Loading...
AMG and Associates Inc (Change Order 04)City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 www.publicworks@rpvca,go CHANGE ORDER MEMORANDUM TO: RAMZI AWWAD, DIRECTOR OF PUBLIC WORKS FROM: ERIN JONES, GRIFFIN STRUCTURES DATE: SEPTEMBER 1, 2022 SUBJECT: LADERA LINDA COMMUNITY PARK CONSTRUCTION CHANGE ORDER NUMBER: 4 Description of Construction Change Order The work includes removal and disposal of an undocumented concrete -encased set of conduits. Justification During excavation to remove existing underground utilities within the new building area, the contractor encountered conduits encased in concrete. These encased conduits were not shown on the plans. Cost Analysis Due to the unknown extent of the material and to minimize impact to the project schedule, the work was performed on a time and material basis. Griffin Structures reviewed work tickets each day to confirm accuracy of labor hours, equipment hours, and materials used. The labor and equipment rates are in line with State of California published rates. Schedule Analysis The contractor has agreed to waive the request for additional time for this change order. Attachments: Construction Contract Change Order Form Construction Contract Change Order Summary Sheet Contractor's Change Order Proposal City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 IRL(310)544-5252 tA�ww. ubficworksLqvqLgov CONSTRUCTION CHANGE ORDER SUMMARY SHEET PROJECT NAME: Ladera Linda Community Park PROJECT CODE: 8405 PREPARED BY: JAMES O'NEILL CONTRACTOR NAME- AMG & Associates, Inc. CONTRACT NUMBER: FY2022-050 PURCHASE ORDER NUMBER: 20220215 ACCOUNT NUMBER: 330-400-8405-8403 ORIGINAL CONTRACT AMOUNT: $13,721,000.00 TOTAL CHANGE ORDERS COST: $129,247.77 DATE: 09/01/22 ORIGINAL CONTINGENCY AMOUNT: $1,029,075.00 NEW CONTRACT AMOUNT: $13,850,247.77 REMAINING CONTINGENCY AMOUNT: $899,827.23 ORIGINAL COMPLETION DATE: 07/27/23 TOTAL SCHEDULE CHANGE ORDERS: 11 Working Days NEW CONTRACT COMPLETION DATE=: 08/11/23 CHANGE ORDER NUMBER COST AMOUNT SCHEDULE EXTENSION DATE C0#1 $54,534.52 0 Working Days 05/27/22 CO#2 $12,628.58 0 Working Days 08/09/22 CO#3 $53,526.25 11 Working Days 08/31/22 CO#4 $8,558.42 0 Working Days 09/01/22 CO#5 Working Days CO#6 Working Days CO#7 Working Days CO#8 Working Days CO#9 Working Days C0#10 Working Days 1of1 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 (310)544-5252 IR www. ublicworks r vca. ov CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER: FY2022-050 PURCHASE ORDER NUMBER: 20220215 CHANGE ORDER NUMBER_ 4 CONTRACTOR NAME: AMG & Associates, Inc. DESCRIPTION AND LOCATION OF PROPOSED WORK PROJECT NAME: Ladera Linda Community Park PROJECT CODE: 8405 Removal and disposal of existing underground concrete -encased conduits. DATE: 09/01/22 SUMMARY OF QUANTITY CHANGES ITEM SPEC ORIGINAL NEW QUANTITY UNIT PRICE ADDITIONAL NO. CODE DESCRIPTION QUANTITY QUANTITY DIFFERENCE PRICE DIFFERENCE WORKING DAYS AMG PCO 8 - Remove unforeseen 1 24119 encased conduits 0.0 LS 1.0 LS 1.0 LS $8,558.42 $8,558.42 0 0 0.0 0 $000 0 0.0 0 $0.00 0 0.0 0 $0.00 0 0.0 0 $0.00 0 0.0 0 $0.00 Totals $8,558.42 0 A TIME EXTENSION OF 0 WORKING DAYS WILL BE ALLOWED FOR THIS WORK ORIGINAL CONTRACT AMOUNT: $13,721,000.00 ORIGINAL COMPLETION DATE: 1 07/27/23 TOTAL OF CHANGE ORDER #1-3j$120,689.35 