Loading...
John L Hunter & Associates (2013) Watershed Mgmt CITY OF RANCHO PALOS VERDES PROFESSIONAL SERVICES AGREEMENT Whereas, the Municipal Separate Storm Sewer System (MS4) Permit was adopted by the Regional Water Quality Control Board on November 8, 2012. In response, the City of Rancho Palos Verdes has elected to develop an Enhanced Watershed Management Plan (EWMP), including a Coordinated Integrated Monitoring Plan (CIMP), with other agencies having storm water jurisdiction on the Palos Verdes Peninsula (these are known as the Peninsula Agencies). The City of Rancho Palos Verdes (City) will serve as the administrative lead for the purpose of implementing this Agreement. With approval of two Memoranda of Understanding (MOUs) by City Council on August 6, 2013, the City has taken the lead to retain professional services, as set forth herein, on behalf of the City and the other Peninsula Agencies in the development of these programs. THIS AGREEMENT ("Agreement") is made and entered into this 1st day of October, 2013, by and between the City of Rancho Palos Verdes (hereinafter referred to as the "CITY") and John L. Hunter and Associates, Inc. (hereafter referred to as "CONSULTANT"). IN CONSIDERATION of the covenants hereinafter set forth, the parties hereto agree as follows: ARTICLE 1 SCOPE OF SERVICES 1.1 Project Description The Project is described as follows: Development of Enhanced Watershed Management Plan (EWMP) and Coordinated Integrated Monitoring Plan (CIMP) for the Peninsula Agencies, as defined in the two Memoranda of Understanding between the Peninsula Agencies. 1.2 Description of Services CONSULTANT shall: Complete EWMP and CIMP Plans, as described in the CITY's Request For Qualifications, which is attached hereto as Exhibit "A" and incorporated herein by this reference, and in CONSULTANT's Proposal, which is attached hereto as Exhibit "B" and incorporated herein by this reference. In the event of any conflict between the terms of this Agreement and incorporated documents, the terms of this Agreement shall control. In the event of any conflict between Exhibits "A" Page 1 of 12 R6876-0001\1633124v3.doc t y and "B," the terms of Exhibit A shall control. 1.3 Schedule of Work Upon receipt of written Notice to Proceed from the CITY, CONSULTANT shall perform with due diligence the services requested by the CITY. Time is of the essence in this Agreement. CONSULTANT shall not be responsible for delay, nor shall CONSULTANT be responsible for damages or be in default or deemed to be in default by reason of strikes, lockouts, accidents, or acts of God, or the failure of CITY to furnish timely information or to approve or disapprove CONSULTANT's work promptly, or delay or faulty performance by CITY, other consultants/contractors, or governmental agencies, or any other delays beyond CONSULTANT's control or without CONSULTANT's fault. ARTICLE 2 COMPENSATION 2.1 Fee CITY agrees to compensate CONSULTANT, on a time and materials basis, an amount not to exceed four hundred seventy six thousand sixty three dollars ($476,063) for services as described in Article 1. 2.2 Terms of Compensation CONSULTANT shall submit monthly invoices for the work completed in the previous month, including a detailed accounting of hours worked and hourly rates performed for each task. CITY agrees to authorize payment for all undisputed invoice amounts within thirty (30) days of receipt of each invoice. CITY agrees to use its best efforts to notify CONSULTANT of any disputed invoice amounts within ten (10) days of the receipt of each invoice. However, CITY's failure to timely notify CONSULTANT of a disputed amount shall not be deemed a waiver of CITY's right to challenge such amount. Additionally, in the event CITY fails to pay any undisputed amounts due CONSULTANT within forty-five (45) days after invoices are received by CITY then CITY agrees that CONSULTANT shall have the right to consider said default a total breach of this Agreement and be terminated by CONSULTANT without liability to CONSULTANT upon ten (10) working days advance written notice. Page 2 of 12 R6876-0001\1633124v3.doc 2.3 Additional Services or Reduction of Services CITY may request additional specified work and may reduce the scope of work under this Agreement, if the number of Peninsula Agencies changes during the term of this Agreement. All such changes to the scope of work must be authorized in writing by the CITY's Director of Public Works prior to commencement. CONSULTANT shall perform such services, and CITY shall pay for any additional services in accordance with CONSULTANT's Schedule of Hourly Rates, which is within Exhibit "B." The rates in Exhibit "B" shall be in effect through the end of this Agreement. 2.4 Term of Agreement This Agreement shall commence on October 1, 2013, and shall terminate on December 31, 2015, unless sooner terminated pursuant to Article 4 of this Agreement. ARTICLE 3 INDEMNIFICATION AND INSURANCE 3.1 Indemnification, Hold Harmless, and Duty to Defend (a) Indemnity for Design Professional Services. In connection with its design professional services and to the maximum extent permitted by law, CONSULTANT shall hold harmless and indemnify CITY and the Peninsula Agencies (consisting of the Cities of Rolling Hills Estates, Rolling Hills, and Palos Verdes Estates, LADWP and the LACFCD, and their special districts), and their respective elected and appointed officers, employees, agents, and independent contractors serving in the role of CITY or Agency officials, and designated volunteers (collectively, "Indemnitees"), with respect to any and all claims, demands, causes of action, damages, injuries, liabilities, losses, costs or expenses, including reimbursement of attorneys' fees, expert fees, and costs of defense (collectively, "Claims" hereinafter), including but not limited to Claims relating to death or injury to any person and injury to any property, which arise out of, pertain to, or relate to in whole or in part to the negligence, recklessness, or willful misconduct of CONSULTANT or any of its officers, employees, subcontractors, or agents in the performance of its design professional services under this Agreement. (b) Other Indemnities. In connection with any and all claims, demands, causes of action, damages, injuries, liabilities, losses, costs or expenses, including attorneys' fees, expert fees, and costs of defense (collectively, "Damages" hereinafter) not covered by Section 3.1(a), and to the maximum extent permitted by law, CONSULTANT shall defend, hold harmless and indemnify the Indemnitees with respect to any and all Damages, including but not limited to, Damages relating to death or injury to any person and injury to any property, which arise out of, pertain to, or relate to the Page 3 of 12 R6876-0001\1633124v3.doc acts or omissions of CONSULTANT or any of its officers, employees, subcontractors, or agents in the performance of this Agreement, except for such loss or damage arising from the sole negligence or willful misconduct of the CITY or any Peninsula Agency, as determined by final arbitration or court decision or by the agreement of the parties. CONSULTANT shall defend Indemnitees in any action or actions filed in connection with any such Damages with counsel of CITY's or other named Agency's choice, and shall pay all costs and expenses, including all attorneys' fees and experts' costs actually incurred in connection with such defense. Consultant's duty to defend pursuant to this Section 3.1(b) shall apply independent of any prior, concurrent or subsequent misconduct, negligent acts, errors or omissions of Indemnitees. (c) All duties of CONSULTANT under Section 3.1 shall survive termination of this Agreement. 3.2 General Liability CONSULTANT shall at all times during the term of the Agreement carry, maintain, and keep in full force and effect, a policy or policies of Commercial General Liability Insurance, with minimum limits of one million dollars ($1,000,000) for each occurrence and two million dollars ($2,000,000) general aggregate for bodily injury, death, loss or property damage for products or completed operations and any and all other activities undertaken by CONSULTANT in the performance of this Agreement. Said policy or policies shall be issued by an insurer admitted to do business in the State of California and rated in A.M. Best's Insurance Guide with a rating of A:VII or better. 3.3 Professional Liability CONSULTANT shall at all times during the term of this Agreement, carry, maintain, and keep in full force and effect a policy or policies of professional liability insurance with a minimum limit of one million dollars ($1,000,000) per claim and aggregate for errors and/or omissions of CONSULTANT in the performance of this Agreement. Said policy or policies shall be issued by an insurer admitted to do business in the State of California and rated in Best's Insurance Guide with a rating of A:VII or better. If a "claims made" policy is provided, such policy shall be maintained in effect from the date of performance of work or services on the CITY's behalf until three (3) years after the date of work or services are accepted as completed. Coverage for the post-completion period may be provided by renewal or replacement of the policy for each of the three (3) years or by a three-year extended reporting period endorsement, which reinstates all limits for the extended reporting period. If any such policy and/or policies have a retroactive date, that date shall be no later than the date of first performance of work or services on behalf of the CITY. Renewal or replacement policies shall not allow for any advancement of such retroactive date. Page 4 of 12 R6876-0001\1633124v3.doc 3.4 Automobile Liability CONSULTANT shall at all times during the term of this Agreement obtain, maintain, and keep in full force and effect, a policy or policies of Automobile Liability Insurance, with minimum of one million dollars ($1,000,000) per claim and occurrence and two million dollars ($2,000,000) in the aggregate for bodily injuries or death of one person and five hundred thousand dollars ($500,000) for property damage arising from one incident. 3.5 Worker's Compensation CONSULTANT agrees to maintain in force at all times during the performance of work under this Agreement worker's compensation insurance as required by the law. CONSULTANT shall require any subcontractor similarly to provide such compensation insurance for their respective employees. 3.6 Notice of Cancellation (a) All insurance policies shall provide that the insurance coverage shall not be cancelled or modified by the insurance carrier without thirty (30) days prior written notice to CITY, or ten (10) days notice if cancellation is due to nonpayment of premium. Additionally, CONSULTANT shall provide immediate notice to the City if it receives a cancellation or policy revision notice from the insurer. (b) CONSULTANT agrees that it will not cancel or reduce any required insurance coverage. CONSULTANT agrees that if it does not keep the aforesaid insurance in full force and effect, CITY may either immediately terminate this Agreement or, if insurance is available at a reasonable cost, CITY may take out the necessary insurance and pay, at CONSULTANT's expense, the premium thereon. 3.7 Entire Policy and Certificate of Insurance At all times during the term of this Agreement, CONSULTANT shall maintain on file with the CITY Clerk both a copy of the entire policy and a certificate of insurance showing that the aforesaid policies are in effect in the required amounts. The commercial general liability policy shall contain endorsements naming the CITY and the Peninsula Agencies (consisting of the Cities of Rolling Hills Estates, Rolling Hills, and Palos Verdes Estates, LADWP and the LACFCD, and their special districts), and their respective officers, employees, attorneys, agents and designated volunteers as additional insureds. Page 5 of 12 R6876-0001\1633124v3.doc 3.8 Primary Coverage The insurance provided by CONSULTANT shall be primary to any coverage available to CITY or named Peninsula Agency. The insurance policies (other than workers compensation and professional liability) shall include provisions for waiver of subrogation. 3.9 Subcontractors The requirements of this Article shall apply to any subcontractor hired by Consultant. ARTICLE 4 TERMINATION 4.1 Termination of Agreement (a) This Agreement may be terminated at any time, with or without cause, by the CITY upon thirty (30) days prior written notice or by CONSULTANT upon ninety (90) days prior written notice. Notice shall be deemed served if completed in compliance with Section 6.14. (b) In the event of termination or cancellation of this Agreement by CONSULTANT or CITY, due to no fault or failure of performance by CONSULTANT, CONSULTANT shall be paid compensation for all services performed by CONSULTANT, in an amount to be determined as follows: for work satisfactorily done in accordance with all of the terms and provisions of this Agreement as determined by the CITY, CONSULTANT shall be paid an amount equal to the percentage of services performed prior to the effective date of termination or cancellation in accordance with the work items; provided, in no event shall the amount of money paid under the foregoing provisions of this paragraph exceed the amount which would have been paid to CONSULTANT for the full performance of the services described in this Agreement. ARTICLE 5 OWNERSHIP OF DOCUMENTS 5.1 Ownership of Documents and Work Product All final documents, plans, specifications, reports, information, data, exhibits, photographs, images, video files and media created or developed by CONSULTANT pursuant to this Agreement ("Written Products") shall be and remain the property of the CITY without restriction or limitation upon its use, duplication or dissemination by the CITY. All Written Products shall be considered "works made for Page 6 of 12 R6876-0001\1633124v3.doc hire," and all Written Products and any and all intellectual property rights arising from their creation, including, but not limited to, all copyrights and other proprietary rights, shall be and remain the property of the CITY without restriction or limitation upon their use, duplication or dissemination by the CITY. CONSULTANT shall not obtain or attempt to obtain copyright protection as to any Written Products. CONSULTANT hereby assigns to the CITY all ownership and any and all intellectual property rights to the Written Products that are not otherwise vested in the CITY pursuant to the paragraph directly above this one. CONSULTANT warrants and represents that it has secured all necessary licenses, consents or approvals to use any instrumentality, thing or component as to which any intellectual property right exists, including computer software, used in the rendering of the services and the production of all Written Products produced under this Agreement, and that the CITY has full legal title to and the right to reproduce the Written Products. CONSULTANT shall defend, indemnify and hold the CITY, and its elected officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of CITY officials, harmless from any loss, claim or liability in any way related to a claim that CITY's use of any of the Written Products is violating federal, state or local laws, or any contractual provisions, or any laws relating to trade names, licenses, franchises, copyrights, patents or other means of protecting intellectual property rights and/or interests in products or inventions. CONSULTANT shall bear all costs arising from the use of patented, copyrighted, trade secret or trademarked documents, materials, equipment, devices or processes in connection with its provision of the services and Written Products produced under this Agreement. In the event the use of any of the Written Products or other deliverables hereunder by the CITY is held to constitute an infringement and the use of any of the same is enjoined, CONSULTANT, at its expense, shall: (a) secure for CITY the right to continue using the Written Products and other deliverables by suspension of any injunction, or by procuring a license or licenses for CITY; or (b) modify the Written Products and other deliverables so that they become non-infringing while remaining in compliance with the requirements of this Agreement. This covenant shall survive the termination of this Agreement. Upon termination, abandonment or suspension of the Project, the CONSULTANT shall deliver to the CITY all Written Products and other deliverables related to the Project without additional cost or expense to the CITY. If CONSULTANT prepares a document on a computer, CONSULTANT shall provide CITY with said document both in a printed format and in an electronic format that is acceptable to the CITY. Page 7 of 12 R6876-0001\1633124v3.doc ARTICLE 6 GENERAL PROVISIONS 6.1 Representation The CITY representative shall be the Director of Public Works or his or her designee, and CONSULTANT shall notify CITY of CONSULTANT's designated representative. These individuals shall be the primary contact persons for the parties regarding performance of this Agreement. 6.2 Fair Employment Practices/Equal Opportunity Acts In the performance of this Agreement, CONSULTANT shall comply with all applicable provisions of the California Fair Employment Practices Act (California Government Code Sections 12940-48), the applicable equal employment provisions of the Civil Rights Act of 1964 (42 U.S.C. 200e-217), and the Americans with Disabilities Act of 1990 (42 U.S.C. § 11200, et seq.). 6.3 Personnel CONSULTANT represents that it has, or shall secure at its own expense, all personnel required to perform CONSULTANT's services under this Agreement. Any person who performs engineering services pursuant to this Agreement shall be licensed as a Civil Engineer by the State of California and in good standing. CONSULTANT shall make reasonable efforts to maintain the continuity of CONSULTANT's staff who are assigned to perform the services hereunder and shall obtain the approval of the Director of Public Works of all proposed staff members who will perform such services. CONSULTANT may associate with or employ associates or subcontractors in the performance of its services under this Agreement, but at all times shall CONSULTANT be responsible for its associates and subcontractors' services. 6.4 CONSULTANT's Representations CONSULTANT represents, covenants and agrees that: a) CONSULTANT is licensed, qualified, and capable of furnishing the labor, materials, and expertise necessary to perform the services in accordance with the terms and conditions set forth in this Agreement; b) there are no obligations, commitments, or impediments of any kind that will limit or prevent CONSULTANT's full performance under this Agreement; c) to the extent required by the standard of practice, CONSULTANT has investigated and considered the scope of services performed, has carefully considered how the services should be performed, and understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. Page 8 of 12 R6876-0001\1633124v3.doc 6.5 Conflicts of Interest CONSULTANT agrees not to accept any employment or representation during the term of this Agreement or within twelve (12) months after completion of the work under this Agreement which is or may likely make CONSULTANT "financially interested" (as provided in California Government Code Sections 1090 and 87100) in any decisions made by CITY on any matter in connection with which CONSULTANT has been retained pursuant to this Agreement. 6.6 Legal Action (a) Should either party to this Agreement bring legal action against the other, the validity, interpretation, and performance of this Agreement shall be controlled by and construed under the laws of the State of California, excluding California's choice of law rules. Venue for any such action relating to this Agreement shall be in the Los Angeles County Superior Court. (b) If any legal action or other proceeding, including action for declaratory relief, is brought for the enforcement of this Agreement or because of an alleged dispute, breach, default or misrepresentation in connection with this Agreement, the prevailing party shall be entitled to recover reasonable attorneys' fees, experts' fees, and other costs, in addition to any other relief to which the party may be entitled. (c) Should any legal action about a project between CITY and a party other than CONSULTANT require the testimony of CONSULTANT when there is no allegation that CONSULTANT was negligent, CITY shall compensate CONSULTANT for its testimony and preparation to testify at the hourly rates in effect at the time of such testimony. 6.7 Assignment Neither this Agreement nor any part thereof shall be assigned by CONSULTANT without the prior written consent of the CITY. Any such purported assignment without written consent shall be null and void, and CONSULTANT shall hold harmless, defend and indemnify the CITY and its officers, officials, employees, agents and representatives with respect to any claim, demand or action arising from any unauthorized assignment. Notwithstanding the above, CONSULTANT may use the services of persons and entities not in CONSULTANT's direct employ, when it is appropriate and customary to do so. Such persons and entities include, but are not necessarily limited to, surveyors, specialized consultants, and testing laboratories. CONSULTANT's use of subcontractors for additional services shall not be unreasonably restricted by the CITY provided CONSULTANT notifies the CITY in advance. Geosyntec Consultants, Inc. is an approved subcontractor. Page 9 of 12 R6876-0001\1633124v3.doc 6.8 Independent Contractor CONSULTANT is and shall at all times remain, as to the CITY, a wholly independent contractor. Neither the CITY nor any of its agents shall have control over the conduct of CONSULTANT or any of the CONSULTANT's employees, except as herein set forth, and CONSULTANT is free to dispose of all portions of its time and activities which it is not obligated to devote to the CITY in such a manner and to such persons, firms, or corporations as the CONSULTANT wishes except as expressly provided in this Agreement. CONSULTANT shall have no power to incur any debt, obligation, or liability on behalf of the CITY or otherwise act on behalf of the CITY as an agent. CONSULTANT shall not, at any time or in any manner, represent that it or any of its agents, servants or employees, are in any manner agents, servants or employees of CITY. CONSULTANT agrees to pay all required taxes on amounts paid to CONSULTANT under this Agreement, and to indemnify and hold the CITY harmless from any and all taxes, assessments, penalties, and interest asserted against the CITY by reason of the independent contractor relationship created by this Agreement. CONSULTANT shall fully comply with the workers' compensation law regarding CONSULTANT and its employees. CONSULTANT further agrees to indemnify and hold the CITY harmless from any failure of CONSULTANT to comply with applicable workers' compensation laws. The CITY shall have the right to offset against the amount of any fees due to CONSULTANT under this Agreement any amount due to the CITY from CONSULTANT as a result of its failure to promptly pay to the CITY any reimbursement or indemnification arising under this Article. 6.9 Titles The titles used in this Agreement are for general reference only and are not part of the Agreement. 6.10 Entire Agreement This Agreement, including any other documents incorporated herein by specific reference, represents the entire and integrated agreement between CITY and CONSULTANT and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be modified or amended, or provisions or breach may be waived, only by subsequent written agreement signed by both parties. 6.11 Construction In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of this Agreement shall not be resolved by any rules of interpretation providing for interpretation against the party who Page 10 of 12 R6876-0001\1633124v3.doc causes the uncertainty to exist or against the party who drafted the Agreement or who drafted that portion of the Agreement. 6.12 Non-Waiver of Terms, Rights and Remedies Waiver by either party of any one or more of the conditions of performance under this Agreement shall not be a waiver of any other condition of performance under this Agreement. In no event shall the making by the CITY of any payment to CONSULTANT constitute or be construed as a waiver by the CITY of any breach of covenant, or any default which may then exist on the part of CONSULTANT, and the making of any such payment by the CITY shall in no way impair or prejudice any right or remedy available to the CITY with regard to such breach or default. 6.13 Severability If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. 6.14 Notice Except as otherwise required by law, any payment, notice or other communication authorized or required by this Agreement shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during CONSULTANT's or CITY's regular business hours or (b) on the third business day following deposit in the United States mail, postage prepaid, to the addresses listed below, or at such other address as one party may notify the other: To CITY: Les Jones, Interim Director of Public Works City of Rancho Palos Verdes 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 To CONSULTANT: John Hunter John L. Hunter & Associates 6131 Orangethorpe Ave., Suite 350 Buena Park, California 90270 IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of Page 11 of12 R6876-0001\1633124v3.doc the date and year first above written. Dated: JOHN L. HUNTER & ASSOCIATES, INC. (" N ULA T") By: Printed Name: 7,L L . ) s /è&. Title: PkeSc By: Printed Name: Title: Dated: //��3 CITY OF RANCHO PALOS VERDES ("CITY") By:�c.�-E7-r-) Mayor ATTEST: APPROVED AS TO FORM: By: rida___C-7270AZIZA By: City Clerk City Attorney Page 12 of 12 R6876-0001\1633124v3.doc r Exhibit "A": City's Request For Qualifications Exhibit "A" R6876-0001\1633124v3.doc Agreement for Design Professional Services City of Rancho Palos Verdes Request for Qualifications (RFQ)for Professional Services The City of Rancho Palos Verdes (City) invites proposals from selected qualified consulting engineering firms to provide professional services related to the development of the Peninsula Enhanced Watershed Management Program (EWMP) on behalf of the Cities of Rancho Palos Verdes, Palos Verdes Estates and Rolling Hills Estates, as well as unincorporated areas of the County of Los Angeles and the Los Angeles County Flood Control District. In addition the City of Rolling Hills will participate in the Coordinated Integrated Monitoring Plan (CIMP) that is prepared as part of the EWMP development. The successful firm will provide complete professional services to accomplish the scope of work attached to this Request for Qualifications. To be considered for this project, six (6) copies of the qualifications must be submitted to the Public Works Department located at 30940 Hawthorne Boulevard, Rancho Palos Verdes, CA 90275, attention: Andy Winje, Associate Engineer, no later than 5:00 p.m. on Wednesday, August 7, 2013. Please also provide a PDF copy of the qualifications by email to andyw@rpv.com and rond@rpv.com by that deadline. Proiects Background and Description In response to the National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System Permit (MS4 Permit) Order No, R4-2012-0175, which establishes the waste discharge requirements for stormwater and non- stormwater discharges within the watersheds of Los Angeles County, the above listed cities have filed a Notice of Intent (NOI, Attachment A) to the California Regional Water Quality Control Board, Los Angeles Region (Regional Board), on June 27, 2013. The NUI indicates the intent of the of these cities to enter into a Memorandum of Understanding to jointly develop an EWMP. In addition the City of Rolling Hills, which is not participating in the EWMP but will be participating in a Coordinated Integrated Monitoring Plan (CIMP) is entering, along with the other Peninsula EWMP agencies, into a second Memorandum of Understanding to jointly develop a CIMP. The CIMP will be developed under the same scope of work as the EWMP. Consultant's Scope of Services The Consultant shall be responsible for providing professional services for all phases of the project. Project Management oversight will be needed during the all phases of the project. The successful firm will be required to complete the tasks as described in Attachment B, Scope of Work. Consultant's Representative The Consultant, as deemed acceptable by the City, shall assign a qualified primary representative and a qualified alternate to perform the services described H-18 Page 2 of 4 in the scope of work. Both shall be identified in the proposal. The Consultant's representative shall remain in responsible charge of all duties from contract negotiations through project completion, If the primary representative is unable to continue with the project, then the alternate representative shall become the primary representative with the City's approval. Additional Consultant Responsibilities The successful Consultant shall be required to enter into a written contract with the City of Rancho Palos Verdes, acting as the lead agency for the agencies, and shall be responsible for completing the specified services in Accordance with the City's standard "Professional Services Agreement" (Attachment C), This Request for qualification, or any part thereof, may be incorporated into and made a part of the final contract; however, the City reserves the right to further negotiate the terms and conditions of the agreement with the successful consultant. At a minimum, the agreement shall include a maximum "not to exceed" cost to the City of Rancho Palos Verdes. The primary components and provisions of the agreement shall include errors and omissions insurance coverage in the minimum amount of one million dollars ($1,000,000). City Responsibilities The City shall provide the following to assist the Consultant with the project and its completion: • Coordination of the Agencies during the project to provide existing information and records as available • Access to existing GIS data owned or available by license to the City, upon completion of any required Agency's GIS Data Licensing Agreements (two samples in Attachment D) In addition, the City shall be responsible for holding a project kick-off meeting, coordinating regular progress meetings, providing timely response to questions and draft documents, and providing or acquiring right of entry access to facilities (to the extent available). For scheduling purposes, it may be assumed that Agencies' turnaround time for review items will be ten working days. Submission of Statement of Qualifications The Statement of Qualifications shall be in letter format, and include at a minimum the following information: • Introduction and understanding of the project, • Identification of any sub-consultants. H-19 Page 3 of 4 • Consultants experience with at least two projects of similar scope, including references with contact persons and telephone numbers. • Identification of the project team, including organizational chart and resumes of each team member. The Consultant's primary representative shall be available on all occasions for discussion with City staff. Specific responsibilities of each team member shall be detailed along with anticipated total effort, expressed in percentages of work hours, to be provided by each member of the team. a Project schedule, including task start and completion dates. For purposes of the proposal, it shall be assumed that the Consultant will receive a Notice to Proceed in mid-September 2013. • Statement of Affirmation that final CIMP can be prepared by the December 2013 deadline. ® Itemized scope of work for CIMP and EWMP. Selection Procedure City staff and other Agencies will review the Statements of Qualifications. Qualifications will be evaluated based on the following criteria: • Experience of the firm in providing similar services. • Relevant experience of individual team members assigned to the project. m Understanding of the project and requirements of the MS4 permit. • References from clients for whom similar services were provided. • Previous services provided to any of the listed agencies by the firm and/or team members assigned to the project. m Previous services provided to other clients on the Palos Verdes Peninsula. • Appropriateness of project schedule. Based on their review and evaluation, staff may prepare a short list of finalist firms and determine whether to offer the projects to a single firm, or multiple firms. The selected firm(s) needs to work with staff to finalize the scope of consultant's work. Based on the final scope of work, staff will ask for a fee proposal from the successful firm(s). The fee will be reviewed by staff and, if necessary, may be negotiated. General Information This Request for Qualifications does not commit the City of Rancho Palos Verdes to pay costs incurred in the preparation of a response to this request. No work may begin until a "Professional Services Agreement" is executed and the City issues a Notice to Proceed. Notwithstanding any other provisions of this Request for Qualifications, the City of Rancho Palos Verdes reserves the right to reject any and all submittals and to waive any informality in a submittal. H-20 Page 4 of 4 Submission of a statement of qualifications shall constitute acknowledgement of all terms and conditions set forth in the Request for Qualifications unless otherwise expressly stated in the proposal. All data, documents, and other products used or developed for this project shall remain in the public domain upon completion of the project. Similarly, all responses to this Request for Qualifications shall become the property of the City of Rancho Palos Verdes. The method of payment upon negotiation of a contract shall be monthly payments based upon satisfactory progress and the submission of invoices for payment. All inquiries questions regarding this proposal shall be submitted in writing to the City of Rancho Palos Verdes, Public Works Department, 30940 Hawthorne Boulevard, Rancho Palos Verdes, CA 90275, attention: Andy Winje, Associate Engineer. RFQ inquiries may be submitted via fax to 310/544-5292 or e-mail to andyw@rpv.com. Please copy Ron Dragoo, Senior Engineer at rond@rpv.com. Please send all inquiries not later than 5:00 pm. on Wednesday, July 31, 2013. Responses to all questions received will be faxed and e-mailed to all prospective proposers soon thereafter. Attachments A: Notice of Intent B: Scope of Work C: Professional Services Agreement Form D: GIS Data License Agreements (2 samples) H-21 ATTACHMENT A NOTICE OF INTENT H-22 Transmittal C 1T`,/0 LIRANCHO GALLS VERDES To: losangeles@waterboards.ca.gov PUBLIC WORKS DEPARTMEN T Sam Unger, Executive Officer Regional Water Quality Control Board, Los Angeles Region 320 4th Street Suite 200 Los Angeles,California 90013 Attention: Rene Purdy SUBMITTAL OF THE NOTICE OF INTENT FOR DEVELOPMENT OF AN ENHANCED WATERSHED MANAGEMENT PROGRAM FOR THE PENINSULA WATERSHED EWMP AGENCIES. Attached: Please find the attached Notice of Intent(NO[)to develop an Enhanced Watershed Management Program (EWMP)for the cities and agencies comprising the Palos Verdes Peninsula Watershed (Peninsula EWMP Agencies).This NOI is prepared on behalf of the Cities of Rancho Palos Verdes,Palos Verdes Estates, and Rolling Hills Estates,the County of Los Angeles,and the Los Angeles County Flood Control District.All agencies have approved this NOI for submission to the Regional Water Quality Control Board, Los Angeles Region.We look forward to working with your staff during the upcoming year in the development of the Enhanced Watershed Management Program. Please contact me at AndyW@rpv.com or(310)-544-5249 if you have any questions. Thank y Andy Winje Program Chair Attachment: Cc: Renee Purdy,California Regional Water Quality Control Board, Los Angeles Region lvar Ridgeway,California Regional Water Quality Control Board, Los Angeles Region William Johnson, Los Angeles County Department of Public Works Andy Winje,City of Rancho Palos Verdes Allan Rigg,City of Palos Verdes Estates Greg Grammer,City of Rolling Hills Estates John Hunter,John L, Hunter and Associates Kathleen McGowan, Geosyntec 30940 1 1AW I IORNE ROULEVARWRANCHO VNOSVEROF',,GA (310)544-5252/FAX(310)544-5,'�W PR[N I ED ON Rr(-Y(,i F,r,)I)Apm H-23 Notice of Intent ........... Peninsula Enhanced Watershed Management Plan (EWMP) City of Rancho Palos Verdes City of Palos Verdes Estates City of Rolling Hills Estates County of Los Angeles Los Angeles County Flood Control District ����� m�� 0��*� � w�w~������ ~ww �n°������ Peninsula� � ���������0�ma Enhanced*� �� � �� m� Management �� �������N�� �� ����� �=� ���mm� ��������� ������� "" Watershed ��" �� � Program K����^�«� � SECTION 1. PROGRAM TYPE AND PERMITTEES The [ides of Rancho Palos Verdes, Palos Verdes Estates, Rolling Hills Estates, the County ofLos Angeles, and the Los Angeles County Rood Control District (Peninsula EVVk4PAgencies) are parties tothis Notice of Intent (NO]) and are hereby notifying the Los Angeles Regional Water Quality Control Board (Regional Water Board) of their intent to develop an Enhanced Watershed Management Plan (EVV&4P) for the Peninsula Watershed. This NO| is being submitted in accordance with Part V|.