AMG and Associates Inc (Change Order 02)City of Rancho Palos Verdes CHANGE ORDER MEMORANDUM TO: RAMZI AWWAD, DIRECTOR OF PUBLIC WORKS FROM: ERIN JONES, GRIFFIN STRUCTURES DATE: AUGUST 9, 2022 SUBJECT: LADERA LINDA COMMUNITY PARK CONSTRUCTION CHANGE ORDER NUMBER: 2 Description of Construction Change Order The work includes installing an additional 8 -inch PVC pipe to encase the underground mechanical piping between the heat pumps in the mechanical yard and the new building. Justification The plans called for one 8 -inch PVC pipe to encase the underground mechanical piping between the mechanical yard and the building. The contractor noted that a single 8 -inch pipe is not large enough to contain all of the required refrigerant lines, insulation and control wiring. The design team concurred that an additional 8 -inch PVC pipe is needed. Cost Analysis The contractor is not charging for labor, only for material. Griffin Structures performed a quantity take -off of the additional length of pipe to ensure the proposed quantity is correct. The proposed cost per linear foot is well below current retail pricing. Schedule Analysis No time extension was requested by the contractor, and work is expected to be completed within the original construction timeframe. Attachments: Construction Contract Change Order Form Construction Contract Change Order Summary Sheet Contractor's Change Order Proposal CONSTRUCTION CHANGE ORDER SUMMARY SHEET PROJECT NAME: Ladera Linda Community Park PROJECT CODE: 8405 PREPARED BY: JAMES O'NEILL CONTRACTOR NAME: AMG & Associates, Inc. CONTRACT NUMBER: FY2022-050 PURCHASE ORDER NUMBER: 20220215 ACCOUNT NUMBER: 330-400-8405-8403 ORIGINAL CONTRACT AMOUNT: $13,721,000.00 TOTAL CHANGE ORDERS COST. $67,163.10 DATE: 08/09/22 ORIGINAL CONTINGENCY AMOUNT: $1,029,075.00 NEW CONTRACT AMOUNT: $13,788,163.10 REMAINING CONTINGENCY AMOUNT: $961,911.90 ORIGINAL COMPLETION DATE: 07/27/23 TOTAL SCHEDULE CHANGE ORDERS: 0 Working Days NEW CONTRACT COMPLETION DATE: 07/27/23 CHANGE ORDER NUMBER COST AMOUNT SCHEDULE DATE EXTENSION CO#1 $54,534.52 0 Working Days 05/27/22 CO#2 $12,628.58 0 Working Days 08/09/22 CO#3 Working Days CO#4 Working Days CO#5 Working Days CO#6 Working Days COV Working Days C0#8 Working Days CO#9 Working Days CO#10 lWorking Days 1of1 CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER: FY2022-050 PURCHASE ORDER NUMBER: 20220215 CHANGE ORDER NUMBER: 2 CONTRACTOR NAME: AMG & Associates, Inc. DESCRIPTION AND LOCATION OF PROPOSED WORK PROJECT NAME: Ladera Linda Community Park PROJECT CODE: 8405 DATE: 08/09/22 Provide an additional 8 -inch PVC pipe to encase the underground mechanical piping between the heat pumps in the mechanical yard and the new building. SUMMARY OF QUANTITY CHANGES ITEMSPEC NO. CODE DESCRIPTION ORIGINAL QUANTITY NEW QUANTITY QUANTITY DIFFERENCE UNIT PRICE PRICE DIFFERENCE ADDITIONAL WORKING DAYS 1 321216 AMG PCO 10 - RFI 29, 37 - Add 8 -inch PVC pipe for underground refrigerant lines 240.0 LF 480.0 LF 240.0 LF $52.62 $12,628.58 0 0 0.0 0 $0.00 0 0.0 0 $0.00 0 0.0 0 $0.00 0 0.0 0 $0.00 0 0.0 0 $0.00 Totals $12,628.58 1 0 A TIME EXTENSION OF 0 WORKING DAYS WILL BE ALLOWED FOR THIS WORK ORIGINAL CONTRACT AMOUNT: $13,721,000.00 ORIGINAL COMPLETION DATE' 07/27/23 TOTAL OF CHANGE ORDER #1:1$54,534.62 TOTAL OF TIME EXTENSIONS #1. L0 Working Days TOTAL OF CHANGE ORDER #2,1$12,628.58 TOTAL OF TIME EXTENSIONS #2:0 Working Days NEW CONTRACT AMOUNT: $13,788,163.10 