TOTAL OF TIME EXTENSIONS 01-3: 11 Working Days TOTAL OF CHANGE ORDER #4'1$8,558.42 NEW CONTRACT AMOUNT: 1$13,850,247.77771 TOTAL OF TIME EXTENSIONS #4:1 0 Working Days NEW COMPLETION DATE: 08/11/23 1of2 City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Blvd, Rancho Palos Verdes, CA 90275 IqL(310)544-5252 www, ubIicworks r vca. ov CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER: FY2022-050 PURCHASE ORDER NUMBER: 20220215 CHANGE ORDER NUMBER: 4 CONTRACTOR NAME: AMG & Associates, Inc. PROJECT NAME: Ladera Linda Community Park PROJECT CODE: 8405 By signing this Change Order, Contractor understands and agrees that it is accepting the specified sums and adjustment of contract time of completion (if any) set forth herein as full, final and complete satisfaction of any and all claims by Contractor for all costs and expenses of Contractor and anyone for whom Contractor may be responsible for the work referred to herein, including but not limited to costs or expenses of the Contractor or any of its subcontractors, materials suppliers, vendors or anyone else for whom Contractor is responsible, for labor, materials, services or equipment, no matter how characterized, whether known or unknown to Contractor, including but not limited to, all field and home office overhead, delay costs/claims, acceleration costs/claims, unabsorbed or under -absorbed home office overhead, extended field costs, general conditions, claim preparation costs, inefficiencies, or the like, no matter how characterized. Contractor further understands and agrees by signing this Change Order that any attempt by Contractor to purportedly reserve rights to claim additional time or compensation for the work referred to herein, is void. Except as set forth, all terms and provisions of the contract and all prior change orders remain in full force and effect. Recommended: Erin Jones Construction Manager, Griffin Structures Signature Date: 9/1/22 Execution of this Change Order by both parties constitutes a binding agreement. This document constitutes the entire agreement between the parties. The person signing this Change Order for Contractor hereby represents and warrants that he/she is fully authorized to sign this Agreement on behalf of Contractor. Contractor: Anthony R. Traverso Vice President/Secretary/Treasurei Accepted and Executed by: City: Ramzi Awwad Contractor Officer Ramzi Awwad Public Works Director Trang Nguyen Finance Director D�gklally signed by Anthony R. Anthony R. Traverso TFavismW 0m: 2072.09.01 11 :3A6 •67'00' Date: Signature Sig cure agnature I k Si 'atur 2 of 2 Date: l 1 !�- Date: Date: f (e�v PCO #008 AMG & Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 251-7401 Fax: (661) 251-7405 Project: 01-22-157 - Ladera Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, Califomia 90275 Prime Contract Potential Change Order #008: CE #018 - Impact Notice #4 $7,809.84 Unforeseen Encased Conduit TO: City of Rancho Palos Verdes FROM: AMG & Associates, Inc. $7,809.84 30940 Hawthorne Blvd. 26535 Summit Circle $546.69 Rancho Palos Verdes, California 90275 Santa Clarita, California 91350 PCO NUMBERIREVISION: 008/1 CONTRACT: City Project No. 8405 - Ladera Linda $84.74 Community Park Project REQUEST RECEIVED FROM: Marco Molina (Interior Demolition