is void. Except as set forth, all terms and provisions of the contract and all prior change orders remain in full force and effect. Recommended: Erin Jones Date: 9/27/22 Construction Manager, Griffin Structures Signature Execution of this Change Order by both parties constitutes a binding agreement. This document constitutes the entire agreement between the parties. The person signing this Change Order for Contractor hereby represents and warrants that he/she is fully authorized to sign this Agreement on behalf of Contractor. p q"Ily signed by Anthony R. Anthony R. Traverso Tra-- Contractor: Anthony R. Traverso Date: 2022 -2909:54:5s-02'00' Date: Vice President/SecretaryfTreasurei Signature Accepted and Executed by: City: Lincoln Lo ` Date: aI Contract Officer Signat Ramzi Awwad Date: ;?—�&---- -2 Public Works Director 5 Ara Mihranian Date: j 2 U ZL City Manager 2 of 2 AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Fax: (661) 251-7405 PCO #013 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 Prime Contract Potential Change Order #013: CE #036 - RFP #3 - ASI #15 Kitchenette Casework TO: City of Rancho Palos Verdes 30940 Hawthorne Blvd. Rancho Palos Verdes, California 90275 PCO NUMBER/REVISION: 013/1 REQUEST RECEIVED FROM: Veronica Wu (CIMA West) STATUS: Pending - In Review REFERENCE: FROM: AMG & Associates, Inc. 26535 Summit Circle Santa Clarita, California 91350 CONTRACT: City Project No. 8405 - Ladera Linda Community Park Project CREATED BY: Christopher Tumasone (AMG & Associates, Inc.) CREATED DATE: 8/16/2022 PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $6,437.02 POTENTIAL CHANGE ORDER TITLE: CE #036 - RFP #3 - ASI #15 Kitchenette Casework CHANGE REASON: RFP #3 POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE #06- RFP #3_=1451 #15 Kitchenette Casework This change event covers the cost per RFP #3. ATTACHMENTS: COR #1 - Revised (9, 15.2 I�f , PCO #013 -RFP #3 KitrhFrtette Casewatk•pdj , favid B Guzman F3E~ASI 15 Kitchenette Caseworis.odf , _COR #1,0 .2 22 . d€ , RFP 03 Kitchenette casework 1 f # I Budget Code Description Amount 1 1 06-200.S Finish Carpentry. Commitment cost for RFP #3 $5,874.00 Subtotal: $5,874.00 Overhead (7.00% Applies to all line item types.): $411.18 Insurance (1.50% Applies to all line item types.): $88.11 Bonding (1.00% Applies to all line item types.): $63.73 Grand Total: $6,437.02 SIGNATURE City of Rancho Palos Verdes AMG & Associates, Inc. 30940 Hawthorne Blvd. 26535 Summit Circle Rancho Palos Verdes, California 90275 Santa Clarita, California 91350 DATE SIGNATURE AMG & Associates Inc. Page 1 of 1 DATE SIGNATURE DATE Printed On: 9/20/2022 10:59 AM Cima West 4961 Santa Anita Avenue, Unit "K", Temple City, CA 91780 (626) 522-0800 CSLB 1046943, DIR # 10000623 89 estimatin �7a activos.us CHANGE ORDER REOUEST #1 - Revised (22LT-005) Date: September 15, 2022 Chris - csutton am associatesinc.com AMG & ASSOCIATES, INC. 26535 Summit Circle Santa Clarita, CA 91350 (661) 251-7401, FAX (661) 251-7405 PROJECT NAME: Ladera Linda Community Park, 32201 Forrestal Dr., Palos Verdes, CA 90275 We hereby propose to the following change order as per Submittal #23, dated 5/19/2022 and RFP #03, dated 7/19/2022: Scope of Work: PRICING PER 1/11/21 PROJECT COST ESTIMATE 1. CREDIT Stainless steel countertop and shelf @ Kitchenette 103 Material $8,875.00 Installation 17 hours @ $100.00/hour $1,700.00 CREDIT CHANGE ORDER (Stainless steel) ($10,575.00) -4 --f- -4,400 NEW quartz countertop and upper cabinets @ Kitchenette 103 1 Quartz countertop without backsplash @ Kitchenette 103 per Chris phon 's directive to Bo, 9/15/2022 2. FIVE upper cabinets @ Kitchenette 103 3. NO PLAM TOE KICK per Chris hone's directive to Bo 9/15/2022 CHANGE ORDER AMOUNT: 516,449.00 e — Material: $14,644.00 Shop Labor: (9 hours @ $145.00/hour) _ $1,305.00 Installation: (5 hours @ $100.00/hour) _ $500.00 TOTAL CHANGE ORDER $5,874.00 Terms and conditions: 1) Additional time may be requiring for delivery. 2) Change order must be signed prior to commence of work. 3) This change order is valid for 30 days from the above date. Bo Hom, Estimator + 10,800 (16 LF x 675/ft) $6,400 Delta per values noted above Or, Add 16 LF of cabinets at $350/LF = $5,600 ?RCU!iECTUR! . 11RB;,'! 13_a!i,r, Project To RFP 03 LADERA LINDA COMMUNITY CENTER AMG & ASSOCIATES Contract No. Office No. No. of Pages 1803 2 Subject Kitchenette Casework Sender Ingrid Dennert, Johnson Favaro Date 7/19/22 The Owner requests an itemized proposal for changes to the Contract Sum and Contract Time for proposed modifications to the Contract Documents described herein. This is not a change order, a construction change directive, or a direction to proceed with the work described in the proposed modifications. Brief Description of Revisions/ Clarifications: Per discussion with city manager, kitchenette open shelf is replaced with upper cabinets, counter finish updated to solid surface and backsplash finish updated to penny round tile. Opening width for ice maker reduced to 1'-3". Attachments: A5.06 — VESTIBULE 1 & 2, STORAGE 1 & KITCHENETTE INTERIOR ELEVATIONS A8.13 — CASEWORK DETAILS 5898 BLACI NELDER STREET CULVER CITY CA 90232 r 310,559.5720 F 310.559.8220 www.iohnsonfavaro.com 2 /]�/,� \ / 2cJ $. CD 9 Sldf ^ z=* 4 SP; � 0 1 § z 0 \ 0 Z :i 0 C, m S LO � }� \\( . ; 0 U3 m z 0 U) z 0 W < F- L�u w < 'r LLI n LLI LU LD m 0 C3 Ir w LU LU F- F z z w F- LLI z LLI (D < 0 U) LU Z) co U) w > -� - - $ m ,, m L) z w M ---- cn L) z LU CD w w < L 0 0 LU , / m �l w 0 06 ILA- Jim 1. ill; 1 11 0 A iRM hi Z: Of zw LL Lu z Lu F�l Fj ..... W....... z ------- --- ... ... I 4 Z) W 0 U) Lu (D uj < 0 U O m cr Lu co I- ... Lu L) 0 z W wm X L) Lu U LL LL Lu Z LLI FF C) F-