[.4.b.i of Order B4-2012- 0175. In accordance with Order R4-2022'0275, the Peninsula EVVMP Agencies meet the LID and Green Streetconditionyandw/il| submiteVVorkP|anvvi1hin1QrnonthsoftheeffectivedateoftheOrder(June 28, ]014) and will submit the Draft EVVK4P within 30 months of the effective date of Order (June 28, 2015).See Table 1for milestone dates associated with the proposed EVVK4P. Table 1:Planning Dates: EVVK8PInitial Submittals,Revisions,and Approval Dates. Permit Milestone Milestone Date Task Effective Date ofOrder December 28,2D12 ' 60 Days from Effective Date February 26, 2013 Initiate LID Ordinance and Green Streets Policy development 6months from Effective Date June I8, 2823 Complete draft of LID Ordinance and Green Streets Policy I8months from Effective Date June 2Q,2D14 Submit EVVK4PWork Plans ]0mun�hufrom Effective Date June 2D,2O15 Submit Draft EVVMPu 4 months from Draft EVVMP October 2015 Regional Water Board comments on EVVK4P 3months from Regional Board January 2016 Submit Final EVVK4P Comments 3months from submission of April 2016 Regional Board approval ofEVVMP Final EWMP Begin implementing EVVK49 Pxninswlo l June 27,2013 sNmxPwo/ H-25 SECTION 2. TOTAL MAXIMUM DAILY LOADS ESTABLISHED WATER QUALITY BASED EFFLUENT LIMITATIONS: The Peninsula EWMP Agencies are responsible for eight TMDLs.Table 2 lists all applicable TMDLs.Table 3 lists all applicable interim and final trash Water Quality Based Effluent Limitations(WQBELs) and all other final WQBELs occurring prior to EWMP approval. Table 2:List of TMDLs applicable to the Peninsula EWMP Agencies. ............................ ........................................-....................................---------------.... .................. ..........._......w.._..........._............... LARWQCB Effective Date and/or TMDL Resolution Environmental Protection Number Agency(EPA)Approval Date Santa Monica Bay Beaches Wet 20032.02 JOly 1 ;200$, Weather Bacteria TMDL-Group 7 Am'endeO by 912,007 2 00 "hoty''eveffe cti e� Santa Monica Bay Beaches Dry 2002-004 July 15,2003 Weather Bacteria TMDL-Group 7 Amended by R12-007 R12-007 not yet effective Santa Monica Bay Nearshore and Offshore Debris TMDL Machado Lake e—TrashTMDL 2007-006 March 6,2008 ................ ........................................ ................. Machado Lake Nutrient TMDL 2,OQ4� k ' 14',70P9, Machado Lake Pesticides and PCBs R10-008 March 20,2012 (Toxics)TMDL Greater Los Angeles and Long Beach Harbor Waters Toxic Pollutants TMDL Santa Monica Bay TMDL for DDTs and EPA Established March 26,2012 PCBs .......... ..................-.............. ................... ..........................................................----------- ........................ Peninsula 2 June 27,2013 EWMP N01 H-26 Table 3: Applicable Interim and Final Trash WOBELs and all other Final WOBELs and Receiving Water Limitations Occurring Before EWMP Approval(April 2016). ........... ............................... TMDL Order WQBEL Interim Compliance /Final Date Compliance W!j,th,tdtaI,alIowabI0 Santa Monica Bay BeachesFinal jiul I e�4podafite,days lo' "S' "'thet-Weather Dry Weather Bacteria TMDL Group 7 Compliance with total allowable Final July 15, 2.009 exceedance days for winter dry-weather Santa Monica Bay NearshoreReduce,blastlin'0,,by,20% Interim and Offshore Debris TMDL Reduce 0 Interim March 6,2012 Ri6d,0c,, 3a i V 013,4,0% Machado Lake Trash TMDL Reduce baseline by —Interim March 6,2024 j67W- -7-7 Uc- -71r--te "M e r '-Zero Tr:aiW ------- -Finales.— —March—6,2016 Peninsula 3 June 27,2013 EWMPN01 H-27 SECTION 3LIDENTIFY TMDLCONTROL MEASURES: The Peninsula EVVK8P Agencies are responsible for three TMDLs that have interim (trash only) and final VVOBELs that occur prior to the anticipated approval of the Program. Table 4 identifies the implementation plans along with the status of those plans. The Peninsula EVVK4P Agencies will continue their efforts to implement the actions of the TMDL Implementation Plans and develop additional plans. Table 4:Implementation Plans for Peninsula Watershed TMDLs. Implementation Plan Plan status Implementation Plan for,JG7 -_i� B__ay­8"e"_a_ci�h_es B-_a`c_te_ri_a__1-T_MDLs Coordinated Shoreline Final plan submitted April 7,2004 Monitoring Plan In addition to the implementation plans described above, full capture trash systems will be installed to comply with the Machado Lake Trash TK4DLand the Santa Monica Bay Naarshore and Offshore Debris TMDL.See Table Gfor the implementation schedule. Table 5:Full Capture System Implementation Schedule. TMDL Implementation Plan and Control Status of Implementation Install certifi d Full Capture Systems to Completed reduce baseline by 60% Machado Lake Trash TMDL Install certified Full Capture Systems to Completion anticipated reduce baseline by 100% by June 2014 Santa Monica Bay Nearshore Install certified Full Capture Systems to Completion anticipated -and Offshore Debris,,TMDL reduce baseline by 20% by March 2016 _____j Section 3.1—Machado Lake Catch Basin Inserts All city-owned cutch basins within the Machado Luke Watershed are planned to be retrofitted with Full Capture Systems to comply with the Machado Lake Trash TMDL.The cities of Rancho Palos Verdes, Palos Verdes Estates, and Rolling Hills Estates have proactively retrofitted approximately 6096 of these catch basins within the Peninsula EVVIVIP Agencies' jurisdiction. The remaining 40Y6 of Machado Lake city- owned catch basins will be retrofitted within the 2013-2014 fiscal year using funding provided by the Proposition 84Round 1Grant"Machado Lake Trash 7MDL"awarded tothe city ofTorrance. Section 3.2—Santa Monica Boy Catch Basin Inserts The Santa Monica Bay Nearshore and Offshore Debris TMDL requires for the baseline load to be reduced by 20% by March 20, 2015. Each of the involved Peninsula E\NK4PAQencies plan to install certified Pu|| Capture Systems to address drainage areas within the Santa Monica Bay Watershed to effectively reduce the baseline load by2O%within the required timeline. Peninsula 4 June 27,2013 pwV»PwD/ H-28 SECTION 4. DEMONSTRATION OF MEETING UD ORDINANCE AND GREEN STREET POLICY REQUIREMENTS: The Peninsula EVVK8PAgendes have LID ordinances and Green Streets policies in development. Table G summarizes the status of the Permittees' LID ordinances and Table 7 summarizes the status of the Peninsula EWMP Agencies'Green Streets policies. More than 50%of the MS4 watershed area that will be addressed by the EWMP is covered by LID ordinances and Green Streets policies. Table 6:Status ofLID Ordinance Coverage ofthe Peninsula EWK8PAgencies. MS4 Watershed Area for which Percentage of Permittee LID Ordinance Status Permittee is Watershed Area Responsible Rancho Palos Verdes Draft Ordinance 415, 60%, Palos Verdes Estates Draft Ordinance 4.8 21% Rolling Hills Estates Dra— r,I h hte'� `36, County of Los Angeles Draft Ordinance 0.7 3% Los Angeles County Flood Control District Total MS4 Watershed Area Covered by LID 22.6 Ordinances City of Rolling Hills Estates utilizes County of Los Angeles contract services and the County's draft LID Ordinance serves as the City's draft LID Ordinance. Status Descriptions: 0 Draft Ordinance—Permittee has completed,or will complete by June 28,2013,the development of a draft LID Ordinance that is in compliance with the requirements of Order R4-2012-0175 for its portion of the MS4 watershed. Peninsula 5 June 27,2023 swMumOI H-29 Table 7:Status of Green Street Policy Coverage of the Peninsula EWMP Agencies. MS4 Watershed Area for ....i Permittee Green Street which Permittee is Percentage of Policy Status Responsible Watershed Area Rancho Palos Verdesmm . . . srluare utiles Draft Policy 13.5 60% Palos Verdes Estates Draft Policy 4.8 w. 21% (ling Hills Estates graft Pal cy 3:6 1f . County of Los Angeles Draft Policy 0.7 ., 3/ Los Angeles County Flood Control District Total MS4 Watershed Area Covered by LID 22.6 Ordinances ..._._._...._..._.W ..__w._._...._..._..._.....w_.__. . ..........—......-., .._ -... _. . ... .,..... . .,...m %of MS4 Watershed Area Covered by LID Ordinance) 1i(f9b Status Descriptions: • Draft Policy—Permittee has completed,or will complete by June 28,2013,the development of a draft Green Street Policy that is in compliance with the requirements of Order R4-2012-0175 for its portion of the MS4 watershed Peninsula 6 June 27 2013 EWMP NOl H-30 SECTION 5. GEOGRAPHIC SCOPE GE ENHANCED WATERSHED MANAGEMENT PROGRAM: Peninsula EWMP Areas �., d.,n 1 + � 1 ' / l Storm Drains � Cly S nda , fMachado Laker Mtershed � Sante Monica Epp MtershedY msµ= r„ ._J GreaWLAHadwiftterstwd Los Angeies County Flout Conftl9'sOcl tooftry y Figure 1.Watershed and Permittee Area Representation. The geographic scope of the Peninsula EWMP comprises the incorporated Cities of Rancho Palos Verdes, Palos Verdes Estates and Rolling Hills Estates and unincorporated areas of the County of Los Angeles.The Palos Verdes Peninsula is situated in the southwestern portion of Los Angeles County atop the Palos Verdes Hills, which are bounded to the north by Torrance, to the east by the City of Los Angeles, and to the south and west by the Pacific Ocean, The Palos Verdes Peninsula is distinct in topography and land usage when compared with much more densely developed, low-lying neighboring areas. The major land use designation on the Peninsula is residential with significant portions of open space and soft bottom canyons. A drainage divide dissects the Peninsula from the northeast to the southwest with the westerly portion draining into the Santa Monica Bay and the easterly portion draining to two sub-watersheds within the Dominguez Channel Watershed;the Machado Lake and the Greater LA Harbor sub-watersheds. Drainage from the Peninsula Cities is conveyed via the natural soft bottom canyon systems in conjunction with structured storm drain systems. These systems are intertwined and cross-connected warranting a Peninsula-wide coordinated approach to monitoring and implementation efforts. The City of Rolling Hills is not currently intending to participate in the EWMP, but will be participating in the Coordinated Integrated Monitoring Program (CIMP)along with the members of the Peninsula EWMP. Peninsula 7 June 27,2013 EWMP N01 H-31 Due tothe City's unique character and topographic features, the City is developed with single family residences on targe estate like lots where low impact development measures are regularly implemented. Therefore, the City has determined that there is no reasonable opportunity for regional or distributed BMPs within the City other than LID implemented on private property;,therefore,the City of Rolling Hills has determined to implement the minimum control measures and utilize source control and institutional controls tomeet the Permit requirements. Figure 1 provides a map of the watershed boundaries and notes the jurisdictional boundaries of the Permittees. Although the Peninsula EVVh4P does not include all jurisdictions within the Palos Verdes Peninsula, all drainage infrastructure operated and maintained by the Los Angeles County Flood Control District within the boundaries shown in Figure 1 will be covered under the EWMP. Permittees do not have jurisdiction over lands owned by school districts, the State of California, or the Federal government. The Peninsula EVVK4P area identified bvwatershed and Permittee is provided in Table 8. Table 8:Santa Monica Say Watershed Land Area byPeninsula EVVK8PAgency. Land Area within Land Area Land Area within Total Permittee Santa Monica Bay within Machado Greater LA Harbor EWMP Watershed Lake Watershed Watershed Area Rancho Palos Verdes 2 W4 Palos Verdes Estates 4.35 0.39 0 4.8 0-46 �olllng Hills Estates —.78 County of Los Angeles 0 0.70 0 0.7 Los Angeles County Flood Control District Peninsula ' 8 June 27,2013 EWMpNOI H-32 SECTION 6. PLAN CONCEPT AND INTERIM MILESTONES AND DEADLINES: The Peninsula EVVK8PABendes have collectively developed Implementation and Monitoring Plans with strategies to comply with the area's TK4DLs. The Peninsula EVVK4P Agencies will continue to apply strategies set forth by the developed plans as well as build upon the current plans. In addition, the Peninsula EWMP Agencies will re-evaluate the proposed watershed control measures, identify additional regional projects to maximize opportunities for retaining all non-stormwater runoff and stormwater from the 85th percentile, 24-hour storm event, and identify additional watershed control measures for those areas inthe watershed that cannot beaddressed bvaregional project. The Peninsula EVVK8PAgendes are comprised mostly of residential land use areas with a geographical setting of multiple hills.The hills in this area pose the greatest challenge in finding an area to implement a regional project, however they also allow for a greater opportunity in a project being fed by gravity rather than pumping water 10 an infiltration project. For example, the Chandler Quarry pit collects flows from a 707 acre tributary area and has the capacity to retain and infiltrate optothe 50'yearstorm before discharging to the nearby Project 77 storm drain. This benefit allows for a less expensive, more sustainable regional project. Table 9lists interim milestones and deadlines for the Peninsula EVVK89. Table 9: Enhanced Watershed Management Program Interim Milestones and Deadlines. Milestone Deadline Complete draft C|MP December 2013 Complete internal draft ofEVVK8PWork Plan March 2014 Compile technical memorandum ofwater quality priorities March 2014 Submit final EVVK4PWork Plan June 2014 Develop interim numeric milestones for EPA developed TMDLs August 2014 Conduct initial RAA based mnselected watershed control measures December 2015 Complete internal draft ofEVVK8P May 2015 Submit draft EVVK4PtoRegional Water Board June 2015 Submit Final EVVK4P10Regional Water Board January 2016 based on Regional Water Board SECTION 7. COST ESTIMATE: It is estimated that the cost for the Peninsula Watershed EVVK4P development is $600,000. in addition, the Peninsula EWMP Agencies will contribute approximately$18,000 in contract administration costs and thousands of dollars to in-kind services.The additional cost beyond the consultant contractual amount to prepare the EWMP has not been evaluated as it may vary for each participating agency. SECTION 0. PERMITTEE MEMORANDA OF UNDERSTANDING: A copy of the final draft Memoranda of Understanding (MOU) between the Cities of Rancho Palos Verdes, Palos Verdes Estates, Rolling Hills Estates,the County ofLos Angeles, and the Los Angeles County Flood Control District is included inAttachment A. All agencies have committed to participation in the EVVK4P through signed letters of intent located in Attachment B. The agreement will be executed before December 28,2013. Peninsula 4 June J7,zoz3 swmvpwo/ H-33 SECTION 9. COMMITMENT TO IMPLEMENT ASTRUCTURAL BMP OR SUITE OF BM8PS: The Permittees listed in Table 10 will implement the identified structural BMP or suite of BMPs to fulfill the obligations under Part V|.C.b.iii Table 10:Structural BMPs to be Implemented in the Peninsula EWMP Watersheds. Structural BMP or Suite of BMPs to be Planned Watershed Implemented Implementation Date Dominguez Channel Model Equestrian Center Completion anticipated Watershed-____ by June 2015 Santa Monica Bay San Ramon Canyon Stormwater Flood Reduction Completion anticipated Watershed Project by June 205 Section 9.I—Model Equestrian Center The Model Equestrian Center project will use the existing municipal Peter Weber Equestrian Center, a seven and one-half (7.5) acre facility that houses 116 horses, to create a public demonstration site for environmentally sustainable horse-keeping practices while improving the quality of atorrnvvater and other runoff.This project will be divided into two parts. Part A of this project will involve retrofits of existing facilities. The existing equestrian facilities will be retrofitted to improve drainage and ytorrowater runoff quality. These retrofits will include downspout redirection, drainage correction from existing horse stalls, biooma|e or similar water quality treatment system installation, cover for daily manure storage, and drainage improvements to existing arenas and the overall site.Water quality will be improved by providing a permanent cover for daily manure storage, directing runoff away from areas where homey are kept, and bioswm|es will provide stormwater treatment by filtering large particles in the svva|e and removing smaller particles and associated contaminants through the 6iorm1emtionportion provided bythe vegetation. Port 8 of this project involves new construdion. A new 15,000 square-foot barn and associated improvements will be constructed on the 2.5 acre northwest portion of the site. Key water quality features will include e covered horse wash area with wash water captured and reused for subsurface irrigation to maintain appearance of habitat buffers and treatment biosvva|es, manure management to control vectors, odors and runoff, and a cistern or rain barrels to collect rainfall from the barn roof for use in irrigation. In addition, the facility will utilize Low Impact Development (LID) and green building techniques, integrated pest management through structural design, and equine-safe native and drought- proofp|antbuffeo. Both parts of the project,the new facility and the retrofit,will be designed to demonstrate BMPs that can be easily replicated at private stables. Interpretive signage will demonstrate and educate the equestrian community on how the 8MPs protect and improve stornnvvaterquality. This signage will be installed to educate horse boarders and visitors on the specific BIVIPs integrated into the facilities and on the site. Section 9.2—Son Ramon Canyon StormwaterFlood Reduction Project The San Ramon Canyon is located in the southeastern corner of the city of Rancho Palos Verdes. The canyon provides a natural drainage course for areas near Palos Verdes Drive East. Due to the geographical characteristics of the canyon, landslide induced rock and soil deposits in the canyon bottom are transported during heavy rainfall events.This creates flooding of the roadway, overwhelming existing drainage facilities,endangering nearby roadway integrity and threatening downstream residents.The San Peninsula 10 June 27,2013 swMPm01 H-34 Ramon Canyon Stomnvxater Hood Reduction Project, estimated to cost approximately twenty million dollars ($20,000000), involves significant drainage restoration work to stabilize Palos Verdes Drive East and Palos Verdes Drive South. According to the Project Study Report for the San Ramon Canyon project the canyon is capable of producing over 5,400 cubic yards of debris and sediment. The effects of sediment in stormwater runoff on receiving water quality are both environmentally and economically costly. Sediment laden runoff can adversely affect water quality physically, chemically, and biologically.The sediment that is transported by stormwmter runoff can carry organic matter, animal wastes, heavy metals, nutrients and pesticides.All of these pollutants bind to sediment particles and can pose significant threats to the quality of downstream waters. Substantial impacts from heavy sediment loading can range from direct effects on aquatic ecosystems such as increased turbidity and e|Qe| blooms, to indirect threats To human health from toxic materials accumulating in fish tissue. The myriad of effects on water quality from sediment-laden runoff can introduce aquatic biota and public health concerns resulting in substantial impacts for municipalities. The San Ramon Canyon Stormwater Flood Reduction Project will help alleviate environmental consequences by reducing the amount ofsediment and associated pollutants tmthe Santa Monica Bay and Pacific Ocean. The San Ramon Canyon Stormwater Rood Reduction Project is anticipated to be completed byJune 2O15. Peninsula Il June 27,2013 swvwrw0/ H-35 Attachment A Memoranda of Understanding (MOU) H-36 MEMORANDUM OF UNDERSTANDING BETWEEN THE CITY OF RANCHO PALOS VERDES, THE CITY OF PALOS VERDES ESTATES, THE CITY OF ROLLING HILLS ESTATES, THE LOS ANGELES COUNTY FLOOD CONTROL DISTRICT, AND THE COUNTY OF LOS ANGELES REGARDING THE ADMINISTRATION AND COST SHARING FOR DEVELOPMENT OF THE ENHANCED WATERSHED MANAGEMENT PROGRAM FOR THE PENINSULA EWMP AGENCIES This Memorandum of Understanding (MOU), is made and entered into as of the date of the last signature set forth below by and between THE CITY OF RANCHO PALOS VERDES, a body corporate and politic, THE CITY OF PALOS VERDES ESTATES, a body corporate and politic, and THE CITY OF ROLLING HILLS .ESTATES, a body corporate and politic, a body corporate and politic, LOS ANGELES COUNTY FLOOD CONTROL DISTRICT (LACFCD), apolitical subdivision of the State of California, and THE COUNTY OF LOS ANGELES (LA County), a political subdivision of the State of California. Collectively, these entities shall be known herein as "PARTIES" or individually as "PARTY." WITNESSETH WHEREAS, the Regional Water Quality Control Board, Los Angeles Region (Regional Board) adopted the National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System Permit Order No. R4-2012-0175 (MS4 Permit); and WHEREAS, the MS4 Permit became effective on December 28, 2012 and requires that the LACFCD, LA COUNTY, and 84 of the 88 cities (excluding Avalon, Lancaster, Long Beach, and Palmdale) within the County of Los Angeles comply with the prescribed elements 6f the MS4 Permit; and WHEREAS, the PARTIES, have agreed to collaborate on the compliance of certain elements of the MS4 Permit; and WHEREAS, the PARTIES collaboratively prepared a final Scope of Work as shown in Exhibit D and Request for Proposal to obtain a Consultant to assist the PARTIES with compliance with certain elements of the MS4 Permit; and WHEREAS, the PARTIES propose for the Consultant to prepare and deliver a Final Work Plan, Draft and Final Enhanced Watershed Management Program (EWMP) in compliance with certain elements of the MS4 Permit, at a total cost of approximately six hundred thousand dollars ($600,000) as shown in Table 1 of Exhibit A; and Page 1 of 18 H-37 WHEREAS, the PARTIES have determined that hiring a Consultant to prepare and deliver the EWMP will be beneficial to the PARTIES and they desire to participate and will provide funding in accordance with the cost allocation in Table 3 of Exhibit A; and WHEREAS, the CITY OF RANCHO PALOS VERDES will act on behalf of the PARTIES in the administration of the consultant service agreement for the preparation of the EWMP; and WHEREAS, the PARTIES have agreed to establish a EWMP working group (comprised of designated staff from each PARTY) to provide technical oversight and project management for the development of the PLANS, and WHEREAS, the PARTIES agree that each shall assume full and independent responsibility for ensuring its own compliance with the MS4 Permit despite the collaborative approach of the MOU. NOW, THEREFORE, in consideration of the mutual benefits to be derived by the PARTIES, and of the promises contained in this MOU, it is hereby agreed as follows: Section 1 . Recitals: The recitals set forth above are fully incorporated as part of this MOU. Section 2. Purpose: The purpose of this MOU is to cooperatively fund the preparation and submittal, to the Regional Board, of the EWMP. Section 3. Cooperation: The PARTIES shall fully cooperate with one another to attain the purpose of this MOU. Section 4. Voluntary: this„MOU is voluntarily entered into for the purpose of preparing and submitting to the" ,Regio' nal Board the EWMP. Section 5. Terms: This MOU shall become effective on the latest date of execution by a PARTY or Decen' ber 28, 2013 and shall remain in effect until the Regional Board's final approval date ,of the last outstanding portion of the EWMP, or until the CITY OF RANCHO "PALOS VERDES has provided written notice of completion of the scope of work described hereto, and payment by all PARTIES of their allocated pro-rata share hereunder. Section 6. Assessment for Proportional Cost for EWMP: The PARTIES agree to pay the CITY OF RANCHO PALOS VERDES for preparation and delivery of the EWMP in the amounts shown in Table 3 of Exhibit A, based on the cost allocation formula shown in Table 2 of Exhibit A, attached hereto and made part of this MOU by this reference. The CITY OF RANCHO PALOS VERDES will invoice the PARTIES upon execution of this MOU as shown in Table 4 of Exhibit A, based on the allocated costs for developing the Page 2 of 18 H-38 Plan and the project administration and management costs at a percentage of 3% of the allocated costs for development of the Plan. At the end of each fiscal year, the CITY OF RANCHO PALOS VERDES will provide the Agencies with a statement with the actual contracted expenditures. Unexpended cost at the termination of this MOU will be reimbursed to the PARTIES. Section T. CITY OF RANCHO PALOS VERDES Agrees: a. To utilize the funds deposited by the PARTIES only for the administration of the Consultant contract, project management, and the preparation and completion of the EWMP. b. To provide the PARTIES with an electronic copy of the draft and final EWMP as submitted to the Regional Board within 5 business days of receipt from the Consultant. c. To provide an accounting at the termination of the MOU or cancellation thereof and return the unused portion of all funds, deposited with the CITY OF RANCHO PALOS VERDES using the cost allocation formula in Table 2 of Exhibit A. d, To notify the PARTIES if the actual cost of the preparation of the EWMP will exceed the cost estimates shown in Exhibit A and obtain approval of the increase from the PARTIES. Upon approval of the cost increase by the PARTIES, the CITY OF RANCHO PALOS VERDES will invoice the PARTIES per the cost allocation formula in Table 2 of Exhibit A. The PARTIES shall have 30 days from receipt of the,invoice to provide the payment to RANCHO PALOS VERDES. Section 8. THE PARTIES Further Agree: a. To make a 'full faith effort to cooperate with one another to achieve the purposes of this MOU by providing information about project opportunities, reviewing deliverables in a timely manner, and informing their respective administration, agency heads, and/or governing body. b. To fund the cost of the preparation and delivery of the EWMP and to pay the CITY OF RANCHO PALOS VERDES for the preparation and delivery of the EWMP based on the cost allocation shown in Table 2 of Exhibit A within 60 days of receiving an invoice. c, To grant reasonable access rights and entry to the Consultant, on an as- needed basis during the terms of this MOU to the PARTY'S facilities (i.e. storm drains, channels, catch basins, properties, etc.) (FACILITIES) to Page 3 of 18 H-39 achieve the purposes of this MOU, provided, however that prior to entering any PARTYS facilities, the CITY OF RANCHO PALOS VERDES or their Consultant shall provide written notice to the PARTIES at least 72 hours in advance. For the purposes of this provision, written notice shall include notice delivered via e-mail that has been delivered to the PARTIES' representative identified on Exhibit B. The CITY OF RANCHO PALOS VERDES shall require the consultant retained pursuant to this MOU to agree to indemnify, defend and hold harmless each PARTY, its special districts, their elected and appointed officers, employees, and agents, from and against any and all liability, including but not limited to demands, claims, actions, fees, costs, and expenses (including attorney and expert fees), arising from or connected with the Consultant's performance of its agreement with 1he CITY OF RANCHO PALOS VERDES. In addition, the CITY OF RANCHO PALOS VERDES shall require the Consultant to carry, maintain, and keep in full force and effect an insurance policy or policies, and each PARTY, its officers, employees, attorneys, and designated volunteers shall be named a's additional insureds on the policy(ies) with respect to liabilities arising out of the Consultant's work. These requirements will also apply to any subcontractors hired by the Consultant. This indemnification is in addition to the other indemnities made herein. d. The PARTIES are, and shall at all times remain as to each other, wholly independent entities. e. Any notices, bills, invoices, or reports relating to this MOU, and any request, demand, statement, or other communication required or permitted hereunder shall be in writing 'and shall be delivered to the representatives of the PARTIES at the addresses set forth in Exhibit B attached hereto and incorporated fierefin,by reference, f. This MOO'shall'be'binding upon, and shall be to the benefit of the respective successors, 'heirs, and assigns of each PARTY; provided, however, neither PARTY May assign its respective rights or obligations under this MOU without the prior written consent of the other PARTIES. g. This MOU is governed by, interpreted under, and construed and enforced in accordance with the laws of the State of California. h. if any provision of this MOU shall be determined by any court to be invalid, illegal, or unenforceable to any extent, the remainder of this Agreement shall not be affected, and this MOU shall be construed as if the invalid, illegal, or unenforceable provision had never been contained in this MOU. i. All PARTIES have been represented by counsel in the preparation and negotiation of this MOU. Accordingly, this Agreement shall be construed Page 4 of 18 H-40 according to its fair language. Any ambiguities shall be resolved in a collaborative manner by the PARTIES and shall be rectified by amending this MOU as specified in section 12(e). j. Each of the persons signing below on behalf of a PARTY represents and warrants that he or she is authorized to sign this MOU on behalf of such PARTY. k. Each PARTY shall have no financial obligation to the other PARTIES of this MOU, except as herein expressly provided. Section 9. Invoice and Payment a. Payment: The PARTIES shall reimburse the, CITY OF RANCHO PALOS VERDES for their proportional share cost for preparation and delivery of EWMP and project administration and management cost as shown in Table 4 of Exhibit A within thirty (30) days of the invoice from the CITY OF RANCHO PALOS VERDES. Invoice: The CITY OF RANCHO PALOS VERDES will invoice PARTIES as shown in Table 4 of Exhibit A. b. Late Payment Penalty: Any payment that is late shall be subject to interest on the original amount due from the date that the payment first became due. The interest rate shall be equal to the Prime Rate in effect when the payment first became due plus one percent for any payment that is made from 1 to 30 days after the due date. The Prime,Rate in effect when the payment first became due plus five (5) percent shall apply for any payment that is made from 31 to 60 days after the due date. The Prime Rate in effect when the payment first becamb,due plus,ten 00) percent shall apply for any payment that is made more than 60 days after the due date. The rates shall, nevertheless, not exceed the "maximum allowed by law. If the PARTY or PARTIES remain delinquent after the above procedures, then the CITY OF CITY OF RANCHO PALOS VERDES may notify the Regional Board that the delinquent PARTY OR'PARTIES are no longer a participating member of the PLANS, and said PARTY or PARTIES shall then be deemed to have terminated its participation as a PARTY to this MOU ("EXCLUDED PARTY") and their name(s) may be removed from the PLANS. Any EXCLUDED PARTY'S delinquent amount(s) will be paid in accordance with the remaining PARTIES pro-rata share pursuant to Table 3 of Exhibit A, as adjusted to remove the EXCLUDED PARTY from the allocation. The CITY OF RANCHO PALOS VERDES will revise Table 3 of Exhibit A to show the recalculated costs for each remaining participating PARTY; these revised exhibits will be included with the next invoice to the PARTIES. The PARTIES shall retain all contractual, legal, and equitable rights and causes of action to recover any delinquent amounts paid Page 5 of 18 H-41 that were owed by an EXCLUDED PARTY or PARTIES who failed to make such payments. Section 10. Indemnification a. To the fullest extent permitted by law, each PARTY shall indemnify, defend, and hold harmless each other PARTY, including its special districts, elected and appointed officers, employees, agents, attorneys, and designated volunteers from and against any and all liability, including, but not limited to demands, claims, actions, fees, costs, and expenses (including reasonable attorney's and expert witness fees), arising from or connected with the respective acts of each PARTY arising from or related to this MOU; provided, however, that no PARTY shall indemnify another PARTY for that PARTY'S own negligence or willful misconduct. b. In light of the provisions of Section 895.2 of the Government Code of the State of California imposing certain tart liability jointly upon public entities solely by reason of such entities being parties to an agreement (as defined in Section 895 of said Code), each of the PARTIES hereto, pursuant to the authorization contained in Section 895.4 and 895.6 of said Code, shall assume the full liability imposed upon it or any of its officers, agents, or employees, by law for injury caused by any act or omission occurring in the performance of this MOU to the same extent such liability would be imposed in the absence of Section 895.2 of said Code. To achieve the above stated purpose, each PARTY indemnifies, defends, and holds harmless each other PARTY for any liability, cost, or expense that may be imposed upon such other PARTY solely by virtue of said Section 895.2. The provisions of Section 2778 of the California Civil` Code are made a part hereof as if incorporated herein. Section 11. Termination or Amendment a. A PARTY may withdraw from this MOU upon 60 days written notice to the other parties, subject to payment of any invoice received from CITY OF RANCHO PALOS VERDES prior to or during the 60-day notice period for its share of the cost of the work completed as of the date of its notice of withdrawal, calculated in accordance with the cost-sharing percentages set forth in Table 3 of Exhibit A. The effective withdrawal date shall be the sixtieth (60th) day after CITY OF RANCHO PALOS VERDES receives the withdrawing PARTY's notice to withdraw from this MOU. CITY OF RANCHO PALOS VERDES shall refund to the withdrawing PARTY any uncommitted and unused funds paid by the withdrawing PARTY's effective withdrawal date. All PARTIES understand, acknowledge, and agree that withdrawal from this MOU will terminate any responsibility, liability, or obligation of the Page 6 of 18 H-42 withdrawing PARTY under this MOU commencing on the effective withdrawal date and that the withdrawing PARTY shall remain liable for its share of any loss, debt or liability incurred prior to the withdrawal date, and for any work which could not be suspended. Withdrawal from this MOU does not release any PARTY from the obligations set forth in MS4 Permit. b. If a substantial change is made to the MS4 PERMIT with regards to compliance through EWMP or other circumstances necessitate an amendment, this MOU may be amended through mutual agreement of all PARTIES specified in section 12(e). c. If a PARTY fails to substantially comply with any of the terms or conditions of this MOU,that PARTY shall forfeit its rights to work completed through this MOU, but no such forfeiture shall occur unless and until the defaulting PARTY has first been given notice of its default and a reasonable opportunity to cure the alleged default. Section 12. General Provisions a. Notices. Any notices, bills, invoices, or reports relating to this MOU, and any request, demand, statement or other communication required or permitted hereunder shall be in writing and shall be delivered to the Representative of the Party at the address set forth in Exhibit B. Parties shall promptly notify each other of any change of contact information, including personnel changes, provided in Exhibit B. Written notice shall include notice delivered via email or fax. A notice shall be deemed to have been received on (a) the date of delivery, if delivered by hand during regular business hours, or by confirmed facsimile or by email; or (b) on the third (3) business day following mailing by registered or certified mail (return receipt requested) to the addresse's set forth in Exhibit B. b. Administration. For the purpose of this MOU, the parties hereby designate as their respective Party Representatives the persons named in Exhibit B. The designated Party Representatives, or their respective designees, shall administer the terms and conditions of this MOU on behalf of their respective Party. Each of the persons signing below on behalf of a Party represents and warrants that they are authorized to sign this MOU on behalf of such Party. c. Relationship of Parties. The Parties are and shall remain at all times as to each other, wholly independent entities. No Party to this MOU shall have power to incur any debt, obligation, or liability on behalf of another Party unless expressly provided to the contrary by this MOU. No employee, agent, or officer of a Party shall be deemed for any purpose whatsoever to be an agent, employee or officer of another Party. Page 7 of 18 H-43 d. Binding Effect. This MOU shall be binding upon and inure to the benefit of each Party to this MOU and their respective heirs, administrators, representatives, successors and assigns. e. Amendment. The terms and provisions of this MOU may not be amended, modified or waived, except by an instrument in writing signed by all the Parties. f. Waiver. Waiver by any Party to this MOU of any term, condition, or covenant of this MOU shall not constitute a waiver of any other ,term, condition, or covenant. Waiver by any Party to any breach of the provisions of this MOU shall not constitute a waiver of any other provision, nor a waiver of any subsequent breach or violation of any provision of this MO I. g. Law to Govern; Venue. This MOU shall be interpreted, construed and governed according to the laws of the State of California. In the event of litigation between the Parties, venue in the state trial courts shall lie exclusively in the County of Los Angeles. h. No Presumption in Drafting. The Parties to this MOO agree that the general rule that an MOU is to be interpreted against the Party drafting it, or causing it to be prepared shall not apply. i. Entire MOU. This MOU constitutes the entire agreement of the Parties with respect to the subject matter hereof and supersedes all prior or contemporaneous agreements, whether written or oral, with respect thereto. j. Severability. If any term, provision, condition or covenant of this MOU is declared or determined by any court or competent jurisdiction to be invalid, void, or` unenfo'ircable, the remaining provisions of this Agreement shall not e be affected thereby and this MOU shall be read and constructed without the invalid, void,or.unenforceable provision(s). k. Counterparts. This MOU may be executed in any number of counterparts, each of which shall be an original, but all of which taken together shall constitute but one and the same instrument, provided, however, that such counterparts shall have been delivered to all Parties to this MOU. I. All Parties have been represented by counsel in the preparation and negotiation of this MOU. Accordingly, this MOU shall be construed according to its fair language. IN WITNESS WHEREOF, the PARTIES hereto have caused this MOU to be executed by their duly authorized representatives and affixed as of the date of signature of the PARTIES: Page 8 of 18 H-44 CITY OF RANCHO P'ALOS VERDES Date: _4...._ By �.