1oft NEW COMPLETION DATE: 07/27/23 C !v o` Rancho Palcs Vemes Department of Public Woi k5 30940 Hawthorne Blvd, Rancho F'alos Verdes, CA 90275 (310)544 5252 wmv.pubiicwprk5@ravCa-eot CONSTRUCTION CHANGE ORDER FORM CONTRACT NUMBER: FY2022-050 PURCHASE ORDER NUMBER: 20220215 CHANGE ORDER NUMBER: 2 CONTRACTOR NAME: AMG & Associates, Inc. PROJECT NAME: Ladera Linda Community Park PROJECT CODE: 8405 By signing this Change Order, Contractor understands and agrees that it is accepting the specified sums and adjustment of contract time of completion (if any) set forth herein as full, final and complete satisfaction of any and all claims by Contractor for all costs and expenses of Contractor and anyone for whom Contractor may be responsible for the work referred to herein, including but not limited to costs or expenses of the Contractor or any of its subcontractors, materials suppliers, vendors or anyone else for whom Contractor is responsible, for labor, materials, services or equipment, no matter how characterized, whether known or unknown to Contractor, including but not limited to, all field and home office overhead, delay costs/claims, acceleration costs/claims, unabsorbed or under -absorbed home office overhead, extended field costs, general conditions, claim preparation costs, inefficiencies, or the like, no matter how characterized. Contractor further understands and agrees by signing this Change Order that any attempt by Contractor to purportedly reserve rights to claim additional time or compensation for the work referred to herein, is void. Except as set forth, all terms and provisions of the contract and all prior change orders remain in full force and effect. Recommended: Erin Jones Construction Manager, Griffin Structures Signature Date: $/9/22 Execution of this Change Order by both parties constitutes a binding agreement. This document constitutes the entire agreement between the parties. The person signing this Change Order for Contractor hereby represents and warrants that he/she is fully authorized to sign this Agreement on behalf of Contractor. Contractor: Anthony R. Traverso ---------- Date Vice President/Secretary/Treasurei Accepted and Executed by: City: Ramzi Awwad Contractor Officer Ramzi Awwad Public Works Director Date ll Trang Nguyen AVADate: Finance Director Sidr&urej U i 2of2 C� V� I �7 6" PCO #010 .!�MG (v 1 /1 AMG & Associates Inc. �• /�. �� Cf } Pro : 01-22-157 - Ladere Linda Community Center and Park 26535 Summit Circle r� 32201 Forrestal Dr. Santa Clarite, California 91350 Rancho Palos Verdes, California 90275 Phone: (661) 251-7401 Fax: (661) 251-7405 Prime Contract Potential Change Order #010: CE #020 - RFI #299 #37 Underground Refrigeration Piping TO: City of Rancho Palos Verdes FROM: AMG & Associates, Inc. 30940 Hawthorne Blvd. 26535 Summit Circle Rancho Palos Verdes, California 90275 Santa Clerite, Celifomle 91350 PCO NUMBERIREVISION: 010/0 CONTRACT: City Project No. 8405 - Ladere Linde Community Park Project REQUEST RECEIVED FROM: Esmseil Noori (New Air Inc.) CREATED BY: Christopher Tumasone (AMG 8 Associates, Inc.) STATUS: REFERENCE: FIELD CHANGE: Pending - In Review No CREATED DATE: 7/22/2022 PRIME CONTRACT None CHANGE ORDER: LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT. $12,628.58 POTENTIAL CHANGE ORDER TITLE: CE #020 - RFI #29, #37 Underground Refrigeration Piping CHANGE REASON: RFI #37 POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE 902 -_RFI #09,0,}7 n e und_I�efng re alfon. piping This change event covers tha cost per RFI #37 response from the design team. ATTACHMENTS: CP for Price difference between B inch and 12 inch PVC pipes pal , _RFI 37 RESPONSE_ ND_JF.pdf , RFI 29 pdf #1 Budget Code 1 15-700.S Heating, Venting and Air Conditioning.Commitment SIGNATURE AMG & Associates Inc. DATE Description Amount cost for an additional 8' pvc conduit per RFI 37 response from the $11,524.00 Design Team Subtotal: Overhead (7.00% Applies to all line Item types.): Insurance 0.50% Applies to all line item types.): Bonding (1.00% Applies to all line item types.): City of Rancho Palos Verdes 30940 Hawthorne Blvd. Rancho Palos Verdes, Callfomia 90275 SIGNATURE Grand Total: AMG & Associates, Inc. 26535 Summit Circle Santa Clarita, California 91350 $11,524.08 " $806.68 $172.86 i $125.04 $12,628.58 ` DATE SIGNATURE DATE Page 1 of 1 Printed On: 7/22/2022 07:53 AM Ae MG AMG A Associates Inc. 26535 Summit Circle Santa Clarita, California 91350 Phone: (661) 261-7401 Fax: (661) 251-7405 RF1 #37.1 Project: 01-22-157 - Ladere Linda Community Center and Park 32201 Forrestal Dr. Rancho Palos Verdes, California 90275 UG Refrig Piping TO: Chandra Sutton (AMG & Associates, Inc.) FROM: Christopher Tumasone (AMG 6 Associates, 26535 Summit Circle Inc.) Santa Clarita, Callfomie 91350 26535 Summit Circle Santa Clarita, CalHomlo 91355 CREATED DATE: 07/18/2022 STATUS: Open LOCATION: DUE DATE: 08/02/2022 COST CODE: REFERENCE: COST IMPACT: SCHEDULE IMPACT: DRAWING NUMBER: SPEC SECTION: RECEIVED FROM: Esmaell Noori (Now Air Inc.) COPIES TO: Dustin Hartman (AMO & Associates, Inc.), Christopher Tumasone (AMG & Associates, Inc.) SUGGESTION: Per discussion with New Air and the Design team, we have decided to proceed with the first suggestion to use an additional 8' pipe vs the 12' pipe to encase the refrigerant linea. This will also result In a cost savings. Please confirm. Attachments: Cont ,med, refer to subm tial 23 2.3 00 05 ' Re'rigerar,t 1' ping for approved product Kimber'y Castillo JF 7 19 2022 BY DATE COPIES TO AMG & Associates Inc. Page 1 of 1 Printed On: 07118/2022 11:07 AM ON�TAIR INC LIC N: 995201 27515 Lyons Ave. Unit 281 Valencia, CA 91355 Tel: 310.302-7400 E -Mail: En@newairinc.com Cost Proposal To: Mr.Chris Tumasone AMG Associates Inc. Date: 7/11/2021 Project: Ladere Linda Community Center and Perk RE: Price for material of an extra 8 inch PVC line more then plan Material & Equipment Description Oyt. Unit Price Diff. I Extension Price for material of an extra 8 inch PVC line more than plan 240% $32.29 $7,750.08 Pnce for elbow material of an extra 8 inch PVC line more then plan 7 . ' $218.30 $1,528.09 Price for coupling material of an extra 8 inch PVC line more then plan 4 vi $72.25 $289.00 Total L7$9,567.17 LaborExaense Description Qty Crew Hrs $/Hrs Extension Total Total Materials and Equipment Subcontractor Description Qty Unit Price Extension Total Materials and Equipment $ 9,567.17 Sales Tax on Equipment / Materials (9.5%) $ 908.88 Labor $ Labor burden $ Subcontractor $ Subtotal $ 10,476.05 Markup (10%) $ 1,047.61 Grand Total $ 11,524 O FEMUSM" WOLSELa FERGUSON ENTERPRISES, LLC #603 2750 SOUTH TOWNE AVENUE POMONA, CA 91766 Phone: 909-517-3085 Fax: 909613-1607 12:42:43 JUL 07 2022 Deliver To: 1322 11-19 From: Gerard Harris Comments-. FERGUSON ENTERPRISES LLC #1350 Price Quotation Phone: 909-517-3085 Fax: 909-613-1607 Bid No: 8824157 Bid Date: 