Loading...
PC RES 2022-004 P.C. RESOLUTION NO. 2022-04 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO PALOS VERDES FINDING THAT THE PROJECTS AND PROGRAMS CONTAINED IN THE FY 2022-23 CAPITAL IMPROVEMENT PROGRAM ARE CONSISTENT WITH THE GOALS AND POLICIES OF THE RANCHO PALOS VERDES GENERAL PLAN. WHEREAS, Sections 65103 & 65401 of the California Government Code require that the Planning Commission review the City's Capital Improvement Program (CIP) for its conformance with the City's General Plan; and, WHEREAS, on January 24, 2022, February 21, 2022, March 14, 2022, and April 18, 2022, the Infrastructure Management Advisory Committee (IMAC) conducted public meetings and considered the proposed FY 2022-23 projects and programs as part of their overall mission to provide advice on the City Council and the Public Works Department; and, WHEREAS, on April 12, 2022, The Planning Commission considered the FY 2022- 23 CIP for conformity with the City's General Plan, and at which time all interested parties were given an opportunity to be heard and present evidence. NOW, THEREFORE, THE PLANNING COMMISSION OF THE CITY OF RANCHO PALOS VERDES, HEREBY FINDS, DETERMINES, AND RESOLVES AS FOLLOWS: SECTION 1. The proposed projects and programs identified in the FY 2022-22 CIP are consistent with the applicable goals and policies of the General Plan. SECTION 2. The proposed projects and programs in the FY 2022-23 CIP are consistent with the following General Plan Elements and goals and policies: A. Conservation and Open Space Element • Portuguese Bend Landslide Remediation • Ladera Linda Park and Community Center • Altamira Canyon Improvements (Erosion) • Stormwater Drainage Improvements — Palos Verdes Drive South at Peppertree B. Social Services Element • Ladera Linda Park and Community Center • Palos Verdes Nature Preserve Signs Program • Palos Verdes Nature Preserve Gate for the Rattlesnake Trail • Park Playground Improvements P C Resolution No 2022-04 Page 1 of 4 • New Civic Center Complex C. Safety Element • Abalone Cove Sanitary Sewer Rehabilitation Program • Palos Verdes Drive South Realignment— East End • Palos Verdes Drive South Landslide Area Resurfacing Program • Portuguese Bend Landslide Remediation • Fence Replacement Program • Park Playground Improvements • Restroom Improvements at Point Vicente Interpretive Center • Facilities Asset Management Program • Restroom Improvements and New Office Space at Eastview Park • Altamira Canyon Improvements (Erosion) • Lift Station Improvements at Lower Point Vicente • Traffic Signs Replacement Program • Sidewalk Repair and Replacement Program • CDBG —ADA Infrastructure Improvements • Traffic Calming — PV Nature Preserve Parking Solutions • Traffic Calming — Citywide • Guardrail Improvements along Palos Verdes Drive East • Retaining Wall Repairs at 3001 Crest Road D. Visual Resources Element • Ladera Linda Park and Community Center • Palos Verdes Nature Preserve Signs Program • Palos Verdes Nature Preserve Gate for the Rattlesnake Trail • Park Monument Signs • Traffic Calming — PV Nature Preserve Parking Solutions E. Circulation Element • Palos Verdes Drive South Realignment— East End • Palos Verdes Drive South Landslide Area Resurfacing Program • Storm Drain Asset Management Program • Stormwater Drainage Improvements — Palos Verdes Drive South at Peppertree • Traffic Signs Replacement Program • Sidewalk Repair and Replacement Program • Pavement Management Program — Arterial Roadway Rehabilitation (Crenshaw Boulevard) P C Resolution No 2022-04 Page 2 of 4 • Western Avenue Traffic Flow Improvements • CDBG —ADA Infrastructure Improvements • Pavement Management Program — Residential Roadway Rehabilitation — Area 5 • Pavement Management Program — Residential Roadway Rehabilitation — Area 1 • Pavement Management Program — Residential Roadway Rehabilitation — Area 9 • Pavement Management Program — Residential Roadway Rehabilitation — Area 2 • Palos Verdes Drive South Intersection Improvements • Pavement Management Program — Residential Roadway Rehabilitation — Area 6 • Traffic Signal at intersection at Palos Verdes Drive South and Palos Verdes Drive East • Western Avenue Beautification (long term) • Pavement Management Program — Arterial Roadway Rehabilitation Silver Spur Road (North of Hawthorne Boulevard) • Pavement Management Program - Triennial Update • Traffic Calming — PV Nature Preserve Parking Solutions • Traffic Calming — Citywide • Guardrail Improvements along Palos Verdes Drive East • Arterial Roadway Rehabilitation (Silver Spur Road — South of Hawthorne Blvd) • Arterial Roadway Rehabilitation (Palos Verdes Drive South) • Arterial Roadway Rehabilitation (Indian Peak Road) • Arterial Roadway Rehabilitation (Palos Verdes Drive East) • Arterial Roadway Beautification Program • City Entrance Roadway Monument Signs • Retaining Wall Repairs at 3001 Crest Road • Palos Verdes Drive East Traffic improvements (from Bronco Drive to Headland Drive) SECTION 3. For the foregoing reasons and based on the information and findings included in the Staff Report and all other records of the proceedings, which are attached hereto and made a part thereof by reference, the Planning Commission hereby finds that the City's FY 2022-23 CIP is consistent with the Rancho Palos Verdes General Plan. PASSED, APPROVED AND ADOPTED this 10th day of May, 2022. P.0 Resolution No 2022-04 Page 3 of 4 AYES: COMMISSIONERS CHURA, NELSON, NULMAN, SAADATNEJADI, SANTAROSA, VICE-CHAIR HAMILL, AND CHAIR PERESTAM NOES: NONE ABSTENTIONS: NONE RECUSALS: NONE ABSENT: NONE Step en Perestam r t Chair Ken Rukavina, PE, Director of Community Development Secretary of the Planning Commission P C Resolution No 2022-04 Page 4 of 4