__.._....... _ _ _ Carolyn Lehr City Manager ATTEST: By: _ Carla Morreale City Clerk APPROVED AS TO FORM: Deputy City Attorney By: Page 9 of 18 H-45 CITY OF PALOS VERDES ESTATES Date: By: Mayor ATTEST: By: Anton Dahlerbruch City Clerk APPROVED AS TO FORM: Deputy City Attorney By: Page 10 of 18 H-46 CITY OF ROLLING HILLS ESTATES Date: By: Mayor ATTEST: By: Douglas R. Prichard City Clerk APPROVED AS TO FORM: Deputy City Attorney By: Page 11 of 18 H-47 LOS ANGELES COUNTY FLOOD CONTROL DISTRACT By Chief Engineer APPROVED AS TO FORM: John F. Krattli County Counsel By Deputy Date Page 12 of 18 H-48 COUNTY OF LOS ANGELES By GAIT.. FARBER Date APPROVED AS TO FORM: John F. Krattli County Counsel By Deputy Date Page 13 of 18 H-49 EXHIBIT A PENINSULA EWMP AGENCIES Funding Contributions Table 1:Total Cost Estimate. Item Total Cast Estimated Contract Cbst $ 00,000 Administration Cast(3%)x $18,000 LAC CD Alloc t1oh,(10%)2 $61 8x10 TOTAL COST TO BE DISTRIBUTED BY AREA $556,200 .,.— �,w.�.,, ._..................�........ ....._.. .ry. . ..., _._. .._.. ..._ .... .. . _.... 1 Administration casts are estimated to be 3 of the Distributed Total Cast far each Peninsula EWMP Agency. The Los Angeles County flood Control District(LACFCD)has committed to contributing 10%of ihe;r6tal Cost for their share in the development of the EWMP. Table 2:Cost Allocation Formula. Total Cast to be Distributed by Area= Contract Cost—LACFCD Allocation Distributed Total Cost= (Total Cost+Administration Cost)x Agency Percent of Total Area Table 3: Distributed Cost Among Peninsula EWMP Agencies. �......,. ...................... .... _....__.......... ....__.................._...�Are�► ..... Ageixcy�Percent .. Distributed Totai..... Agency (Square l�iies) of Total Area. Cost ...... RANCHO PALOS,'VERDES Palos"Verdes Estates 4.8 .� 21% � $118,131 lung)dill Rtes The Cajun sof Los Angeles 0.7 3% $17,227 , $556,200............_ Table 4:Invoice Schedule. Agency Total Cost Invoice Schedule November 1,2013...... ... .......��_......._....w_W�_.. . July 1,2014 RANCHO PALOSRD � 5 $332244 VEE� � , $166,12zm... ,.,�.. ............_.$166,122.......... ... "Pa�l�►s'Uerd�e Estates $.. _..$$9,L365 µ a9,�465 Rolling Hills Estates $88,598 $44,299 $44,299 t f La n les 7 28 614 n a 5A 86. y LACFCD $61,800 $30,9017 TOTAL 618,000 $309,000 $309,000 �.....,.. rv�....... ........ ..... . ....... ,.... ti. ..�..�.$ ,........ ...w._,.� ,.. �...._ ...,,.,. ....�..w, �....�... ,...... ..��....�k Page 14 of 18 H-50 EXHIBIT B PENINSULA EWMP AGENCIES Agencies Representatives - EWMP Working Group 1. City of Rancho Palos Verdes Department of Public Works 30940 Hawthorne Boulevard , Rancho Palos Verdes, CA 90275 Party Representative: Andy Winje a; E-mail: andyw@rpv.com , Phone: (310) 544-5249 Fax. (310) 544-5292 V01/"","""",_" l 2. City of Palos Verdes Estates Department of Public Worksg ' 340 Palos Verdes Drive West ' ' �l'' Palos Verdes Estates, CA 90274 Party Representative: Allan Rigg le, E-mail: arigg@apvestates.org �� r�. Phone: (310) 378-0383 ' Fax: (310) 375-5918; ! 3. City of Rolling Hills Estates Department of Public Wore 4045 Palos Verdes j,,e Noi V Rolling Hills Estates, y74 U,, , H 6 Party Represen t e. g Grammer is E-mail: � g �ing Ils-estates.ca.us Phone, 3r � ' i!1,`7 is Fax ( � 3 X4468 � ' d' ,t 4. s Anle � ur�ty Flood Control District D pa kMent oi*ublic Works ��m Wished Management Division, 11 ' Floor � r 900nth Fremont Avenue Alham�bi�a, CA 91803-1331 Party Representative: Gary Hildebrand E-mail: GHILDEB@dpw.lacounty.gov Phone: (626) 458-4300 Fax: (626) 457-1526 Page 15 of 18 H-51 5. County of Los Angeles Department of Public Works Watershed Management Division, 11`"` Floor 900 South Fremont Avenue Alhambra, CA 91803-1331 Party Representative: Angela George E-mail: AGEORGE@dpw.lacounty.gov Phone: (626) 458-4304 Fax: (626) 457-1526 y/ aIN la(/ /✓�� / y%%,✓ / ��'/// / 4/52 "✓S r Y w 1� wyw� w M/ wk Page 16 of 18 H-52 EXHIBIT C PENINSULA EWMP ANGENCIES Peninsula EWMP Areas a ' _.. y y .Storm Drains . :City Boundary Machado Lake Walefshed Some Monica Bay Watershed ... . Greater t.AHarbor Watershed L Los Angeles County Fpood ControtDistrdt leffitory Figure 1:Peninsula EWMP Agencies Map. Page 17 of 18 H-53 EXHIBIT D PENINSULA EWMP SCOPE OF WORK In Development— to be included in Final MDU r , 40 r d, y r Page 18 of 18 H-54 Attachment B Signed. Letters of Intent CITVOFLiRANCHO PAI..OS VERDES OFFICE OF THE CITY MANAGER June 27, 2013 Samuel Unger, Executive Officer Los Angeles Regional Water Quality Control Board 320 West Fourth Street, Suite 200 Los Angeles, California 90013 Attention: Renee Purdy LETTER OF INTENT TO PARTICIPATE IN THE DEVELOPMENT OF AN ENHANCED WATERSHED MANAGEMENT PROGRAM IN COLLABORATION WITH THE PALOS VERDES PENINSULA WATERSHED AGENCIES Dear Mr. Unger; The City of Rancho Palos Verdes, with this letter, states its intent to collaborate with the Palos Verdes Peninsula Watershed Group (Group) in the development of an Enhanced Watershed Management Program (EWMP) in accordance with the new MS4 Permit by Order No. R4-2012-0175 for submission to your Board. The EWMP will address all of the required elements in the MS4 Permit for each of the watersheds to which the City is tributary, The Palos Verdes Peninsula Watershed Group includes only the following agencies: the City of Rancho Palos Verdes, the City of Palos Verdes Estates, the City of Rolling Hills Estates, the County of Los Angeles, and Los Angeles Flood Control District. The City of Rancho Palos Verdes further intends to cost share in the development cost of an Enhanced Watershed Management Program (EWMP). A cost sharing formula has been negotiated among participating representatives of the Group as to the equitable distribution of costs. Should you have any questions, please contact me or Andy Winje at 310544-5252. Sincerely, Carolyn Lehr City Manager 30,940 HAWTHORME Bwo/RANCHO F1ALos\/Ew-)E4,GA 90275-5391/(310)544`5205/FAX (310) 544.5291 E+1431. CLPH}d Tdtw'CC}h1/Uv`t✓'4JY"AU7SVkRC�t@9t;E7MlRP4 I'RI'vBfD C")Ci RC(;Y6A,PCS H-56 C I T Y 01, CJ rr OFFICE OF 61 J CD ('Zt&0j 1'1 W,CITY MANAGEIR '4LIFOON' June 20,2013 Samuel Unger,Executive Officer Los Angeles Regional Water Quality Control Board 320 West Fourth Street, Suite 200 Los Angeles, California 90013 Attention: Renee Purdy LETTER OF INTENT TO PARTICIPATE IN THE DEVELOPMENT OF AN ENHANCED WATERSHED MANAGEMENT PLAN IN COLLABORATION WITH THE PALOS VERDES,PENINSULA WATERSHED AGENCIES Dear A ftgpr: 1 am writing to express our intent to collaborate with the Palos Verdes Peninsula Watershed Group (Group) in the development of an Enhanced Watershed Management Program (EWMP) in accordance with the new MS4 Permit by Order No.R4-2012-0175 for submission to your Board, The City Council was provided an overview of the MS4 Permit requirements and, accordingly, we will be presenting a Memorandum of Understanding (MOU) to the City Council for formal consideration by the due date of December 28, 2013. The MOU for the EWMP will address all of the coordination of compliance with the MS4 Permit for each of the watersheds to which the City is tributary. Moreover,the MOU will address the cost allocation for the EWMP. The Palos Verdes Peninsula Watershed Group includes only the following agencies: the City of Ranchos Palos Verdes,the City of Palos Verdes Estates, the City of Rolling Hills Estates, the County of Los Angeles, and Los Angeles Flood Control District. Should you have any questions, please contact Allan Rigg at 310,378.0383. Sincerely, )ablerbruch Manager 3/40 Pah)s Verdes Drivc NVest, Palos Verdo Flsutcs,("Idifornia 90274 310-378-0383 H-57 FICANK V ZERI1NAN Jum mi-rcHEL.L CITY OF lJau,,Iho'!r'=u JOHN<: ,ADDx_:XI,LN r ROLLING HILLS ESTATES �4r n,rC hXs rnr`rr a sVS�N 'EANIA NS rra5 ri r.c,s vElur I7IZit I: C)Ez�Pki Int>I_L.Ir�r;LiILLS I �r:�r ,c,� ,r7�� TEL6.P}�IC�N E �)O x77.1'x77 FAX W1�7%.44fiti a �a.n.It<rlhnz-1fifk Lszaur .c..0 STFATN' ZCt;URNIAN d tr<:,,,r,,., DOUGLAS R. PRICHARD 0' Cf[y X'(wwiag^, June 25, 2013 Samuel Unger, Executive Officer Los Angeles Regional Water Quality Control Board 320 West Fourth Street, Suite 200 Los Angeles, California 90013 Attention: Renee Purdy LETTER OF INTENT TO PARTICIPATE IN THE DEVELOPMENT OF AN ENHANCED WATERSHED MANAGEMENT IN COLLABORATION WITH THE PALOS VERDES PENINSULA WATERSHED AGENCIES Dear Mr. Unger: The City of Rolling Hills Estates, with this letter, states its intent to collaborate with the Palos Verdes Peninsula Watershed Group (Group) in the development of an Enhanced Watershed Management Program (EWMP) in accordance with the new MS4 Permit by Order No. R4-2012-0175, for submission to your Board. The EWMP will address all of the required elements in the MS4 Permit for each of the watersheds to which the City is tributary. The Palos Verdes Peninsula Watershed Group includes only the following agencies: the City of Rancho Palos Verdes, the City of Palos Verdes Estates, the City of Rolling Hills Estates, the County of Los Angeles, and Los Angeles Flood Control District. The City of Rolling Hills Estates further intends to cost share in the development cost of an Enhanced Watershed Management Program (EWMP). A cost sharing formula has been negotiated among participating representatives of the Group as to the equitable distribution of costs. Should you have any questions, please contact Assistant City Manager Greg Grammer, (310) 377-1577 ext 107, gregq(a-)ci.rolling-hills-estates.ca.us. Sincerely, Dougla Prichard City Manager adm/Itrunger-enhanced watershed H-58 COUNTY OF LOS ANGELES + 4 DEPARTMENT OF PUBLIC WORKS "To Enrich Lives Through Effective and Caring Service" 900 SOUTH FREMONT AVENUE ALLIAMBIRA,CALIFORNIA 91803-1331 GAIL.FARBEP-Director Tclephatw(626)459-5100 http://dpw.lacouwity.gov ADDRESS ALL CORRESPONDENCE TO- June 24, 2013 P.O,BOX 1460 ALHAMBRA,CALIFORNIA 91802.1460 IN REPLY PLEASE REFER TCFILE: WM-7 Mr. Samuel Unger, P.E., Executive Officer California Regional Water Quality Control Board — Los Angeles Region 320 West 4th Street, Suite 200 Los Angeles, CA 90013 Attention Ms, Renee Purdy Dear Mr. Unger: LETTER OF INTENT—COUNTY OF LOS ANGELES PALOS VERDES PENINSULA ENHANCED WATERSHED MANAGEMENT PROGRAM The County of Los Angeles (County) submits this Letter of Intent to participate in and share the cost of the development of an Enhanced Watershed Management Program (EWMP) with the Peninsula EWMP Agencies. This Letter of Intent serves to satisfy the EWMP notification requirements of Section VI.C.4.b.iii(3) of Order No. R4-2012-0175. The Peninsula EWMP Agencies consist of the following agencies: City of Rancho Palos Verdes as the coordinating agency for EWMP development, County, Los Angeles County Flood Control District, and cities of Palos Verdes Estates and Rolling Hills Estates, The Peninsula EWMP Agencies have included a final draft Memorandum of Understanding as Attachment A of the Notice of Intent. The County intends to submit a final Memorandum of Understanding to its Board of Supervisors for approval prior to December 28, 2013, If you have any questions, please contact Ms. Angela George at (626) 458-4325 or ageorge@dpw.Iacounty.gov. Very truly yours, GAIL FARBER Director of Public Works JD:jht PAwmpub\Secreta6aK2013 Documents\Lettar'LOI Peninsula EWMP County,dWC13211 cc: City of Palos Verdes Estates City of Rancho Palos Verdes City of Rolling Hills Estates H-59 COUNTY OF LOS ANGELES 4 * IL DEPARTMENT OF PUBLIC WORKS "To Enrich Lives Through Effective and Caring Service" '11FOR 900 SOUTH FREMONT AVENUE ALHAMBRA,CALIFORNIA 91803-1331 GAIL II Director Telephone:(626)458.5 100 http://dpw,lacounty.gov ADDRESS ALL CORRESPONDENCE TO: June 24, 2013 P.O.BOX 1460 ALHAMBRA,CALIFORNIA 91802.1460 IN REPLY PLEASE REFER TOFILE: WM-7 Mr. Samuel Unger, P.E., Executive Officer California Regional Water Quality Control Board — Los Angeles Region 320 West 4th Street, Suite 200 Los Angeles, CA 90013 Attention Ms. Renee Purdy Dear Mr. Unger: LETTER OF INTENT— LOS ANGELES COUNTY FLOOD CONTROL DISTRICT PALOS VERDES PENINSULA ENHANCED WATERSHED MANAGEMENT PROGRAM The Los Angeles County Flood Control District (LACFCD) submits this Letter of Intent to participate in and share the cost of the development of an Enhanced Watershed Management Program (EWMP) with the Peninsula EWMP Agencies. This Letter of Intent serves to satisfy the EWMP notification requirements of Section VI.C.4.b.iii(3) of Order No. R4-2012-0175. The Peninsula EWMP Agencies consist of the following agencies: City of Rancho Palos Verdes as the coordinating agency for EWMP development, County of Los Angeles, LACFCD, and cities of Palos Verdes Estates and Rolling Hills Estates. The Peninsula EWMP Agencies have included a final draft Memorandum of Understanding as Attachment A of the Notice of Intent. The LACFCD intends to submit a final Memorandum of Understanding to County of Los Angeles Board of Supervisors (which is the LACFCD's governing body) for approval prior to December 28, 2013. If you have any questions, please contact Ms. Terri Grant at (626) 458-4309 or tgrant@dpw.lacounty.gov. Very truly yours, bAll- FARBER Chief Engineer of the Los Angeles County Flood Control District JD-jht PAwrnpub\Secretarial\2013 DocumentskLetleAL01 Peninsula EWMP LACFCD,doc\C 13212 cc: City of Palos Verdes Estates City of Rancho Palos Verdes City of Rolling Hills Estates H-60 ATTACHMENT B SCOPE OF WORK H-61 Development of the Peninsula Enhanced Watershed Management. Program Scope of Work July 22, 2013 1 of 19 H-62 Table of Contents 1.0 Background..... ..... ....... ............... ................... ........... 3 2,0 Project Area .................. ...... ........ ................. ........ ...............4 10 Objectives .......... ........ ...... ..... ................... ........ ....... ....-—6 4.0 Task Items.........--..... ....... .............................. ............... ..............6 5.0 Project Management, Coordination, and Meetings .... ............ ............... ..7 6.0 Enhanced Watershed Management Program (EWMP) Work Plan ....................7 7.0 Coordinated Integrated Monitoring Plan (LIMP) .................. ...... .............. 12 &0 Enhanced Watershed Management Program (EWMP) Plan ...... ....... 15 2 of 19 H-63 Development of the Peninsula Enhanced Watershed Management Program Scope of Work 1.0 Background The National Pollutant Discharge Elimination System Municipal Separate Storm Sewer System Permit (MS4 Permit) Order No. R4-2012-0175 establishes the waste discharge requirements for stormwater and nonstormwater discharges within the watersheds of Los Angeles County. This MS4 Permit was adopted by the California Regional Water Quality Control Board, Los Angeles Region (Regional Board), on November 8, 2012, and became effective on December 28, 2012. The MS4 Permit and all attachments are posted on the Regional Board's website at the following address: http://www.waterboards.ca.gov/1osangeles/Waterissues/programs/stormwater/munieipaI/ index.shtml The MS4 Permit includes provisions that allow permittees the flexibility to customize their stormwater programs to achieve compliance with certain receiving water limitations and water quality based effluent limits over time. Specifically, permittees may voluntarily choose to implement an Enhanced Watershed Management Program (EWMP). The EWMP includes prioritization of water-quality issues, identification of implementation strategies, control measures, and Best Management Practices (BMPs) sufficient to meet pertinent standards, integrated water-quality monitoring, and opportunity for stakeholder input. The EWMP uses integrated planning to comprehensively evaluate opportunities to implement multi-benefit regional projects. Through the EWMP, permittees will not only implement projects to improve water quality, but also have incentives to evaluate and, where feasible, implement regional projects that retain all nonstormwater runoff and all stormwater runoff from the 85th percentile, 24-hour storm event for the drainage area tributary to those projects. These projects may also achieve other benefits such as flood protection, water supply enhancement, recreational opportunities, and wildlife habitat enhancement. 3 of 19 H-64 The following permittees are entering into a Memorandum of Understanding to jointly develop an EWMP: • County of Los Angeles (County) • Los Angeles County Flood Control District (LACFCD) • City of Palos Verde Estates • City of Rancho Palos Verdes • City of Rolling Hills Estates The City of Rolling Hills is not participating in the EWMP; however, it will be participating in a Coordinated Integrated Monitoring Plan (LIMP) along with the other Peninsula EWMP agencies. The following permittees are entering into a Memorandum of Understanding to jointly develop a LIMP: • County of Los Angeles (County) • Los Angeles County Flood Control District (LACFCD) • City of Palos Verde Estates • City of Rancho Palos Verdes • City of Rolling Hills • City of Rolling Hills Estates 2.0 Project Area The geographic scope of the EWMP comprises the incorporated Cities of Palos Verdes Estates, Rancho Palos Verdes, and Rolling Hills Estates, as well as unincorporated areas of the County of Los Angeles. Although the Peninsula EWMP does not include all jurisdictions within the Palos Verdes Peninsula, all drainage infrastructure operated and maintained by the Los Angeles County Flood Control District within the boundaries shown in Figure 1 will be covered under the EWMP. The Palos Verdes Peninsula is situated in the southwestern portion of Los Angeles County atop the Palos Verdes Hills, which are bounded to the north by Torrance, to the east by the City of Los Angeles, and to the south and west by the Pacific Ocean. The Palos Verdes Peninsula is distinct in topography and land usage when compared with much more densely developed, low-lying neighboring areas. The major land use designation on the Peninsula is residential with significant portions of open space and soft bottom canyons. A drainage divide dissects the Peninsula from the northeast to the southwest with the westerly portion draining into the Santa Monica Bay and the easterly portion draining to two sub-watersheds within the Dominguez Channel Watershed: the Machado Lake and the Greater Los Angeles Harbor sub-watersheds. Drainage from the Peninsula Cities is conveyed via the natural soft bottom canyon systems in conjunction with structured storm drain systems. These systems are intertwined and cross-connected warranting a Peninsula-wide coordinated approach to monitoring and implementation efforts, 4 of 19 H-65 The City of Rolling Hills is not currently intending to participate in the EWMP, but will be participating in the CIMP along with the members of the Peninsula EWMP. Due to the City's unique character and topographic features, the City is developed with single family residences on large estate like lots where low impact development measures are regularly implemented. Therefore, the City has determined that there is no reasonable opportunity for regional or distributed BMPs within the City other than LID implemented on private property; therefore, the City of Rolling Hills has determined to implement the minimum control measures and utilize source control and institutional controls to meet the Permit requirements. Figure 1. Watershed and Permittee Area Representation Peninsula EWMP Areas y 1"T YI IV, Storm Drains CRY frounaafy Machado Lake Watershed Sanno Monica say Watershed Greater LAKaftr Watershed L _Los Angeles County Flood Control Oistict territory Figure 1 provides a map of the watershed boundaries and notes the jurisdictional boundaries of the Permittees. Permittees do not have jurisdiction over lands owned by school districts, the State of California, or the Federal government. The Peninsula EWMP area identified by watershed and Permittee is provided in Table 1. 5 of 19 H-66 Table 1 Land Are by Peninsula EWMP Aecr _w.ww.ww._...._._.... Land Area within Land Area Land Area within Total Santa Monica within Machado Greater LA Harbor Permittee EWMP Bay Watershed Lake Watershed Watershed Area q oars Miles S oars Miles kaneho Palos x:07 112 13 ; Verdes 9.35 Palos Verdes Estates 4.35 0.39 0 4.8 RollinHills es Estat .. Oti4 o, i"78 , 0 County of Los. . 0a� 0.70 p0.7 An,qeles Los Angeles County Flood Control N/ : / ' / District Total, 14.2 4.9 3.4 22.6 3.0 Objectives The objective of the consultant contract is to develop an EWMP and a corresponding LIMP for the participating agencies of the Palos Verdes Peninsula. The EWMP shall prioritize water-quality issues and comprehensively evaluate opportunities for multibenefit regional projects and maximize the recharge and capture and reuse of stormwater runoff. Ultimately, the EWMP shall include controls to the maximum extent practicable to ensure that discharges from Permittees' jurisdictions achieve applicable water-quality standards pursuant to the MS4 Permit. 4.0 Task Items The consultant shall be familiar with pertinent MS4 Permit provisions and applicable TMDLs to complete the following work to the satisfaction of the Peninsula EWMP agencies and the Regional Board, and other associated bodies: 4.1 Provide project management and organize and conduct meetings 4.2 Prepare a Final EWMP Work Plan 4.3 Prepare a Coordinated Integrated Monitoring Plan (LIMP) 4.4 Design Project identification (for each watershed) 4.5 Prepare Draft EWMP Plan 4.5 Prepare a Final EWMP Plan 5of19 H-67 5.0 Project Management, Coordination, and Meetings The Consultant shall provide project management services to ensure that all work deliverables are provided on or ahead Of Schedule and within budget. The consultant shall: 5.1 Provide a detailed schedule to complete all the tasks of this Scope of Work to be approved by the Peninsula agencies. This schedule shall be updated monthly and provided to the Peninsula agencies. It is estimated at issuance of this RFP that the total number of regular meetings will be close to fifteen (15) monthly meetings plus a total of eight (8) additional regular meetings that would be needed at the beginning and close of the process. Also, it is estimated at issuance of this RFP that the meeting duration would average 1.5 hours, but may be longer for the meetings at the beginning and end of the process. 5.2 Schedule and prepare agendas and minutes for each regular and special Peninsula EWMP/CIMP meeting. 5.3 Attend and participate in meetings of the Technical Advisory Committee (TAC), which will be established pursuant to the MS4 Permit to provide input in the development of the EWMP. Consultant should assume that four(4) TAC meetings will occur. 5.4 Attend and lead special meetings with the Peninsula agencies and interested parties to solicit input and feedback on the Draft EWMP Work Plan, Draft CIMP, and Draft EWMP Plan. Consultant should assume that three (3) special meetings will occur. 5.5 Attend and participate in meetings with Regional Board staff and other stakeholders as needed, Consultant should assume that six (6) meetings will occur. 6.0 Enhanced Watershed Management Program (EWMP) Work Plan In consultation with the Peninsula EWMP agencies and TAC, the Consultant shall prepare interim technical memos, a draft Work Plan and a final EWMP Work Plan. The consultant shall perform, at minimum, the following activities: 6.1 Organize the Work Plan, draft EWMP, and final EWMP into three chapters. One chapter that meets the requirements for the Santa Monica Bay Watershed (J7), one chapter for the Machado Lake Watershed, and one chapter for the Greater Los Angeles Harbor Watershed. Organization of final EWMP including the three separate chapters shall be consistent and in compliance with the Los Angeles Regional Water Quality Board's requirements. 7 of 19 H-68 6.2 Consultant will need to incorporate the existing and emerging work products from various other individual WMPs, collective WMPs, and other EWMPs as needed to address regional TMD L compliance for members of the Peninsula EWMP. 6.3 Identification of Water Quality Priorities: Consultant shall develop a memorandum characterizing water quality conditions within each WMA, identifying water quality priorities, determining water body-pollutant classifications, and assessing sources. Completion of the memorandum shall include the following: 6.3.1 Compile all readily available, relevant, and appropriately collected water quality monitoring datasets, containing data collected within at least the last 10 years (January 1, 2002). It is expected that the majority of datasets will be provided by the Peninsula EWMP agencies or be available from the Regional Board. Consultant shall establish quality assurance/quality control (QA/QC) criteria and conduct a QA/QC check of the data and identification of the datasets meeting the criteria for use. 6.3.2 Evaluate existing water-quality conditions, including characterization of stormwater and non-stormwater discharges from the MS4 and the receiving water body. The evaluation shall consider existing TMDLs and 303(d) listings as well as available receiving water and outfall data compiled as part of the task above and result in the identification of water-quality issues. 6.3.3 Identify the potential water-quality priorities including applicable water quality based effluent limitations and/or receiving water limitations established pursuant to TMDLs included in the MS4 Permit and 303(4) listings, and other exceedances of receiving water limitations. 6.3.4 Classify water-quality issues resulting from stormwater and non- stormwater discharges to the MS4 and from the MS4 to receiving waters issues as Category 1 (Highest Priority), Category 2 (High Priority), or Category 3 (Medium Priority) as described in the Permit. 6.3.5 Identify which 303(d) listings and other exceedances of receiving water limitations are in the same class as those addressed in a TMDL in the watershed. 6.3.6 Gather available reports and sampling information and research, to identify, evaluate, and prioritize known and suspected stormwater 8 of 19 H-69 and non-stormwater pollutant sources in discharges to the MS4 and from the MS4 to receiving waters and any other stressors related to MS4 discharges causing or contributing to the highest water-quality priorities (Categories 1 through 3). 6.3.7 Utilize the data compiled as part of the above tasks to complete a source assessment for the water body-pollutant combinations in Categories 1 through 3. 6.4 Summary of Existing and Potential Control Measures: Consultant shall develop a memorandum characterizing existing control measures within the Peninsula EWMP agencies. The summary shall include: 6.4.1 Compile existing control measures, including minimum control measures, and BMP programs already in effect. Consultant shall develop a template for Peninsula EWMP agencies to use to summarize existing minimum control measures and identify areas where modification to MCMs may be warranted, Consultant shall compile submitted materials. 6.4.2 Outline a process for determining which IVICIVIs could potentially be modified, how to modify MCMs, and information that may be necessary to support the modifications. 6.4.3 Review existing planning efforts, including TMDL IPs, IRWMPs, etc, provided by the Peninsula EWMP agencies for projects throughout the watershed for possible inclusion in the EWMP. Summarize the regional projects that are proposed in previous planning efforts including location, preliminary design characteristics, and the status of project implementation. Also summarize regional control measures in existing plans that provide multiple benefits and support beneficial reuse, recycling, or recharge of treated stormwater in addition to opportunities to incorporate habitat recreational, and open space. 6.4.4 Review and summarize data regarding performance of regional, distributed structural, and institutional non-structural control measures for reducing stormwater and non-stormwater flows and priority pollutants. Data to be considered will be provided by the Peninsula EWMP agencies, will be specific to southern California, and should be analyzed in consideration of applicable receiving water limitations, WQBELs, etc. 6.4.5 Identify a preliminary list of potential regional projects, based on Task 6.2.3, to retain (i) all non-stormwater and (ii) all stormwater runoff of the volume equivalent to the 85th percentile, 24-hour 9 of 19 H-70 storm event for the drainage area tributary to the project. 6.4.6 Develop an approach for identifying additional regional projects and evaluating all potential regional projects. Approach should consider focusing on publicly-owned properties as well as private properties with open space (such as large parking lots). Evaluation should consider opportunities for incorporation of multi-use features at potential locations. 6.5 Reasonable Assurance Analysis Approach: Consultant shall develop an approach to meet the requirements of conducting a Reasonable Assurance Analysis (RAA) to demonstrate that the watershed control measures identified in the EWMP will result in MS4 discharges achieving applicable WQBELs and RWLs per Part Vl.C.5.b.iv.(5). Development of the approach shall include the following: 6.5.1 Outline the proposed modeling process for evaluating and selecting watershed control measures. The types of watershed control measures to be evaluated should be summarized including MCMs and non-structural, distributed structural, and regional/centralized structural controls. Describe the process for representing these watershed control measures in the modeling system and quantifying their effectiveness. Describe how the model will select the watershed control measures that are recommended for implementation via the EWMP. Describe how jurisdictional boundaries will be accounted for when selecting watershed control measures. 6.5.2 Outline the process for demonstrating the effects of to-be- implemented watershed control measures on stormwater quality, non-stormwater quality, and receiving water quality. Describe how the effects of BMPs will be compared to receiving water limitations, TMDL wasteload allocations, WQBELs and other applicable targets at the watershed and jurisdictional scale. 6.5.3 Outline the process for creating a BMP implementation sequence/schedule/timeline based on the model-recommended BMP scenario(s). Consider schedules for watershed control measures that have already been planned, scheduled, and/or implemented by agencies in the watershed or region. 6.6 Prepare Draft and Final EWMP Work Plans: Consultant shall prepare a Draft and Final EWMP Work Plan incorporating the above information and: 10 of 19 H-71 6.6.1 Propose approaches to addressing 303(d) listed and non-303(d) listed receiving water exceedances not addressed by a TMDL in the watershed. 6.6.2 Develop detailed schedule and strategy to complete the EWMP Plan. Additionally, milestones presented in the NO[ should be re- evaluated to ensure consistency or, if necessary, alternatives shall be proposed for consideration by the Regional Board. 6.6.3 Propose a prioritization and sequence to the waterbody pollutant issues. Prioritization shall include TMDLs and other receiving water considerations. 6.6.4 Prepare a Draft EWMP Work Plan with a schedule and strategy to complete the EWMP Plan as described in the MS4 Permit and this Scope of Work. The Consultant shall provide up to 6 hard copies (double sided) and electronic copies (in Microsoft Word and PDF) of the Draft EWMP Work Plan. 6.6.5 Finalize EWMP Work Plan. It is assumed that Consultant will revise the Draft EWMP Work Plan two times. The Consultant shall provide four weeks for review of the initial Draft EWMP Work Plan and two weeks for review of the revised Draft EWMP Work Plan. The Consultant shall provide up to 6 hard copies (double sided) and electronic copies (in Microsoft Word and PDF) of the Final EWMP Work Plan. 6.7 Outreach Specific to EWMP Work Plan Development: Consultant shall conduct up to four meetings specific to EMWP Work Plan Development to perform outreach to community groups, nongovernment organizations, water supply agencies, and other potential project partners and stakeholders to solicit input on the scope and content of the draft Work Plan. 6.8 Review and Validation of EWMP Development Scope and Budget (Task 8): Consultant shall review the Task 8 scope of work and budget estimate to identify whether significant differences exist and, if necessary, propose revisions for consideration by the Peninsula EWMP agencies. Deliverables and Schedule: 1. Draft Memorandum as described in Task 6.3: December 2013 2. Draft Memorandum as described in Task 6.4: December 2013 3. Draft Memorandum as described in Task 6.4.3-6.4.4: January 2014 4. Draft EWMP Work Plan as described in Task 6.6: February 2014 5. Final EWMP Work Plan as described in Task 6.6: June 2014 11 of 19 H-72 6. Draft Memorandum as described in Task 6.8: June 2014 It is expected that one revision will be required of each of the draft memoranda. However, memoranda will not be finalized, per se; rather final versions of the information will be presented in the Draft and Final EWMP Work Plans. Note there is no specific task to revise the Final EWMP Work Plan based on Regional Board comments as it is expected their comments will be received on the Draft EWMP Work. Additionally, comments on the Final EWMP Work Plan can potentially be addressed during EWMP Plan development. 7.0 Coordinated Integrated Monitoring Plan (CIMP) The consultant shall prepare interim technical memos, a draft CIMP and a final CIMP. The CIMP shall address all TMDL and Non-TMDL monitoring requirements of the MS4 Permit for all members of the Peninsula CIMP including: • Receiving water monitoring • Stormwater outfall based monitoring • Nonstormwater outfall based monitoring • New development/redevelopment effectiveness tracking • Regional Studies In preparing the CIMP, the consultant shall perform the following activities to meet the requirements of the above-listed monitoring elements: 7.1 Outfall and Receiving Water Monitoring Approach: The Consultant shall develop an approach to meet all of the required monitoring elements and generate a memorandum consisting of the following: 7.1.1 Compilation of GIS layers associated with storm drains, channels, and outfalls. 7.1.2 A summary of all TMDL and MS4 Permit required outfall based, receiving water, and special study monitoring requirements. 7.1.3 A summary of existing programs completed to date and available data. 7.1.4 A storm water outfall based monitoring approach including an estimated number of outfalls necessary to meet the TMDL and MS4 permit requirements. 7.1.5 A non-storm water outfall based screening and monitoring plan including approaches to 1) conducting an inventory of MS4 outfalls, 2) identify outfalls with significant non-stormwater discharges, 3) prioritize source investigations, 4) identify sources of significant 12 of 19 H-73 non-stormwater discharges, and 5) monitoring of non-stormwater discharges exceeding criteria. 7.1.6 An approach to integrating TMDL and MS4 Permit receiving water monitoring requirements and identification of an estimated number of sites, and general locations, necessary to meet TMDL and MS4 permit requirements. 7.1.7 An approach to integrate, to the extent practicable, the TMDL special study requirements. 7.1.8 A discussion of how Peninsula CIMP members plan to participate in the Southern California Stormwater Monitoring Coalition (SMC) Regional Watershed Monitoring Program (bioassessment). 