07/07/22 Quoted By: GQH Customer: NEW AIR INC. 1363 W 37TH PL k COD COD COD !r� LOS ANGELES, CA 90007 GO ylS Cust PDX: E �' Cust Phone: 310-302-7400 Terms: CASH ON DEMAND Ship To: NEW AIR INC. Job Name: Page 1 of 2 1363 W 37TH PL COD COD COD LOS ANGELES, CA 90007 k Item Description Quantity Net Price UM P40BEPX20 BX20 FT PVC S40 BE PIPE 240 3229 200 C P4039X 8 PVC S40 SXS 90 ELL 7 218 299 EA P40SCX 8 PVC S40 SXS COUP 4 72 250 EA P40BEP1220 12X20 FT PVC S40 BE PIPE 240 6282.989 C P40S912 12 PVC S40 SXS 90 ELL 7 1118.628 EA P40SC12 12 PVC S40 SXS COUP 4 78.432 EA Net Total: Tax: Freight: Total: Item Code Description P40SEPX20 BX20 FT PVC S40 BE PIPE P40S9X 8 PVC S40 SXS 90 ELL P40SCX 8 PVC S40 SXS COUP P40BEP1220 12X20 FT PVC 640 BE PIPE P40S912 12 PVC S40 SXS 90 ELL P40SC12 12 PVC S40 SXS COUP .,\ Vu 2 I kol Total 2,iA•0o C -k 7750.08 1528.09- 289.00 15079.17 q S r c O L 7830.40 313.73 $32790.47 $3115.10 $0.00 $35905.57 Notice ®WARNING: Cancer and Reproductive Hann - www.P85wamfnps. ca.gov ®WARNING: Cancer and Reproductive Harm - www.P65wamings.ca.gov m WARNING: Cancer and Reproductive Hann - www.p65wamings.ca.gov m WARNING: Cancer and Reproductive Harm - www.P65wamings.ca.gov ®WARNING.- Cancer and Reproductive Hann - www. 1265wa rni ng s .ca. gov m WARNING: Cancer and Reproductive Hann - www.P55wamings.ca.gov HOW ARE WE DOING? WE WANT YOUR FEEDBACKI Scan the QR code or use the link below to complete a survey about your bids: _ ' https://survey.madallia.com/?bidsorder&fc=1137&on=34313 0 FEMUSON' � "OLSELEY Page 2 of 2 .ouffr.u� FERGUSON ENTERPRISES LLC #1350 Price Quotation Fax: 909-613-1607 12:42:43 JUL 07 2022 Reference No: 8824157 Quoted prices are based upon receipt of the total quantity for immediate shipment (48 hours). SHIPMENTS BEYOND 48 HOURS SHALL BE AT THE PRICE IN EFFECT AT TIME OF SHIPMENT UNLESS NOTED OTHERWISE. QUOTES FOR PRODUCTS SHIPPED FOR RESALE ARE NOT FIRM UNLESS NOTED OTHERWISE. CONTACT YOUR SALES REPRESENTATIVE IMMEDIATELY FOR ASSISTANCE WITH DBE/MBEANBE/SMALL BUSINESS REQUIREMENTS. Seller not responsible for delays, lack of product or Increase of pricing due to causes beyond our control, and/or based upon Local, Slate and Federal laws governing type of products that can be sold or put Into commerce. This Quote Is offered contingent upon the Buyer's acceptance of Seller's terms and conditions, which are incorporated by reference and found either following this document, or on the web at https://www.forguson.conVoontent/website-infolterms-of-sele Govt Buyers: All Items are open market unless noted otherwise. LEAD LAW WARNING. It is illegal In install products that are not 'lead free' In accordance with US Federal or other applicable law In potable water systems anticp)pated for human consumption Products with 'NP in the description are NOT lead free and can only be installed In non -potable appllcatlons. Buyer is solely responsible for product selection. WATER FLOW RATE NOTICE: Lavatory Faucets with flow rates aver 4.5 GPM are not allowed for 'public use' sn Califomia. COVID-19 ORDER. ANY REFERENCE TO OR INCORPORATION OF EXECUTIVE ORDER 14042 ANDIOR THE E0.1MPLEMENTING FEDERAL CLAUSES (FAR 52.223-99 ANDIOR DFARS 252.223.7999) IS EXPRESSLY REJECTED BY SELLER AND SHALL NOT APPLY AS SELLER IS A 0 0 HOW ARE WE DOING? WE WANT YOUR FEEDBACKI Scan the QR code or use the link below to complete a survey about your bids: p https://survey.modallia.com/?bidsorder&fc=1137&on=34313