Inc.) CREATED BY: Christopher Tumasone (AMG & Associates, Inc.) STATUS: Pending - In Review CREATED DATE: 6/29/2022 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: 0 days PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT. $8,558.42 POTENTIAL CHANGE ORDER TITLE: CE #018 - Impact Notice #4 Unforeseen Encased Conduit CHANGE REASON: Existing Condition POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) C.E #018•Impact Natice #4 Ur�fgreseen Enra��nd �i This change event covers the cost for the unforeseen encased conduit in the building pad area. ATTACHMENTS: Change Order 1 -Removing concrete conduit REV081222,pdf , _Change Order 1 -Removing concrete conduitpdf , T&M 6-8-2_0.22 Encased Conduit Removal .pdf , T&M-6-7-2022-Encased Conduit Removalpdf , Erin Jones_FW Impact _Notice #4 ,pdf , _Impact Notice #4_,pdf # Budget Code Description Amount 1 02-220.S Site Demolition.Commitment cost to remove the unforeseen encased conduit $7,809.84 2 02-000.S General.Commitment AMG General Conditions: Impact included on PCO #007 per agreement with CM $0.00 Subtotal: $7,809.84 Overhead (7.00% Applies to all line item types.): $546.69 Insurance (1.50% Applies to all line item types.): $117.15 Bonding (1.00% Applies to all line item types.): $84.74 Grand Total: $8,556.42 SIGNATURE City of Rancho Palos Verdes AMG & Associates, Inc. 30940 Hawthorne Blvd. 26535 Summit Circle Rancho Palos Verdes, California 90275 Santa Clahla, California 91350 DATE SIGNATURE AMG & Associates Inc. Page 1 of 1 DATE SIGNATURE DATE Printed On: 8/12/2022 12:53 PM M //ITER/OR DEMOL/T/ON,, //VC. Ah mor -: DEmoL/T/ON -ABA TEMENT-EARTHwoR1( L/C# 603409 • (818/249.4932 Change Order 1 June 9, 2022 REVISED August 12, 2022 Between the Owner: AMG & ASSOCIATES, INC 28296 Constalation Rd. Santa Clarita, CA 91355 And the Contractor: Interior Demolition, Inc. 2621 Honolulu Ave. Montrose, California 91020 United States CSI -B# 603409 818.249.4932 'Corporate Ogee 2621 Aono/u1u Avenue lft,?trose, L'A 91020 www•lnteriordemolition'17e t For the Change Order: Change Order 1- Removing concrete conduit For the Project: Description: Name 0610712022 Jose Cosme Lopez Francisco Espinoza Excavator ES300 CAT 973 Concrete Load END Dump (Trucking) 06/08/2022 Jose Cosme Lopez Francisco Espinoza Ruben Gonzales Excavator ES300 END Dump (Trucking) Concrete Load TOTALS 2207* 32201 Forrestal Dr. Rancho Palos Verdes, CA 90275 Description Qty Cost Unit Markup Amount Operator 6 / $128.68 '� Per Hour $115.81 $887.89 Labor 6 ✓ $97.05• Per Hour $87.35 $669.65 4 ✓ $210.00 ✓ Per Hour $126.00 $966.00 2 -" $157.00 r Per Hour $47.10 $361.10 4,/ $300.00 Per Hour $180.00 $1,380.00 4 $450.00 Per Hour $270.00 $2,070.00 Operator 1 `� $128.68 Per Hour $19.30 $147.98 Labor 1 $97.05 Per Hour $14.56 $111.61 1 ✓ $97.05 Per Hour $14.56 $111.61 1 $210.00 Per Hour $31.50 $241.50 1 f $450.00 Per Hour $67.50 $517.50 1 $300.00 Per Hour $45.00 $345.00 $1,018.67 $7,809.84 CONTRACTOR ACCEPTANCE SIGNATURE DATE OWNER ACCEPTANCE SIGNATURE DATE I � I�F�-EDE M CD [._ITIr-4 i roc See•ar.r.L llr gal Ea-_�!a-. r. .,ak - !�-,�.. .. E<._ F�.-aa„ ..cel LADERA LINDA (PrujM NarnelNl Interior DemolOion Inc. _ (Cowes") (Addiml EMPLOYEES DAILY TIME AND MATERIAL DATE: 06/08/2022 CIIMKIY r 11'r:dhra a nl.