7.2 Site Selection: The Consultant shall develop a memorandum identifying sites to meet the requirements of MS4 Permit outfall and receiving water monitoring and TMDL requirements. The memorandum shall consist of the following: 7.2.1 A summary of field surveys evaluating potential sites, with consideration of all necessary factors including, but not limited to the expected representativeness, accessibility, availability of power as needed and security, to determine the most appropriate monitoring stations for both dry- and wet-weather monitoring. The consultant shall consider existing monitoring stations already used for TMDLs and land use based representative sampling is strongly encouraged. It is acknowledged that dry weather outfall sites may not be identified at this point given the MS4 Permit process for selecting non-stormwater outfall monitoring sites. 7.2.2 A summary of the proposed sites, including the description of factors used in the selection, photographs of the selected sites, and maps showing the sites. 7.3 New Development and Re-development Effectiveness Tracking: The Consultant shall develop a memorandum consisting of the following: 7.3.1 A template for Peninsula CIMP members to use to summarize existing tracking processes. 7.3.2 Reporting and data management protocols. 7.3.3 A system to share the tracking among the permittees in the Peninsula CIMP. 13 of 19 H-74 7.4 Draft and Final CIMP: The Consultant shall prepare a Draft and Final CIMP that proposes an optimal and cost-effective monitoring design that meets the intended objectives of the MS4 Permit, incorporates the above information and: 7.4.1 Describes the sample collection methods, analytical methods, field observation requirements, Toxicity Identification Evaluation (TIE) initiation approach, and QA/QC protocols. 7.4.2 If possible, identify appropriate laboratories. It is acknowledged that due to procurement requirements it may not be possible to identify laboratories prior to Final CIMP submittal to the Regional Board. 7.4.3 Describe how collected data will be compiled and stored to support future assessment and reporting efforts. 7.4.4 Outline an integrated monitoring and assessment program to evaluate progress toward achieving applicable limitations. 7.4.5 Describe the process for revising components of the CIMP. 7.4.6 Prepare a Draft CIMP as described in the MS4 Permit and this Scope of Work. Additionally, a cost estimate to implement the CIMP shall be provided. The Consultant shall provide up to 6 hard copies (double sided) and electronic copies (in Microsoft Word and PDF) of the Draft CIMP. 7.4.7 Finalize CIMP. It is assumed that Consultant will revise the Draft CIMP two times. The Consultant shall provide four weeks for review of the initial Draft CIMP and two weeks for review of the revised Draft CIMP. The Consultant shall provide up to 6 hard copies (double sided) and electronic copies (in Microsoft Word and PDF) of the Final CIMP. 7.4.8 The consultant shall revise the CIMP based on the Regional Board's comments within 2 months of receiving the comments. 7.5 Outreach Specific to CIMP Development: The Consultant shall conduct up to four (4) meetings specific to CIMP development to perform outreach to community groups, nongovernment organizations, water supply agencies, and other potential project partners and stakeholders to solicit input on the scope and content of the draft CIMP. Deliverables and Schedule: 14 of 19 H-75 1. Draft Memorandum as described in Task 7.1: September 2013 2. Draft Memorandum as described in Task 72 October 2013 3. Draft Memorandum as described in Task 7.3: October 2013 4. Draft CIMP as described in Task 7.4: November 2013 5. Final CIMP as described in Task 7.4: December 2013 It is expected that one revision will be required of each of the draft memoranda. However, memoranda will not be finalized, per se; rather final versions of the information will be presented in the Draft and Final CIMPs. 8.0 Enhanced Watershed Management Program (EWMP) Plan In consultation with the Peninsula EWMP agencies and TAC, the Consultant shall prepare an EWMP Plan by implementing all aspects of the Final Work Plan, providing technical memos, a Draft EWMP Plan and a Final EWMP Plan. It is acknowledged that the following scope items may need to be revised based on the Final EWMP Work Plan. In preparing the EWMP Plan, the consultant shall perform the following activities: 8.1 Finalize Approach to Addressing USEPA TMDLs, 303(d) Listings, and Other Exceedances of Receiving Water Limitations: The Consultant shall address permit requirements related to USEPA TMDLs, 303(d) listings, and other exceedances of receiving water limitations as follows: 8.1.1 Develop interim numeric milestones and compliance schedules for the following eight (8) TMDLs: a. Santa Monica Bay Beaches Wet Weather Bacteria TMDL — Group 7 b. Santa Monica Bay Beaches Dry Weather Bacteria TMDL — Group 7 c. Santa Monica Bay Nearshore and Offshore Debris TMDL d. Santa Monica Bay TMDL for DDTs and PCBs e. Machado Lake Trash TMDL f. Machado Lake Nutrient TMDL g. Machado Lake Pesticides and PCBs (Toxics) TMDL h. Greater Los Angeles and Long Beach Harbor Waters Toxic Pollutants TMDL 8.1.2 Develop interim numeric milestones and compliance schedules for the 303(d) listed and non-303(d) listed receiving water limitations exceedances not addressed in a TMDL in the watershed. 8.2 Develop List of Regional Projects and Conduct Initial Screening: For regional projects the Consultant shall: 15 of 19 H-76 8.2.1 Identify additional potential locations for regional projects to retain (i) all non-stormwater and (ii) all stormwater runoff of the volume equivalent to the 85th percentile, 24-hour storm event for the drainage area tributary to the project. Describe the multiuse features of these potential projects. 8.2.2 Select a preliminary list of regional projects for initial screening based on the Final EWMP Work Plan approach and develop draft memorandum. 8.2.3 Develop list of proposed project sites based on Peninsula EWMP agencies feedback on memorandum. 8.2.4 Conduct preliminary soils analysis and testing of proposed regional project sites to support feasibility analysis. 8.2.5 Perform an initial environmental study for all proposed regional projects to support feasibility analysis. Review and summarize the regulatory issues, environmental permits and other requirements, for implementing the proposed project sites. 8.2.6 Evaluate the feasibility of constructing all identified regional projects including rough costs and develop recommended final list. 8.3 Identify Selected Watershed Control Measures and Conduct Reasonable Assurance Analysis: Utilizing the process outlined in the Work Plan the Consultant shall: 8.3.1 Prepare quantitative analysis or modeling tool to represent hydrology, hydraulics, stormwater quality, non-stormwater quality, and receiving water quality before and after implementation of watershed control measures. 8.3.2 Summarize MCMs, specific modifications to MCMs proposed by Peninsula EWMP agencies, and information supporting modifications to MCMs provided by Peninsula EWMP agencies. 8.3.3 For the portion of the watershed that cannot be addressed with regional projects, identify additional structural and nonstructural watershed control measures to achieve applicable WQBELs and/or RWI-s for each TIVIDL, 303(d) listing, and receiving water exceedances, consistent with applicable compliance schedules in the Permit. Incorporate effective innovative technologies, approaches and practices, including green infrastructure and low- impact development strategies. 16 of 19 H-77 8.3.4 Conduct a Reasonable Assurance Analysis for each TMDL, 303(d) listing, and receiving water exceedances that consists of an assessment (through quantitative analysis or modeling) to demonstrate that the identified in the watershed control measures will achieve applicable WQBELs and/or RWI-s. 8.4 Develop Project Schedules and Cost Estimates: Based on the selected watershed control measures the Consultant shall: 8.4.1 Develop cost estimates for implementing the proposed watershed control measures. The cost analysis should include any necessary planning, design, permits, construction, operation and maintenance, energy, waste removal, post construction monitoring, and right of way acquisition. 8.4.2 Prepare schedules and sequencing for each of the proposed watershed control measures. The sequencing shall be based on the approach outlined in the Work Plan. The schedules should account for: 8.4.2.1 TMDL compliance schedules, Water Quality Priorities categories, and proposed milestones. 8.4.2.2 The implementation period and milestones during the current Permit term should be differentiated from the future implementation period beyond of the current Permit term. 8.4.2.3 The schedules shall identify the responsibilities of each individual Permittee. 8.4.2.4 The project schedules should include planning, design, permits, right of way acquisition, construction, operation and maintenance, energy, waste removal, and post- construction monitoring. Develop realistic construction durations for each proposed project including preconstruction activities such as bid, award, notice to proceed, move in, construction subaGtivities depending on the Scope of Work, construction completion, post- construction monitoring, etc. 8.4.2.5 Recommend a reasonable time frame to initiate the projects, nonstructural solutions, and programs during the compliance timeframes. 17 of 19 H-78 8.5 Prepare Draft and Final EWMP Plans: Consultant shall prepare Draft and Final EWMP Plans incorporating the above information and: 8.5.1 Incorporate and where necessary, develop milestones and compliance schedules into the EWMP to measure progress toward addressing the highest water-quality priorities and achieving applicable WQBELs and/or RWLs in the shortest time as possible taking into account technological, operation, and economic factors, 8.5.2 As needed, propose modifications to the LIMP for consideration by the Peninsula EWMP/LIMP agencies and Regional Board. 8.5.3 Outline an adaptive management process for the Peninsula EWMP agencies to 1) support the required every two year comprehensive evaluation of the effectiveness of the EWMP and 2) modify control measures and/or monitoring accordingly to address currently identified priorities and/or future priorities. 8.5.4 Prepare a Draft EWMP Plan as described in the MS4 Permit and this Scope of Work. The Consultant shall provide up to 6 hard copies (double sided) and electronic copies (in Microsoft Word and PDF) of the Draft EWMP Plan. 8.5.5 Finalize EWMP Plan. It is assumed that Consultant will revise the Draft EWMP Plan two times. The Consultant shall provide four weeks for review of the initial Draft EWMP Plan and two weeks for review of the revised Draft EWMP Plan. The Consultant shall provide up to 6 hard copies (double sided) and electronic copies (in Microsoft Word and PDF) of the Final EWMP Plan. 8.5.6 The consultant shall revise the EWMP plan based on the Regional Board's comments within 2 months of receiving the comments. 8.6 Outreach Specific to EWMP Plan Development: Consultant shall conduct up to four (4) meetings specific to EMWP Plan development to perform outreach to community groups, nongovernment organizations, water supply agencies, and other potential project partners and stakeholders to solicit input on EWMP Plan. Deliverables and Schedule: 1. Draft Memorandum as described in Task 8.1: August 2014 2. Draft Memorandum as described in Task 8.2.1 and 8.22 August 2014 3. Draft Memorandum as described in Task 8.2.3-8.2.6 and 8.3: December 2015 4, Draft Memorandum as described in Task 8.4: February 2015 5. Draft EWMP Plan as described in Task 8.5: June 2015 18 of 19 H-79 6. Final EWIVIP Plan as described in Task 8.5: January 2016 It is expected that one revision will be required of each of the draft memoranda. However, memoranda will not be finalized, per se; rather final versions of the information will be presented in the Draft and Final EWMP Plans. 19 of 19 H-80 ATTACHMENT C STANDARD FORM PROFESSIONAL SERVICES AGREEMENT H-81 CITY OF RANCHO PALOS VERDES DESIGN PROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT ("Agreement") is made and entered into this day of 2013, by and between the City of Rancho Palos Verdes(hereinafter referred to as the"C TY")and ,(hereafter referred to as"CONSULTANT"). IN CONSIDERATION of the covenants hereinafter setforth,the parties hereto agree as follows: ARTICLE I SCOPE OF SERVICES 1.1 Proiect Description The Project is described as follows: 1.2 Description of Services CONSULTANT shall: as described in the CITY's Request For Proposals,which is attached hereto as Exhibit'W'and incorporated herein by this reference, and in CONSULTANT's Proposal, which is attached hereto as Exhibit"B" and incorporated herein by this reference. In the event of any conflict between the terms of this Agreement and incorporated documents,the terms of this Agreement shall control. In the event of any conflict between Exhibits "A" and "B," the terms of Exhibit A shall control, except for section in Exhibit B. 1.3 Schedule of Work Upon receipt of written Notice to Proceed from the CITY, CONSULTANT shall perform with due diligence the services requested by the CITY. Time is of the essence in this Agreement. CONSULTANT shall not be responsible for delay, nor shall CONSULTANT be responsible for damages or be in default or deemed to be in default by reason of strikes, lockouts, accidents, or acts of God, or the failure of CITY to furnish timely information or to approve or disapprove CONSULTANT's work promptly, or delay or faulty performance by CITY, other consultants/contractors, or governmental agencies, or any other delays beyond CONSULTANT's control or without CONSULTANT's fault. Page 1 of 11 R6876-000111 347704vl.doc Agreement for Design Professional Services H-82 ARTICLE 2 COMPENSATION 2.1 Fee CITY agrees to compensate CONSULTANT an amount not to exceed dollars ($ for services as described in Article 1. 2.2 Terms of Compensation CONSULTANT shall submit monthly invoices for the percentage of work completed in the previous month. CITY agrees to authorize payment for all undisputed invoice amounts within thirty (30) days of receipt of each invoice. CITY agrees to use its best efforts to notify CONSULTANT of any disputed invoice amounts or claimed completion percentages within ten (10)days of the receipt of each invoice. However, CITY's failure to timely notify CONSULTANT of a disputed amount or claimed completion percentage shall not be deemed a waiver of CITY's right to challenge such amount or percentage. Additionally, in the event CITY fails to pay any undisputed amounts due CONSULTANT within forty-five (45) days after invoices are received by CITY then CITY agrees that CONSULTANT shall have the right to consider said default a total breach of this Agreement and be terminated by CONSULTANT without liability to CONSULTANT upon ten (10) working days advance written notice. 2.3 Additional Services CITY may request additional specified work under this Agreement. All such work must be authorized in writing by the CITY's Director of Public Works prior to commencement. CONSULTANT shall perform such services,and CITY shall pay for such additional services in accordance with CONSULTANT's Schedule of Hourly Rates,which is within Exhibit "B," The rates in Exhibit "B" shall be in effect through the end of this Agreement. 2.4 Term of Agreement This Agreement shall commence on and shall terminate on unless sooner terminated pursuant to Article 4 of this Agreement. Additionally, there shall be --Year options to renew the Agreement with the mutual written consent of both parties. ARTICLE 3 Page 2 of 11 86876-0001\1 347704vl.doc Agreement for Design Professional Services H-83 INDEMNIFICATION AND INSURANCE 3.1 Indemnification, Hold Harmless, and Duty to Defend (a) Indemnity for Design Professional Services. In connection with its design professional services and to the maximum extent permitted by law, CONSULTANT shall hold harmless and indemnify CITY, and its officials, officers, employees, agents and independent contractors serving in the role of CITY officials, and designated volunteers (collectively, "Indemnitees"),with respect to any and all claims,demands, causes of action, damages, injuries, liabilities, losses, costs or expenses, including reimbursement of attorneys' fees and costs of defense (collectively, "Claims" hereinafter), including but not limited to Claims relating to death or injury to any person and injury to any property, which arise out of, pertain to, or relate to in whole or in part to the negligence, recklessness, or willful misconduct of CONSULTANT or any of its officers, employees, subcontractors, or agents in the performance of its design professional services under this Agreement. (b) Other Indemnities. In connection with any and all claims, demands, causes of action, damages, injuries, liabilities, losses, costs or expenses, including attorneys' fees and costs of defense (collectively, "Damages" hereinafter) not covered by Section 3.1(a), and to the maximum extent permitted by law, CONSULTANT shall defend, hold harmless and indemnify the Indemnitees with respect to any and all Damages, including but not limited to, Damages relating to death or injury to any person and injury to any property, which arise out of, pertain to, or relate to the acts or omissions of CONSULTANT or any of its officers, employees, subcontractors, or agents in the performance of this Agreement, except for such loss or damage arising from the sole negligence or willful misconduct of the CITY, as determined by final arbitration or court decision or by the agreement of the parties. CONSULTANT shall defend Indemnitees in any action or actions filed in connection with any such Damages with counsel of CITY's choice, and shall pay all costs and expenses, including all attorneys' fees and experts' costs actually incurred in connection with such defense. Consultant's duty to defend pursuant to this Section 3.1(b) shall apply independent of any prior, concurrent or subsequent misconduct, negligent acts, errors or omissions of Indemnitees. (c) All duties of CONSULTANT under Section 3.1 shall survive termination of this Agreement. 3.2 General Liability CONSULTANT shall at all times during the term of the Agreement carry, maintain, and keep in full force and effect, a policy or policies of Commercial General Liability Insurance, with minimum limits of one million dollars ($1,000,000) for each occurrence and two million dollars($2,000,000) general aggregate for bodily injury, death, loss or property damage for products or completed operations and any and all other Page 3 of 11 86876-0001\1 347704vl.doc Agreement for Design Professional Services H-84 activities undertaken by CONSULTANT in the performance of this Agreement. Said policy or policies shall be issued by an insurer admitted to do business in the State of California and rated in A.M. Best's Insurance Guide with a rating of A:V11 or better. 3.3 Professional Liability CONSULTANT shall at all times during the term of this Agreement, carry, maintain, and keep in full force and effect a policy or policies of professional liability insurance with a minimum limit of one million dollars($1,000,000) per claim and aggregate for errors and/or omissions of CONSULTANT in the performance of this Agreement. Said policy or policies shall be issued by an insurer admitted to do business in the State of California and rated in Best's Insurance Guide with a rating of A:V11 or better. If a "claims made" policy is provided, such policy shall be maintained in effect from the date of performance of work or services on the CITY's behalf until three(3)years after the date of work or services are accepted as completed. Coverage for the post-completion period may be provided by renewal or replacement of the policy for each of the three (3) years or by a three-year extended reporting period endorsement, which reinstates all limits for the extended reporting period. If any such policy and/or policies have a retroactive date, that date shall be no later than the date of first performance of work or services on behalf of the CITY. Renewal or replacement policies shall not allow for any advancement of such retroactive date. 3.4 Automobile Liability CONSULTANT shall at all times during the term of this Agreement obtain, maintain, and keep in full force and effect, a policy or policies of Automobile Liability Insurance,with minimum of one million dollars($1,000,000)per claim and occurrence and two million dollars ($2,000,000) in the aggregate for bodily injuries or death of one person and five hundred thousand dollars ($500,000) for property damage arising from one incident. 3.5 Worker's Compensation CONSULTANT agrees to maintain in force at all times during the performance of work under this Agreement worker's compensation insurance as required by the law. CONSULTANT shall require any subcontractor similarly to provide such compensation insurance for their respective employees. 3.6 Notice of Cancellation (a) All insurance policies shall provide that the insurance coverage shall not be cancelled or modified by the insurance carrier without thirty(30) days prior written notice to CITY, or ten (10) days notice if cancellation is due to nonpayment of premium. Page 4 of 11 86876-0001\1 347704vl.doc Agreement for Design Professional Services H-85 Additionally, CONSULTANT shall provide immediate notice to the City if it receives a cancellation or policy revision notice from the insurer. (b) CONSULTANT agrees that it will not cancel or reduce any required insurance coverage. CONSULTANT agrees that if it does not keep the aforesaid insurance in full force and effect, CITY may either immediately terminate this Agreement or, if insurance is available at a reasonable cost, CITY may take out the necessary insurance and pay, at CONSULTANT's expense, the premium thereon. 3.7 Entire Policy and Certificate of Insurance At all times during the term of this Agreement, CONSULTANT shall maintain on file with the CITY Clerk both a copy of the entire policy and a certificate of insurance showing that the aforesaid policies are in effect in the required amounts. The commercial general liability policy shall contain endorsements naming the CITY,its officers,agents and employees as additional insureds. 18 Primary Coverage The insurance provided by CONSULTANT shall be primary to any coverage available to CITY. The insurance policies (other than workers compensation and professional liability) shall include provisions for waiver of subrogation. ARTICLE 4 TERMINATION 4.1 Termination of Agreement (a) This Agreement may be terminated at any time,with or without cause, by the CITY upon thirty(30)days prior written notice or by CONSULTANT upon ninety(90) days prior written notice. Notice shall be deemed served if completed in compliance with Section 6.14. (b) In the event of termination or cancellation of this Agreement by CONSULTANT or CITY, due to no fault or failure of performance by CONSULTANT, CONSULTANT shall be paid compensation for all services performed by CONSULTANT, in an amount to be determined as follows:for work satisfactorily done in accordance with all of the terms and provisions of this Agreement as determined by the CITY, CONSULTANT shall be paid an amount equal to the percentage of services performed prior to the effective date of termination or cancellation in accordance with the work items; provided, in no event shall the amount of money paid under the foregoing provisions of this paragraph exceed the amount which would have been paid to CONSULTANT for the full performance of the services described in this Agreement. Page 5 of 11 R6876-0001\1 347704vl.doe Agreement for Design Professional Services H-86 ARTICLE 5 OWNERSHIP OF DOCUMENTS 5.1 Ownership of Documents and Work Product All final documents, plans, specifications,reports, information, data, exhibits, photographs, images, video files and media created or developed by CONSULTANT pursuant to this Agreement ("Written Products") shall be and remain the property of the CITY without restriction or limitation upon its use, duplication or dissemination by the CITY. All Written Products shall be considered "works made for hire,"and all Written Products and any and all intellectual property rights arising from their creation, including, but not limited to, all copyrights and other proprietary rights, shall be and remain the property of the CITY without restriction or limitation upon their use, duplication or dissemination by the CITY. CONSULTANT shall not obtain or attempt to obtain copyright protection as to any Written Products. CONSULTANT hereby assigns to the CITY all ownership and any and all intellectual property rights to the Written Products that are not otherwise vested in the CITY pursuant to the paragraph directly above this one. CONSULTANT warrants and represents that it has secured all necessary licenses, consents or approvals to use any instrumentality,thing or component as to which any intellectual property right exists, including computer software, used in the rendering of the services and the production of all Written Products produced under this Agreement,and that the CITY has full legal title to and the right to reproduce the Written Products. CONSULTANT shall defend, indemnify and hold the CITY,and its elected officials, officers, employees, servants,attorneys, designated volunteers,and agents serving as independent contractors in the role of CITY officials, harmless from any loss, claim or liability in anyway related to a claim that CITY's use of any of the Written Products is violating federal,state or local laws, or any contractual provisions, or any laws relating to trade names, licenses, franchises, copyrights, patents or other means of protecting intellectual property rights and/or interests in products or inventions. CONSULTANT shall bear all costs arising from the use of patented, copyrighted, trade secret or trademarked documents, materials, equipment,devices or processes in connection with its provision of the services and Written Products produced under this Agreement. In the event the use of any of the Written Products or other deliverables hereunder by the CITY is held to constitute an infringement and the use of any of the same is enjoined, CONSULTANT, at its expense, shall: (a) secure for CITY the right to continue using the Written Products and other deliverables by suspension of any injunction, or by procuring a license or licenses for CITY; or(b) modify the Written Products and other deliverables so that they become non-infringing while remaining in compliance with the requirements of this Agreement. This covenant shall survive the termination of this Agreement. Page 6 of 11 86876-000111 347704vl.doc Agreement for Design Professional Services H-87 Upon termination, abandonment or suspension of the Project, the CONSULTANT shall deliver to the CITY all Written Products and other deliverables related to the Project without additional cost or expense to the CITY. If CONSULTANT prepares a document on a computer, CONSULTANT shall provide CITY with said document both in a printed format and in an electronic format that is acceptable to the CITY. ARTICLE 6 GENERAL PROVISIONS 6.1 Representation The CITY representative shall be the Director of Public Works or his or her designee, and CONSULTANT shall notify CITY of CONSULTANT's designated representative. These individuals shall be the primary contact persons for the parties regarding performance of this Agreement, 6.2 Fair Employment Practices/Equal Opportunity Acts In the performance of this Agreement, CONSULTANT shall comply with all applicable provisions of the California Fair Employment Practices Act (California Government Code Sections 12940-48), the applicable equal employment provisions of the Civil Rights Act of 1964 (42 U.S.C. 200e-217), and the Americans with Disabilities Act of 1990 (42 U.S.C. § 11200, et seg.). 6.3 Personnel CONSULTANT represents that it has, or shall secure at its own expense, all personnel required to perform CONSULTANT's services under this Agreement. Any person who performs engineering services pursuant to this Agreement shall be licensed as a Civil Engineer by the State of California and in good standing. CONSULTANT shall make reasonable efforts to maintain the continuity of CONSULTANT's staff who are assigned to perform the services hereunder and shall obtain the approval of the Director of Public Works of all proposed staff members who will perform such services. CONSULTANT may associate with or employ associates or subcontractors in the performance of its services under this Agreement, but at all times shall CONSULTANT be responsible for its associates and subcontractors' services. 6.4 CONSULTANT's Representations CONSULTANT represents, covenants and agrees that: a)CONSULTANT is licensed,qualified, and capable of furnishing the labor, materials, and expertise necessary to perform the services in accordance with the terms and conditions set forth in this Agreement; b)there are no obligations, commitments, or impediments of any kind that will Page 7 of 11 86876-0001\1 347704vl.doc Agreement for Design Professional Services H-88 limit or prevent CONSULTANT's full performance under this Agreement; c) to the extent required by the standard of practice, CONSULTANT has investigated and considered the scope of services performed, has carefully considered how the services should be performed, and understands the facilities,difficulties and restrictions attending performance of the services under this Agreement. 6.5 Conflicts of Interest CONSULTANT agrees not to accept any employment or representation during the term of this Agreement or within twelve(12)months after completion of the work under this Agreement which is or may likely make CONSULTANT "financially interested" (as provided in California Government Code Sections 1090 and 87100) in any decisions made by CITY on any matter in connection with which CONSULTANT has been retained pursuant to this Agreement. 6.6 Legal Action (a) Should either party to this Agreement bring legal action against the other, the validity, interpretation, and performance of this Agreement shall be controlled by and construed under the laws of the State of California,excluding California's choice of law rules. Venue for any such action relating to this Agreement shall be in the Los Angeles County Superior Court. (b) If any legal action or other proceeding, including action for declaratory relief, is brought for the enforcement of this Agreement or because of an alleged dispute, breach,default or misrepresentation in connection with this Agreement,the prevailing party shall be entitled to recover reasonable attorneys' fees, experts' fees, and other costs, in addition to any other relief to which the party may be entitled. (c) Should any legal action about a project between CITY and a party other than CONSULTANT require the testimony of CONSULTANT when there is no allegation that CONSULTANT was negligent, CITY shall compensate CONSULTANT for its testimony and preparation to testify at the hourly rates in effect at the time of such testimony. 6.7 Assignment Neither this Agreement nor any part thereof shall be assigned by CONSULTANT without the prior written consent of the CITY. Any such purported assignment without written consent shall be null and void, and CONSULTANT shall hold harmless,defend and indemnify the CITY and its officers, officials,employees, agents and representatives with respect to any claim,demand or action arising from any unauthorized assignment. Page 8 of 11 86876-0001\1 347704vl.doe Agreement for Design Professional Services H-89 Notwithstanding the above, CONSULTANT may use the services of persons and entities not in CONSULTANT's direct employ, when it is appropriate and customary to do so. Such persons and entities include, but are not necessarily limited to, surveyors, specialized consultants, and testing laboratories. CONSULTANT's use of subcontractors for additional services shall not be unreasonably restricted by the CITY provided CONSULTANT notifies the CITY in advance. 6.8 Independent Contractor CONSULTANT is and shall at all times remain, as to the CITY, a wholly independent contractor. Neither the CITY nor any of its agents shall have control over the conduct of CONSULTANT or any of the CONSULTANT's employees, except as herein set forth, and CONSULTANT is free to dispose of all portions of its time and activities which it is not obligated to devote to the CITY in such a manner and to such persons, firms, or corporations as the CONSULTANT wishes except as expressly provided in this Agreement. CONSULTANT shall have no power to incur any debt,obligation,or liability on behalf of the CITY or otherwise act on behalf of the CITY as an agent. CONSULTANT shall not, at any time or in any manner, represent that it or any of its agents, servants or employees, are in any manner agents, servants or employees of CITY. CONSULTANT agrees to pay all required taxes on amounts paid to CONSULTANT under this Agreement, and to indemnify and hold the CITY harmless from any and all taxes, assessments, penalties, and interest asserted against the CITY by reason of the independent contractor relationship created by this Agreement. CONSULTANT shall fully comply with the workers' compensation law regarding CONSULTANT and its employees. CONSULTANT further agrees to indemnify and hold the CITY harmless from any failure of CONSULTANT to comply with applicable workers' compensation laws. The CITY shall have the right to offset against the amount of any fees due to CONSULTANT under this Agreement any amount due to the CITY from CONSULTANT as a result of its failure to promptly pay to the CITY any reimbursement or indemnification arising under this Article. 6.9 Titles The titles used in this Agreement are for general reference only and are not part of the Agreement. 6.10 Entire A-greement This Agreement, including any other documents incorporated herein by specific reference, represents the entire and integrated agreement between CITY and CONSULTANT and supersedes all prior negotiations, representations or agreements, either written or oral. This Agreement may be modified or amended, or provisions or breach may be waived, only by subsequent written agreement signed by both parties. Page 9 of 11 86876-0001\1 347704vl doc Agreement for Desugn Professional Services H-90 6.11 Construction In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of this Agreement shall not be resolved by any rules of interpretation providing for interpretation against the party who causes the uncertainty to exist or against the party who drafted the Agreement or who drafted that portion of the Agreement. 6.12 Non-Waiver of Terms, Rights and Remedies Waiver by either party of any one or more of the conditions of performance under this Agreement shall not be a waiver of any other condition of performance under this Agreement. In no event shall the making by the CITY of any payment to CONSULTANT constitute or be construed as a waiver by the CITY of any breach of covenant, or any default which may then exist on the part of CONSULTANT, and the making of any such payment by the CITY shall in no way impair or prejudice any right or remedy available to the CITY with regard to such breach or default. 6.13 Severability If any term or portion of this Agreement is held to be invalid, illegal, or otherwise unenforceable by a court of competent jurisdiction, the remaining provisions of this Agreement shall continue in full force and effect. 6.14 Notice Except as otherwise required by law, any payment, notice or other communication authorized or required by this Agreement shall be in writing and shall be deemed received on(a)the day of delivery if delivered by hand or overnight courier service during CONSULTANT's or CITY's regular business hours or(b) on the third business day following deposit in the United States mail, postage prepaid,to the addresses listed below, or at such other address as one party may notify the other: To CITY: Responsible Person: City of Rancho Palos Verdes 30940 Hawthorne Blvd. Rancho Palos Verdes, CA 90275 To CONSULTANT: Responsible Person: Address: Page 10 of 11 R6876-0001\1 347704vl.doc Agreement for Design Professional Services H-91 IN WITNESS WHEREOF,the parties hereto have executed this Agreement as of the date and year first above written. Dated: ("CONSULTANT") By: Printed Name.- Title: By: Printed Name: Title: Dated: CITY OF RANCHO PALOS VERDES ("CITY") By: Mayor ATTEST: APPROVED AS TO FORM: By: By: City Clerk City Attorney Page 11 of 11 86876-0001\1 347704vl.doc Agreement for Design Professional Services H-92 ATTACHMENT d GIS LICENSE AND CONFIDENTIALITY AGREEMENT SMAPLES H-93 Reset Fnrrn ��'ririt'Fainm CITY OF RANCHO PALOS VERDES LICENSE AND CONFIDENTIALITY AGREEMENT FOR GEOGRAPHIC INFORMATION SYSTEMS DATA THIS AGREEMENT, affective as of the date specified below in Section 1, is entered into between the City of Rancho Palos Verdes, a municipal corporation ("City") and ("Licensee"). RECITALS A. City owns, maintains, and periodically updates Geographic Information Systems data and databases that are more specifically described in the attached Schedule 1 and that are referenced herein as "GIS data. B. Licensee has requested use of the GIS Data to be used exclusively by Licensee for the specific project described as ("Project"). C. City is willing to provide the GIS Data to Licensee without charge, subject to Licensee's acceptance of the terms and conditions of this Agreement. In consideration of the mutual covenants and conditions set forth below,, the parties agree as follows. AGREEMENT 1. TERM. This Agreement is effective on the date that the last of the parties, whether City or Licensee, executes this Agreement. It is the intention of the parties that Licensee will first execute this Agreement and then submit it to the City. The City Clerk will attest to the execution of all counterparts of this Agreement by City's duly authorized representative and transmit one or more fully executed counterparts to Licensee. This Agreement shall continue in effect until the Project has been completed unless sooner terminated pursuant to the contract documents for the Project. 2. GRANT OF LICENSE. City hereby grants to Licensee, and Licensee hereby accepts, a nonexclusive, nontransferable, and nonassignable license to use the GIS Data from the effective date of this Agreement until the completion or earlier termination of the Project, as provided for above in Section (1). H-94 3. AUTHORIZED USE OF LICENSED GIS DATA. A. Licensee must restrict access to the GIS Data to those employees or agents assigned the responsibility for use of the GIS Data in connection with the Project. Licensee must take all commercially reasonable actions to prevent access to the GIS Data by unauthorized persons. B. Except as authorized by this Agreement, Licensee agrees that no part of the GIS Data may be reproduced, or stored in a retrieval system, or transmitted in any form, whether electronic, mechanical, or otherwise, without the City's prior written consent; provided, however, that Licensee is authorized to make backup copies of the GIS Data solely for archival purposes. C. Licensee's use of the GIS Data is authorized by City exclusively for Licensee's completion of the Project described in this Agreement, and not for additions to this Project or completion of this Project by others. D. Use of the GIS Data for any purpose not expressly authorized by this Agreement requires the execution of a separate agreement with the City, or a written modification of this Agreement. E. Licensee agrees that it shall not solicit for sale, sell, loan, rent, lease, sublicense, donate, or share with unauthorized third parties the licensed GIS Data. 4. SPECIAL TERMS AND CONDITIONS. A. City makes no representations concerning the compatibility of the GIS Data with any hardware or software used by Licensee. B. City makes no representations concerning the accuracy or inclusiveness of the licensed GIS Data, nor their fitness for a particular purpose. C. All licensed GIS Data are and will remain the City's property. D. City has no obligation to provide updates to the licensed GIS Data. The delivery of any updated GIS Data is subject to the execution of a separate agreement by the parties, or a written modification of this Agreement. E. Licensee assumes all responsibility for verifying the accuracy of the GIS Data and for safeguarding against unintended or inappropriate use of the GIS Data. F. Licensee will assist the City in enhancing the reliability of the GIS Data by providing to the City information concerning any errors or discrepancies that are discovered while using the GIS Data, 2 H-95 5. INDEMNIFICATION AND HOLD HARMLESS. X To the maximum extent authorized by law, Licensee shall indemnify, defend, and hold harmless the City, its officers, employees, agents, and contractors,from and against all claims, actions, damages, losses, expenses, penalties, and liabilities of any kind, including attorney's fees and administrative costs, attributable to or arising out of Licensee's use of the GIS Data, or their use by unauthorized third-party recipients, or from City's efforts to enforce this Agreement. B, Licensee hereby releases City from all claims, actions, liabilities, losses, and damages, including consequential or incidental damages, loss of profits, and indirect, special, or other damages, attributable to or arising out of Licensee's use of the GIS Data. 6. TERMINATION OF AGREEMENT. Upon termination of this Agreement, Licensee must delete from Licensee's computer network system, and from tape and disk storage devices and individual computers, all electronic copies, backups, and archives of the GIS Data and any derivatives thereof. 7. NOTICES. Any notices that either party may desire to give to the other party under this Agreement must be in writing and may be given either by (i) personal service; (ii) delivery by a reputable document delivery service, such as but not limited to, Federal Express, that provides a receipt showing date and time of delivery; or (iii) mailing in the United States Mail, certified mail, postage prepaid, return receipt requested, addressed to the address of the party set forth below or at any other address that party may later designate by notice: To City: City of Rancho Palos Verdes 30940 Hawthorne Boulevard Rancho Palos Verdes, CA 90275 Attention: City Manager To Licensee: 3 H-96 TO EFFECTUATE THIS AGREEMENT, the parties have caused their duly authorized representatives to execute this Agreement on the dates set forth below. ATTEST: "CITY" By: CITY OF RANCHO PALOS VERDES Carla Morreale, City Clerk By: Carolyn Lehr, City Manager Reviewed by Department Head: Date: Reviewed by Director of Finance& Information Technology Date: "LICENSEE" By: Title: Date: 4 H-97 SCHEDULE 1 DESCRIPTION OF LICENSED GIS DATA GIS DATA FILES WERE PREPARED ON THE FOLLOWING: Computer Hardware: Operating System: SSRI Software: Version: Date of Release.- DESCRIPTION elease:DESCRIPTION OF LICENSED GIS DATA: H-98 DISCLAIMER LOS ANGELES COUNTY STORM DRAIN SYSTEM The Los Angeles County Storm Drain System shows drains, channels, catch basins, and debris basins in the County of Los Angeles. it currently includes facilities owned and maintained by the Los Angeles County Flood Control District (District), Cities, and the United States Army Corps of Engineers (Corps). Department of Public Works Internet Disclaimer By viewing this website and accessing any of the Information (as defined below) thereon, you agree as follows: Disclaimer of Warranties and Representations The data available on this website, including but not limited to all Computer Aided Design (CAD) as well as Geographic Information Systems ("GIS") data, maps, tables, numbers, graphics, and text(hereinafter collectively referred to as the "Information"), is provided "AS IS" and you view, access, copy, distribute and otherwise use this Information at your own risk. The County of Los Angeles, its Department of Public Works ("DPW"), its affiliated entities, elected and appointed officers, officials, employees and agents (hereinafter referred to as the "County") make no representation or warranty of any kind regarding this website or Information, express or implied. Without limiting any of the foregoing, the County does not represent or warrant that (1) this website or the Information on this website is error-free, accurate, current, complete, adequate, reliable or useful, either in isolation or in the aggregate, (2) defects with this website or the Information will be corrected or that, (3) this website, the Information, or this website's servers is free of viruses or other harmful components, (4) this website or the Information will be secure or will be accessible continuously and without interruption. Further without limiting any of the foregoing, County makes no warranty or guarantee as to the ownership of any intellectual property or other property interest contained in the Information. Furthermore, the County expressly disclaims any responsibility to defend or indemnify you against claims which others may assert based on the copying, distribution, or other use of any such information. Information on this website is not intended to constitute advice nor is it to be used as a substitute for specific advice from a licensed professional. You should not act (or refrain from acting) based upon Information on this website without independently verifying the original source information and, as necessary, obtaining professional advice regarding your particular facts and circumstances. H-99 DISCLAIMER LOS ANGELES COUNTY STORM DRAIN SYSTEM To the extent permissible under applicable law, the County disclaims all warranties, express or implied, including but not limited to the implied warranties of merchantability, fitness for a particular purpose, freedom from contamination by computer viruses, title and non - infringement of proprietary rights. Disclaimer of Liability The County shall not be liable for any conduct, acts or omissions occurring with the Information or at this website. In addition, the County shall not be liable for any special, indirect, incidental or consequential damages that may arise in any way from the use of, or the inability to use, this website or the Information contained therein regardless of the source of the Information. This disclaimer of liability applies to any damages or injury, including but not limited to those caused by any failure of performance, error, omission, interruption, deletion, defect, delay in operation or transmission, computer virus, communication line failure, or theft, destruction or alteration of or unauthorized access to or dissemination of any record, whether based upon breach of contract,tortious behavior, negligence,violation of statute or any other cause of action. Indemnification You agree to defend, indemnify, and hold harmless the County from and against any and all liability, including but not limited to demands, claims, actions, fees, costs, and expenses (including attorneys and expert witness fees) arising out of or related to the use of this website or any Information thereon by or on behalf of you. No Endorsement Reference to any specific product, computer software, process, or service by trade name, trademark, website, or manufacturer does not constitute or imply endorsement or recommendation by the County. No Warranty As To Links to Other Websites The County has not reviewed all third party sites linked to or framing this website and is not responsible for the content of any pages of such third party sites. Links to the third party sites are not intended to, and do not imply affiliation with or sponsorship or endorsement of, these third party sites, The County shall not be liable for any damages incurred as the result of the use of any such third party sites and their content. The linking to any other pages connected to other sites is at your own risk. 2 H-100 DISCLAIMER LOS ANGELES COUNTY STORM DRAIN SYSTEM Privacy and Security Policy;Terms of Use Unless otherwise expressly noted in these Disclaimers, you acknowledge and agree that your use of this website and the Information is subject to DPWs Privacy and Security Policy and Terms of Use (http://www.ladpw.org/general/TermsOfUse.cfm) in all respects. Forum Selection/Choice of Law You agree that jurisdiction over and venue in any legal proceeding directly or indirectly arising out of or relating to these Disclaimers or the ownership, operation or maintenance of this website,or the Information shall be resolved exclusively in the appropriate state or federal court in Los Angeles County, California. Resolution of all such disputes shall be governed by the laws of the State of California. In addition, the City of Los Angeles information contained in this website is subject to the following conditions: City of Los Angeles Intellectual Property "Disclaimer" on Materials Released Under California Public Records Act "Enclosed materials may be protected by copyright and/or trademark laws. The materials are provided under the California Public Records (Gov. C. Sections 6250 et seq.). No copyright and/or trademark licenses have been conferred herein by the City of Los Angeles for any intellectual property owned by the City of Los Angeles or other third parties. Use of the materials may be subject to U.S. and international copyright and trademark laws. Where applicable, users of the materials are responsible for obtaining the licenses from respective right owners." Los Angeles City Attorney's Office Intellectual Property Unit General Counsel Practice Group I AGREE WITH THE LOS ANGELES COUNTY STORM DRAIN SYSTEM DISCLAIMER. Sign City/Organization Representative: Print Representative Name and Title: City/Organization: 3 H-101 Exhibit "B": Consultant's Proposal and Schedule of Hourly Rates Exhibit "B" R6876-0001\1633124v3.doc Agreement for Design Professional Services Exhibit "B": Consultant's Proposal and Schedule of Hourly Rates Exhibit "B" 86876-0001\1 347704vl,doc Agreement for Design Professional Services H-102 .. .,.... ......... ... ...... ..... ..... �.nh1 1 �'m" ,r ✓�, �iM,!�Mw / M / `� r/ / ,,,�i// ii ,� r�r�r rr/ri r . ......... k i do, P/ ��r /iiiiii6 i J i rr %/,: r / , , ,,,,, r �;.� � -" „, �� r �iiiiiii r/i%/ilii r / /%// ter,,,,, ✓/%///� �� lii0 %/ ire t, Prepared For: Palos Verdes Peninsula Watershed Group Attn: Andy Winje, Associate Engineer City of Rancho Palos Verdes 30940 Hawthorne Blvd Rancho Palos Verdes, CA 90275 Prepared By: John L. Hunter & Associates and Geosyntec Consultants John L.-flunter Geosyntec +acaau�araxa.` Q 01sl11iIl' `i H-103 TABLE OF CONTENTS Firms'QuaUOcadmuo—_—..._.—___---_-----------------....—....... --------.—._.J A. John l^ IIooter&Associates_'..............,....—~... ...............~...............-- ....... —__'.l B. GeomyntecConeoltan\s-----------....... ----- ................-------...........---.......... ..2 C. Kinoe6cLaboratories... ........------........... —........ .........--_----- ...... -- ......---....... — ....3 |. Key Staff and Management Stroctnra---.......... --- ...... --............. ----_—.............. ....... ......5 A. Key Staff Roles....... ............ _------_—.......---.......... _-----------....... ....6 EL Qualifications ufKey ytaf ---_.~__.---......... ... —......................... —........---.......--- ......... 7 IL General Scope ofSecvicos~_..—_ .....--.'.~. ...................... ........—_— ................... ... '---- —.~..'l2 DLSpecific Tasks.....~'............. ._..___.._---...........—..__---_-___—_ ........... .... l4 l. Project Cormjina6moan6 _ ... ......................---_......-----_-- ... 4 2. Enhanced Watershed ManagementProgram Work Plan...... ...—.-.—........._—_.___---��4 3. Coordinated Integrated Monitoring Plan-------- ................------ ...... --_----.�19 4� Enhanced Watershed management program plan........... ...---- ...... --- ......................... ... ..22 BFROm3TyJ3LBEXPRESSED D0HO[7RS— ......—_......... ....... ----..................... ----------- .....27 Appendix AcStandard Rate Sdhedulem--...----.---------- .................... ------------&I AppendixB-,Resumes.... .......... ........... ..—...... .............._..--...—........., ...._._..~.— ...... _. ...8l Appendix C:[emdLedProject Experience Descriptions and refercmces ........ -----_-------- ...[l /LHARelated Project Expezience-- ....—............----- ...... ..... ...........— ...... -------- .....--.C2 { eosyotecRelated Project -- ........ ~~.-- ......... ......... —........... ....... . ....... -.—.— ..... �C4 Appendix[):Task 5chednle..—.—..—_—...—~..------_------_—_-- ......... .......—......'..—. .....�Dl H-1 04 us= Enhanced Watershed Management Program Proposal. John L.Hunter & Associates (JLHA) and Geosyntec Consultants (Geosyntec) appreciate the opportunity to submit our proposal to assist the Palos Verdes Peninsula Watershed Group with the development of an Enhanced Watershed Management Plan under the National Pollution Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System Permit (MS4 Permit) Order No. R4-2012-0175. The services described in this scope of work will be performed jointly by JLHA and Geosyntec, with John L. Hunter of JLHA assuming the role of primary representative and Kathleen McGowan of Geosyntec assuming the role of alternate representative. JLHA and Geosyntec also plan to team with experienced contractor, Kinnetic Laboratories, Inc. (KLI), for the monitoring components of this scope of work. FIRMS' QUALIFICATIONS JLHA and Geosyntec have both implemented numerous projects relating to the NPDES program, M54 permit, and Total Maximum Daily Load (TMDL) implementation demonstrating our ability to successfully complete the work laid out in this Request for Qualifications (RFQ). Both firms have extensive experience working on the Palos Verdes Peninsula, and this experience and knowledge will be invaluable in the timely and cost-efficient development of an Enhanced Watershed Management Program (EWMP) for the Palos Verdes Peninsula EWMP Agencies. Below is a brief description of each firms' qualifications. Please see Appendix C for detailed project descriptions and references. A. JOHN L. HUNTER&ASSOCIATES John L. Hunter and Associates has considerable experience assisting municipalities with NPDES MS4 permit (stormwater) compliance programs and has had continuing contracts with clients for the administration of environmental programs since 1985. JLHA is currently implementing NPDES MS4 programs for 20 cities in a tri-county area with populations ranging from 5,000 to 140,000. Land uses in these areas vary from highly industrialized to commercial, residential and semi-rural. JLHA has been providing NPDES M54 stormwater services to the Palos Verdes Peninsula since 1994. JLHA provides NPDES services to multiple cities in the following watersheds: • Santa Monica Bay • Los Angeles River • Ballona Creek Dominguez Channel Santa Arta River Anaheim Bay/Huntington Harbor San Gabriel River H-105 ME= Enhanced Watershed Management Program.Proposal JLHA currently provides stormwater services to agencies located within the following watersheds and subwatersheds: Watershed Subwatersheds and Tributaries EWNCEMP�' WO X�IWMIOMMC�ittMNKNNI N 0 Santa Monica Bay Ballona Creek Beaches Dominguez Channel/LA Harbor Dominguez Channel Greater LA Harbor Machado Lake Los Angeles River Estuary Reach 1 Reach 2 Compton Creek Rio Hondo .......... San Gabriel River Estuary Reach 1,2,4,5 Coyote Creek San Jose Creek Walnut Creek Santa Ana River Middle San Antonio Creek ,B Bear Lake ........... ................. ..... Los Cerritos Channel Anaheim Ba/Huntington Harbor In addition to NPDES MS4 permit implementation activities,JLHA has participated in the drafting and implementation of numerous TMDL Implementation Plans, including the Santa Monica Bay Bacteria J7, the Machado Lake Trash and Nutrient TMI)Ls, and the Los Angeles River Metals and Trash TMI)Ls. B. GEOSYNTEC CONSULTANTS Geosyntec Consultants is an employee-owned company with offices throughout the United States, including local offices in Los Angeles and Huntington Beach. Geosyntec works with public and private sector clients to address complex problems involving the environment,natural resources, and civil infrastructure. Geosyntec understands the business of local government and the daily demands of strict accountability, tight budgets, deadlines, and answering to a diverse range of constituents. Geosyntec has served municipalities and local/regional agencies throughout the United States since its founding in 1983 by providing services in stormwater quality planning, water 0 H-106 ME= Enhanced Watershed Management Program Proposal resources, environmental consulting, and engineering design and construction management. Geosyntec is known for its innovative work in stormwater and surface water quality management, including TMDL studies and.implementation plans, specifically in the Los Angeles region, technical guidance manuals, including BMP and LID manuals; hydromodification assessments and mitigations;BMP design and assessment; strategic monitoring support; adaptive management; development of construction, industrial, and municipal NPDES compliance programs; and erosion and sediment control. Within the California stormwater practice, Geosyntec frequently leads state-of-the-practice workshops on stormwater management, NPDES requirements, erosion and sediment control, and regulatory relief strategies. Geosyntec recently completed a study for Ventura County on the feasibility of meeting low nutrient limits for submittal to USEPA. Geosyntec is also the author of the RWQCB-approved SBPAT model. Geosyntec has developed and presented in-depth analyses of both WMMS and SBPAT, the two Regional Board approved models for use in the Reasonable Assurance Analysis .requirement of the MS4 permit. Geosyntec's project team includes staff who have coordinated closely with Courity staff to review and troubleshoot WMMS as well as staff who developed SBPAT. Because Geosyntec has executed and investigated both models already, its staff is uniquely able to objectively and comprehensively evaluate and implement both RAA models. C. KINNETIC LABORATORIES Mr, Stevenson, principal at Kinnetic Laboratories, has over 35 years of experience working on applied problems in water quality and ecology. He was involved in the desigi-t and implementation of the San Jose/Santa Clara and Alameda stormwater monitoring programs, which were the first programs in the State and served as the template for subsequent MS4 programs in California. He has been instrumental in the development and application of quality control guidance materials for stormwater monitoring in Califorriia. He has over 20 years of experience in stormwater monitoring both for purposes of characterization and BMP performance evaluation. This includes 12 years of work on the City of Long Beach program, which has provided one of the largest,high quality data sets available. The high quality of this data set allowed for development of metals translators for the Los Cerritos Channel TMDL that led to substantial improvements in Waste Load Allocations that will further translate to major cost reductions and more targeted BMIrs. Kirmetic Laboratories, Inc. has provided environmental science services to ilidustry, government, engineering and environmental firms on applied projects for the past 40 —0 H-107 ME= Enhanced Watershed Management Program Proposal years. They have extensive stormwater and BMP monitoring experience developed through groundbreaking work conducted over the past 20-25 years. They have designed and implemented more than 20 major stormwater/watershed projects throughout California, Alaska and Hawaii. on H-108 Knifmn�ed 14.der4ha3 hiuna�;enu;rt 4"rn�;¢am P.mta..al I. KEY STAEC AND MANAGEMENT STRUCTURE Key Stafl and Managem(mt Struaurebetween JLtM and Geosynlec � 0 Y YY 1 Y H-109 Enhanced Watershed Management Program flioposal A. KEY STAFF ROLES The following table summarizes key staff responsibilities for this project. JLHA Key Roles Project Role John Hunter,PE Project I.eadlILHA Project Direct-or • Oversee contracted services • Serveas primary contact with client • Coordinate project implementation with client • Reyie and iTp -tvir t ��nmen a] Jillian Brickey,MSES,CPSWQ, QSI) Project Managerl Senior Reviewer • Serve as alternate contact with client • Assist client with project management tasks • Assess regulatory compliance • Review and_y I�.. p are me.nta.l..plans ............. . Susan Dworsky,MESM Task Lead • Serve as alternate contact with client • Coordinate project implementation with client • Assess regulatory compliance Mikki Klee, CPESC-IT Task Lead • Assist Project Managers with project implementation • Review environmental plans Anne Chang Outreach Manager • Produce and distribute outreach materials • Develop and implement outreach campaigns • Conduct outreach meetings ................................... Geosyntec Key Roles Project Role .. . ... Ken Susilo,P.E.,D.WRE,CPSW .. ......... Q Geosyntec Project Director • Quality assurance of Geosyntec deliverables • Guidance to project manager and project staff • Manage senior review of Geosyntec project deliverables and provide review of overall project deliverables Kathleen McGowan,P.E. Geosyntec Project • Coordinate work flow between fL.HA and Geosyntec Consultants Managerl.Atternate Project Lead • Manage Geosyntec project staff • Prepare,conduct,and attend regular,special,and stakeholder meetings d­WiIII.Regional Board ..................... ................. Scott Struck,P.E.PWS RAA Senior Reviewer • Provide technical input on RAA approach • Provide senior review for RAA work.products Brandon Steets,P.E. LIMP Senior Review 0 Provide technical input on LIMP approach ---*,--,,Pr,o..v,id,e,,se,n,i,,or,re.vi,e,w,,for CIMP wor.kT �t�s ----------- Rebecca Botchelder,P.E. RAA Task Lead 0 Manage RAA tasks and technical staff • D e v I o p RAA technical appro,ach ............. H-110 1121= Enhanced VVatersbed Management Program Proposal Ge.osyntec Key Roles Project Role ............. Megan Otto,AE. CIMP Task Lead • Manage CIMP tasks and technical staff • Develop LIMP tedrnical approach Scott Mansell,ME) RAA Technical Staff • Develop RAA model .... ....... —------ ......- Christopher Wessel,P.E. CIMP Technical Staff • Lead site selection and field verification effort • Lead new development/redeye�o,ment effectiveness tracking effort ...........------ .......... B. QUALIFICATIONS OF KEY STAFF Below is a brief description of the overall history and qualifications of the key staff. Full resumes can be viewed in Appendix B, John Hunter, PE—Project Lead/JLHA Project Director Mr, Hunter is the President of JL1 IA, with over 30 years of experience in the environmental compliance fields of NPDES and Industrial Waste/FOG Control. He is a Certified Professional Chemical Engineer and a Registered Environmental Assessor. His relevant experiences include implementing and managing all aspects of NPDES Permit and FOG Control provisions for municipalities. He specializes in providing executive oversight and guidance to clients for these programs, as well as preparing and reviewing environmental plans. Mr. Hunter holds a B.S. in Chemical Engineering from California State University Long Beach and a B.S. and Biology from University of California Irvine. Kathleen McGowan—Geosyntec Project Manager/Alternate Project Lead Ms. McGowan's professional experience spans 25 years of varied environmental work for public and private clients including: NPDES permit compliance and negotiation, water quality monitoring, TM JL implementation planning, environmental compliance, industrial and hazardous waste management, site investigations and due diligence. Kathleen has won favorable regulatory/permit modifications for clients and has assisted clients in securing more than$3 million in grant funding for water quality projects, two of which have won multiple awards. She has developed sampling and analysis plans, quality assurance plans, conducted field monitoring, prepared work plans, cost estimates, regulatory analyses and technical reports. Ms. McGowan holds an M.S. in Environmental Engineering from Georgia Institute of Technology and a B.S. in Chemical Engineering from The Johns Hopkins University. H-111 Enhanced Watersbod Management program Proposal Jillian Brickey, MSES, CPSWQ, QSD/P—Project Manager/Senior Reviewer Ms. Brickey is a Programs Manager with JLHA with over seven years of experience in the environmental compliance fields of NPDES and Industrial Waste/FOG Control. She is a Certified Professional in Stormwater Quality and a Qualified SWPPP Developer and Practitioner. Her relevant experiences include implementing and managing all aspects of NPDES Permit and FOG Control provisions for municipalities. She specializes in managing the plan development element of these programs,such as environmental plan preparation and review. Ms. Brickey holds an M.S. in Environmental Science from California State University Fullerton and a B.S.in Zoology from California State Polytechnic University Pomona. Susan Dworsky, MES M—Task Lead Ms. Dworsky is a Watershed Management Specialist with JLHA with over six years of experience in the environmental compliance and management field and five years of experience with NPDES and stormwater/watershed management. Her relevant experiences include implementing and managing all aspects of NPDES Permit and FOG Control provisions for various municipalities. She specializes in TMDL implementation and watershed management, Ms. Dworsky holds an M.S. in Environmental Science and Management from University of California, Santa Barbara and a B.A. in.Environmental Studies from University of North Carolina, Chapel Hill. Mikki Klee, EIT, CPESC-IT—Task Lead Ms. Klee is an Engineer with JLHA with over two years of experience in the environmental compliance fields of NPDES. She is a Certified Engineer in Training and a Certified Professional in Erosion and Sediment In-Training. She specializes in the plan development element of NPDES programs, such as environmental plan preparation and review. Ms. Klee holds a B.S. in Civil Engineering from California State Polytechnic University Pomona. Anne Chang—Public Outreach Manager Ms. Chang is a Public Outreach Manager with JLHA with more than 13 years experience in the public outreach aspect of municipal environmental programs such as NPDES and Industrial Waste/FOG Control. Her relevant experiences include assisting municipalities in planning, developing, facilitating and implementing activities and campaigns based on the guidelines of these programs. Ms. Chang specializes in producing outreach materials and organizing campaigns. H-112 .Emm E'Tlhanced Watershed Management Progra-in Proposal Ms. Chang holds an M.A. iri Communications, Emphasis in Public Relations, from California State University Fullerton. Ken Susilo, PE, D.WRE, CPSWQ-Geosyntec Project Director Mr, Susilo has over 20 years of experience in planning, permitting, engineering design, hydraulics,hydrology, computer modeling, storm water management, and integrated 'water resources. His efforts focus on the development of multi-benefit, environmentally sensitive solutions to design and planning efforts, while cost-effectively leveraging leading-edge technologies to enhance the natural and built environment. He has managed TMDL Implementation Plans and directed the groundbreaking GIS-based Structural BMP Prioritization and Analysis Tool. He has also served as an Expert Witness in cases involving storm water, hydrology, flooding, and water quality. In 2006, Mr. Susilo was recognized as the ASCE Outstanding Civil Engineer in the Private Sector by the Los Angeles Section and ASCE Region 9. Mr. Susilo holds an M.S. and B.S. in Civil Engineering from the University of California, Berkeley, Brandon Steets, P.E.-Senior Review Mr. Steets has over 13 years of experience conducting and managing large water quality modeling and monitoring projects to support NPDES permitting, TMDL implementation, stormwater quality management and planning, and BMP design. His experience includes bacteria source investigations and implementation planning; watershed, receiving water, and stormwater quality modeling;water quality monitoring plan development, implementation, data analysis, and reporting; and storrnwater BMP selection and design. Mr. Steets has led or provided technical support on bacteria TMDL MS4 compliance plans for nine California watersheds, including Morro Bay, Channel Islands Harbor, Malibu Creek, North Santa Monica Bay, Ballona Creek,San Luis Rey, and San Diego River. Mr. Steets,holds an M.S. in Environmental Engineering from the University of California, Santa Barbara and a B.S. in Environmental Engineering from Rensselaer Polytechnic Institute. Scott Struck, Ph.D.-Senior Review Dr. Strucks work focuses on planning and implementation of green infrastructure and other storn-twater best management practices into municipal, county and state programs. This includes identification of opportunities and barriers, screening and prioritization, modeling, design, monitoring, and performance assessment of these systems. He has participated in projects throughout the country designed to monitor the effectiveness of green infrastructure for CSO and stormwater control and support —M H-113 E= Enhanced Watershed Management Pyograrn Proposal planning and implementation of integrated watershed management strategies. Dr. Struck has been involved with selection, design, placement, and cost optimization of runoff management and source control practices (LID and Green Infrastructure techniques) providing decision support for watershed planning and capital improvement projects in the unincorporated areas of Los Angeles County. Dr. Struck holds a Ph.D., in Water Resources from Indiana University at Bloomington as well an M.S. in Water Resources Engineering and an M.P.A in Environmental Policy and Natural Resources Management. Mr. Stuck also holds a B.S. in Zoology and a B.A. in Psychology from the University of Washington, Seattle. Rebecca Batchelder,P.E.—RAA Task Lead Rebecca Batchelder is an environmental and water resource engineer with seven years of project-based experience. She has expertise in the areas of LID and BMP design, regional water resource planning, and watershed monitoring. Her experience includes modeling of pollutant removal; design, installing and permitting of residential graywater reuse systems; and estimating the water quality and quantity benefits of the open space and habitat areas. Ms. Batchelder holds an M.S. in Water Resources and Environmental Engineering and a B.S. in Environmental Engineering from Tufts University. Megan Otto,P.E. QSD/QSP—CIMP Task Lead Megan Otto has contributed to and managed portions of many complex, controversial, and time sensitive projects in the Los Angeles Basin for public, private, and non-profit sectors. f-for project experience includes stormwater planning, industrial and municipal NPDES permit compliance, water quality monitoring and reporting, engineering feasibility studies, hydrologic and hydraulic modeling, and litigation support. She led the planning and implementation of a tiered dry weather storm water tracking and monitoring study for two high priority sub-watersheds under the Jurisdictional Groups 5&6 Santa Monica Bay Beaches Bacteria TMDL Implementation Plan. Ms. Otto holds an M.S. in Environmental Engineering from the University of Massachusetts, Amherst, and a B.S. in Environmental Engineering from California Polytechnic State University, San Luis Obispo. Christopher Wessel, P.E., QSD/QSP—CIMP Technical Staff Chris Wessel has over four years' experience in hydraulics, hydrology, computer modeling, and stormwater management. Mr. Wessel is providing MS4 Permit support to the Cities of Rolling Hills, Rolling Hills Estates and Palos Verdes Estates Hermosa Beach, Manhattan Beach, and El Segundo. He has led BMP monitoring activities in for the Jurisdictional Groups 5&6 Source Identification Study. Other project experience IN H-114 no= Enhanced Watershed Management Program Proposal includes: compliance with water quality objectives including Total Maximum Daily Loads (TMDLs), Basin Plan Objectives, and NPDES effluent limits; stormwater planning and BMP design; hydraulic and hydrologic modeling, with an emphasis on BMP design and evaluation; and dry and wet weather field sampling. Mr. Wessel holds an M.S. in Hydrology and Water Resources Engineering and a B.S. in Civil and Environmental Engineering from the University of California, Los Angeles. D. Scott Mansell, Ph.D.