-a ?iFudia mi r onJann•a (Pn M1I lec6.rrl EMPLOYEE NAME/ TRADE RATE HOURS WORK ACCOMPLISHED - DQ -.E ' Ruben Gonzales 1 ✓ - 1 1 End DumD MATERIAL I SUPPLIES DESCRIPTION OF MATERIAL RECEIVED T OTY. A QUANTITY f MATERIAL USED M� EOUIPMENT OWNED MAINTENANCE/ REPAIRS RENTED RATE HOURS 1 End DumD _ DISCRIPTION AMG & Associates, Inca Customer Approval: x NQT AN APEROVAL Vp-b—a N' bo= wmkm only. Name: l� Position: Signed:- Date:C4 OAL-- qrAF% qr INTFR/OROFPlOLMON, INC. ArM60Ar 0M4COun N-AALd71G4[ivr•tasniwowK c fCi 00x00 • /iu.4AW"V se #2207 - Ladera Linda Community Park, Rancho Palos Verdes (ftjccl NahkMl INTERIOR DEMOLITION, INC. Icannac') (nddwM1 EMPLOYEES DAILY TIME AND MATERIAL DATE: June 7, 2022 (Walhn/@hn SWnlfknM t7-Afi ns) (I'm -M51 In Chairl EMPLOYEE NAME TRADE RATE HOURS WORK ACCOMPLISHED Jose Cosme Lopez Maldonado 6 CAT 973 Track loader Removal of conduit utility line concrete Francisco Espinoza 6 MATERIAL I SUPPLIES I DESCRIPTION OF MATERIAL RECEIVED I OTY I QUANTITY / MATERIAL USED I EQUIPMENT OWNED MAINTENANCE/ REPAIRS RENTED RATE HOURS Volvo ES300 Excavator 4 CAT 973 Track loader 2 DESCRIPTION 6 end dump loads AMG & Anodatm Inc. Customer Approval: x KW AN APPROVAL V ww6rb " watt w G* - /LATER/OR OEMOL/T/ON, /_NC. OENOL/T/ON •AB4 TENENT•EARTNWOR/Y L/CO 60JI0D /Bfs/ 2I D LDS2 PROJECT NAME CONTRACTOR CALTRANS Intenor Demofition, Inc. TRADE: Laborer HOURLY LABOR RATE WORKSHEET Colpo.-ote 0-71-te 2621 Lfal,1c/u/u Avenue /l1o�L�ose, CA 91020 WWW�/1tGr/O/dG/170� t/O/! -/lG L - PROJECT NO. 2018 -SA CONTRACT NO. 2018 DATE CLASSIFICATION: Group 1 cwswceoe ur t 703.33 - IWO Prevallinq Wa a Rate Item % Rate Notes I Regular Time Overtime Double Time i Base Labor Rale $ 37.43 $ 56.15 $ 74.86 e.�t eenefA Paid Provided F6Ne Benefits: (FA xinwpoopia*bm) Pension' x 10.32 10.32 10.32 Healf fflelfare t x \ t ` 8.10 % 8.10 8.10 ' Training/Certification x l/ _ 0.70 0.70 0.70 VacadonfHoliday' x 4.87 4.87 4.67 Other x 0.61 0.61 0.61 Fringe Benefits Subtotal S 24.60 $ 24.60 $ 24.60 Total Hourly Rate S 62.03 $ 80.75 $ 99.46 = ease Labor Rate + Benefds Paid. Benefits Provided Total Paid Hourly Rate ; 62.03 $ 80.75 S 99.46 ° ease Labor Rare + Benefits Paid Burden: Taxes & Insurance FICA 0.0620 3.85 5.01 6.17 Medicare 0.0145 0.90 1.17 1.44 Federal Unemployment 0.006 0.37 0.48 0.60 Caltfomia Unemployment 0.062 3.85 5.01 6.17 Workers Compensation' 0.131 8.13 10.58 13.03 General Liability Insurance 0.289 17.93 23.34 28.74 Burden Subtotal $ 35.02 $ 45.58 $ 56.15 TOTAL HOURLY RATE (Total Hourly Rate + Burden) S 97.051$ 126.33 $ 155.61 = Amount Confrador pard fo emplo cwswceoe ur t 703.33 - IWO qwmpmb Mir /LATER/OR CFMOLITION. /NC i iP i OETIOL/7YON-Qaa TCT/ENT-E4R77lWOR/r L/C/� QOSIOD • /s/e/IID.IO.T� PROJECT NAME Cacpo�ote Office 2621 flonv/u/u Avenue /llontcasa, CA 91020 www•/nte�iocdemo/'tion-net PROJECT NO. CONTRACTOR Interior Demolttlon, Inc. CONTRACT NO. DATE HOURLY LABOR RATE WORKSHEET TRADE: Operator Eng. _ CLASSIFICATION: Group 4 _ Item % Rate Prevaillno Waaa Rate Notes Regular Time Overtime Double Time Base Labor Rate $ 5221 $ 78.32 $ 104.42 amar IV" Pain PMVWW Fringe Benefits: WA MP aWogrcre tq* Pensionx 13.15 el 13.15 13.15 HealthlWelfare' x 1 L� 11.85 11.85 11.85 TraininglCertification' x 1.05 1.05 1.05 Vaca6on/Holiday' x 3.60 3.60 3.60 Other Ex 0.39 0.39 0.39 Fringe Benefits Subtotal $ 30.04 $ 30.04 $ 30.04 Total Hourly Rate $ 82.25 $ 108.36 $ 134.46 =Sm Labor Rde+SeneMsPad +BenefAs Provided Total Paid Hourly Rate $ 82.25 $ 108.36 $ 134.48 =Base Labor Rate +Benel9sPad Burden: Taxes & Insurance FICA 0.062 5.10 6.72 6.34 Medicare 0.0145 1.19 1.57 1.95 Federal Unemployment 0.006 0.49 0.65 0.81 California Unemployment 0.062 5.10 6.72 8.34 Workers Compensation' 0.131 10.77 14.19 17.61 General Liability Insurance 0.289 23.77 31.31 38.66 Burden Subtotal S 46.43 $ 61.17 $ 75.90 roTAL HOURLY RATE (Total Hourly Rate + Burden) I $ 128.681$ 169.52 $ 210.36 1= Amount Cantniclor paid to employee coaame on mgm! 70133 - 10/10 MWE AF% qw /LATER/OR VE"M/r/CAI. /NC. mmw ma oEnsocirroiv-sea sEivt�vr•Ea�vrriwo�v�r cicr sossoa • /eie/sin.�asr PROJECT NAME CarPorvte ice 2621 80170/u/u Avenue /Montrose, CA 91o20 www /nttrrardcrrra/ tivn We t PROJECT NO. CONTRACTOR Interior Demolition. Ine. CONTRACT NO. TRADE: HOURLY LABOR RATE WORKSHEET Dnver CLASSIFICATION: DATE cmanew ug". 703.33 - IWID Prevailing Wage Rate Itsm %Rate Notes Ra lar Time Overume I Double Time Base Labor Rate S 22.54 $ 33.81 $ 45.08 80" Basil Paid ProvWed Fnnge Benefits: JW x r awnpnu W4 Pension' x $ 0.08 0.08 0.08 Health/Welfare' x 2.05 2.05 2.05 Training/Certification' x - Vacation/Holiday' x 0.33 0.33 0.33 Other x - Fringe Benefits Subtotal S 2.46 $ 2.46 $ 2.46 Total Hourly Rate S 25.00 S 3627 $ 47.54 = Base Labor Rale + Benefits Paid +BenefAs Pwided Total Paid Hourly Rate S 25.00 $ 3627 $ 47.54 = Base Labor Rab + Benefda Paid Burden Taxes & Insurance FICA 0.062 1.55 225 2.95 Medicare 0.0145 036 0.53 0.69 Federal Unemployment 0.006 0.15 022 0.29 Caldomia Unemployment 0.062 1.55 2.25 2.95 Workers Compensation' 0.184 4.60 6.67 8.75 General Liability Insurance 0.315 7.87 11.41 14.96 Burden Subtotal $ 16.08 $ 23.33 $ 30.58 TOTAL HOURLY RATE (Total Hourly Rate + Burden) S 41.081$ 59.60 $ 71L12 Iz Amount Contractor paid to employee cmanew ug". 703.33 - IWID End Dump Trucking Charge FUEL Total Rountrip Miles 6 Miles per Gallon $7 per Gallon 120 20 $140 [Depreciation Equiptment per day ZSI cru Driver (0nldff-Haul ing To/From - Hourly Rate Hours Total 541.08 8 $328.64 INTER/OR DEMOLITION, INC mmu mop Amr OEMOL/TION -ARA TEMENT-EAR TMWORK L/C.V 003409.1818/ 249.8932 EFFECTIVE: JANUARY 2022 HOURLY EQUIPMENT LIST Carparote Office 2627 Hona/u/u Avenue /ylantrace, CA 97020 www•/nteriardemal "tion •net EQUIPMENT RATE CAT 300 EXCAVATOR $210.00 CAT 320 EXCAVATOR $225.00 CAT 320 EXCAVATOR W/BREAKER $280.00 CAT 325 EXCAVATOR $225.00 CAT 325 EXCAVATOR W/ BREAKER $340.00 CAT 336 EXCAVATOR $240.00 CAT 336 EXCAVATOR W/BREAKER $330.00 CAT 345 EXCAVATOR $350.00 CAT 345 EXCAVATOR W/BREAKER $400.00 CAT 345 EXCAVATOR W/PULVERIZER $380.00 CAT 345 EXCAVATOR W/SHEAR $380.00 CAT 973 TRACK LOADER $210.00 BOBCAT 225 $155.00 BOBCAT 225 WBREAKER $190.00 NEW HOLLAND BACKHOE 75B $185.00 NEW HOLLAND BACKHOE 75B W/BREAKER $220.00 SEMI END DUMP $450.00 40 Yard Container (Special Waste) $1200.00 1. ALL EQUPMENT RATES ARE OPERATED AND MAINTAINED. 2. RATES ARE STRAIGHT TIME: OVERTIME WILL BE CHARGED WHEN 01 th2419Tff0" 3. PRICES TO MOBILIZE EQUIPMENT $750.00 _ � � � ✓ T 1� � � - � �. �i l.� � � � -1 1 �j _ l r .J j r � � �, i' • r _ I ( l� ot���_. .'�_ t i. � 1 ,. t ., �, .. ', _ . .- 9:F-059� L / t, y ) S?-! z 3d 9- �