—RAA Technical Staff Dr. Mansell has created and used various hydrologic, hydraulic, water quality, and watershed models. These projects have included analysis and design of BMPs and stormwater infrastructure, water quality regulation compliance assessment, and implementation planning. Dr. Mansell has downloaded and run the Los Angeles County's WMMS model, using the LSPC portion to model various watersheds to assess loading and flow conditions, and the NIMS component to determine optimum flow reductions in for sub-basins. The feedback he provided was used to update the model for others to download and to help clarify how various components of the model are used for EWMP determination. He has provided analyses to compare and contrast SBPAT and WMMS to help clarify and differentiate to stakeholders their individual utility and applicability in the development of RAA modeling for EWMPs. Dr. Mansell holds a Ph.D. and M.S. in Civil and Environmental Engineering from the University of California,, Berkeley and a B.S. in Civil and Environmental Engineering from the University of Utah. H-115 Enhanced Watershed Management Program Proposal H. GENERAL SCOPE OF SERVICES The National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4 permit) Order No. R4-2012-0175, which became effective on December 28, 2012, allows permittees the flexibility to develop EWMPs to customize their stormwater management programs through integrated regional planning. The goal of an EWMP is to prioritize water quality issues, evaluate opportunities for collaborative multi-benefit regional projects, and identify additional watershed control measures that will achieve applicable water quality based effluent limitations (WQBELs) and Receiving Water Limitations (RWLs). During the April 25th, 2013 meeting of the Palos Verdes Peninsula EWMP Group Technical Committee (Peninsula EWMP Agencies), a decision was made to prepare an EWMP on a 30-month schedule. Due to its unique character and features, the City of Rolling Hills will not be participating in the Peninsula Agencies EWMP; however it will be participating in a Coordinated Integrated Monitoring Plan (CIMP) along with the other Peninsula Agencies. We understand that in order to meet the City of Rolling Hills' earlier deadline for submittal of an Integrated Monitoring Program that the CIMP may need to be prepared by the December 28, 2013 deadline, and the Team is prepared to meet that deadline if relief is not provided by LARWQCB staff. The existing TMDL monitoring plans for Santa Monica Bay and Machado Lake will be leveraged in developing the CIMP. The Team proposes to build on previous years' efforts, which included many tasks required by the EWMP to prepare an EWMP Work Plan, including the CIMP, for submittal to the Regional Board by June 28, 201.4. Based on the EWMP Work Plan, the Team will develop a final Draft EWMP for submittal to the Regional Board by June 28, 2015 as specified in the NPDES MS4 Permit. Implementation, unless specifically directed by the Peninsula EWMP Agencies, is not included in this scope of work. There are currently eight TMDLs in effect for the Peninsula EWMP Agencies in the Santa Monica Bay, Dominguez Channel, and Greater Los Angeles Harbor sub- watersheds. Significant work has already occurred on the Santa Monica Bay bacteria TMDL and the Machado Lake TMDLs. The Team will rely on these previous TMDL Implementation Plans and significantly expand the EWMP to include: • Characterization and prioritization of water quality issues, • Identification of strategies and control measures, • Reasonable Assurance Analysis (computer modeling) H-116 = Enhanced Watershed Management Progrant Proposal 0 A Coordinated Integrated Monitoring Plan The EWMP plan being developed under this Scope of Work will be a "living" document that can and should be modified as future monitoring data become available and the program develops following a strategy of adaptive management. The Team will develop a process for the Peninsula Agencies to use when reviewing and updating the EWMP Plan. Specific tasks for this scope of work are described in the following section. A schedule outlining task start and completion dates can be seen in Appendix D. H-117 ME= Enhanced Watershed Management Program Proposal III. SPECIFIC TASKS 1. PROJECT MANAGEMENT, CORRDINATION AND MEETINGS This task includes project management services including schedule and budget oversight, and assurance of timely completion of all project deliverables. In addition regular meetings and communications between Consultant, Peninsula EWMP Agencies, the Regional Board, and other stakeholders will be critical during the preparation of the EWMP. Deliverables: • Preparation and monthly updates of project schedule • Schedule and prepare agenda and minutes for fifteen (15) monthly regular meetings, plus an additional eight (8) regular meetings with the Peninsula EWMP Agencies and CIMP Agencies • Schedule, lead, and prepare agenda and minutes for three (3) special meetings with the Peninsula Agencies and interested stakeholders • Attend and participate in four (4)Technical Advisory Committee meetings • Attend and participate in six (6) meetings with Regional Board staff and other interested stakeholders 2. ENHANCED WATERSHED MANAGEMENT PROGRAM WORK PLAN Permittees electing to develop an EWMP are required to submit a Work Plan guiding the development of the EWMP to the Regional Board. For this task, the Team will outline a detailed schedule and strategy for completion of the Peninsula Agencies EWMP, including milestones consistent with the Peninsula Agencies Notice of Intent (NOI), which was submitted to the Regional Board in June 2013. In the case that intended milestones are found to be unfeasible, the Team will propose alternative milestones for consideration by the Agencies and the Regional Board. All relevant work products developed pursuant to TMDL implementation will be integrated into the Work Plan, which will be divided into chapters organized by Watershed Management Area (WMA). Team members are all very familiar with Peninsula Agencies TMDL programs,which will allow for streamlined integration of these elements. The Team's approach will be organized into the following sub-tasks outlined in the RFP: H-118 ME= Enhanced Watershed Management Program Proposal Sub Task 2.1 Identification of Water Quality Priorities One of the foundations of the MS4 permit is the identification and prioritization of water quality goals to be addressed by the WMPs and EWMPs. This task is critical to focus the development of the Peninsula Agencies EWMP, and establish a strategy for achieving EWMP goals in the most effective manner possible. The Team will first characterize existing water quality in the three WMAs that the Peninsula Agencies are a part of(Santa Monica Bay (J7) WMA, Machado Lake WMA, and Greater Los Angeles Harbor). This will include the compilation and evaluation of relevant water quality datasets going back at least ten (10) years. Using this data, along with information from TMDLs and 303(d) listings, the Team will characterize storm and non-stormwater discharges from the MS4 and receiving water quality, and identify water quality priorities considering applicable WQBELs and RWLs, 303(d) listings, and any known exceedances of water quality objectives. Pollutant-waterbody combinations identified through the characterization described above will be classified according to the categories outlined in Section V1. C of the MS4 permit(Category 1: Highest Priority, Category 2: High Priority, Category 3: Medium Priority), and pollutants in the same class as those addressed by a TMDL will be identified. The Team will conduct a source assessment for those water body-pollutant combinations classified as Category 1-3 using available literature, data, and information gathered by the Peninsula Agencies through existing stormwater programs, and will prioritize a sequence for addressing sources considering applicable TMDL deadlines and receiving water quality goals. Deliverable: The Team will prepare a draft memorandum characterizing water quality conditions within each WMA to be submitted ............................. to the Peninsula EWMP Agencies in December Objectives of Watershed Control 2013. Measures must include: • Prevention and elin-dnation of Sub Task 2.2 Summary of Existing and non-stormwater discharges that Potential Control Measures contribute pollutants to the MS4, • Implementation of controls The exercise of identifying and prioritizing necessary to achieve all applicable water quality goals is intended to inform the WQBELs and RWLs,and selection of Watershed Control Measures • Assurance that discharges from (WCMs)to be implemented individually and the MS4 do not cause or collectively to address water quality goals in contribute to exceedances of RWLs the EWMP. Existing WCMs, including Minimum Control Measures (MCMs) as defined in Section Vl.D of the MS4 permit, and other BMPs already in place in the WMAs will be compiled —M H-119 ME= Enhanced Watershed Management Program Proposal and evaluated, and areas of potential modification to better focus resources in order to meet the goals of the EWMP will be identified. The Team will develop a process template for summarizing existing MCMs, identifying, and justifying areas for modification. In addition, a review and summary of existing regional planning efforts (including TMDLs, and IRWMPs), and proposed regional projects will be conducted for inclusion in the EWMP. The Team, in consultation with the Peninsula Agencies, will identify potential regional projects that might feasibly retain (i) all non stormwater runoff and (ii) all stormwater runoff from the 851h percentile 24-hour storm event for the drainage area tributary to the project, and develop an approach for identifying and evaluating additional regional projects. The performance of regional control measures, including distributed structural and non-structural control measures, in reducing flows and pollutant loading will also be evaluated. Deliverables: The Team will prepare a draft memorandum characterizing existing control measures within the Peninsula EWMP Agencies, and template for evaluating opportunities for customization of MCMs, for submittal to the Agencies in December 2013. In addition, the Team will prepare a draft memorandum summarizing regional projects, planning efforts, control measures, and performance of structural and non- structural control measures for submittal to the Peninsula Agencies in January 2014. Sub Task 2.3 Reasonable Assurance Analysis (RAA) Approach The Peninsula Cities are essentially in An evaluation of reasonable assurance will compliance with the Santa Monica Bay be a critical element of the Peninsula Beaches Bacteria TMDLs as evidenced by Agencies' EWMP.While the term is ongoing receiving water monitoring. The somewhat new, the required analyses are not RAA focus therefore will likely be on the and Geosyntec will rely on experience more difficult TMDL objectives to meet, developing Reasonable Assurance Analysis the Machado Lake wet-weather nutrient (RAA) approaches in a wide variety of objectives(0.1 mg/L Total P and 1 mg/L watershed conditions, to develop an Total N). WMMS has been optimized for appropriate RAA approach for the Peninsula nutrients and metals which are relevant to Watersheds within the context of Peninsula Machado Lake and LA Harbor, Agency specific compliance risk tolerances. respectively Geosyntec will develop an RAA approach leveraging previous studies (by Geosyntec and others) which have: 1) set target pollutant load reductions, 2) assessed identified BMP project performance, and 3) evaluated implementation performance. We understand that the County developed the WMMS model in part to support the RAA process, and therefore Geosyntec has invested considerable internal resources to understanding the functionality, assumptions, and underlying logic of WMMS. H-120 MEMME lagemoit Prograni Proposa.1 _�,nhanced Watenhed Man,� Consistent with the RFP, Geosyntec will conduct the following subtask activities: Subtask 2.3.1. Geosyntec will review and present to the Peninsula Agencies an assessment of the WMMS stormwater quality model and determine whether updates are needed to perform the RAA for Peninsula Watershed areas, including an assessment of pollutants modeled, and receiving water quality modeling. Geosyntec has already completed extensive review of the WMMS model capabilities as they pertain to the RAA process, resulting in EWMP cost savings. In addition, Geosyntec has preliminarily reviewed the Peninsula area for optimization and compliance points, and preliminary indications that supplemental analyses (reviewing monitoring data or additional WMMS calibration may be required. Geosyntec will describe the proposed modeling process for evaluating and selecting WCMs. As with previously conducted TMDL implementation and load reduction plans, WCMs will include a suite of existing and proposed: programmatic and source control ------- measures as reflected in customized MCMs, distributed relatively small structural controls, and Figure L Subcatchments and compliance y)oints regional/centralized structural controls. It currently included in WMMS is critical to appropriately describe the process for representing these WCMs in the modeling system and quantifying their effectiveness, and to avoid false precision. Geosyntec has considered several approaches for selecting and evaluating watershed control measures, from those that give emphasis to non-structural controls, to those that provide a transparent and comprehensive methodology for siting and selecting structural controls.jurisdictional boundaries will also be addressed within the RAA framework. The process we propose will be based on input we receive regarding the needs and preferences of the Peninsula agencies. Subtask 2.3.2. Geosyntec will describe how the RAA analysis will demonstrate the water quality benefits and the effects of WCMs on stormwater quality, non-stormwater quality, and receiving water quality. This is critical as the effects of BMPs will be compared to receiving water limitations, TMDL waste load allocations, WQBELs and other applicable targets at the watershed and jurisdictional scale. Subtask 2.3.3. With TMDL implementation schedules and interim deadlines, sequencing is critical. Geosyntec will outline the process for creating a BMP H-121 no= Enhanced Watershed Management Program Proposal implementation sequence/schedule/timeline based on final modeled BMP scenario(s). Consideration will be made for watershed control measures that have already been planned, scheduled., and/or implemented by Peninsula agencies, e.g., the Chandler Quarry/Landfill regional infiltration basin, San Ramon Canyon project and Model Equestrian Center. Sub Task 2.4 Prepare Draft and Final EWMP Work Plan The EWMP Work Plan will outline a cost-effective approach for developing a Peninsula Agencies EWMP that meets the objectives of the MS4 Permit. Comments received on each of the draft technical memoranda will be addressed and incorporated into the Draft and Final EWMP Work Plan. The Team will prepare a Draft EWMP Work Plan for the Peninsula Agencies to review and comment on in February 2014. A Final draft EWMP Work Plan will be developed, incorporating comments received from the Peninsula Agencies, and submitted to the Regional Board in June 2014. Deliverables: The Team will prepare a Draft EWMP Work Plan with a schedule and strategy to complete the EWMP Plan per the MS4 permit and Peninsula EWMP Agencies RFP, and submit six (6) double sided hard copies, and electronic copies (in Microsoft Word and PDF) to the Peninsula EWMP Agencies in February 2014. Upon receipt of comments on the Draft EWMP Work Plan, the Team will revise the document and resubmit the revised Draft EWMP Work Plan for review by the Peninsula Agencies in June 2014. A Final Draft EWMP Work Plan for submittal to the Regional Board will be submitted within two weeks of receipt of consolidated comments from the Peninsula agencies in order to meet the June 28, 2014 deadline. Sub Task 2.5 Outreach Specific to Work Plan Development The development of the Work Plan will benefit from outreach and input from community groups, nongovernmental organizations,water supply agencies, and other potential project partners and stakeholders to solicit input on its scope and approach. Up to four(4) meetings are assumed. In addition, the Team will compare the Work Plan with the proposed scope and budget for EWMP Plan development, identifying any significant deviations or revisions needed. The Team will prepare a draft memorandum outlining significant deviations from EWMP estimated scope and budget identified during Work Plan development for the Peninsula Agencies in June 2014. H-122 1AN= Enhanced Watershed,NJanagernent Program Proposal 3. COORDINATED INTEGRATED MONITORING PLAN The Monitoring and Reporting Program (MRP) of the MS4 Permit outlines a Characteristics of a well-designed cost effective Coordinated Integrated Monitoring significant suite of requirements. The Program: overarching purpose of the MRP is to assess ® chemical, physical, and biological impacts Minimum credible scope a Adaptive based on monitoring from the MS4 on receiving waters; assess results compliance with Receiving Water Limitations strategically considers future and Water Quality Based Effluent Limits; regulatory outcomes characterize pollutant loads;identify sources of pollutants in MS4 discharges; and measure and improve the effectiveness of controls. Five required elements are identified: receiving water monitoring, outfall monitoring of both stormwater and non-stormwater,new development/redevelopment effectiveness tracking, and regional/special studies. The MS4 Permit contains the most extensive monitoring requirements of any MS4 Permit the Team is aware of nationally. However, the opportunity is provided in the MS4 Permit to modify or eliminate elements of the MRP with appropriate justification through the development of a Coordinated Integrated Monitoring Plan (LIMP). The Team will identify those elements that should be modified or eliminated to create a monitoring plan that achieves the monitoring objectives of the MS4 Permit while not placing unnecessary burdens on the Peninsula Agencies. Sub Task 3.1 Outfall and Receiving Water Monitoring Approach A critical decision for the Peninsula Agencies is the approach taken to implement the receiving water and outfall monitoring elements. The key cost drivers for long-term implementation of both elements will be the frequency of the monitoring, the constituents monitored, and the spatial distribution of the monitoring (i.e.,how many locations). Public agencies have neither the resources nor the time to monitor all pollutants, in all places, at all times. The goal will be to limit, to the extent possible, the number of sites, samples, and constituents tested. The focus will be on establishing whether there is significant non-natural, non-stormwater flow, if there is an established issue with the pollutant in the watershed, if the MS4 could be a contributor of the pollutant, and if there are parameters in the receiving water that exceed the water quality objectives. The Scope of Work in the RFP provides a process to gather existing information needed to develop the monitoring approach----the Team's familiarity with the ongoing TMDL monitoring programs being implemented by the Peninsula Agencies (Machado Lake Nutrient TMDL and Santa Monica Bay Beaches Bacteria TMDL) will allow this effort to be streamlined. The Team's approach to developing the outfall and receiving water —M H-123 ME= Enhanced Watershed Management Program Proposal monitoring programs will be to evaluate existing water quality data and monitoring locations in concert with the prioritization that will occur as part of the EWMP Work Plan development to focus efforts. The proposed approach is to focus on receiving water monitoring to first determine if there is a persistent water quality concern. Outfall monitoring will focus on pollutants where data sufficiently suggest MS4s may be causing or contributing to exceedances observed in the receiving waters. The approach will consider other ongoing efforts that could be integrated into the CIMP, such as the Coordinated Compliance Monitoring and Reporting Plan for the Greater Los Angeles and Long Beach Harbor Waters, which can be incorporated into the Peninsula CIMP by reference to address the Peninsula Agencies' responsibilities for TMDL and receiving water monitoring in the Greater Los Angeles Harbor. An important element of CIMP implementation is the non-stormwater outfall-based screening and monitoring plan. The development and implementation of this plan will drive subsequent monitoring and.source investigation efforts. The Team will give careful consideration to defining what constitutes an MS4 outfall and a significant non- stormwater discharge--recent communication with Regional Board staff has confirmed that natural flows from blue line streams may be excluded from non-stormwater discharges which require screening and monitoring. The Team will work closely with the Peninsula agencies to determine how to most efficiently implement monitoring, particularly the outfall monitoring requirements. The Peninsula agencies will need to decide whether outfalls will be sampled as individual jurisdictions (including at jurisdictional boundaries) or if outfalls discharging directly to receiving waters (some of which will have comingled flows) will be the focus. A tiered approach can be considered for these locations. The approach will consider how to integrate into the CIMP the Special Study #3 submitted by the County of Los Angeles for mass-based compliance with the Machado Lake Nutrient TMDL. Likewise the approach will consider how to integrate the proposed Machado Lake Toxics TMDL monitoring plans submitted by the Peninsula Agencies but not yet approved by Regional Board staff. The monitoring approach will also address how and to what degree Peninsula CIMP members plan to participate in the Southern California Stormwater Monitoring Coalition Regional Watershed Monitoring bioassessment program. Geosyntec is providing an expert panel member to the Southern California Stormwater Monitoring Coalition and so has the expertise to advise Peninsula Agencies appropriately. This approach recognizes the existence, sensitivities, and potential implications of South Coast California Monitoring Plan for Marine Protected Areas (August 2011) that will be applied to the designated Marine Protected Area along the Palos Verdes Peninsula. Its potential relevance to the CIMP will be examined as part of this effort. M H-124 IMIMEnhanced Watershed Management Program Proposal Deliverable: The Team will submit a draft memorandum describing the approach to meet all of the required monitoring elements to the Peninsula agencies in September 2013. Sub Task 3.2 Site Selection Some of the most challenging and costly monitoring requirements under the MS4 Permit are those associated with the stormwater and non-stormwater outfall monitoring. The Team understands the cost implications of carefully and efficiently selecting a limited number of monitoring sites to meet monitoring requirements while still collecting useful water quality data. Field and desktop surveys will be conducted by the Team to identify potential monitoring sites for Peninsula sub-watershed areas not previously studied. Outfall monitoring locations will be selected based on the amount and frequency of non-stormwater flow, existing TMDL monitoring locations, TMDL and MS4 Permit monitoring requirements, accessibility, and land use representativeness, among other factors. The scope of this subtask assumes that necessary GIS maps of the storm drain system for the Peninsula CIMP watershed areas are available, (i.e., this effort does not include GIS mapping of storm drain systems). Once selected, outfall locations will be displayed prominently on maps along with appropriate surface water bodies,watershed boundaries, land uses, and jurisdictional boundaries. In conjunction with the watershed priorities, these maps will be used to justify proposed modifications to the MS4 Permit and/or TMDL requirements to achieve the monitoring objectives of the MS4 Permit and TMDLs cost effectively. Our site selection process will link the ownership, geographical coordinates, physical description, photographs of outfalls, determination of significant non-stormwater discharges, and monitoring data. Our extensive familiarity with TMDLs on the Peninsula and receiving water monitoring requirements in the MS4 Permit enables our team to readily justify the representativeness of selected existing monitoring locations thereby reducing the associated long-term cost of added monitoring locations. Deliverable: Information on the proposed sampling sites will be summarized in a memorandum and submitted to the Peninsula Agencies for review in October 2013. The memorandum will include a description of the site selection process, photographs and GPS locations of each site, and associated maps. Sub Task 3.3 New Development and Re-development Effectiveness Tracking This task is an annual reporting requirement, but could be more effective and useful if designed to coordinate with the RAA model used in the EWMP. The Team will gather and compile information on existing systems used by the Peninsula Agencies to track New Development and Re-Development activities and associated post-construction Best Management Practices (BMPs). Collected information fields will be evaluated and —M H-125 10MEnhanced Watershed Management Program Proposal we will identify missing information considered to be essential to measuring the effectiveness of post-construction ordinances both with respect to the MS4 Permit reporting requirements but also with respect to the RAA model. Based on this evaluation, our Team will provide the Peninsula agencies with a template for Peninsula CIMP members to summarize and standardize effectiveness tracking. Deliverable: Recommendations for reporting and data management protocols that will provide reliable systems to access, store, and input data and systems and to share tracking among the Permittees will be summarized in a memorandum to be provided in October 2013. Sub Task 3.4 Prepare Initial Draft and Revised Draft CIMP The CIMP will propose a cost-effective monitoring approach that meets the objectives of the MS4 Permit according to the process set forth in the RFP. Comments received on each of the draft memoranda discussed in Subtasks 7.1 through 7.3 will be addressed and incorporated into the Draft and Final CIMP. Deliverables: The Team will prepare an initial Draft CIMP for the Peninsula agencies to review and comment in November 2013. A revised Draft CIMP for submittal to the Regional Board will be submitted within two weeks of receipt of consolidated comments from the Peninsula Agencies in order to meet the December 28, 2013 deadline for the City of Rolling Hills as an agency not participating in a WMP or EWMP. Sub Task 3.5 Outreach Specific to CIMP Development CIMP preparation efforts will benefit from outreach and input from community groups, non-governmental organizations, water supply agencies and other potential project partners and stakeholders to solicit input on the scope and approach of the CIMP. Up to four (4) meetings are assumed. 4. ENHANCED WATERSHED MANAGEMENT PROGRAM PLAN This task represents the analysis and integration of the information collected in Tasks 1 through 3, and preparation of a Draft EWMP plan for submittal to the Regional Board by the June 28, 2015 deadline. The EWMP plan will be guided by and incorporate all elements of the final EWMP Work Plan, including the CIMP. Any necessary revisions of the CIMP identified during the development of the EWMP will be proposed to the Peninsula Agencies and submitted to the Regional Board for approval as part of the Final CIMP which will also incorporate Regional Board's comments on the Draft CIMP. The Team will incorporate any comments received from the Regional Board following submittal of the draft EWMP Plan, and submit the final EWMP Plan within two (2) ME H-126 Enhanced Watershed Management Program,Proposal months of receiving any such comments. A process for evaluating and updating the EWMP on a two (2) year schedule will developed and included in the EWMP Plan. Sub Task 4.1 Finalize Approach to Addressing Waterbody-Pollutant Combinations Based on the water quality priorities identified in the Final EWMP Work Plan, the Team will develop compliance schedules (including interim numeric milestones),to be used to measure progress in achieving applicable WQBELs and RWLs, for the eight (8) TMDLs iri effect for the Peninsula Agencies, and for other waterbody-pollutant combinations identified as Highest, High, and Medium Priority. Compliance deadlines and interim milestones will be based on TMDL milestones and deadlines occurring within the permit term, and include additional interim milestones and final deadlines for achieving RWLs for those pollutants not addressed by a TMDL. Deliverable: The Team will prepare a draft memorandum outlining compliance schedules and interim milestones for each waterbody-pollutant combination identified in the EWMP Work Plan for submittal to the EWMP Agencies in August 2014. Sub Task 4.2 List of Regional Projects and Identification of WCMs Based on the list of potential regional project sites developed in the EWMP Work Plan, the Team will conduct a feasibility analysis for each project, including evaluation of regulatory issues and permitting, and. cost. This analysis will be used to develop a final list of recommended project sites for inclusion in the EWMP. The Team plans to leverage its knowledge of the Peninsula watersheds, and work closely with the Peninsula Agencies to streamline this process. For areas in the watershed that cannot be incorporated into a regional project, identification of distributed.structural and non-structural control measures to be implemented to achieve applicable WQBELs and RWLs will be based on the EWMP Work Plan evaluation of BMP performance, and current knowledge of technologies, approaches, and practices. The Team will work closely with the Peninsula Agencies to develop a strategy for implementing these measures in the most reasonable and cost effective manner. The flexibility to customize MCMs within a watershed to meet WQBELs and RWLs is another key component of the EWMP plan. The process for summarizing and identifying areas for modification developed in the EWMP Work Plan will be used to propose a program of customized actions within each category of MCM outlined in Section VI.D of the MS4 permit. Each modification to the requirements outlined in this section will be supported by information justifying these modifications. The Team's familiarity with Peninsula Agencies' current MCM programs will help to arrive at the most cost effective programs available to meet requirements. H-127 ME= Enhanced Watershed Management Program Proposal Deliverables:The Team will prepare a list identifying potential locations for regional EWMP sites and preliminary list of regional projects for initial consideration and feasibility analysis and submit a summary memorandum to the Peninsula Agencies EWMP Group in August 2014. In addition, the Team will prepare a draft memorandum describing the feasibility of identified regional EWMP projects and recommend projects for consideration, as well as propose WCMs and MCM customization based on the EWMP Work Plan and the RAA for submittal to the Peninsula Agencies EWMP Group in December 2014. Sub Task 4.3 Conduct RAA Utilizing the process outlined in the Work Plan the Geosyntec Team will: a) prepare a quantitative analysis or modeling tool to represent hydrology,hydraulics, stormwater quality, non-stormwater quality, and receiving water quality before and after implementation of watershed control measures;b) summarize MCMs, specific modifications to customize MCMs proposed by the Peninsula agencies, and information supporting modifications to MCMs provided by Peninsula agencies; c) for the portion of the watershed that cannot be addressed with regional projects, identify additional structural and nonstructural control measures to achieve RAA requirements and incorporate appropriate BMP strategies; and d) conduct an RAA to demonstrate that the identified measures will achieve applicable WQBELs and/or RWLs. The results from this subtask and portions of Subtask 4.3 will be consolidated into a Task memorandum. Arriving at an implementation plan that provides reasonable assurance to achieve applicable WQBELs and/or RWLs can be an iterative process. To reduce costs associated with iteration, it is sometimes best to quantify and consider water quality needs after the implementation of all low cost (non-structural controls and facility retrofits) measures to frame higher-cost BMP identification processes. We will evaluate existing and proposed non-structural BMPs and quantify the pollutant load reductions associated with these measures to provide the Peninsula Agencies maximum credit for these programs before considering the need for additional structural BMPs. The actual final approach will be determined through the development of the EWMP Work Plan. The following flowchart illustrates a potential approach, subject to confirmation upon completion of the Work Plan, and assumes WMMS primarily is used to conduct the RAA. H-128 Enhanced Watershed Management Program Proposal a. C arat.Load reduction targets,potential BMP r,rc,ce3r; utMzatuon,:and cost by subwatershed v 9 �ar°r �Y Q7u!g t feasibility,load reductions cast ,...., _ .. _.e,....s-..t.imate $e<ziEih 1xa¢reductions,cost estimates...__._l WW., ­., . „ ..�...„.... Sub Task 4.4 Develop Project Schedules and Cost Estimates Develop cost estimates and recommended schedules for the implementation of control measures, accounting for TMDL compliance schedules, identified water quality priorities, and any other compliance schedules proposed in EWMP Work Plan. Deliverable; The Team will prepare a draft memorandum summarizing the costs of implementing proposed WCMs, a proposed schedule and sequencing of WCMs, responsibilities for each permittee, and recommended time frame for initiating projects, non-structural solutions, and programs to achieve water quality goals in line with proposed compliance schedules. Sub Task 4.5 Prepare Draft and Final EWMP Plan The EWMP Plan will propose a cost-effective, customized regional stormwater management program that meets the objectives of the MS4 Permit. Comments received on each of the draft memoranda discussed in Subtasks 4.1 through 4.4 will be addressed and incorporated into the Draft and Final EWMP Plan, The Team will prepare a Draft EWMP Plan for the Peninsula Agencies to review and comment on in June 2015, A _M H-129 ME= Enhanced Watershed Management Program Proposal. Final EWMP Plan for submittal to the Regional Board will be submitted within two weeks of receipt of consolidated comments from the Peninsula agencies in order to meet the June 28,2015 deadline. Deliverables: The Team will prepare a Draft EWMP Plan per the MS4 permit and Peninsula EWMP Agencies REP, and submit six (6) double-sided hard copies, and electronic copies (in Microsoft Word and PDF) to the Peninsula EWMP Agencies in February 2015. Upon receipt of comments on the Draft EWMP Plan, the Team will revise the document and resubmit the revised Draft EWMP Work Plan for review by the Peninsula Agencies in June 2015. A Final Draft EWMP Work Plan for submittal to the Regional Board will be submitted within two weeks of receipt of consolidated comments from the Peninsula agencies in order to meet the June 28,2015 deadline. The Team will respond to any comments from the Regional Board upon submittal of the Draft EWMP Plan, and revise the document as necessary within two (2) months of receipt of comments. The final EWMP Plan incorporating Regional Board comments is anticipated be delivered to the Peninsula EWMP Agencies and the Regional Board in January 2016. As the EWMP plan is intended to be a"living document", the Consultant will develop and incorporate a process for evaluating the effectiveness of the EWMP plan every two (2)years, and modifying the control measures based on this evaluation. Sub Task 4.6 Outreach Specific to EWMP Plan Development EWMP preparation efforts will benefit from outreach and input from community groups, non-governmental organizations, water supply agencies and other potential project partners and stakeholders to solicit input on the scope and approach of the EWMP plan. Up to four (4) meetings are assumed. ME H-130 am= Enhanced Watershed Management Program Proposal EI-TOR"I' TABLE The following table itemizes the estimated effort iri work hours (fiscal years 2013-2014, 2014-2015, and 2015-2016) for this project, FY FY FY Total Task 2013-14 2014-15 2015-16 Hours Rate Cost �stim��f�edHou�rsLor�EW ............................... Project Management Coordination,and Meetings QLHA) schedule 2 0 0 2 $165 $330 4 0 0 4 $135 $540 9 0 0 9 $115 $11035 ------------ Regular and Special Monthly Meetings Agenda, 6 15 2 23 $165 $3,795 Schedule,and Minutes 5 15 1 21 $135 $2,835 4 1 7 $115 $805 ............. ............. .......... Regular Mecting Attendance 8 20 6 34 $165 $5,610 8 20 6 34 $135 $4,590 4 4 2 10 $115 $1,150 Attend and participate in the Technical Advisory 30 30 7 67 $165 $11,055 Cornn-tittee 30 30 8 1 68 $135 $9,180 8 8 2 18 $115 $2,070 Special Meeting Attendance 1 3 0 4 $165 $660 2 3 0 5 $135 $675 0 1 0 1 $115 $115 ............ ...........w._..___...... Other Meeting Attendance(i.e.Regional Board) 3 5 0 8 $165 $1,320 4 6 0 10 $135 $1,350 0 3 0 3 $115 $345 Coordination,and Meetin (G 56 $12,068 I�r)j ct Management 384 $59,528 ,,.Rey�LopTenf of EWMP Work Plan(JILHA) .......... ——------------------------------------- ....... ...............70..................... Identification of Water Quality Priorities 10 35 35 13 $4,725 35 35 11 $4,025 .......... ------------ Surnmary of Existing control Measures 20 20 $165 $3,300 40 40 $135 $5,400 40 40 $115 $4,6W ................... ....................... RAA Approach 5 5 $165 $825 10 10 $135 $1,350 .. 7 7 $115 $805 ................... .......... Prepare Draft and Final Work Plan. 50 50 $165 $8,250 75 75 $135 $10,125 7575 $115 $8,625 QAQC(JLHA and KL) 30 30 $165 $4,950) 23 23 $135 $3,105 15 15 $115 $1,725 ......... .... Outreach .. 8 8 $165 $1,320 17 17 $135 $2,295 15 15 $115 $1,725 eve 1ca�rment $14,872 of EWMP WorkPlan(Ge 70 .................................. EIVIVIP Work Plan Total 586 $83,6_72 co;I-rdin-'a"t--................r.................................r i n..........g.............P I a i a (............I..........M.............P"),........................................................................................................................................................................................................................................................................... Moni .......... www Outfall and Receiving Water Approach 128 128 $18,264 Site Selection soSO $11,624 ....... N I. .. ewevel Dmc�ntaiidRedevelopmo�itEffcctivt,.iiessl'rackio KIP- 4'' 4r $Cr 268 )�I I I I- e— --, ---- _i�_ 111 11- .. - ............. I repare Draft and Final cIMP � �t18 $301776 QA/QC(Gt ntec) 12 12 ........ ...... H-131 MMEnhanced Watershed Management program Proposal FY FY Eli" Total Task 2013-14 2014-15 2015-16 flours hate Cost wmww .wwuumnmarnaiolio......inunnnnwmwr�erreur0rnar;�ucwsd mnaumev,�,r"Ww"r"M wr",,�u0uur�uuuiuramre�v�;�wi�riuniuwunrrr��wu�nuir�uw�u�+r�+rn�r�i m�re�r wrud�w�e�dvu¢ur�im�irr��dMUMixim�dxim�ixi�ir�u�vrrr!r�rriaisr�riauiure�viumrur i lutre a.ch 36 36 $5 812 Cell/CSC"OL11A) t0 10 $'165 $1,650 30 30 $135 $4,050 €�c r.�.,w...�m.. �..� _.... �...._,..... ...�.�. ��......�. w��. ��. �..- ....,��.. _...zl ...$165 $�slio� 22... 115_. ....... ....._. _.....d cIMP Total 588 $86,902 1 e sa able„Arpsmance.Artalysxs......�.�.�..���.._�_...��..��.._ ..�...�. �.�.�.�.......�.�.....� 960.�.� �.........................�... �..�,�,�,....� ` ....... 9617 ........... ...µ.. �w " "$139,350 'Offs is aro estimate of total effort to conduct RAA osing a rlmrantltatroe and peer-rez7r'e ved model with rednctr"ons Jor previous modeling(ifaccepted lry the Regional Board),Actual Inst will lre determined upon selection of RAA Approach,and direction(V the Technical cornnrittee. _ ............. .. QA/QC(11.1-1A and ICL.) 56 56 $165 1 $9,240 40 X11;1 13 $5,400 $4,60(} 4t) 1t> 3x115 AA'1 atal 1.096 $158,590 Dc�c.Ccop C`cpmtpliarece Schedules 5 $165 � $825 25 25 $135 $3,375 _ 20 20 $115 $2,300 p.� p .... . t sites. .... ..._,._,w.4- _......._ ...._._.... ..- _... - Develop list of potential EWMP p rojec s 4 $165 $660 10 10 $135 $1,350 10 10 $1.1.5 $1,150 Conduct Feasibility Analysis of EWMP Sites 0 $165 $0 0 $'135 $0 ...... ................ _... _ _...... 0 $115 $0 Custornization of MCMs 10 10 $165 $1,6 50 35 35 $135 $4,725 35 35 $115 $4,025 Develop implementation Schedule and Sequc,nce4 4 $165 $660 18 1.8 $135 $2,430 18 18 $115 $2,070 Prepare Draft and Final Draft EWMP Plan 40 40 $165 $6,600 50 50 $135 $6,750 30 30 $115 $3,450 On tre ach 4 4 $165 $660 18 1.8 $1.35 $2,430 18 18 $115 $2,070 QA/QC(1111A) 20 20 $165 $3,300 30 30 $135 $4,050 30 30 $115 $3,450 )AIC2C (Cir*oantec} .............�............ 49 ................... 49 $10,131_ F4VTv P.To al otal _ 483�u �$68,011 llinalEnhanced Watershed Management Plan for subm_ittal to . ... . ....... 30 ^ . . � $135 gin 40 40 $115 Review Cie=a>s rntec 14 14 $3 060 Final EWMP Total 1.34 $19,360 7"07ALEFFORTXtOUR& 3271 $476,063 *See the attachmn�eSd�a Geodo sduwyntwesu c E1umumuuow PICTP east esttntat�eMmn�nsp'm'm readsheet for details nn hourly l2d iaSl 4, H-132 no= Enhanced Watershed Management Program Proposal Hours provided are estimates.Hours are likely to be reallocated from one task to another as necessitated by the development of the EWMP and at the direction of the Peninsula Agencies,Some variation will occur depending on specific staff assigned to each task. H-133 Enhanced Watershed Management Program Proposal APPENDIX A: s'rANDARD .A° "E SCHEDULES JLHA Principal./Project Leads $165/hr Senior Project Engineer/Project Manager $165/hr Project Engineer $135/hr Environmental Compliance Manager $115/hr Environmental Compliance Specialist $95/hr Public Outreach Manager $95/hr Public Outreach Specialist $85/hr Clerical and Public Outreach Assistant $65/hr State Certified Laboratory Analysis Cost+5% Legal Consultation, Court Appearances/Document review, etc. $250/hr Subcontracted equipment Cost+5% Prices effective as of July 1, 2013 JLHA does not add charges for overhead items such as administrative copying or mileage in and around the city. H-134 Enhanced Watershed Management Program Proposal GEOSYNTEC CONSULTANTS 2013-2015 Rate Schedule Engineer/Scientist Rate/Hour Staff Professional $117 Senior Staff Professional $133 Professional $154 Project Professional $176 Senior Professional $199 Associate $219 Principal $236 Construction Services Ratefflour Engineering Technician 1 $ 60 Engineering Technician 11 $ 66 Senior Engineering Technician 1 $ 71 Senior Engineering Tecl-mician 11 $ 76 Site Manager 1 $ 84 Site Manager 11 $ 94 Construction Manager $107 Design, Grahical, and Administrative Services Rate/Hour Designer $128 Senior Drafter/Senior CARD Operator $ 113 Drafter/CARD Operator/Artist $ 97 Project Administrator $ 62 Clerical $ 50 General Rate/Hour Direct Expenses Cost plus 6% Subcontract Services NA Specialized Computer Applications (per hour) $ 15 Personal Automobile (per mile) Current Gov't Rate Photocopies (per page) $ .09 Rates are provided on a confidential basis and are client and project specific. Rates for field equipment,health and safety equipment, and graphical supplies presented upon request. H-135 F ih VK V} yy VI 4Y 1M1 m C qp 4x O. m x ,C w u V .r w n rn w Y� as a � m ,3 2 m m 0 � c _ Q _ pC U V pp U C m u �dy pp p m Ov 0 n m n o *,c 0 m pw Yr a^' ry p o a � a t4 n Com? e� a .x d atl cm d �"'. ,by iF C M nN il4 u 'a p 75 >.j k..: �pw p O 2 •� a ��yy �pj yy�� a � r - y a a m � � r G � � Y C C .Q c a YY C La ro a va a a m c c c M C � O d �a m m C7 � c ria � '' m °i a+ d � ---� .cp; acr � � �' `n o '� Rk[(. � r. ��^e •c C C O d se +a' C 4 h qA V tlJ0 C of c p m r^ � ro u U wi � "qq,,. up by ro •� � ii "� °� c c � u .. � y � ro � g c m o m _ c c c � � c a..� m w E ae'�ss G`) �� ° � �Li ".ao- ii_ 47 .c "�7'a ^�+ ;.:..'�y a -" a "`i � C% .c -�, tJ +� 4° 4�'' � m: E •i. v m d +trotii Nt0r7 HNI Jua1 aEa wawmuw 3. O za42O4 F4alfrY1 YW:"T. dhLS":I.'I ^idqOWU.t1,.♦0NaCqC}S17''Kd{�a`p6r rwUic:N1. nW.C3!�CYl! c4Rc��In( H.xFu'm%NC�a. -136wy ME= Enhanced.Watershed Management Prograrri Proposal APPENDIX B: RESUMES Resumes for key staff are included on the following pages, H-137 = Enhanced Watershed Management Program Proposal John L.Hunter,PE Principal Areas of Expertise NPDES Permits: Implementing and managing compliance programs. TMDLs. Preparing and managing Implementation/Monitoring Plans. FOG Control: Implementing and managing compliance programs. Overview Mr.Hunter has 30 years of experience in municipal environmental programs and.currently oversees: (1) a 17 city NPDES program encompassing three counties that covers programs such as: watershed management,TMDL implementation,site inspections,stormwater management plan reviews, construction inspections,public agency activities,illegal discharge investigations and.public outreach; (2)a 9 city FOG program encompassing permitting,inspections and enforcement;(3)a 6 city Used Oil Recycling program;and(4)a 3 city Beverage Container Recycling program.He has also administered "right-to-know"hazardous materials programs for local fire departments and has substantial experience in underground tanks removals and mitigation of subsurface soils contamination. Education Certifications and Licenses Bachelor of Science-Chemical Engineering CA Professional Chemical Engineer CH 4724 California State Universihj,Long Beach CA Registered Environmental Assessor REA-0900 Bachelor of Science-Biological Sciences CA Hazardous Substance Removal A3382 University of California,Irvine CA General Engineering Contractor License A-582340 NPDES Experience and Skills TMDLs: ■ Los Angeles River Trash TMDL—Obtained$0.78 million in grant funding for the Hamilton Bowl BMP Study.The intent of the study was to evaluate different end-of-pipe trash capture systems for City of Signal Hill and Long Beach. ■ Los Angeles River Metals TMDL—$200,000 contract with Gateway Cities Council of Governments for preparation of Reach I Implementation Plan on behalf of 9 local agencies. ■ Dominguez Channel Bacteria Study—Conducted regional Board directed bacteria study to investigate elevated bacteria levels found in the Dominguez Channel by the Regional Board (City of Hawthorne). ■ Regional Board Audit of MS4 municipal permit program—City of Big Bear Lake NPDES: ■ Oversees a 20 city NPDES program encompassing site inspections,stormwater management plan reviews,construction inspections,public agency activities,illegal discharge investigations and public outreach. ■ Has chaired the following committees: • Los Angeles River Watershed Management Committee (Current Chair) • Santa Monica Bay Bacterial TMDL Subcommittee—J 7 (Current Chair) • Dominguez Channel Bacterial TMDL Subcommittee ■ Also participates in: • LA Permit Group/Executive Advisory Committee • Trash/metals TMDL Subcommittees on H-138 I Enhanced Watershed Management Prograin Proposal Cameron McCullough,CPSWQ,QSD/QSP Environinenfal Coinpliance Manager Areas of Expertise Implementing and managing NPDES and FOG Control compliance programs for municipalities. Overview Mr.'N4cCullough has worked with JLI-IA for nine years in the environmental compliance fields of NPDES, Industrial Waste and Fats,Oils and Grease(FOG)Control and Phase 1/11 site assessment. His relevant experiences and tasks include implementing and managing all aspects of NPDES municipal permit provisions and supervising field staff.'These provisions include watershed management,TMDL implementation,inspecting industrial/commercial,municipal and construction sites,detecting and eliminating illicit discharges,educating the public, training staff and preparing annual reports. Education • B.S.in Physics,Minor in Applied Math California State University Long Beach (CSULB) • In progress:M.S.in Applied Mathematics CSULB(graduation Fall 2013) Certifications,Training and Affiliations • CPSWQ#0842(Certified Professional in Stormwater Quality) Issued to/ CPSWQ), Inc. • QSD/QSP#22706(Qualified SWPPP Developer/Practitioner) CASQA • Basic[?,nvironmental Inspector Academy CallEPA • Stormwater Core Competencies Training Program County of Orange • HAZWOPER(40 Hour General Site Worker), Certificate#52527 Safet l Managenient Systems • Society for Industrial and Applied Mathematics Meniber • Phi Beta Kappa Society Meniber NPDES Experience and Skills Program Management: • Manage NPDES,permit provisions for municipal clients in LA,Orange and San Bernardino Counties. Clients include South Pasadena,Norwalk, Signal Hill,Big Bear Lake, Stanton,and Seal Beach. • Represent cities in State compliance inspections/audits(NPDES and FOG). Also perform self- audits. Four audits total for the cities(f'Seal Beach, Stanton and Big Bear Lake. • Manage"Trash TMDL DGR studies. • Prepare NPDES annual reports and Storm Water Quality Management Plans(SWMPs). • Prepare and present NPDES training modules to various divisions of municipal staff. • Represent cities at LA and Orange County-wide NPDES Program meetings. • Design electronic databases to meet State reporting requirements. Field activities: Has inspected and investigated thousands of sites for NPDES/FOG/Industrial Waste compliance. I Mondtor pollutant loading for municipalities under Trash TMDLs. Collect and analyze stormwater,wastewater and soil samples. ■ Participate in public education events at City functions. H-139 Enhanced Watershed Management Program Proposal Jillian Brickey,MSES,CPSWQ,QSD/QSP Enviromnentfll Conipliance Manage), Areas of Expertise NPDES Permits: Implementing and managing compliance programs, Plan Reviews: Reviewing Standard Urban Stormwater Mitigation Plans and Water Quality Management Plans with emphasis in Low impact Development(LID)compliance. Overview Ms.Brickey has worked with John L.Hunter&Associates in the environmental compliance field of NPDES,being versed in all departments at JLHA,for seven years. She is the Lead NPDES Plan Reviewer for Seal Beach,Stanton, Buena Park,La Habra,and Signal Hill and the Stormwater Program Manager for Seal Beach.Her relevant experiences and tasks include implementing and managing NPDES municipal permit provisions such as watershed management,new development,construction,TMDL compliance, municipal staff training and representing clients in program audits. Education • M.S.in Environmental Science Cal State University Fullerton • B.S.in Zoology,Minor in Chemistry Cal State Polytechnic University Pomona Certifications and Training • CPSWQ#0845(Certified Professional in Stormwater Quality) Issued by CPSWQ,Inc. • QSD/QSP#22731 (Qualified SWPPP Developer/Practitioner) CASQA • Stormwater Core Competencies Training Program County of Orange • 40 flour HAZWOPER pursuant to Title 29 of CFR section 1910.120 NPDES Experience and Skills NPDES Municipal Permit experience: • Manage selected NPDES permit provisions for clients in LA,Orange and San Bernardino Counties. Including South Pasadena,Norivalk, Signal Hill,Big Bear Lake, Stanton, Seal Beach • Represent cities in State New Development compliance audits, Seal Beach and Stanton ■ Supervise engineering staff. • Participated in Planning Advisory Group(PAG) to develop LID provisions for Orange County cities. • Prepare and present NPDES training modules to various divisions of municipal staff. • Represent cities at various LA and Orange County-wide NPDES Program meetings, • Conducted thousands of NPDES/FOG/IW investigations and inspections. • Participate in public education events at City functions. • Prepare NPDES annual reports,Storm Water Quality Management Plans(SQMPs)and Local Implementation Plans(LIPs). • H-140 Enhanced Watershed Management Program Proposal Susan Dworsky,MESM Envir•onrnental Compliance Specialist Areas of Expertise TMDL Implementation and Watershed Management Overview Ms.Dworsky has over six years of experience in the environmental compliance and management field and five years of experience with NPDES and stormwater/watershed management.Her relevant experiences include implementing and managing all aspects of NPDES Permit and FOG Control provisions for various municipalities.She specializes in TMDL implementation and watershed management. Ms.Dworsky has participated in numerous TMDLs in the Dominguez Channel and Santa Monica Bay watersheds,including preparing the annual Santa Monica Bay Bacteria TMDL F report on monitoring data,developing Portions of the Machado Lake Nutrient TMDL Implementation Plan,and implementing the Machado Lake Trash TMRP for Rolling Hills.In addition,Ms.Dworsky has completed over 1,000 NPDES site inspections. Prior to joining John L. Hunter and Associates, Ms.Dworsky worked for the State of North Carolina Division of Coastal Management's Coastal Reserve program as a research technician.Ms.Dworsky worked on numerous projects tailored to preserve the coastal environment.She monitored the water quality of North Carolina's Currituck Sound in order to help create a model of this vital estuary. Her tasks included collecting and filtering weekly water and atmospheric deposition samples.Ms.Dworsky also worked to map and eradicate invasive species along the northeastern coast of North Carolina.In addition,she coordinated a number of outreach programs and events. Education M.S.in Environmental Science and Management Universihj of California,Santa Barbara B.A.in Environmental Studies,Minor in Marine Science Universitf of Nortli Carolina, Chapel Hill Project Specific Experience ■ Inspect the following for compliance with state and local environmental regulations: o NPDES Critical Sources sites(e.g. restaurants, auto shops and manufacturing facilities). o State permitted industrial and construction sites(IGPs/CGPs). • Municipal facilities(e.g. corporate yards and transfer stations). o New Developments for BMP installation and maintenance verification(SUSM. P sites). cr Industrial Waste and FOG pretreatment devices at permitted facilities. • Conduct environmental investigations and impose enforcement actions. ■ Prepare Municipal NPDES Annual Reports. • Supervise and participate in NPDES Public Outreach events. • Compile and prepare annual J7 report on bacterial monitoring data. ® Conduct Trash TMDL Monitoring studies. m Participate in development of Nutrient TMDL Implementation Plans. m Prepare annual TMDL reports. H-141 no= Enhanced Watershed Management Program Proposal Anne Chang Public Outreach Manager Areas of Expertise NPDES Municipal Permits: Development and implementation of educational and outreach programs to businesses,municipal employees and the residential community in conformance with the goals and requirements of the MS4 stormwater permits, Used Oil: Responsible for maintaining the annual grant status,establishing recycling centers,educating the general public,holding events and preparation of the annual reports. Beverage Container Recycling: Responsible for educating the general public and incorporating recycling messages in event activities. Overview Ms. Chang has more than 13 years experience in the public outreach aspect of the municipal environmental programs.Programs under her purview include:NPDES MS4,Used Oil Recycling and Beverage Container Recycling.She has helped local municipalities in planning,developing,facilitating and implementing activities and campaigns based on the guidelines of these programs.With various campaigns and outreach materials,she has not only successfully raised the awareness,but also gradually constructed pollution prevention practices and behavior among residents,businesses and school children. Ms.Chang is bilingual in English and Mandarin(Chinese). Education Master of Arts-Communications(with emphasis on Public Relations) California State Universitlf,Fullerton Project Specific Experience Ms.Chang has successfully kept all contract cities in compliance with the public outreach aspect of the LA County NPDES Model Program. Activities and campaigns she has developed and administered include,but are not limited to: Restaurant Sidewalk Washing Campaign: Ann-u.al messages to restaurants Pet Waste Campaign: Events and promotions at events,pet stores and veterinary hospitals Point-of-Purchase(POP)Campaign: Ongoing outreach at hardware,grocery and auto businesses • School Outreach:Ongoing efforts to educate students Business outreach,Service Clubs:Organizes presentations Earth Day Event:Organizes and/or attendance annual April events. H-142 ME= Enhanced Watershed.Management Program Proposal KATHLEEN McGOWAN,P.E. environmental consulting NPDES permit compliance TMDL planning and implementation storm water quality monitoring industrial and hazardous waste management EDUCATION B.S.,Chemical Engineering,The Johns Hopkins University, 1983 M.S., Environmental Engineering,Georgia Institute of Technology,1987. REGISTRATIONS AND CERTIFICATIONS Registered Professional Engineer in Chemical Engineering,CA License No. CH 4989 CAREER SUMMARY Kathleen McGowan's professional experience spans 25 years of varied environmental work for public and private clients including: NPDES permit compliance and negotiation, water quality monitoring, TMDL implementation planning, environmental compliance, industrial and hazardous waste management, site investigations and due diligence. Kathleen has won favorable regulatory/permit modifications for clients and has assisted clients in securing more than $3million in grant funding for water quality projects, two of which have won multiple awards. She has developed sampling and analysis plans, quality assurance plans, conducted field monitoring, prepared work plans, cost estimates, regulatory analyses and technical reports. Ms. McGowan's recent work includes leading the development and approval process of the Peninsula Cities Machado Lake Nutrient TMDL Monitoring and Implementation Plans.. She assisted five municipalities in evaluating,defending,and preparing responsive information reports required by NOVs and Orders Pursuant to California Water Code Section 13383 issued by the LARWQCB for exceedances of the Summer Dry-Weather objectives under the Santa Monica Bay Beaches Bacteria TMDL. Ms. McGowan was involved in negotiation and comment on behalf of municipal clients during development of the LA MS4Permit including participation on the TMDL and Monitoring subcommittees of the LA Permit Group. A key permit modification achieved on behalf of the Peninsula Cities provides relief for single family home development projects from the stringent hydromodification requirements. Ms. McGowan is intimately familiar with the unique character of the Palos Verdes Peninsula, has provided M54 Permit and TMDL consulting services for three of the Peninsula cities, and was a resident of the Palos Verdes Peninsula for nineteen years. H-143 ME= Enhanced Watershed.Manageroent Program Proposal REPRESENTATIVE EXPERIENCE City of Rolling Hills Estates, California. Ongoing environmental consulting services to support City staff in complying with the MS4 Permit including annual training, industrial and commercial facility inspections; targeted public education brochures; compliance strategies for Nutrient, Trash and Bacteria TMDLs; WDRs for Sanitary Sewer Collection Systems. Serving as QA Manager for the Peninsula Cities Machado Lake Nutrient TMDL Monitoring program. Secured over $1 million in Prop 84 TRWMP Grant funding for Model Equestrian Center stormwater quality improvement project. City of Rolling Hills, California. Environmental consulting services in implementing the requirements of the Municipal Stormwater Permit as well as technical and regulatory support in developing and implementing compliance strategies for TMDLs.Recently managed the revision of the City's stormwater ordinance to address the newly adopted 4t'-term MS4.permit. City of Palos Verdes Estates, California. Under subcontract to Charles Abbott Associates, assisting the City of Palos Verdes Estates in preparing to implement the new MS4 Permit and in developing implementation strategies for compliance with the TMDLs. Provided training for City staff on the new MS4 Permit Planning and Land Development requirements and managed the revision of the City's draft stormwater ordinance to meet the notice of intent deadline for a draft LID ordinance, City of Hermosa. Beach, California. Ongoing environmental consulting services to assist in MS4 Permit compliance as well as for T.MDL-related issues for Santa Monica Bay. Services include: annual reporting, management of Clean Bay Restaurant program, commercial facility inspections, staff training, grant funding applications and monitoring plan design for structural BMP projects,and representing the City's interests at watershed comn-dttees. Revising City's stormwater ordinance to address the LID and other requirements of the newly adopted MS4 Permit. City of Manhattan Beach, California. Environmental consulting services to assist in compliance with the MS4 Permit as well as technical and regulatory support in for Bacteria and Marine Debris TMDLs for Santa Monica Bay. Services include: annual reporting, automotive facility inspections, Clean Bay Restaurant program management, and staff training. Secured grant funding from the Santa Monica Bay Restoration Commission for construction of the Greenbelt Infiltration Project. Prepared project assessment and evaluation plan for grant funded porous paving project. Jurisdictional Groups 5 & 6 Implementation Plan. Developed conceptual strategy for the implementation plan specific to the jurisdiction's characteristics while maintaining consistency with compliance approaches in other jurisdictions. Served as primary author/technical editor of the implementation plan. H-144 Enhanced Watershed Management Program Proposal KEN J.SUSILO,P.E.,D.WRE,CPSWQ watershed management and water quality integrated water resources design of hydraulic and water quality structures EDUCATION MS,Civil Engineering,University of California,Berkeley,CA 1991 BS,Civil Engineering,University of California,Berkeley, CA 1990 REGISTRATIONS AND CERTIFICATIONS Professional Civil Engineer,California,No.C51194 Certified Professional in Storm Water Quality,No.0086 Diplomate,Water Resources Engineer No.00281 CAREER SUMMARY Ken Susilo, PE, D.WRE, CPSWQ is a Professional Engineer, Diplomate Water Resources Engineer, and Certified Professional in Water Quality. He has over 20 years of experience in planning, permitting, engineering design, hydraulics, hydrology, computer modeling, storm water management, and integrated water resources. Mr. Susilo's efforts focus on the development of multi-benefit, environmentally sensitive solutions to design and planning efforts, while cost-effectively leveraging leading-edge technologies to enhance the natural and built environment. He has managed TMDL Implementation Plans and was the Project Director of the groundbreaking GIS-based Structural BMP Prioritization and Analysis Tool, He has also served as an Expert Witness in cases involving storm water, hydrology, flooding, and water quality. In 2006, Mr. Susilo was recognized as the ASCE Outstanding Civil Engineer in the Private Sector by the Los Angeles Section and ASCE Region 9.Mr.Susilo has served as a technical reviewer for the Design of Urban Storinwater Controls MOP 23, 2nd edition. WEF; is a Peer Reviewer for the Journal of Irrigation and Drainage. ASCE; and has over 40 technical papers and/or conference presentations/workshops. REPRESENTATIVE EXPERIENCE Santa Monica Bay Beaches Bacteria TMDL Implementation Plan, jurisdictions 1 and 4 (and Jurisdictions 2 and 3), Los Angeles, CA. Project Manager for Malibu, Los Angeles County, and Caltrans 18-year TMDL Implementation Plan, which addresses integrated water resources, site-specific source controls and structural BMPs. Task manager for hydrology and structural BMP tasks for SMB Jurisdictions 2&3. City of Los Angeles Metals and Bacteria TMDL Implementation Plans, Los Angeles, CA. Geosyntec Project Director(as subconsultant)responsible for TMDL Implementation Plans for Ballona Creek Metals (Copper, Lead, Zinc, Selenium) and Bacteria. Also participated in BMP prioritization development for Los Angeles River. San Luis Rey Watershed TMDL Implementation Plan (Comprehensive Load Reduction Plait), San Diego County, CA. Project Manager for potential development of a watershed-wide Comprehensive Load Reduction Plan for the 562 square mile San Luis Rey Watershed,which includes the County of San Diego and cities of Carlsbad and Oceanside. The objective was to address multiple pollutants, as well as other M H-145 I Enhanced Watershed Management Program Proposal watershed and water resources benefits,while complying with the Bacteria TMDL. San Diego River Watershed TMDL Implementation Plan (Comprehensive Load Reduction Platt), San Diego County, CA, Project Manager for potential development of a watershed-wide Comprehensive Load Reduction Plan for the San Diego River Watershed, which includes the County of San Diego and cities of San Diego,El Cajon,La Mesa, Poway,and Santee, North Santa Monica Bay TMDL Implementation Activities,Los Angeles County, CA. Principal-in-Charge for project that used GIS-based methods to identify project opportunities in North Santa Monica Bay to support Los Angeles County with project identification, opportunity development, and feasibility/concept level designs. Tasks included development of cistern technology assessment and standards evaluation. South Santa Monica Bay TMDL Implementation Activities, Los Angeles County, CA. Principal-in- Charge for project that used GIS-based methods to identify project opportunities in South Santa Monica Bay with source identification (including HBM methods), project identification, prioritization, and concept development. Malibu Creek TMDL Implementation Plan and Regional Watershed Implementation Plan (RWIP), Ventura County, CA. Technical consultant for TMDL Implementation Plan(all program elements), which addresses integrated water resources, site-specific source controls and structural BMPs. Task manager for hydrology and structural BMP tasks,multiple stakeholder presentations and outreach. Primary focus for TMDL implementation planning was bacteria,while RWIP focused on bacteria and nutrients. City of Malibu, Los Angeles County, CA. Consultant and Testifying Expert Witness for City of Malibu supporting litigation(NRDC and Santa Monica Baykeeper v. City of Malibu) ASKS project development, grant applications and responses to Regional Water Quality Control Board Notices of Violation. City of Los Angeles Water Quality Compliance Master Plan for Urban Runoff, Los Angeles, CA. Technical Reviewer and contributor. Greater Los Angeles County Integrated Regional Water Management Plan(IRWMP), Los Angeles County, CA, Project Director for Geosyntec(as Subconsultant) H-146 on= Enhanced Watershed Management Program Proposal. REBECCA BATCHELDER,F.E. stormwater treatment Engineer low-impact development wastewater treatment riparian restoration erosion and sedimentation control NPDES permitting EDUCATION M.S.,Water Resources and Environmental Engineering,Tufts University,2005 B.S.,Environmental Engineering,Tufts University,2003 REGISTRATIONS AND CERTIFICATIONS Registered Professional Engineer,Texas,License No. 1.05875 CAREER SUMMARY Rebecca Batchelder is an environmental and water resource engineer with seven years of project-based experience. She has expertise in the areas of LTD and BMP design,regional water resource planning, and watershed monitoring. Ms. Batchelder designed many innovative stormwater BMPs for the City of Austin Watershed Protection Department,including pollutant removal modeling,most notably for Pease Park, an iconic urban park in Central Austin In addition to her stormwater experience,Ms. Batchelder's work in Austin included making pioneering steps towards establishing graywater reuse as a viable water conservation strategy through design,installing and permitting Austin's first residential graywater reuse system. As a result of these efforts, she was asked to serve on the City of Austin's Graywater Working Group and advise the City of Los Angeles Building and Safety Department on developing a new graywater permitting process. Her recent work in Southern California has included obtaining permits from multiple state and federal agencies for projects aimed at diverting LA River water for beneficial reuse in the LA State Historic Park, completing a stormwater capture feasibility study prioritizing water supply,water quality,and flood risk for the Water Replenishment District, and assisting the City of Los Angeles and Ventura County in securing grants for stormwater capture projects through Proposition 84 funds. Ms. Batchelder also developed a technically based, yet easy to use tool for estimating BMP water quality and quantity benefits for the Open Space and Habitat Areas Recreation Plan for the Los Angeles Integrated Water Resource Plan. REPRESENTATIVE EXPERIENCE Greater Los Angeles County Integrated Regional Water Management Plan - Open Space, Habitat and Recreation Area Plan. Developed tools for quantifying water quality and water quantity benefits of open space and recreation areas, and set targets for open space and recreation in the Greater Los Angeles Country Region. Developed a modeling tool to accurately estimate recharge from stormwater capture —M H-147 ism= Enhanced Watershed Management Program Proposal BMPs using generic SWWM modeling. This too] allows non-water resource experts to easily quantify the benefit of proposed stormwater capture projects in terms that relate to IRWMP targets. Siempre Agua: the Los Angeles River Water Wheel. Obtained permits for a geotechnical investigation in the Los Angeles River to support the design of a diversion charmel off the main channel of the LA River. Required permits included Section 401 and 404 from the Regional Water Board,a Section 408 from the US Army Corps of Engineers, and a Stream Alteration Agreement from the Department of Fish and Game. Additionally, an access agreement from the City of LA was obtained. All permits were obtained at a highly expedited schedule due to project deadlines. City of Sunset Valley, TY Served as water quality engineer for the City of Sunset Valley.Responsibilities included reviewing permanent and temporary stormwater control designs, performing construction inspections of these designs,and evaluating requests for variances from the City design criteria. Stormwater BMP Design, City of Austin Watershed Protection Department. Designed multiple innovative stormwater treatment systems, including biofiltration ponds, vegetative filter strips, rain gardens, and pervious pavement parking lots. Responsibilities included developing conceptual design, modeling pollutant removal,hydraulic modeling,and generating plans and specifications. Residential Graywater Reuse System, Austin, TX Designed, permitted and installed Austin's first residential graywater reuse system. Notable accomplishments include proclamation from the City of Austin for pioneering work in graywater and invitation to serve on the City's Graywater Working group. Lower Rio Grande Valley Disaster Recovery Block Grant Program Review, Texas Appleseed. Reviewed drainage improvement projects in southern Texas where local governments were seeking disaster relief funding from the federal government. After the initial review, continued as technical advisor to client during negotiations with the project designers to achieve project revisions that would provide benefits for the lowest income residents in the region, H-148 IN Enhanced Watershed Management Prograin Proposal D.SCOTT MANSELL,Ph.D. hydrologic and hydraulic modeling stormwater pollutant fate and transport stormwater and wastewater BMPs quantitative microbial risk assessment EDUCATION Ph.D.,Civil and Environmental Engineering,University of California,Berkeley,2012 M.S.,Civil and Environmental Engineering,University of California,Berkeley,2007 B.S., Civil and Environmental Engineering,University of Utah,2006 REGISTRATIONS AND CERTIFICATIONS Engineer in Training,Utah(2005) CAREER SUMMARY Dr. Mansell joined Geosyntec Consultants in July 2012. Throughout his career he has created and used various hydrologic, hydraulic, water quality, and watershed models. These projects have included analysis and design of BMPs and stormwater infrastructure, water quality regulation compliance assessment, and implementation planning. In addition, he has been involved with several technical papers and presentations addressing the fate, treatment,and regulation of stormwater pollutants. Dr. Mansell recently provided analysis and feedback on Los Angeles County's WMMS model. He used the LSPC portion to model various watersheds to assess loading and flow conditions, and he used the NIMS component to determine optimum flow reductions in for sub-basins. The feedback he provided to the County was used to update the model for others to download and to help clarify how various components of the model are used for EWMP determination. He provided analyses that were used to compare and contrast SBPAT and WMMS to stakeholders to help explain their strengths and weaknesses in EWMPs. REPRESENTATIVE EXPERIENCE TMDL Implementation Plait for Bacteria and Nutrients, Malibu Creek Watershed, CA. Analyzed effectiveness and costs of various non-structural BMPs, and made recommendations to client. Contributed to preparation of comprehensive TMDL implementation plan. White Paper on Scientific Shortcomings of Bacteria TMDL, San Diego County, CA Provided analysis of the shortcomings of a bacteria TMDL and an expert panel review using technical information from the literature and statistical analysis of rainfall patterns in Southern California. Analysis focused on the appropriateness of wet/dry weather WLAs and the protection of human health. Quality Assurance Plan for MS4 Pollutant Source Identification Study, San Diego Country, CA Analyzed necessary sampling and laboratory techniques required to provide highest quality data for a county-wide —M H-149 No= Enbanced Watershed Management Program Proposal MS4 pollutant source identification study. Provided insight into specific needs for various analytes and challenges associated with sampling/laboratory techniques. MS4 and Industrial Stormwater Permit Requirement Support, Port of Portland, OR, Conducted analysis of all current stormwater regulations relevant to the Port, and all potential effects of future changes in stormwater policy on a local, state, and national level. Determined pollutants relevant to the site and wrote review papers for each discussing their properties, environmental fate, likelihood to be in urban/industrial stormwater, and the treatment using both active and passive methods. Currently modeling for water quality analyses using SWMM and a Monte Carlo-based model.Will model complex site under various scenarios, design BMPs to address the many relevant pollutants, and provide all other analyses necessary for compliance. Compliance with Fish-Consumption-Rate-based Stormwater Policy Changes Renton, WA, Analyzed a major industrial facility's stormwater system for its ability to achieve new FCR-based water quality criteria,and recommended treatment alternatives,provided conceptual designs and costs.Modeled using SWMM, GIS, and CAD. Also provided review and comments on a white paper about the properties, analytical detection,and treatment of various relevant pollutants. Central Coast Phase H MS4 Stormwater RetentionlCapture Requirement Analysis, Central Coast, CA, Analyzed requirements in the Phase 11 MS4 permit for all of California and the Central Coast-specific requirements. Sized a bioretention bioinfiltration facility according to requirements and modeled in SWMM using continuous simulation. Analyzed runoff volumes, capture, and flow duration curves for different scenarios. Development of GIS-based Tool to Model Hurricane-induced flooding, Los Alamos National Laboratoty, Gulf Coast. Developed a too] in ArcGIS using Visual Basic to model storm surge inundation as part of a larger research project to model overall flooding from hurricanes. _IE H-150 Enhanced Watershed Management Program Proposal MEGAN M.OTT©,P.E.,QSP/QSD municipal NPDES permit compliance surface water management and monitoring stormwater engineering feasibility studies industrial NPDES permit compliance EDUCATION M.S., Environmental Engineering, University of Massachusetts,Amherst,MA,2007 B.S.,Environmental Engineering,California Polytechnic State University,San Luis Obispo, CA,2005 REGISTRATIONS AND CERTIFICATIONS Professional Engineer in Civil Engineering, California Board for Professional Engineers and Land Surveyors,No.C74745 Qualified SWPPP Practitioner,Qualified SW PPP Developer,Certificate No.22153 CAREER SUMMARY Since joining Geosyntec,Megan Otto, P.E., QSD/QSP, has contributed to and managed portions of many complex, controversial, and time sensitive projects in the Los Angeles Basin for the public, private, and non-profit sectors. Her project experience includes a variety of topics including stormwater planning, industrial and municipal NPDES permit compliance, water quality monitoring and reporting, engineering feasibility studies, hydrologic and hydraulic modeling, and litigation Support. Ms. Otto has also assisted with several multi-faceted stormwater planning projects,including Malibu legacy Park and the design of a treatment wetland at the Los Angeles State Historic Park, both of which have required significant inter-agency cooperation. She served as Task Manager for the Jurisdictional Groups 5&6 Santa Monica Bay Beaches Bacteria TMDL Implementation Plan Source Identification Study, Ms, Otto is currently the. Assistant Project Manager for the Malibu Broad Beach Bioinfiltration Project, a Preposition 84 funded project designed to improve water quality at the adjacent beaches. She is also the stormwater lead on the Siempre Agua and Piggyback Yard projects, REPRESENTATIVE EXPERIENCE Jurisdictional Groups 1 and 4, Santa Monica Bay Beaches Bacteria TM.DL Implementation Plan, Los Angeles County, California. Analyzed bacterial shoreline monitoring data to re-evaluate, based on recent data, previously identified high priority watersheds. Produced technical memorandurn summarizing analysis methodology and prioritization recommendations, which will guide the source control and BMP siting and selection recommendations. Jurisdictional Groups 5 and 6, Santa Monica Bay Beaches Bacteria TMDL Implementation Plan, Cities of Torrance, Redondo Beach Hermosa Beacti, arid Manhattan Beach, California. Responsible for managing field reconnaissance and storm drain sampling of ,,elected high priority drainage areas. This includes a drainage area study to identify the most critical sampling locations based on land use, business types, storm drain configuration, and past evidence of dry weather flows and contamination based on interviews with NPDES inspectors. Sampling results served as basis for selection of the most effective locations for stormwater capture and treatment. H-151 ME= Enhanced Watershed Management Program Proposal Legacy Park Storinwater BMP Design, City of Malibu, Malibu, California. Assisted with the design and development of a stormwater BMP system in order to achieve compliance with the Bacteria TMDL for Malibu Creek, Hydrologic and hydraulic simulations included SWMM5 and WSPG. Involved significant coordination with Los Angeles County Flood Control District to obtain Flood Permit, Proposition 0, Westchester Stonnwater Best Management Practices (BMP) Project, City of Los Angeles, Los Angeles, California. Project will assist in meeting the Santa Monica Bay Beaches Wet-Weather Bacteria TMDL, while also removing other pollutants such as trash, oil, and grease from stormwater runoff. Provided technical assistance and support in the assessment of several project design alternatives,as well as a significant level of vendor coordination with respect to trash-capture devices.Also evaluated system hydraulics using Los Angeles County's hydraulic modeling program, Water Surface Profile Gradient (WSPG). Pier Avenue Improvement Project Effectiveness Monitoring, City of Hermosa Beach, California, Designed and implemented an effectiveness monitoring program for the award-winning green street retrofit of Pier Avenue in the central business district of the City of Hermosa Beach. Low-Flow Infiltration Trench Monitoring for Bacteria TMDL Compliance, City of Hennosa Beach, California. Prepared draft monitoring plan for the grant-funded low flow infiltration trench designed to demonstrate compliance with the Santa Monica Bay Beaches Bacteria TMDL, Content included proposed sampling frequency, monitoring points and constituents, equipment and procedures, and QA/QC procedures. Machado Lake TMDLs, City of Rolling Hills and City of Rolling Hills Estates, California, Assisted with review of the Machado Lake Trash and Nutrient TMDL development documents and helped to draft technical memoranda for clients during TMDL negotiation. AM H-152 no= Enhanced Watershed Management Program Proposal BRANDON STEETS,P.E. NPDES permitting&strategic regulatory support watershed&receiving water modeling&monitoring stormwater quantity/quality modeling&monitoring stormwater BMP design TMDL development/implementation bacteria source investigation EDUCATION M.S., Environmental Engineering,University of California,Santa Barbara,2000 B.S.,Environmental Engineering,Rensselaer Polytechnic Institute,Troy,New York, 1998 REGISTRATIONS AND CERTIFICATIONS Registered Professional Engineer,Chemical,State of California,No.CH6132 CAREER SUMMARY Mr, Steets has significant experience in conducting and managing large water quality modeling and monitoring projects to support NPDES permitting, TMDL implementation, stormwater quality management/planning, and BMP design. His experience includes bacteria source investigations and implementation planning; watershed, receiving water, and stormwater quality modeling; water quality monitoring plan development, implementation, data analysis, and reporting; and stormwater BMP selection and design. He is an expert on bacteria issues,being a member of the SWRCB's Clean Beaches Task Force and Beach Water Quality Workgroup and of EWRI's Urban Water Resources Research Council's technical. committee on pathogens in wet weather flows (and is assisting in the development of a report on the subject), reviewer for the 2010 WERF/ASCE International Stormwater BMP Database performance summary for bacteria, and peer reviewer for the journal Water Research on coastal bacteria topics. His project specific management and technical experience includes the following: Los Angeles County-Wide Structural BMP Prioritization Project[SBPA71,Los Angeles Counhj, California. Phase 1: Development of ASCE award-winning GIS-based Methodology (www.labmpmethod.org) for identifying and prioritizing structural retrofit BMPs in a watershed based on costs, effectiveness, and feasibility.Phase IT: Methodology demonstration on Ballona,Creek Watershed.Phase III: development of SBPAT, the Strategic BMP Planning and Analysis Tool (www.sbpat.net), a GIS-based graphical user interface for the Methodology and incorporation of modeling functions using U.S. EPA's SWMM model for hydrology and Monte Carlo(statistical model)for water quality,including bacteria. Malibu Creek Bacteria and Nutrient TMDL Implementation Plans, Ventura County, California. Development of Implementation Plans for unincorporated Ventura County portions of Malibu Creek watershed, including identification and prioritization of structural and non-structural BMPs, and recommendations for future monitoring and special studies. Includes Prop 84 grant support to assist in development of an application for special monitoring studies and structural BMP implementation, and review and comment on TMDL reopener materials. AM H-153 EI= Enbanced Witersbed Management Progrim Proposal Ballona Creek Bacteria and Metals TMDL Implementation Plaits, Ciul t> Los Angeles, California. Development of Implementation Plans for this '130 square mile, watershed, including application of tire SBPAT, a SWMM-Monte Carlo linked hydrologic and water quality model, to prioritize retrofit BMP projects in the watershed and evaluate the costs and water quality benefits of implementation scenarios, Bacteria TMDL Implementation Plans, Channel Islands Harbor (CIH), Ventura County Watershed Protection Department, Ventara County, California, Development of dry and wet weather implementation plans, as required by the LA Regional Board for the CIH bacteria TMDL. Includes review of previous studies (e.g,, microbial source tracking and circulation enhancement studies), selection and prioritization of structural controls (e.g., bird deterrents, circulation enhancements and stormwater treatment BMPs), pilot study planning, human fecal source identification study recommendations, and a Quantitative Microbial Risk Assessment ((;,MRA) study plan for a Site Specific Recreational Criteria, San Luis Rey and San Diego River Combined Load Reduction Plaits (CLRPs), Satz Diego County, Coli6brnia. Development of MS4 CLRPs and TMDL Compliance Monitoring Plans for the San Luis Rey and Sari Diego River watersheds, including collaboration with multiple co-permittees. CLRPs include prioritization, cost, and quantitative evaluation of both nonstructural and structural (retrofit) BMPs, to comply with the San Diego Region coastal bacteria TMDL. Also includes development of new Sari Diego- specific land use runoff concentrations, BMP prioritization using both the SBPAT model and receiving water and MS4 monitoring data. Microbial Source Tracking Investigation, San Diego Counol, California. Plan and implement investigation of human waste contamination of MS4 outfall /networks and surface water drainages(including in septic rise areas) as a pre-QMRA study within the unincorporated County portions of the San Luis Rey, San Diego River,and San Dieguito River watersheds. H-154 ME= Enhanced Watershed Managenient Program Proposal CHRISTOPHER WESSEL,PE,QSD/QSP MS4 permit compliance surface water management and monitoring hydraulic and hydrologic modeling stormwater BMPs NPDES permitting EDUCATION M.S., Hydrology and Water Resources Engineering, University of California, Los Angeles,2009 B.S.,Civil and Environmental Engineering, University of California,Los Angeles,2007 REGISTRATIONS AND CERTIFICATIONS Registered Professional Engineer,Civil, State of California,No.078522 California Construction General Permit Qualified SWPPP Developer/Practitioner, No.20321 CAREER SUMMARY Chris Wessel,PE, QSD/QSP,is a Professional Engineer and Qualified SWPPP Developer and Practitioner. He has over four years' experience in hydraulics, hydrology, computer modeling, and stormwater management. Mr. Wessel is providing MS4 Permit support to the Cities of Hermosa Beach, Manhattan Beach,, El Segundo, Rolling Hills, Rolling Hills Estates and Palos Verdes Estates. Fie has led BMP monitoring activities in Manhattan Beach and flermosa Beach and was a co-author of the City of Los Angeles LID Handbook. Other project experience includes stormwater pollution prevention plan development and NPDES permitting under the California Construction General Permit; compliance with water quality objectives including Total Maximum Daily Loads (TMDL,$), Basin Plan Objectives, and NPDES effluent limits; stormwater planning and BMP design; hydraulic and hydrologic modeling, with an emphasis on BMP design and evaluation; and dry and wet weather field sampling. fie has also presented a variety of teclu-rical findings at multiple conferences, and has been a QSD/QSP training instructor for various clients in both the private and public sector. Environmental Planning and Stormwater Best Management Practices Environmental Consulting Services for MS4. Permit Compliance, Various Clients. Providing environmental consulting services to assist six different cities in the implementation of the requirements of the Los Angeles County MS4 Permit. Ongoing Municipal Stormwater Permit assistance has included: presentations to city staff on the Planning and 'Land Development requirements set forth in the new Permit, implementation planning, commercial facility inspections, and illicit connection and illicit discharge program planning. City of Los Angeles Low Impact Development Handbook Cita/ of Los Angelcs, California, Responsible for drafting a significant portion of the technical sections of the City of Los Angeles' new LID Handbook. Specific content included residential BMP design guidance and factsheets, large development BMP design guidance and feasibility criteria, constraint mapping, and teclmical writing, The Handbook was designed to be highly user-friendly while still remaining technically advanced. H-155 on= Enhanced Watershed Management Program Proposal Bacteria TMDL Wasteload Allocation Attainment Plans, San Luis Obispo County and City (�Morro Bay, C.A. Responsible for writing Wasteload Allocation Attainment Plans to be included in each client's Stormwater Management Plan and submitted to the RWQCB for approval. Content included source identification and prioritization, BMP identification, prioritization, and implementation, monitoring planning,and effectiveness assessment. Hvdraulic and Hvdrologic Modeling jurisdictional Groups 5 and 6, Santa Monica Bay Beaches Bacteria TMDL Implementation Plan, Cities of Torrance, Redondo Beach, Herinosa Beach, and Manhattan Beach, California. Responsible for EPA SWMM modeling of the Herondo and 281" St. watersheds, The modeling was used as part of the quantitative assessment for the project, which analyzed the impact of various BMPs on meeting the Bacteria 'IAML. Modeling was also conducted for the design of a large infiltration BMP at the Flerondo watershed outfall to meet the Bacteria TMDL discharge requirements while seeking to minimize costs, San Diego River TMDL Comprehensive Load Reduction Plait, Connty of San Diego, California, Responsible for the quantitative assessment of various distributed and regional BMPs within the San Diego River Watershed. Assessment modeling was done using the Structural BMP Prioritization and Analysis Tool (SBPAT) and GIS. The analysis sought to quantify the load reductions associated with multiple Alarmed and existing BMPs throughout the watershed. NPIES Permitting California Construction General Pe"nit:Drafting,Implementing, and Training, Various sites, Responsible for the drafting of various stormwater pollution prevention plans under the new California Construction General Permit, including linear utility projects and traditional projects, and on-site field training and auditing for SWPPP compliance. Project QSP for various projects of different risk categorizations. Has also taught more than a dozen QSD/QSP training courses for various clients including the City of Los Angeles and CMAA, INVITED PRESENTATIONS StorrnCon,2011. Pier Avenue Iniprovenient Project:Monitoring for TMDL Certification. Anaheim, CA. August 25. CASQA Stormwater Conference, 2011. City of Los Angeles, Low linpact Developinent Handbook Monterey, CA.,September 27. American Council of Engineering Companies, Los Angeles Chapter, 2012, Storni Water Seininar. Los Angeles,CA,November 1. H-156 No= Enhanced Watershed Management Program Proposal SCOTT STRUCK,Ph.D. infrastructure planning and implementation stormwater BMPs surface water monitoring green infrastructure EDUCATION Ph.D.,Water Resources, Indiana University, Bloomington,IN,2003 M.S.,Water Resources Engineering,Indiana University,Bloomington,IN,2001 M.P.A.,Env.Pot, and Nat,Res.Mrigmt., Indiana University, Bloomington, IN,2001 B.S.,Zoology,University of Washington,Seattle,WA, 1995 B.A., Psychology,University of Washington,Seattle,WA, 1995 REGISTRATIONS AND CERTIFICATIONS Professional Wetland Scientist,2006(No. 1655) CAREER SUMMARY Dr. Strucks work focuses on planning and implementation of green infrastructure and other stormwater best management practices into municipal, county and state programs. This includes identification of opportunities and barriers, screening and prioritization, modeling, design, monitoring, and performance assessment of these systems. He has participated in projects throughout the country designed to monitor the effectiveness of green infrastructure for CSO and stormwater control and support planning and implementation of integrated watershed management strategies. REPRESENTATIVE EXPERIENCE Orange County Transportation Authority Measure M2 Environmental Cleanup Prograin Tier 2 Grant Evaluation Assistance, Orange, California. Scott assisted a team in applying an integrated model to identify and categorize strategically effective areas and types of water quality mitigation,fie led the team in providing evaluation of cost effective plans based on criteria developed through a technical advisory committee to rank and prioritize projects for future implementation Los Angeles County Watershed Planning, Los Angeles, California, Scott worked with a team to provide watershed planning prioritization and cost optimization for meeting regulatory requirements. Dr.Struck has been involved with selection, design, placement, and cost optimization of runoff management and source control practices (LID and Green Infrastructure techniques) providing decision support for watershed planning and capital improvement projects in the unincorporated areas of Los Angeles County. Development of LID Design Manual — City (�San Diego, California, Dr. Struck %vas instrumental in the development of the City of San Diego Lfl) manual for the implementation of LID and source control practices for Municipal (and private) use. "This manual incorporates regional and local climate, soil, and topographic conditions for the City of San Diego in the consideration of planning guidance: BNIP selection; design standards, specifications, and drawings; BMP sizing tool; fact sheets; construction H-157 ME= Enhanced Watershed Management Program Proposal considerations; operation and maintenance checklists; and plant and soil guides for bioretention, vegetated swales,permeable hardscapes (paver stones,porous concrete and porous asphalt), and several other LID BMPs, The manual emphasizes LID applications and examples in municipal rights-of-way. Stonnwater Strategic Planning, City of San Diego, California. In order to ensure that stormwater management activities are sufficiently and cost-effectively contributing to an overall improvement water quality throughout the City, Dr. Struck assisted with the City's stormwater strategic planning section to establish a systematic method for evaluation of BMP costs and impacts. Aliso Creek TMDL Review and Data Needs Assessment, Orange Connty, California. Dr. Struck provided review and assessment of collected data for Aliso Creek. The purpose was to determine whether the allocations and goals were in need of change following 7 years of management and data collection through assessment of existing data and modeling to address remaining water quality issues. Evaluation of Memorial Park Infiltration Basin, City of San Diego, California. Dr.Struck helped the City to determine the water quantity and quality performance of a treatment train of best management practices(BMPs)in Memorial Park,San Diego, CA, Dr.Struck was project manager. PROFESSIONAL EXPERIENCE Geosyntec Consultants,Senior Professional,2012 to present Tetra Tech,Senior Manager,Golden, Colorado,2002 to 2012 DISTINGUISHING QUALIFICATIONS o Conference Co-Chair of the 2010 International Low Impact Development Conference in San Francisco e Chair of the Urban Water Resources Research Council of the Environmental Water & Resources Institute(EWRI)under the American Society of Civil Engineers(ASCE) a Provided training on sustainable water resources management at national and international conferences and workshops(EPA, WEF,and ASCE). H-158 = Enhanced Watershed Management Program Proposal APPENDIX C: DEAN ILED PROJECT EXPERIENCE DESCRIPTIONS AND REFERENCES Detailed project descriptions and references for JL11A and Geosyntecare included below, H-159 Enhanced Watershed Man agement Prograrn Proposal JLHA RELATED PROJECT EXPERIENCE Tables]. and 2 below summarize the experience of the key staff with regard to their completion of similar projects.The tasks listed in the table are explained below.The key staff member associated with each task is listed in the tables by their initials. • Program Assistance—Assess compliance provisions,oversee implementation of program elements,train client staff,serve as client contact and represent client in program audits. Develop Plans—Prepare environmental documents such as TMDL Implementation Plans, Stormwater Quality Management Programs,Watershed Management Programs and Storm-water Pollution Prevention Plans. • Permit Facilities—Administer environmental permitting programs(FOG and Industrial Waste Control). • Review Plans—Review new development plans to address risks and assess regulatory compliance related to the sanitary and storm drain systems(e.g. SUSMTs and WQMPs). • Provide Outreach—Produce and deliver relevant outreach materials to facilities and hold educational events.Develop and implement outreach campaigns to public and private sectors, • Conduct Fieldwork—Conduct field Best Management Practice(BMP)inspections at industrial, commercial,municipal and construction sites. Conduct field monitoring and data collection. • Enforce—Issue enforcement actions to noncompliant facilities. • Annual Report—Complete Annual Reports for NPDES MS4,Construction,Industrial and Individual Permits. Table 1:Summary of Related NPDES Stormwater Experience" Program Develop Check Provide Conduct Annual Client Assistance Plans Plans Outreach Fieldwork Enforce Report wwwwxmwwwwnw�EMMUMMUMMM Arcaclia JLHA JH/JB AC JLHA JLHA JLHA Big Bear Lake CM AC SD/JLHA JLHA CM Diamond Bar CM AC JLHA JLHA Downey CM Jl-l/CM/JB JH/JB AC JLHA JLHA CM I liwaiian Gardens Cm Jlt/cm/fB J]i/JB 5, AC 6. JLHA T JL S. CM FIA Hawthorne JLHA Ji'-I/CM/JB JH/JB AC JLHA JLHA Manhattan Beach(CBR) CM/SD 517 SD Monrovia JLHA JLHA Monterey Park CM JH/CM/IB jfl/fB AC JLHA JLHA SD Norwalk CM jfl/CM/IB JH/JB AC CM CM CM Rancho Palos Verdes CM jfi/CM/JB/",D jfi/JB AC SD JLHA CM Rolling Hills SD 5D SD SD Seal Beach JB CM/JB JH4B AC 1317 JLHA JB Signal Hill CM )H/CM/,JB JF-J/JB AC SD JLHA CM South Cate JLHA M/Cm/fli JH/J13 AC JLHA JLHA JLHA South Pasadena CM AC SD JLHA CM Stanton CM CMITB JH/JB AC JLHA JLHA CM Teinple City CM JH/CM/.IIF JH/JB AC JLHA JLHA SD West Hollywood JB Jl-1/JB SD JLHA I AC—Anne Chang,JB—Jillian Brickey,JH—John Hunter,SD—Susan Dworsky,CM—Cameron McCullough,JLHA—other JLHA staff H-160 ME= Enhanced Watershed Management Program Proposal Table 2:Summary of Related FOG Control Experience Inventory/ Manage Prioritize Permit Review Provide Inspect Client Program Facilities Facilities Plans Outreach Facilities Enforce Arcadia (JLHA) ULIIA) OLPIA) JH/(JLJiA) AC (JLl-IA) (JLHA)LHA) Baldwin Park (JLHA) (JLHA) OUJA) W/MG AC (JLHA) (JLHA) Big Bear Like (City) CM (City) (City) AC SD/(ILHA) SD/(JLHA) Hawthorne JR JR JR JI-1/(JLHA) AC (JLHA) (JLHA) Manhattan Beach city/CM (City) (City) ,ity) (City) (JLHA) (JLHA) Signal Hill CM CM SD JH/(JIHA) AC SD SD South El Monte (JLHA) (JLHA) (JUIA) J14 AC (JLHA) (JLHA) South Gate (JLHA) (JLHA) (JLHA) JH/(JLHA) AC (JLHA) (JLHA) South Pasadena CM/City Cm (City) City/JH AC (JLHA) (JLHA) Stanton CM CM CM IH/(JLHA) AC ULHA) (JLHA) ................. ................... ............ In addition to the experience listed in the above tables: 0 JLHA manages the Clean Bay Restaurant(CBR)Program for the City of Rancho Palos Verdes and conducts CBR/FOG inspections for the City of Manhattan Beach. • Team members Jillian Brickey and Cameron McCullough have represented clients in several NPDES MS4 program audits by the Regional Water Quality Control Board,This includes audits of Big Bear lake(2007),Seal Beach(2006,2010)and Stanton(2010). • ']'earn member Susan Dworsky has participated for some time in the Peninsula J7 activities relating to the Santa Monica Bay Bac-teria'IMDL,helped develop and implernent a Trash Monitoring and Reporting Plan for the City of Rolling Hills(Machado lake'rrash'rMDt,),and helped develop the Machado Lake Nutrient TMDI.,.Implementation Plan. REFERENCES Name and Title Firm Contact Project ONWANNUMMOM mom= Charlie Honeycutt City of Signal Hill 2175 Cherry Ave NPDES MS4 Compliance Assistant City Manager Signal Hill,CA 907155 562 989-7356 Andy Winje City of Rancho 30940 Hawthorne Blvd NPDES M54 Compliance Associate Engineer Palos Verdes Rancho Palos Verdes, CA 90275 310-544-5249 Doug Krauss City of Hawthorne 4455 W 126'" St NPDES MS4 Compliance Environmental Programs Coordinator Hawthorne,CA 90250 310-349-2987 H-161 MINESF-hanced 1^vatershed Management Program Proposal. EOSYNTEC RELATED PROJECT EXPERIENCE Comprehensive Load Reduction Plan for TMDL Compliance San Diego County,Ca _ . . _...... Client. County of San Diego "I e �I Reference:Todd Snyder dao Watershed Plauuning Manager 5510 Overland Ave.,Suite 41.0 �< San Diego,CA 858. 94.3452 ' .; a a, 14tod.d.snydertpsdcounty.ca.gov d";u— ��� �� Stormwater d: 'Services Provide Quality Services ,., ✓ Watershed Modeling ✓ Watershed Monitoring Planning Project Objective The County of San Diego(County)has taken a leadership role in the development of TMDL Implementation Plans for the San I.,uis Rey and San Diego River watersheds in order to achieve compliance with San Diego Regional Water Quality Control.Board Resolution R9-2010-0001.Geosyntec was hired by the County to develop Comprehensive Load Reduction Plan;(CLRPs)for the San Luis Rey and San Diego River watersheds to help meet the TMDL requirements. 7be purpose of this effort is to prepare and process baseline data and to develop and present implementation strategies and metrics from which pollutant reduction activities can be developed.'The CLRPs will identify structural (regional, distributed,and institutional)and non-structural BMPs that are feasible,cost-effective, reduce pollutants of concern, and provide multiple stakeholder benefits.The CLRPs will also incorporate an integrated water resources management approach to address pollutants,identify beneficial use opportunities, and integrate multiple agencies in developing a plain to protect the water quality and beneficial uses of the two watersheds. Geosyntec's Scope of Services Geosyntec has applied a previously-developed Structural BMl'Prioritization Methodology to assist in the identification of priority areas and potential structural retrofit BMP implementation opportunities for inclusion in the CLRP. The Methodology first identifies or screens areas based on need(i.e.,pollutant load generation and downstream impairments)and then identifies opportunities for BMP implementation.''the Methodology uses a Geosyntec-developed GIS-based decision support tool called the Structural BMP Prioritization and Analysis Tool(SBPAT, www.sbpat.net).Geosyntec's specific tasks included.: 1)compiling watershed data in order to develop baseline watershed characteristics,2) identifying priority subwatersheds/catchments for structural.BMP implementation based on pollutant loading potential,3)identifying potential BMP sites within high priority catchments,4)evaluating and selecting potential BMPs based on factors such as cost,maintenance, and effectiveness for the pollutants of concern, and.,S)developing a cost effective monitoring plan that meets TMDL requirements and assesses the effectiveness of CLRP implementation. In addition,Geosyntec evaluated CLRP alternatives using a water duality modeling component of SBPAT to quantify the,range of potential TMDL compliance outcomes based on:implementation of the alternatives.A quantitative assessment of H-162 11MMUE.-banced Watershed Maxwgeinent Program Proposal pollutants(bacteria),loads,and concentrations was critical in developing an implementable and fundable plan, Notable Accomplishments Geosyntec worked with multiple stakeholder agencies to develop dry and wet-weather bacteria management strategies that ultimately will achieve TMDL compliance while minimizing unnecessary implementation costs.The CLRP incorporates Multiple approaches; water quality analytical methods; special studies that inform the regulatory targets;and techr-rical,physical and procedural methods in a comprehensive, technically-based,manner to achieve the water quality goals contained in the'I'MDL. Santa Monica Bay Beaches Bacteria TMDL Implementation Plan,jurisdictions 5/6 Los Angeles,California Client-, Cities of Manhattan Beach,Hermosa Beach, Redondo Beach,Torrance,and El Segundo; County of Los Angeles;Caltrans Reference:Frank Senteno Public Works Director 1315 Valley Drive Hennosa Beach,CA 90254 310.318.0238 Priority Calcitinents,Tributary Areas to 28th Street and f senteno@hennosabch.org Herondo Outfalls Services Provided: ,- Dry Weather Flow Monitoring&Analysis Project Objective V Source Identification and Control 'The Santa Monica Bay Beaches Bacteria Total ✓ BMP Site Prioritization&Feasibility Assessments Maximum Daily Load(SMBBB TMDL) Jurisdictions 5/6(J 5/6) Structural BMP Siting and Source Identification and Control Project(Project)is funded and managed by agencies having jurisdiction within the J 5/6 territory. The objectives of the project are to implement the Source Control and Structural BMP aspects of Phase 1 of the J 5/6 SMBBB'I'MDL Implementation Plan which focuses onf4igh Priority Drainage Areas#1 (tributary area to 2801 Street outfall)and#2(tributary area to lierondo outfall). Geosyntec's Scope of Services (,',cosyntec conducted the following efforts: 1)identification and control of dry-weather bacteria sources, 2)siting and design of structural BMPs,3)evaluation of the potential for sewer infrastructure to contribute to pollution levels, and 4)development of project concepts and evaluation of potential effectiveness using advanced hydrologic modeling.Sources of dry weather bacteria were investigated through a comprehensive dry-weather flow reconnaissance and sampling procedure which involved the sampling of over three dry-weather periods.The first round of sampling was a comprehensive evaluation of both watersheds whereas the second and third events were designed to focus on hot-spots identified during previous events.The remaining scope involved dry-weather monitoring to inform source control recommendations and implementation. H-163 Enhanced Watershed Management Program Proposal Geosyntec utilized the Structural BMP Planning and Assessment Tool (SBPAT),a GIS-based decision support tool,to identify and prioritize potential structural BMP projects,A number of viable sites for Client: City of Malibu Reference,Jennifer Brown,Sr,Environmental Programs Coordinator,510-456-2489 x275 g , jbrown@malibucity.org Services Provided: ✓ Draft TMDL Review and Comments • Beach monitoring data analysis Natural Source Exclusion Request `/%�/ � ✓ QMRA screening calculations Santa Monica Bay.Yooking toward Point Dunne from Broad Beach structural BMP implementation were identified and evaluated for physical constraints and feasibility related to implementation of infiltration BMPs.The remaining scope consists of site visits,BMP concept development and quantitative assessments of effectiveness relative to TMDL compliance.Furthermore,Geosyntec ruled out the influence of sewer infrastructure on bacteria concentrations at the shoreline through mapping of sewer infrastructure near potential pathways of transport to the shoreline at high priority outfalls and through the sampling of groundwater between the infrastructure and.shoreline using the direct push method. Geosyntec developed a number of project concepts,including regional structural BMP retrofit projects that utilize public parcels to mitigate bacteria loads to support project development and grant funding opportunities. Notable Accomplishments Geosyntec has ruled out salutary sewer infrastructure near the outfalls as a source of bacteria and has worked collaboratively with key staff from multiple agencies in a workshop environment to screen potential BMP opportunity sites for constraints. Santa Monica Bay Beaches Bacteria TMDL Reopener and Natural Source Exclusion Support Malibu,California Project Objective The Santa Monica Bay(SMB)Beaches Bacteria Total Maximum Daily Loads(TMDLs)for wet and dry weather became effective in July 2003; these were the first bacteria TMDLs in the Los Angeles region to implement the reference watershed approach for Waste Load Allocation(WLA)development. For TMDL implementation plant-iting, the responsible parties and subwatersheds were separated into jurisdictional groups. Jurisdictional groups 1 and 4 include the less developed North SMB subwatersheds and include City of Malibu.(City),Los Angeles County Department of Public Works(LACDPW),and Caltrans. The SMB Bacteria TMDLs for wet and dry weather were reopened in March 2012 to reconsider various technical items. In response to this reopener,Geosyntec was retained by the City to review and comment on the draft revised TMDL Basin Plan Amendment and associated staff report. —M H-164 momEnhanced Watershed two anagenient Prograrn Proposal Geosyntec's Scope of Services Ge(rsyntec produced a comprehensive technical summary of available literature on natural sources of bacteria in coastal surface water environments(including recent risk assessment and epidemiology studies), and performed an extensive analysis of several years of north Santa Monica Bay beach monitoring data,including the reference beach(Leo Carrillo/Arroyo Sequit), Geosyntec developed an extensive comment letter for the City,suggesting revised wet and dry weather WLAs. Select comments addressed: the reference beach and critical year selection, the reference beach single sample exceedance rate analysis approach, the Natural Source Exclusion(NSE)alternative for lesser developed or higher water quality beaches that warrant such consideration,and the Geometric Mean calculation approach (averaging periods and non-detect assumptions). Following the TMDL adoption,Geosyntec continues to assist the City with a formal NSE request,which included a new proposed weight-of-evidence approach for NSE detennination and discussion of Quantitative Microbial Risk Assessment(QMRA),for Regional Water Quality Control Board (RWQCB) staff consideration. Geosyntec also performed site-specific screening-level QMRA calculations for the City using local available virus data to assess whether a full QMRA might have value. Notable Accomplishments Geosyntec was able to allocate significant resources on short notice to perform extensive review of literature and analysis of data,and prepare a high quality comment letter for RWQCB consideration. As a result of the reopener,winter dry weather allowable exceedance rates increased from 3% to 10%of samples,and the geometric mean averaging period increased from 30-day to 6-week. Our ongoing dialogue with RWQCB TMDL staff regarding the request for NSE at several of Malibu's beaches has the potential to set precedent in the State for setting site specific criteria for bacteria at recreational beaches, Malibu Creek Watershed Bacteria and Nutrient TMDL Implementation Plan Client: Ventura County Watershed Protection /� �� District Reference: Ewelina N4utkowska, Stormwater Program Manager,(805)645-1382, EweIina.Mutkowska@ventura.org Services Provided: V TMDL Implementation Plans V Compliance Monitoring Data Analysis V' Structural Retrofit BMP Planning Ventura County,California ✓ Estimation of BMP Costs and Benefits ............. H-165 EJEEEntranced Watershed 1\4.-age-e-t ProgranPoposat Project Objective Historic water quality monitoring throughout the Malibu Creek Watershed(MCW)has revealed high bacteria and nutrient concentrations,prompting the development of Total Maximum Daily Loads (TMDI.,$)by the Regional Water Quality Control Board(Regional Board)and the EPA. Bacteria and Nutrient TMDL-specified Waste Load Allocations(WLAs)are now incorporated into the County's MS4 NPDES permit as numeric effluent limits,The TMDL requires MS4 dischargers to submit an implementation plan for achieving compliance with the TMDL WLAs.Geosyntec was hired by the County to develop this plan for the County's responsibility area, which encompasses approximately 21,000 acres and represents approximately 30%of the total area in the MCW. Geosyntees Scope of Services Geosyntec conducted a detailed review of previous studies and available data to assess bacteria and nutrient sources within the County's jurisdiction. Geosyntec then performed a detailed GIS-based screening of County land uses and stormdrains,analyzed historic bacteria compliance monitoring data, and gathered site-specific information through a field reconnaissance visit.Based on this data, a compliance strategy was proposed involving phased implementation of nonstructural and structural BMPs along with bacteria source investigations to maximize the return on the County's TMDL compliance investment.A review of the County's existing nonstructural BMP programs led to recommended enhancements to a number of these Programs as well as new nonstructural BMP programs including equestrian source control and LID incentives for commercial and residential areas.Geosyntec evaluated structural retrofit opportunities using established methodologies based on GIS-screening and, field reconnaissance. Nonstructural and structural BMP costs and benefits were quantified using the SBPAT model. Geosyntec also developed a Proposition 84 implementation grant concept proposal for a green street retrofit project and conducted field geotechnical investigations to evaluate infiltration feasibility at the proposed project sites. Geosyntec also was retained by the County to develop comments on the 2012 draft bacteria TMDL reopener and the precedent-setting 2013 draft EPA benthic and sediment'I'MDI-, including a white paper evaluating the technical feasibility of achieving the EPA's proposed nutrient limits in stormwater discharges. Notable Accomplishments In one of the first MS4 permit examples in the country where TMDL-based numeric limits for stormwater discharges became effective and enforceable,Geosyntec successfully worked with the County to develop a phased, cost-effective, adaptive management-based bacteria and nutrientTMDL implementation plan. IN H-166 Enhanced Watershed Management Program Proposal APPENDIX D: TASK SCHEDUIX H-167 ........... --------- ........ ... ........... DOOOC4'rrmw 6`rtry,ocI S0 w hPlo P P,n mn iias 4 I i c �r 7v ----------- uwxx xm ter— wry .......... ............ H-168